Inactivate material MRP views

Hello,
the MRP views for a service material (DIEN) was mistakenly extended and now is causing problems, specifically, SAP is throwing a "no checking group" error for the service material when it tries to run ATP.  There is no checking group field to populate as this is a service material.  Any suggestions?
Thanks!

Thanks for the help guys, but......
1) Setting the MRP type to ND does not resolve the "no checking group" error
2) There is no availability check field for the material in the MRP view as this is a service material of type DIEN
3) I would be able to delete and re-create the material, but, since the material type uses internal number assignment, we would end up with a different material number.
Any other suggestions?  Appreciate the help.....

Similar Messages

  • MRP views

    Dear All,
    I have 2 materials of the same material type.
    For a material,MRP views need to be there and for other material,MRP views,need not to be.
    How to configure this?
    Regards

    hi,
    check the field reference key based on PLANT...This is possible both are maintained for different plants...
    If Material type , industry sector and plant are same, then not possible...
    Regards
    Priyanka.P
    Suppose if you make the once material with material type A with plant 1000 and other material with same material type with plant 2000, then its possible to control dependent on the plant settings....
    You the required Field reference key for the field selection group and make the Hide/Display/re/optional settings...
    check it at:
    SPRO > Logistics general >> MM >> Field selection >> Field selection to field selction group...here check the group...and click on the Arrow button to go to furthur settings >> here chek for field reference key for your plant >> and make the settings....
    Edited by: Priyanka Paltanwale on May 15, 2009 9:19 AM

  • Material Master MRP View not be created till Basiv View is created

    Hello All,
    I need an information where i would like to know if an MRP view in a Material master can be restricted without the creation of the Basic View. Basically an MRP view is getting created even though the Basic View of material master is not there and it needs to be stopped.
    Thanks for your inputs.
    Ismail

    Dear Syed ,
    If you want to prevent end users update other material master views , you can apply the concept of SAP note 545380 - FAQ: Authorizations material master , with this you will not more problem with this kind of problem.
    Hope this can help you.
    Please let me know if my thinking about your question is correct.
    best regards,
    Carlos Moçatto

  • MRP view maintenance for Material Master

    What is the basic entry for R3 material master, if, I want EBP below condition works:
    Stock in R/3 sufficient: Shopping Carts creates MatReservation.
    Stock in R/3 not sufficient: Shopping Cart still creates MatReservation, and when run MRP (in R/3), it gives Purchase Requisition, with the exact shortage qty.
    Info: We have set customizing in EBP so that every follow-on document for Shopping Cart will be Reservation.
    -Mimi-

    In R/3  , the material should have MRP view and all planning related settings ...
    wr u want to go for consumption based planning or deterministic planning .
    Based on the planning procedure setting in MRP views of the R/3 sytem , PRs will get generated.
    This is what u are looking for .. otherwise post your feedback...
    Regards
    Mani

  • How to delete MRP view data after create in Material master data ?

    Hi all ,
          After user  create a useless MRP view data in Material master data , how to remove it ?

    Hi
    Material master once created cannot be deleted.Only thing u can do is to mark it for deletion
    Go to Logistics > Materials management > Material master > Material > Flag for deletion > Immediately.
    Give the necessary data that is needed for the view you want to delete.
    Press and flag the view you want to delete.
    Now the view is flagged for deletion. This means that it's use is limited and it will be cleaned up or really deleted at the next clean up of the system.
    regards
    Anand

  • MRP view in material master creation

    Hi Guys,
    Can anyone tell me how to change the settings for field dependency. My requirement is to use only the filed for "reorder point" in MRP view and do not enter any other data like MRP type or lot sizing etc.
    I have tried changing the setting for field selection group for MRP type etc but whenever i enter the value in Reorder point field it asks me for MRP type and does not allow me proceed...
    Thank you for your help.
    Regards,
    Siddharth

    Hi
    You cannot change that dependency as it is done through program code and not thru config.
    If you want reorder point only as an info field and not for actual Reorder point planning, I suggest you to explore any other unused information field in the masterial master.
    You can also use classification
    Best regards
    Ramki

  • What will happen if don't set follow-up material in material mas view MRP4

    Client get the information that some materials will not manifacture until one date. After this date, client want this material can't create BOM or PO anymore.
    I gave solution for set delete flag for this material so that when create BOM or PO error happens.
    But client want to use discontinue material in material master view MRP4, so that he can enter the last date when this material is out of use.
    Will discontinue material in material master view MRP4 can meet this requirement? enter discontinuation indicator and date then after this date will not create BOM or PO.

    As per my understanding discontinuation is related only to MRP (how system handles requirements).
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/b1/c044d1439a11d189410000e829fbbd/frameset.htm
    If you want to disallow the creation of BOM / PrdOrd / etc, you have to apply to the suggested material status control or to your own solution (marking the material for deletion), etc.
    n my opinion discontinuation makes sense if the real situation is also discontinuation (you have a real follow-up material). In this case you can use it to manage the requirements properly.
    Edited by: Csaba Szommer on Sep 2, 2010 1:37 PM

  • AFS material-/mrp-status not active for plant.

    Hello Everyone
    I am facing an issue while executing the sales order
    Issue  :AFS material-/mrp-status not active for plant..
    CAN ANY ONE RESOLVE THIS...
    Regards,Rajneesh

    Hi Rajneesh,
    Tht prb might be the material master.
    Goto Material master, select AFS MRP View and activate/ press the AFS MRP status button and save.
    Reward with points if it is helpful
    Kishore

  • Special Procurement MRP View VS. Costing View

    Hi Experts,
    What's the difference between the 2 Special Procurement Key in the MRP veiw and the Costing View?  Should they always be the same?
    Thanks,
    Kumar

    Hi,
    MRP:
    You use special procurement when you want to be able to override the procurement type in the material master or define the procurement type more precisely.
    If the procurement type is in-house, you can nevertheless force the system to ignore the BOM and routing, and process the material as if it were externally procured, by specifying the special procurement as external.
    Costing:
    If you enter a special procurement type in the Costing view of the material master record, it will be used in costing.
    If you do not enter a special procurement type in the costing view of the material master record, the system will use the special procurement type in the MRP view.
    For further Clarification revert.
    Regards,
    S.Babu

  • MRP views in MM02

    I need to create a Screen Variant  and apply to a Z transaction which only allows users access to change MRP Information u2013 MRP1, MRP2, MRP3 and MRP4 tabs. in the Material Master.
    I do not want to give everyone access to MM02 u2013 Change Material Master as this allows them to change all master data within the Material.
    I only want them to be able to change MRP1, MRP2, MRP3 and MRP4 tabs.
    How to make the screen variant for this. I haven't worked on screen variants..Just need details on that. Please help.
    Edited by: yorker on Jun 27, 2011 9:08 AM

    Hi,
    No need of creating any Trasnaction/Screen Variant
    Go to OMT3B - Copy New Screen Seq from 21 and under "Data screens" delete all except MRP.
    Now Go to OMT3E - Here under "User screen reference", assign a Key to all user whom you want to give change option for MRP views. Now In Screen Seq Control Screen, maintain an entry with SRef; Trans as MM02, SRef: User as that Key, SRef: mat Type as *, SRef: Industry as * and assign the new Screen Seq.
    Now Check in MM02.

  • MRP view maintenance

    Hi All,
    I have developed a programme to uplaod MRP views for huge number of materials across Plants.
    There are few material for which one strange thing is observed
    1. Material A plant 1-MSTA -D not mantained, but the same is there in MM01
    2..MaterialA plant 2-MSTA-D maintained and its maintained in MM01.
    Is MRP maintained on the basis of Plant or Storage location or both...because my programme is looking at material plant combination level and uploading the MRP as per maintenance status maintained in table MSTA.
    But in above case, it gave an error probably  because for one storage location MRP was maintained  and for other not...
    Can you all throw some light on this....
    Regards,
    Satyendra

    One thing i missed...there are few plants for which above things are appearing for all the materials...
    i.e MRP view maintained in MM03 but for the same materials MSTA doesnt have D status for those plants..
    Regards,
    Shailesh

  • How to create MRP view using BO BUS1001006 & Method CreateViews.

    Guys,
    I need to create MRP view using BO BUS1001006 & Method CreateViews.
    i am not able to unterstand, what i need to specify to create MRP view, other than material number.
    what field i need to send for MRP view.
    Regards.
    santosh.
    Edited by: santosh koraddi on Jun 23, 2010 6:14 PM

    Hi,
    I have a similar question, have done a search and I see this sort of thing has come up a few times but with no definitive answer.... this thread seems close but don't really understand the solution (I'm not an ABAPER)
    I have a material master creation workflow under construction, it uses BUS1001006 and method createviews.
    The issues is that I want to restrict creation of certain views to certain agents, I have a fork in my workflow and its meant to split up the various views for various agents.
    The problem is that if an agent in one of the forks completes their views the workflow tries to get them to completes teh other views which they do not have authoisation to do... anyway the end result is that the workflow thinks all teh views have been created and the workflow items dissappear from the others inboxes.
    How do I setup my workflow such that each agent in each fork only has to complete the views they have authorisation to maintain and leaves work items in the inboxes of other agents for them to complete?

  • Material Master views for every material type

    HI Expertis,
    I am facing to the big problem. My requirement is to identify the Material Master Views relevent to the each and every Material Type.
    As an example, for the material type "FGTR" what should be the required views to create material master?
    From the MM01 Txn i found 36 Material types. Also found the standard views in "OMS2" Txn. But in OMS2 txn it gives me almost all the views in material master.
    Atlease i hope to categorize the material types which are going to use same material views. So i can ask abaper to develop it.
    these are the required Material types : MODE, FGTR, WETT, KMAT, LEER, LGUT, FERT, FOOD, INTR, CONT, IBAU, HERS, NLAG, NOF1, UNBW, HIBE, VERP, FRIP, PIPE, FHMI, ROH, LEIH, HALB, DIEN, ERSA, HAWA
    I would be gratefully thank u, if u can guided me on this matter.
    Thanx & Regards,
    Rashika.

    Hi,
    You can ask your abaper to write a small program by using table t134(T134-PSTAT) and T132T   .From this tables ,for each material type, you get all views.
    User department Maintenance status
    Work scheduling A
    Accounting B
    Classification C
    MRP D
    Purchasing E
    Production resources/tools F
    Costing G
    Basic data K
    Storage L
    Forecasting P
    Quality management Q
    Warehouse management S
    Sales V
    Plant stocks X
    Storage location stocks Z
    hopw this will help you.
    With Regards,
    Jaheer

  • Exclude Material Master views in IDoc

    Hi,
    I am using the MATMAS04 IDoc to replicate material master data from one client to another (two clients in the same system). I need to exclude the MRP I-IV views and the Storage Location views - except for these views the data in all other views should be replicated in the target client. Is there a way to just disable the data for these views in the Idoc? I have checked the various segments, but was not able to find any flag/field to disable views selectively.
    Please help.
    thanks,
    ram.

    Hi Ram,
    I am not familiar with Idoc type MATMAS04. I guess you are using a later version of R3.
    However there is a segment filtering functionality for IDocs which you can use.
    As an example , I will use IDoc Type MATMAS03. This idoc type has a segment E1MVKEM which stores the Sales View data for the material. This segment is not a mandatory segment and hence it can be filtered when sending the idoc downstream.
    In BD64, for the distribution model, create a filter. The filter should be set to check the contents of Sales Org  field. Then set the filter to a value which you are never expecting to find in VKORG field.
    What happens is this: A master idoc will be created with all the views ( meaning all the segments ). During the filtering stage, the filters set up in BD64 will be checked. If the Sales Org in the idoc does not match the Sales Org in the Filter, the E1MVKEM segment will be deleted in the idoc.
    A similar approach could be used for the MRP views and Storage Location views in your idoc.
    Thanks,
    Urmila

  • Creating Material Master views

    Hi Experts,
    I am writing a program to upload material master views.
    From that program i am getting the file as output and by using RMDATIND program(Direct input program) i am uploading that output file to that program and creates the material when it does not exists and if the material exists it will check the particular view that i want to upload.
    In doing this i got one question that, i am checking the field VPSTA in MARA table for the views that are created to that material.
    That field contains the values as EDALS.
    E for PURCHASING VIEW
    D for MRP VIEW
    A for WORK SHEDULING VIEW
    L for GENERAL PLANT DATA
    S for WAREHOUSE MANAGEMENT VIEW
    I want to know the characters for the other views also.
    Can any one give information for that views.
    Thanks,
    Kruthik.

    Hi,
    Work scheduling A
    Accounting B
    Classification C
    MRP D
    Purchasing E
    Production resources/tools F
    Costing G
    Basic data K
    Storage L
    Forecasting P
    Quality management Q
    Warehouse management S
    Sales V
    Plant stocks X
    Storage location stocks Z
    Rgds,
    PB

Maybe you are looking for

  • Memory full for Internal table

    Hi all, I have an intenal table where I need to pass millions of records. I am getting short dump due to the memory full. The message is 'the maximum no of bytes passed is exceeded'. To avoid this, I have used the Hash table, but still got the same e

  • Java_app_platform_sdk-5_07-windows.exe does not install

    Recently I updated jre to build 1.6.0_13-b03, and wanted to update platform sdk from 5.06 to 5.07. However, I can not continue on the installing progress page "Select Installation Directory". I pressed "next" but nothing happened. I tried uninstalled

  • How do I get or set my network key?

    How do I get or set my network key? I secured my wireless network and now I can't connect with my laptop. Thanks

  • Occasionally, macbook pro requires a manual restart by holding the power button

    Error log I receive upon restart is below: panic(cpu 0 caller 0x226ec0): "thread_invoke: preemption_level -1, possible cause: unlocking an unlocked mutex or spinlock"@/SourceCache/xnu/xnu-1504.15.3/osfmk/kern/sched_prim.c:1471 Backtrace (CPU 0), Fram

  • How i can ping an IP within intranet via a Form

    Dear All I want to ping an IP through Form6i and return the result into a variable, if it is pinging (live) then TRUE else FALSE. Please help how i can using Forms6i. Regards Sayeed