Inbound Delivery & STO

Can anybody please tell me why exactly do we use Inbound delivery for Imports cycle? i.e. What are the use or features of Inbound Delivery?
Regarding STO, why do we use document NB and not UB for Inter company stock transfer?

Refer below link
Re: Inbound Delivery and Goods Receipt
addition to above if you use Handling unit managed storage locations then inbound delivery is required to manage HU stock for postings.
For STO s UB document type is used to transfer goods between plants in same company code.For NB document type to transfer the goods between the plants in different company codes.Here sales billing processis required for settlements.
why 2 diffrent document types are used to diffrentiate delivery documents for billing .

Similar Messages

  • Partner Function for STO and relevant inbound delivery

    Dear Expert,
    i did the partner configuration for Vendor and STO with partner VN-vendor DP-delivery plant.
    When i create the STO vendor UP07, both of VN and DP are UP07, but when i create the STO for UP07, no partner data come out for the PO, the partner data didn't copy out from vendor master.For standard PO not STO, the partner data are copied from vendor master automatically. Any advice any further more setting need to do?
    I manually input the partner data for the STO, then i try to create inbound delivery, following incompleteness came out"Vendor : Account Number of Vendor or Creditor Missing",user need to manually input the partner number for LF-vendor.But when i check the partner setting for inbound delivery, LF is copied out from VN.Any more setting need to do to make sure the partner number of LF is auto copied from PO data.
    Look forward to your reply,
    Thank you and regards

    Hello,
    PLease check the vendor data created as a plant. Go to Vendor master and in purchasing view select extras -> additional Purchasing data-> in the plant assignment enter the Plant number. This will pull in the vendor details into the inbound delivery.
    Thanks!!

  • Inbound delivery vendor for STO

    Dear Expert,
    I did the partner configuration for Vendor and STO for site with partner VN-vendor DP-delivery plant.
    But when I create the STO for site no partner data come out for the PO, the partner data didn't copy out from vendor master.
    Any advice any further more setting need to do?
    I manually input the partner data for the STO and site, then I try to create inbound delivery, following incompleteness came out"Vendor : Account Number of Vendor or Creditor Missing",user need to manually input the partner number for LF-vendor.But when i check the partner setting for inbound delivery, LF is copied out from VN.Any more setting need to do to make sure the partner number of LF is auto copied from PO data.
    I have below config. setting:
    1. Site master has the vendor partner function as OA -Ordering address,DP- Delivering plant, VN- Vendor and PI-Invoicing Party.
    2. Define Permissible Partner Roles per Account Group
    3. Partner Settings in Vendor Master Record-Assign Partner Schemas to Account Groups
    4. Assign Partner Schemas to Document Types
    5. Logistics Execution-Partners-Set Up Partner Determination for Deliveries and "EL" Partner Determination Procedure
    Also I have search in the SCN before posting I found same post i.e.Partner Function for STO and relevant inbound delivery but no answer hence posting again kindly extend your help.
    With Regards,
    Avinash Kowale

    Did configure the definition of shipping data for Plant?
    Aslo, you have to assign the UB document type to the EL inbound delivery
    And Maintain Country and Transportation Zone for Shipping Point (In Route Determination)

  • PO,STO and Inbound delivery flow

    Hi all,
    I need to know the basic flow forthe creation for the foll docs:
    PO
    Transfer Order
    STO(Stock Transfer Order)
    Inbound delivery
    In what sequence are these documents created??
    Is there any difference between Transfer order and Stock transfer Order(STO)?
    Please help.Thanks for your time.

    Hi Ram Mohan,
    Please search the info in the SDN forum you will get information for all your queries.
    Regards
    Suresh.

  • Intercompany STO with inbound delivery with freight....Urgent

    Hi,
    I have following scenario to map.
    There are 2 company codes A & B and a shipment of goods is to be transferred from A to B.
    I wish to use Intercompany STO process with UB.
    However, A & B are geographycally separated so there involves transportation costs which will be beared by B.
    How can I have the pricing procedure if I wish to have one in STO ?
    If I create some freight conditions then I can add the values but I will not able to know the exact freight charges till B receives the shipment and the invoice for the same.
    In this case how can I use pricing procedure ?
    If I do not enter any freight charges in PO then how can I add them before I do the GR in B as this is requirement to add freight costs on material at the time of goods receipt so to arrive at exact landed cost for that material in B.
    Once I wish to transfer the goods from A to B, I will do delivery so that stock gets reduced from A otherwise if I wait till the stock is physically transferred to B and then B changing the PO and add freight and subsequently doing picking, PGI and GR ,it will not correctly reflect stock positions in A.
    What is the better way I can map this process.
    If I wish to use inbound delivery before receiving the goods in B can I add conditions in Inbound delivery ? If so how it can be done ?
    So my intended procedure will look as
    Intercompany STO-UB
    Outbound Delivery
    Picking/PGI
    Inbound Delivery with freight
    GR
    Please suggest as this is very critical and important requirement
    Thanks in advance
    regards,
    manOO

    Hi,
    Thanks for the feedback.I wished to use NB but I don't want to go with the regular NB and subsequent billing cycle.
    I want to use UB.
    Anyways, is there any way by which I can have freight cnditions added at the time of Delivery.Be it Outbound or Inbound.
    Please suggest.
    Thanks in advance
    Regards,
    manOO

  • STO with Inbound delivery

    hi,
    Can anybody tell me how to do an intra company STO with inbound delivery..
    Kindly udate with all configuration nad T.codes also.
    what is the T code (apart from VL31N)  for creating inboud delivery..( In vl31n i have given pur oder no , but system is asking for vendor. in Intracompany STO there is no vedor.
    regards
    RAj

    1)Create one Customer for Supplying Plant Sales area and assign this Customer no with Receiving Plant in OLME---> PO -
    > Set up STO -
    > define Shipping Data for plants. and maintain the same sales area in your Supplying plant.
    2) In OLME---> PO -
    > Set up STO.....for your Document Type: UB and Suppying plant Combination assign Del. Type NL and Checking rule RP
    3) In OLME---> PO -
    > Set up STO...for your Supplying Plant and Receiving Plant combination Maintain Doc. Type : UB
    Make sure you are maintaining Sales View for your Material at Supplying Plant.
    4) Maintain Shipping point at, SPRO----> Logistics Execution -
    > Shipping -
    > Basic Shipping Functions -
    > Shipping Point Determination for Plants.....there for your Loading group,Shipping Condition, Shipping Plant combination maintain Shipping plant..
    Now Create STO in ME21N with Doc.type: UB at Receiving Plant.
    Then Create Delivery in VL10B from Supplying Plant...
    Then Do PGI in VL02N from supplying Plant.
    Then do GR at Receiving Plant based on Outbound Delivery at Receiving Plant...

  • Save STO in inbound delivery

    Hi Gurus,
    Requirement is to save Stock transfer order number in Inbound delivery line item when STO is created in SAP.STO will be captured in purchase order level as reference field.
    ME_PROCESS_PO_CUST is this BADI can be used.Pls suggest
    Regards
    Ravi

    U can use Program MV50AFZ1
    and code can be written  in
    FORM userexit_save_document.
    ENDFORM.

  • Inbound delivery for a STO ??

    Hi
    What are the steps to do a Inbound delivery for a STO so that I can do Goods Receipt using that Inbound delivery in receiving plant.??
    Pls tell me the configuration steps involved and other relevant steps involved.
    Also give me any SAP help link too.
    Thanks
    Maruthi Ram

    Hi,
    You have to do Replenishment delivery (Outbound) at the issuing plant and goods receipt in the receiving plant with respect to the same.
    Process Flow (Stock Transport Order with Delivery and Billing Document/Invoice ):
    Creating a stock transport order in the receiving plant
    Purchasing also determines the price for the materials.
    Posting a delivery in the issuing plant
    The issuing plant enters a replenishment delivery in Sales and Distribution. Unlike a stock transfer without a billing document, no stock in transit is created.
    Creating a billing document in the issuing plant
    The issuing plant creates the billing document for the delivery. SD also determines the price for the delivery
    Posting a goods receipt in the receiving plant
    The receiving plant posts a goods receipt for the delivery. The goods are posted to unrestricted-use stock
    Posting an invoice in the receiving plant
    The invoice referring to the billing document is entered in the receiving plant.
    Please refer to link: http://help.sap.com/saphelp_47x200/helpdata/en/4d/4b9036dfe4b703e10000009b38f889/frameset.htm
    for further details.
    Regards,
    Narayana.

  • Choose the Inbound delivery type for STO process

    Hey guys,
    I am struggling with this process.
    For STO process we are going to use SPED output type to create the Inbound delivery automatically after O/B delivery PGI.
    The thing is I do not want the I/B Delivery type to be EL. Cause we are using HUM. I want it to be HID.
    I can't find where in config I can't set up the system to choose HID rather than EL.
    Does anyone have an idea?
    Cheers Guys

    Hi,
    Thanks for your answer. But  what you are describing is more for PO (external purchase) not STO.
    What I want is to control the I/B delivery type that get created after PGI of the O/B delivery via the output type SPED (special function).
    Cheers
    Julien

  • Inbound Delivery in STO

    Hi all,
    What is the procedure to include inbound delivery in intra company STO process. what configuration needs to be done for following this process.
    Thanks
    Nitesh

    Hello Nitesh,
    If  both of your plants within your compnay code are warehouse managed you can set up inbound delivery for your rcieving plant. You need to customize output type WMTA in transcation NACE under application EL-Inbound delivery, so that transfer order are created automatically when the inbound delivery is created with transcation VL31N.
    Also, you need to configure this outptu type WMTA in NACE for creating outbound delivery from issuing plant in transcation NACE under application V2- shipping.
    To set up WMTA output type refer the attcahed link
    http://help.sap.com/saphelp_470/helpdata/en/6f/c5a3f28d7711d5b2c80050dadf6bf7/content.htm
    The main criteria that storage location must be warehouse managed.
    BR,
    Tushar
    Edited by: Tushar Patankar on Feb 26, 2011 5:09 PM

  • Is it possible to create an inbound delivery for STO in a 2 step process ?

    Hi Experts,
    Is it possible to create an inbound delivery for STO in general (how do I get a vendor for a Plant. I have already assigned a plant to my vendor in vendor master - additional purchasing data, but it does not seem to work).
    In particular if I want to create an inbound delivery in intra-company plant STO scenario, how do i do it?
    Let me know in case if that is not possible.
    Thanks,
    Nitin

    Hi Tao,
    I did that also, but it did not work.
    Finally I had to debug, and found that the for the document type UB (intra-company transfer) i should make the customizing setting which makes the vendor data to be considered. (Table T161).
    Anyways, thanks for your help.
    Regards,
    Nitin

  • Inbound delivery creation in STO via EDI/Idoc

    Hello experts,
    My requirement is like this:-
    Stock transfer order is created for supplying plant 2000 & receiving plant 2010.
    When the supplying plant 2000 posts an outbound delivery & PGI, at same time an Inbound delivery should be created in receiving plant 2010.
    I know theoretically that this is achieved by making confirmation settings & output types. But don't know exactly how to configure it.
    Can you please mention the process?
    I have referred the scn threads:
    Outbound Delivery to Inbound delivery by using IDOC
    how to configure the message control for DESADV
    SAP note 111903
    Receiving Vendor Confirmations via EDI - Purchasing (MM-PUR) - SAP Library
    But there is lack of clarity from my side.

    You do not need to use EDI messages to get an inbound delivery created when a PGI is done on the outbound delivery.
    Search for the config on the SPED output type. This SPED output message can be triggered during the PGI which results in the creation of an inbound delivery in the receiving plant.
    The receiving plant will have to maintain the confirmation control key 0004 at item level in the purchasing document.
    Link to SAP help Automatic Creation of Inbound Delivery - Transfer and Inventory Management - SAP Library
    Refer SAP note 1119073 point 3 and note 965176
    Regards,

  • Error while creating TO w.r.t. Inbound delivery

    Dear All,
    As there is a requirement to track the pallet, a storage location with Handling unit management activated in it.
    The storage unit management  is also activated in the warehouse  and storage type.
    When initial entry of stock was uploaded in MB1C, an inbound delivery is created with the movement type 561.
    But when we try to create a TO w.r.t. the inbound delivery(after assigning the packing material), system throws an error with
    " No items or handling units to be placed in storage could be determined ".
    (Or) Is there any way to track the pallets for which stock movements happen through Intra company STO's.
    Regards,
    Deepak

    Verify the determination of Storage  Location & Warehouse  and also
    Refer SAP Notes
    833748 &  497287

  • Automatic inbound delivery creation.

    Hi All
    In our STO process, when the outbound delivery is created from the issuing plant it should automatically create inbound delivery in the receiving plant. I think it is happening by triggering output type SPED.
    In some cases for the same STO we are able to get inbound delivery for few items and not for other items.
    First of all i want to understand usage of SPED and secondly why we are not getting inbound delivery in some cases.
    Thanks & Regards
    Amit

    Hi
    Adding to what i have asked, why SPED didn't worked for some materials. What can be the possible points?

  • Check amount of transition stock during inbound delivery creation

    I want to move stock between plans, therefore I have the following steps:
    1. Stock Transfer Order (STO), e.g. 500 pieces
    2. Sending plant: MIGO (GI for STO) with MT 351 to post to transition stock,  e.g. 100 pieces
    3. Receiving plant: Inbound Delivery with reference to STO VL31N
    4. process Inbound delivery in warehouse (SAP-WM)
    The question is:
    During step 3, when accessing VL31N the system proposes the full order quantity (e.g. 500 pc.)
    I can change the amount to any amount I like, e.g 240 pieces.
    How can I tell SAP, that Inbound delivery creation is only possible for the amount
    which has been posted to stock in transition (100 pieces)
    I want an error/warning message in case user wants to create Inbound delivery quantity higher than the amount that has been posted to transition stock.
    Any ideas?

    MIGO in sending Plant?
    How it is possible? MIGO means, Goods receipt. This should be in Receiving plant.
    Sending plant should do the PGI
    MIRO in receiving plant
    Billing in sending plant
    Payment from Receiving palnt and clearing in sending plant
    Correct me if i am wrong
    Thanks

Maybe you are looking for

  • Regarding Application server file path browsing

    Hi All, I have a issue regarding Application Server File Path browsing. Actually in my selection-screen i will declare a parameter as <b>Application Server File Path</b> now when i press F4 in that field it should be able to browse through <b>Applica

  • How to make default line segment

    is there a way to limit the length of a line segment stay a default length instead of it getting longer as you drag your mouse ? For example in a program called ChemBioDraw you can limit the default length for drawing molecules

  • Hyper-v Miniport switch driver not working

    Bought a brand new MSI Z97 G55 SLI motherboard to install tech preview on.  All went well except it has error installing driver for Hyper - V Network Switch Default Miniport (ROOT\VMS_MP\0000) Comes up with error 39 and says some PNP devices will not

  • What is happening to my Macbook?

    I bought a used Macbook Pro Early 2008 from eBay 1 year ago. It has gone through a lot. I upgraded from Mac OS 10.7 to 10.8 then acidently downgraded to 10.5 then back up to 10.6 to 10.7 and back to 10.8. Then the fan on the right side of the compute

  • Upgrade exp/expdp issue

    Hi, We are in the process of upgrading our 10.2.0.4 databases to 11.2.0.2. We are going from RAC to RAC. I have already upgraded many databases successfully with the exp/imp method. However I have run into a 10.2.0.4 database that is not relatively b