Hello,
I want to do incoming inspection for few raw materials on lot basis (each trucks is one lot). But quality department do the inspection for certain characteristics and truck will allowed inside only if QA dept accepts the lot.
Then gross weight is taken and material is unloaded in yard. Again empty truck wt is taken through weigh bridge. Then Good receipt for that lot is done based on formula GRN qty= GROSS - Tare wt.
So I think option for me for incoming inspection is Source inspection. But quality needs data and Usage decision done to be based on lot wise. Is it possible for me to do source inspection based on lot wise for one open purchase order.
Concluding:- I need incoming inspn before Goods Receipt for each lots I receive. I may have one PO, but my vendor may give 5 trucks on that PO. Each truck I need to maintain as a lot for inspection.
Whats the best way...Assured rewards for best solution
Have you tried using inspection points for this? Each truck can be a new inspection point. But you can't make the UD until the end of the day or the next day which could be a problem. I think you'll have to have the material go right to unrestricted inventory, (turn off post to inspection stock in the inspection type setup for the 01.)
As you do each receipt, the qty of the truck will increment the inspection lot posting qty as well as unrestricted inventory. If an inspection point fails, the tech/mgr. would post that qty in the returns stock line. This would move the qty from unrestricted back to the vendor.
The final UD would be on the qty of all five trucks received for the day minus any that were rejected. You may need to work with the invoicing folks as to how this all impacts the invoice. But I beleive they'll see a shortage of material if any trucks were rejected.
Craig
Similar Messages
-
Block GR through source inspection
Hi,
We want to block the GR if the material is under test or else is rejected by QC. For this we have select source inspection functionality but the system is not blocking GR for under test material or rejected material. Please confirm what setting are missing. However I have made the following setting:
mm02 ---> 0101 insection type and control key as 0007 (Configration -----Good receipt not allowed for rejection)
qp01 -----> 51 Good receipt model
qi01 ------> Inspection control tab -----> Vendor source inspection----> 0101
------> tick not selected ------------ Source inspection- No GR
Regards,Hi Shailendra,
We are not allowing user to do GR, but there should be system control to restrict the user to do GR if the source inspection lot has not been created yet or inspection lot is created but user decision is pending.
Here the system is allowing to do the GR if the inspection lot has not been created in qi07 and also it is allowing GR if the inspection lot is created and is pending for user decision.
Our requirement is that system should allow for GR in the following case.
1. If user decision is pending
2. If inspection lot creation through qi07 is pending
3. If the material is rejected --------- This is happening properly.
Regards,
sun -
Scenario with reference to source inspection and MIGO
Hi all,
My scenario as follows:
1.Source Inspection lot should get generated as per the lead time given in Q-Info while creating PO.
2.MIGO should not be allowed when source inspection lot is open(Means UD is not taken).
3.Inspection lot should be generated while doing GR in MIGO when source inspection lot is accepted.
These all three points are with reference to one raw material.
Kindly throw some light on the above said scenarios.
Thanks in advance
SudharDear Sudhar
1) For generating inspection lot automaticaly please use QA51. here you can shedule the program as in Qi07 and can be sheduled in a defined frequency
2) You may have to go for user exit if you need to stop GR when the source inspection is open. You may use MB_CF001. Please check the exact exits as there is no option in standard for the same
3) just check - in config maintain GR for Rejection - GR not allowed and in quality info record maintain No GR inspection for source inspection
Please let me know the issues
Regards
Gajesh -
Stock posting in block stock after grn for source inspection
Hi All,
I have following scenario
I am doing source inspection at vendor site i have maintained control key 0005 in material master & necessary certificate with certificate check required at GRN & UD stage
i am creating a source inspection lot for a release po through t.code qi07 & then processing that lot before GRN
Now when i am doing GRN for same PO it is giving me the following message stage
<b>A category ZC01(user sp. category) inspected certificate is required</b>
Message no. QA312
Diagnosis
An inspected certificate must exist at the first goods receipt for a purchase order item.
Procedure
Check whether a suitable certificate exists for the purchase order and delivery, and create a certificate record with the status "Certificate checked and stored".
If there is no certificate or no suitable certificate, this does not comply with the requirements in the material master record. If there is no inspection lot for this goods movement, the system posts the quantity to blocked stock or does not post the goods receipt.
If you have created an inspection lot, the system marks the certificate check with the status "In lot". You must confirm the availability of an inspected certificate by the time you make the usage decision.
after doing the GRN stock is being posted to block stock
if i do not process the source inspection lot then the stock is posted to quality stock but this does fulfill the requirement of source inspection
plz suggest soultion
It's urgent
Regards
Ashutosh Shende
9860681314Hello Ashutosh,
In the material master you have defined certificate type with the customizing setting indicator for 'Enhanced Certificate Processing' active.
If you set this indicator, extended certificate processing is active for
this certificate type. You can then manage the inbox for quality
certificates independent of the goods receipt.
The electronic inbox of certificates for the purchase order is only
possible if this indicator is set.
This means you have to create a certificate in QM (Transaction QC51),
before you can update your PO with cert. enclosed.
If you do not want the enhanced certificate processing you have change
the indicator into inactive.
Another problem known here is if you have activated the 05 Inspection type in the material master, that it is not activated in all plants relevant although QM in Procurement is set in all plants.
I hope that this resolves the described issue.
Regards,
Isabelle -
Supplier relationship status for Source inspection
Is it not possible to intiate supplier relationship status in quality info record for source inspected material???, please advice..
I already assigned no GR inspection in Quality info..Hi,
Please go through the below links.
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/e0c680d3-0706-2e10-4a9a-a5c67d6c4321?QuickLink=index&overridelayout=true
http://help.sap.com/saphelp_46c/helpdata/en/2d/351149448c11d189420000e829fbbd/content.htm
Regards
Hari -
How to prevent MIGO when source inspection lot is either open or rejected.
Hi
How to prevent doiMIGO when source inspection lot for the vendor/material is open or the source inspection lot is rejected.Hi Sudhar,
Please find the process steps for your question :
How to prevent MIGO when source inspection lot is rejected
Go to Q-info record (QI02) for that particular material, vendor and Plant combination.
1.Use Inspection Type 0130 for source inspection.
2.Number of days ahead of lot to be created.
3.Through transaction code QI07 run the manual program to create a lot.This source Inspection may be rejected as in your case.
4.Control key contains the control on GR in the QM view of MM.
In the spro>QM>QM in Procurement-->Define Control Key and assign it to MM.
We can define here under Source Inspection Control that in case of GR for rejection-->GR not allowed.
This will prevent MIGO if in case Source Inspection Lot is rejected.
Thanks,
Ravi. -
Quality Mgt - can I create a new inspection type for source inspection
I want to create a new inspection type for surce inspection and I will assign it to Miscellaneous insp lot origin.
What is the application of vendor inspection lot origin ? Can be used for source inspection ?HI,
For source inspection.
If existing insp types are not going to solve your purpose , you can create insp type & assign it to insp lot origin 01.
But before that , check whether you can use the existing insp type 01 / 0130.
You need to assign that inspection type in the Q-info record , in the source insp field of insp control.
Also go through the help tips provide by SAP
Inspection Type for Insp. Lot Origin (Source Inspection)
Inspection type for the source inspection
Use
If you enter an inspection type for inspection lot origin 01 in this field, you can create an inspection lot for the source inspection within the lead time before the (scheduled) delivery date.
Dependencies
The inspection type must be active in the inspection setup (Quality Management view) of the material master.
If a status profile is stored in the quality info record for the supply relationship, a goods receipt inspection takes place instead of a source inspection.
Regards
K.M.Arun -
Source inspection without Q-info record?
Can we do source inspection without using quality info record?
If yes then what master data we need to set-up?
Thanks.Hi
Mass creation of quality info records is possible through QI06.
Pre requistes are
1) In material master activate qm procurement key and enter control key with delivery /vendor release.
Use Transection Code OQBA and create your screen varients with required User status.
Go to QI06,
Enter material, vendor , plant. In add tab enter release until date and other required fields
When adding records, you can enter one or several materials. As a rule, the only materials used for processing are those for which QM in Procurement is active in the material master and a vendor release or quality assurance agreement is required by the control key.
You can enter one or more vendors, for whom a quality information record is to be created.
If the indicator u201COnly for Purchasing Info Recordsu201D is set, the system only creates those quality info records, for which a purchasing information record has been maintained.
By doing this you can create quality information records for all possible material-vendor combinations.
If you execute this then You will get the list of all possible vendor material combination for which QI can be maintained by selecting line you can save them.
The quality info records printed in the list have a traffic light indicator which denotes the following:
Green light: - All data is correct
Yellow light: - Ordered quantity is greater than released quantity
- There is no quality assurance agreement
- Lock function is active
- Validity period of QM system has expired
Red light: - Deletion flag is set
Regards
Hari
Edited by: Harikris_83 on Sep 20, 2011 12:16 PM -
Settings for source inspection lot
Hi,
Can any one explain how do you set source Inspection?
Regards
vikram raghuwanshiHi,
Do following settings:-
Go to Q-info record (QI02)
1. source inspection type 010
2. Number of days ahead of lot to be created.
3. Tick the check box u201Csource Inspection No GRu201D in the quality info record.
4. Through transaction code QI07 run the manual program to create a lot.
5. Control key contains the control on GR if source inspection lot is rejected.
Regards
Nikhilesh Ray -
Source inspection before 365 days of delivery date of purchase order
Hi Experts,
Business wants to create source inspection lot well in advance before 365 days of delivery date of purchase order. this lot is required to record results.
In SAP, transaction code QA51 allows only two digit characters for 'number of days for opening period' so system is not creating inspection lot for more than 99 days delivery date from current date.
Please advise.Hi Patel, I really got interested on this particular issue because we have been using source inspection in our company for a while. After some investigation on ABAP code of report I will share with you my fact findings:
1) System calculates the start date of source inspection (delivery date from PO - Leadtime from q-info record). For example, in my test case it was 14.08.2015 - 0 days. So field g_datum below will be 14.08.2015:
2) System then checks if you are running the report in background (highlighted in yellow above). If so then it will check if the start date of inspection (g_datum) falls on opening horizon (g_datum_eroff). The opening horizon is calculated as per formula below (system login date + opening period). As an example: 14.08.2014 + 30 days = 13.09.2014.
Default opening period (p_eroff) is 30 days:
3) So all-in-all, when you are running QI07 online you´ll get a yellow traffic light on the long leadtime PO but you will be able to process it (on-line). However if you run the report in background (job scheduling) system will only create inspection lot to the relevant POs if the PO's delivery date falls on the 30 days window based upon the current date. -
Source inspection - STOP Purchase Order GR
Hi,
We have a requirement in quality management in procurement process:
Requirement: System should perform inspection before goods receipt is made to the purchase order. Pre-receipt inspection should have three MIC to be inspected. When all the inspection characteristics are OK then system should receive the material to unrestricted. If MIC are not ok system should not let doing GR of purchase order.
Possible solution: I tried leveraging source inspection functionality to meet above requirement. I created QIR and selected Source inspection = 0101 and check box for Source insp u2013 no GR active.
Material master is assigned with inspection type 0101 and selected control key with GR for rejection = Goods receipt not allowed, GR control/Batch = u2018Do not create new ILu2019
When purchase order is created system is letting GR for the purchase order without error. I used QI07 and created an inspection lot for the purchasing document, however before I do UD for the inspection lot system is letting to do GR for purchase order Or before I create IL for the purchasing document system is allowing to do GR for the purchase order. Which I believe is incorrect.
Is there a way I can stop doing GR of purchase order if source inspection UD is not Ok. If source inspection UD is rejected then system should not let doing GR of purchase order.
Please advice...
Thanks
Regards
SJust want to check if any recommendations for below issue ?
Thanks
S -
Source inspection - inspection lot skip for certified vendor
Hii,
I have a requirement in which during source inspection, the inspection lot should not be created if the Vendor is certifed. I have made the following settings:-
1. In Vendor Master, maintained the Actual QM system in control-reference data.(QM system marked for skip in customizing)
2. In Material Master-
- Activated QM Proc- QM control Key -Delivery release
- Target QM system
- Inspection type for source inspection activated in inspection set up
3.In Quality Info Record for Vendor,Material,Plant combination-in Inspection Control tab-
- Maintained the existing QM system & validity
- Selected 'No Inspection' in Insp. control
In Vendor source inspection tab maintained the inspection type & lead time.
Inspite of the above settings, I can see this PO (for vendor,material,plant) in the source inspection worklist(QI07).
Please suggest as to which setting I might be missing.
Thanks!!!
Regards,
SVHi,,
You have to go T code QI07
where give input Vendor ,Material plant,
Delivery dateopening peroid
Then execute the transaction .
Select line item click oninsp lot & save.
Where you have trigger lot for the same then only lot will get genarated.
Regards
SANIL
This confugaration required if you have option if lots get rejected.
Quality management-QM logistics-QM procurement -Control key
Define control key;
GR/Source inspection control;
GR for rejection; three option is available
1.source inspection has no effect on goods receipt
2.Creation of new inspection lot
3.Goods receipt not allowed
Regards
SANIL
Edited by: Sanil Vadke on Mar 12, 2010 7:29 AM -
Hi
Qm Gurus
Can Anybody Tell me the cycle of Source Inspection
As Per My Knowledge we can decide Source Inspection In QInfo Record
Here We Gave lead time Days
Then In QI07 we trigger it Manually & generate Inspection Lot .
My Quesion is how it trigger Automatically.This inspection lot is not Stock Relevant? why
Regards
SanjayHi Sanjay,
Here are the steps and settings for Source inspection:
In Q-infor record, select source inspection. Activate 01 insp type for material master in the QM view.
ME21N-CREATE PURCHASE ORDER
QI07-WORKLIST OF SOURCE INSPECTION -Select Create insp. lot and save.
QA32-INSPECTION WORKLIST
QA11-UD FOR SOURCE INSPECTION
MIGO-GR
QF11-DEFECT RECORDING
QA11-UD FOR GR
QA12-INCASE TO CHANGE QUALITY SCORE
QA13-TO CHECK HISTORY CHANGES
Reward if cleared or get back with queries
Keerthi -
Vendor rating on source inspection
Hi,
I am doing source inspection for some materials ; now my requirement is I want to consider these usage decision scores given for these inspection lots in vendor evaluation rating,so how to do that.
Thanks
VinayDear Vinay
In standard SAP vendor evaluation is based on GR inspection only. So it will not be possible to add source inspection to that. What you can do is add source inspection as subcriteria
1) You can maintain this manualy by
SPRO> MM> Purchasing> vendor evaluation > Define Criterial > quality > maintain subcriteria as Source inspection> maintain scoring rate as No automatic determination
2) try using the user exit and try to automize
SPRO> MM> Purchasing> vendor evaluation > Define Criterial > quality > maintain subcriteria as Source inspection> User exit MM06L001
Search for this user exit in the forum you will get lot of response.
hope this helps
Regards
gajesh -
Material rejected through quality inspection lot goes to blocked stock
Dear All,
All materials that are rejected through quality inspection lot should go to blocked stock. My client want to generate a report for viewing what all materials are rejected. How can do that?
scenario2: If the materials are rejected then can they be automatically be sent back to the vendor (return to vendor). if possible
pl send me some suggestions...!!!
pl discussHi,
See mvt of material directly to blocked stock u can do by setting the Selected Set of ur specific UD code. in QS51/QS52. there is one column near to code, set R=rejected and set that field "BloCked Stock" . Define there and execute ur transcation, whenever u provide an UD system automatically post the stock in blocked location.
MCVX is the report where u can get the stock lying in blocked location, or for temp. purpose use QVI and developed the new report.
regards
Maybe you are looking for
-
How to connect a time capsule with an ATT Elevate Hot Spot
Hi, Need help connecting my time capsule to my ATT Elevate Hot Spot....since I have no ethernet connection. Thanks!
-
Loss of "Edit in Photoshop" button functionality with Photoshop CC
First, I must say I am highly dissapponted in Adobe's decision to stop developing Encore. I know that streaming and cloud access to video projects is the fture, but DVD and BluRay is still the standard for a majority. I film events, weddings, trainin
-
Is it possible to open a PDF file with Adobe Reader 5 starting on a particular page?
I could only find a documentation for version 6 and above
-
Selecting all rows currently visible in the table
Hi , we need to add the "Select all" functionality for the a table used in one of the screens. The examples I have found for this would select all the elements of the node bound to the table. However, we need to select only those elements which a
-
I receivedan unused Elements 8 bundoled with a Canon scanner. When I installed it from the provided (PC) disc, it would show only an Edit/Oreganize screen. When I tried to registe,r it would tell me (repeatedly, over a week or more) that my reques