dear all,
i have a problem in incompletion log ,  my requirement is  i need the incompletion log to be trigered  in the sales order over view screen  .
The senario is :
There is a excel sheet maintained in the    sale order over view screen - extras tab - Documents - there excell sheet will be maintained  and   from that the item will be selected .  
is there any way to inclued this   field and table  in the log of in completion terms  in incompletion procedure .  or is there any
user exist to be involved  for this 
kindly guide me how to  go about it  so that the error or warning msg   is triggered when this  incompletion is checked
regards
kumi

Hi Kumi,
Do you mean you want to check whether DRAW-DOKNR  or DRAD-DOKNR is filled with value?
If yes, I don't think standard incompletion log could fulfill your requirement since only check for VBAK, VBKD, VBAP and VBEP could be defined.
I also checked Userexit_save_prepare (MV45AFZZ). Table DRAW is not available. DRAD is empty.
Sorry but I could not provide more positive answer.
Best regards,
Smile
Edited by: Smile Zhang on May 25, 2010 3:39 PM

Similar Messages

  • Possibility of addition creation time in the sales order over view screen

    Hi,
    Is there a possibility of adding the creation time in the sales order overview screen in VA01/2/3.
    thank you

    hi,
    this is to inform you that,
    contact your ABAPER for this is to find out if there any possibility making time field mandatory if it is there in Standard SAP. there in VBAK table i am able to see VBAK - ERZET
    or
    if it is not available then you need to go for field exit.
    hope this helps.
    balajia
    Edited by: balaji timmampalli achari on Nov 30, 2010 6:11 AM

  • Incompletion log for sales order

    Hi, Experts.
    I am looking for the user-exit for incompletion log for sales order, If the user choose DC = '20', so the incompletion log will check the field of Incoterms.

    hi,
    yes shiva sir is right.
    Form  USEREXIT_CHECK_VBKD
          This Userexit can be used to add additional logic for         *
          checking the sales details for completeness and consistency.  *
          US_DIALOG  -  Indicator, that can be used to suppress         *
                        dialogs in certain routines, e.g. in a          *
                        copy routine.                                   *
          This form is called from form VBKD_PRUEFEN.     
    just adding to the context:
    there are two ways of doing it.
    1. hard code - vbak-vtweg - DC = '20' then system has to check the fields vbkd-inco1 = knvv-inco1, vbkd-inco2 = knvv-inco2.
    2. create a Z table and link the user exit to check what the entries are there in Z table and react according to the entries.  before that in Z table should be with this fields called - vtweg, inco1 &2.
    hope this clears your issue.
    balajia

  • No Incompletion Log for Sales Order with net value as zero

    Hi all,
    There is an Inbound IDOC which creates a Sales Order.
    When we check the IDOC, we find that it has got 4 line items (E1EDP01). However, for all the items except the third one (for example), the segment E1EDP05 is filled. In the segment E1EDP05 the field KRATE contains the corresponding net value for the respective line items.
    Then when we check Sales Order which is created, we find that the third line item (for example) has the net value as zero. In this case, ideally there should have been an entry in the Incompletion Log. However, it does not happen so.
    I suppose the issue is with the third line item in the IDOC for which the segment E1EDP05 is not present. I have debugged the corresponding FM is IDOC_INPUT_ORDERS, but was unable to find any clue.
    Please let me know the reason for this.
    Thanks and regards,
    Anishur

    In routine interpret_idoc_orders the item conditions are filled by calling
    WHEN 'E1EDP05'.
           MOVE IDOC_DATA-SDATA TO E1EDP05.
           PERFORM ZUORDNEN_ORDERS_E1EDP05.
    In case KRATE is empty no values are transferred to the order
        IF NOT E1EDP05-KRATE IS INITIAL.
          PERFORM IDOC_CUR_MOVE USING E1EDP05-KRATE XKOMV-CURRDEC
                                      XKOMV-KOEIN
                                      XKOMV-KBETR D_FLAG_P-PKON.
        ENDIF.
    If that is a valid scenario, you need to adjust your incompletion procedure in customizing to include the net value on item level so any missing value is reported.
    If this is not supposed to happen you might want to hook into one of the user exits in the idoc and in case KRATE is missing let the idoc fail.
    Hope that helps,
    Michael

  • Creating change log for sales order

    hi all,
    i want to create change log for any given sales order if it exists.
    can any one tell me how to do that??

    Hi Gouri,
    CDHDR and CDPOS are the tables for all change history.
    CDHDR contains the details such as who made the change, when, using what tcode and the change type ie. update, delete.
    CDPOS contains the field name which was changed, its old value and its new value.
    The change document object is VERKBELEG for sales documents.
    The object value is the SD document number with leading zeros.
    The following link will be also useful.
    http://www.sap-img.com/ab024.htm
    Regards,
    Nitin.

  • Updating processing log for sales order header output

    I want to prevent a custom sales order confirmation from printing when the order has not been approved.  When the user requests the form to print in the background, I want to update the processing log to have a red light and a message indicating the order has not been approved, so it cannot be printed.  When I pass an error message to the protocol processing, the update is terminated and my changes to the sales order are lost.  Is there a way to update the processing log, show the red light, and not get the hard error? 
    Thank you in advance. 
    Jay

    Setting the return code after the protocol update did the trick.

  • User exit to update the incompletion log in sales order for pricing error

    Hi experts,
    I have to check the some mandotory pricing conditions in sales order, if that conditions are not exist in sales order then i need to show the information message as well as i need to update it in incompletion log of sales order. (incopletion log we can see on menu bar 'EDIT' or ctrl+F8 on main screen of VA01). So that user can save the sales order but it will be in incomplete status.
    I have completed it upto showing the information message using user exit 'MV45AFZZ', but after this i don't know how to update it in incompletion log of sales order for pricing. I tried to update in tables VBUK-UVPRS, but i am not getting the desired result.
    Please anyone can tell me how to update it. In which user exit i can update the incompletion log.
    Thanks and Regards,
    Vicky.

    Hi Vinod,
    I am sending you my code please check it,
       if TKOMK-SPART = 10.
        if XKOMV is not INITIAL.
          clear v_JEXP.
        READ TABLE XKOMV with key kschl = 'JEXP'.
        if sy-subrc = 0.
          check XKOMV-kwert = 0.
          message i003(ZT) with 'Value should not be 0 for conditioin type JEXP'.
          v_JEXP = 'X'.
        else.
          message i003(ZT) with 'Maintain the mandatory Conditioin type JEXP'.
          v_JEXP = 'X'.
        endif.
        if v_JEXP = 'X'.
      XVBUV-MANDT = sy-mandt.
      XVBUV-POSNR = '000010'.
      XVBUV-TBNAM = 'VBAP'.
      XVBUV-FDNAM = 'PRSOK'.
      XVBUV-FEHGR = 20.
      XVBUV-STATG = '06'.
      XVBUV-FCODE = 'PKON'.
      XVBUV-SORTF = 9999.
      XVBUV-LFDNR = 0000.
      XVBUV-UPDKZ = 'I'.
      append XVBUV.
        endif.
    endif.
    endif.
    Please suggest something to solve this.
    Thanks and Regards,
    Vicky.

  • Work flow for incompletion log in sales order/ quotations

    Hi all,
    I am looking for a standard workflow for checking in-completion log in sales order and quotations. I found one object type BUS2032/2031 which is more related to removing certain master data or Customizing settings related errors in "internet" sales order and quotation. My requirement is to check the flag/ status in the incompletion log which is turned on as a result of "locking" the characteristics in VC in sales order/ quotation
    Any pointers will be helpful.
    Thanks
    RG

    Hello,
    If you know the BOR (e.g. BUS2032) then you can check for workflows that have an event of that BOR as triggering event by looking in table HRS1212 where OTYPE = WS and OBJTYP = BUS2032.
    You can then look at the workflow (e.g. via PFTC_DIS) to see if it does something similar to what you're looking for.
    Standard workflows usually aren't enough, you may have to copy and adjust, or create a new one.
    regards
    Rick Bakker
    hanabi technology

  • Fast Entry Screen for Sales order

    dear gurus
    Is there any fast entry screens avaliable for creating sales order
    regards
    Sanil Tony

    Hi
    I have same requirement before but what i found that there is no such fast entry screen is available for Sales order creation.
    You have to get help of you ABAPer to create a BAPI which is small program. You have specify the text file in which all your required values for Sales order is maintained.
    i have successfully used this functionality
    Regards
    Happy Surana

  • How to configure rescheduling for sale order quantities

    kindly explain how to configure rescheduling for sale order quantities that are created last month. kindly explain. i am in urgent.
    regards,
    g.v.shivakkumar

    Hi,
    Short text
    Rescheduling sales and stock transfer documents: by material
    Description
    The 'Rescheduling' program (SDV03V02) processes sales document items that are contained in the item directory for the material. It takes into consideration open items and schedule lines from stock transfer items, stock transfer scheduling agreements and purchase order requests (items only), referred to hereafter as stock transfer documents, for the materials.
    All sales documents for the material that are still open are selected. This means that the material index must be activated for at least all sales document types, whose items may have requirements. All stock transfer documents or items for the material that are still open are also selected. Open in this case means for example, that there is no deletion indicator, that the item from a stock transfer purchase order request cannot be labeled as completed or that the quantity delivered and posted to goods issue for the item in a stock transfer purchase order is the same as the amount ordered. An availability check can only be carried out if a checking rule is assigned to the document type - if this is not the case, the document or document item is not checked.
    Checking rule 'A' is used as a basis for rescheduling sales orders (exceptions to this are rush orders  they use checking rule B, and orders with individual customer stock; they use checking rule AE). Stock transfer documents use the checking rule that is assigned in Customizing for Purchasing. It is important that the scope of checks is consistent for both the stock transfer documents and the sales documents and that they do not exclude each other, as this can lead to incorrect test results. An example of an incorrect setting would be: The scope of check for checking rule 'A' checks delivery schedules for stock transfer purchase orders and stock transfer purchase requests, however the scope of check for the checking rule for the stock transport scheduling agreement does not.
    The items and schedule lines found in the selection are sorted according to 'Priorities' - document category, delivery priority, creation date of the item or schedule line (for stock transfer purchase orders and delivery plans) entered on the selection screen or according to the schedule line date of the earliest schedule line with order quantity, document number and item number and then transferred to the availability check. Priority 1 is highest priority and priority 5 the lowest. Stock transfer purchase order requests are sorted after stock transfer purchase orders and scheduling agreements, as they are less binding. This means that when you have identical sort criteria such as delivery dates, the stock transfer purchase order item is checked first and then the item from the stock transfer purchase order request.
    The preset option 'Unconfirmed documents required' only carries out rescheduling for materials for which there is at least one unconfirmed transaction.
    You can use the parameters 'Sorting criteria delivery date' to define whether sorting is carried out with the order quantity after the creation date of the item or the delivery date of the earliest schedule line.
    If you mark the 'Simulation' field, the checked documents are not saved. Instead a results list is generated and saved. However, the availability check for the corresponding documents continues as if saving has taken place already, that is, that the simulated list corresponds to the actual one.
    Under 'Options' on the selection screen, specify whether sales documents and/or stock transfer documents should be processed. For stock transfer documents you can enter whether stock transfer purchase orders and scheduling agreements should be processed at item or schedule line level:
    Processing at item level:
    All open schedule lines for the item are read and collected, then transferred to the availability check. To sort and prioritize documents, you do not need each individual schedule line. It is sufficient to have the item or data from the first schedule line. All open schedule lines for the item are processed and checked.
    Example of processing at item level:
    Sorting: Date (Delivery date first schedule line) - Document number - Document item
    Doc. cat. Doc. number  Doc. item  Doc. schedule line  Delivery date PO        4500000012      10               0001              26.01. PO        4500000012      10               0002              26.02. PO        4500000025      20               0001              28.01. PO        4500000025      20               0002              02.02.
    You can see that the second schedule line for document 4500000025/20 from 02.02 was processed after the second schedule line for document 4500000012/10 from 26.02. This is because all open schedule lines for an item are read and processed. The first schedule line from 4500000012/10 has the earliest delivery date, therefore it has priority.
    Processing at schedule line level:
    Each open schedule line for an item is entered in document sorting in accordance with the values entered under 'Priorities'. The availability check is carried out for each individual schedule line.
    Example for processing at schedule line level:
    Sorting: Date (delivery date first schedule line) - document number -document item
    Doc. cat.    Doc. number  Doc. item  Doc. sched. line  Del. date PO           4500000012    10             0001           26.01. PO           4500000025    20             0001           28.01. PO           4500000025    20             0002           02.02. PO           4500000012    10             0002           26.02.
    Here you can see that each schedule line was sorted according to its delivery date. Note that this type of processing requires more runtime due to the individual checks and more frequent saving.
    The results of rescheduling are saved, as long as the program was not started in simulation mode. When calling up from the 'Sales' area menu or when directly starting via the development environment, the iniator is informed via a dialog box that he has just started a process that changes data. He can then decide whether or not he wants to continue.
    Checking procedure for stock transfer documents:
    An availability check of stock transfer documents in rescheduling is carried out in accordance with the check carried out when manually creating a document. If, however, the required quantity for a schedule line is not available on a particular date and will not be ready until later, new schedule lines are created for the stock transfer purchase orders and scheduling agreements, containing the relevant data. New items are created in this case for stock transfer purchase order requirements. The total sum of schedule line quantities for a processed schedule line corresponds to the schedule line quantity of the original schedule line.
    First example: Using a stock transfer purchase order item with a schedule line:
    a) Status of item before rescheduling run:
    Del. date  PO quantity   Confirmed quant  Confirmed del. date 23.07.      50 items       0 items              -
    ==> This now affects the stock/requirement situation:
        - Goods issue is posted for the material in the delivering plant on the 23.07.
        - A purchase order of 10 items was created for the material in the delivering plant. Delivery is expected on the 29.07.
    b) Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity   Confirmed quant   Confirmed del. date 23.07.     40 items      40 items            23.07. 29.07.     10 items      10 items            29.07.
    ==> The first schedule line was changed in accordance with the results of the rescheduling availability check. Only 40 of the 50 original items could be delivered on the 23.07. Therefore, a new schedule line is created for the rest on the 29.07. for 10 confirmed items.
    Second example: Same output situation as the above example.
    ==> There is now a change in the requirement/stock situation:
    A purchase order for 10 items is created for the material in the delivering plant. Delivery is expected on the 29.07. A further purchase shows another 40 planned items on the 30.07.
       Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity  Confirmed quant  Confirmed del. date 29.07.     10 items       10 items          29.07. 30.07.     40 items       40 items          30.07.
    ==> The first schedule line was changed in accordance with the result of the availability check for rescheduling. The original delivery date is set to the date confirmed in the ATP check. A new schedule line is created for the remaining 40 items, that are available on the 30.07.
    Note:
    Any set fixed delivery date and quantity indicators and creation indicators for schedule lines or items are 'inherited' by newly created schedule lines. Assuming that the original schedule line was fixed in the above example (since it is created manually), this indicator is also set for the newly created schedule line.
    If shipping scheduling is activated for a stock transfer document type, this is also implemented for newly created schedule lines, with the exception of route schedule determination. This means that in the current version of the program no route schedule has been determined for a schedule line containing a route schedule for which new schedule lines may need to be created.
    The results of the run are issued in the form of a list, which is also saved, so that the results can be controlled at a later date. This is done using the function 'Evaluate rescheduling', but it is only a good idea to do this after the first rescheduling has taken place. You can restrict selection requirements but these can however affect the runtime. You can use this function to analyze the saved list until the next rescheduling run, which writes over the result. If you start rescheduling in the background, a spool file with the result list referred to will be created in the corresponding setting. You can see this in spool management.
    Output
    A list of changed documents, a list of documents in which an error occurred during processing and as a result were not changed, can be called up via the menu 'Edit - Error log'. If in a subsequent evaluation a restricted selection is carried out, a note appears at the end of the list to say that not all document items are displayed.
    You can set the scope of the list under the menu option 'List' in the list display. You can view improvements, deteriorations and the whole list. Before the documents can be included in one or either of the restricted lists, the date or quantity has to have changed so that the item can be contained in both the list of improved or deteriorated documents.
    You can use the interface for changing transactions and the order list to navigate. Use 'Back' to exit the list and 'New selection' to return to the selection screen.
    Recommendation
    You should only start this program occasionally and use very restricted selectin criteria during working hours as it requires enormous system resources.
    Note
    The columns for 'New date' and 'New confirmed qty' only contain entries if the dates or quantities have changed.
    As the system only runs the change check (dates/quantities) per line in the original list, an item whose backlog has increased in the list of improvements. This occurs, for example, if the whole quantity can be delivered at once but at a later date. In this situation, the system determines an increase for the line when it compares quantities.
    Regards,
    Amrish Purohit

  • Archiving Process for Sales Order

    Hi,
    We have this new client. Archiving was previously working & has suddenly stopped. Logs are also unavailable as they have been erased.
    We just have a list of Batch Jobs which contain the following Programs.
    1. RSARDISP - The Scheduling Job
    2. S3VBAKWRS - Archiving Program (Input or output error in archive file /oracle/STP/ixos/exchange/RSD04210.220142.BATCHBA)
    3. RSARCH_STORE_FILE
    We need to run these batch jobs, in order to find out where the error is occurring.
    We can see the old already archived documents, by ckicking on Enviorment -> Display Originals on VA02 screen
    Questions:
    1 What is the sequence in which we need to run these programs?
    2.Is this the entire list of steps in order to enable archiving for Sales Orders
    3.I am not sure if SARA is being used to schedule, or is it just these Batch Jobs with the programs. How can I know the exact process that was employed previously
    Any assistance is Appreciated
    Thanks

    Hi
    If you don't have any documentation, I suppose that you are using the object SD_VBAK, and your client is using SARA. Check these points:
    - The settings for the auth.objects are in tcode AOBJ. See the reports for preprocessing, archiving and deletion. You must mantain selection variants to call them with SARA.
    - See mantain networks graphic. You must archive and delete all documents in the flow before to archive SO.
    - See the settings in tcode VORA (customizing tcodes) where you do the settings for residence time (Number of days which must elapse in order to archive the sales document).
    I hope this helps you
    Regards
    Eduardo

  • RBA GATP check is not getting invoked for Sales Order

    Hi Everyone,
    RBA GATP check is not getting invoked for Sales order.
    I maintained the configuration settings for 'Rules-Based Availability Check', APO general settings (check mode, check instruction), carried out integrated rule maintenance, Rule determination for the combination of order type & product, associated the check mode to product master. Also maintained all the settings in ECC towards Req class, Req type, checking control etc.
    However, sales order is not invoking RBA Check though it is showing up the 'Rule' icon in the screen. Also, in the APO Availability check in Sales order when I click onto 'check instruction', I get the checking mode that pertains to RBA for business event 'A' (Sales order). Though I have not maintained any stock for the main material for which I have the sales order, yet system is confirming any quantity that I put in.
    I would expect that system would propose the same material in an alternate location where we have stock through RBA.
    Request you to share ideas on this.
    Regards,
    Avijit Dutta

    Hi Avijit,
    You should used No Checking Horizon in Checking instructions and also Check your rule control settings.
    What you have defined in 1st and 2nd steps. Check whether product substitution is carried out or Location Substitution.
    Thanks,
    Bala.

  • How to create a daily report for sales order

    hi
    how to create a daily report for sales order. what fields it must consists of. what are the tables it need?

    Hi
    You have to use the sales order tables VBAK,VBAP and VBEP
    So keep date field on selection screen
    and treat this date as Order creation data audat field in VBAK.
    based on this fetch the data from VBAK and VBAP  with the following fields like
    VBELN, KUNNR,NETWR,POSNR, MATNR,ARKTX,KWMENG,WAERS  etc and display in the report
    <b>Reward points for useful Answers</b>
    Regards
    Anji

  • How to write a requirement for sales order outbound iDOC

    i need to write the requirement for sales order IDOC
    Please help

    Hi
    From the sales order screen itself you can create the delivery from the menu
    Sales order -> deliver/y
    or from VL01N , enter shipping point and Order number, create and save
    Reward points if useful
    Regards
    Anji

  • How to see archive data for Sales order

    Hi all,
            I am working on PS , network is created with sales order 10911. the components are added while sales order created, but after that someone deletes the sales order, because now it is showing oder does not found, where i get the entreis for sales order.
    Regards,
    Khushi.

    Hi Khushi,
    To see the archived data for sales order , go to transaction code SARA.
    Choose object name as SD_VBAK.Click READ.
    It will show a screen giving a name of program and option to execute in background or foreground.
    It will help you to get information about archived sales order data.
    Hope it helps you.
    Thanks,
    Sarita singh Rathour
    Edited by: Sarita Rathour on Aug 28, 2009 7:46 AM

Maybe you are looking for

  • ODS Delta Process, DataSource and Delta Queue

    Hi to all, loading data from a SAP source system into SAP BW 7.0 via generic 3.x datasource causes problems. Here is a short description: The data flow is from a source table using a generic extractor into a target ODS in full update mode. Update rul

  • Display the technical name of the last level of the hierarchy

    Hello, I have a report with hierarchy. Each level of the hierarchy uses different infoObject. I want the report to display the technical name only for nodes from specific infoObject. For example if the infoObject uses 0cust_grp1 (for the first level)

  • 3 different data providers

    I have 3 different data providers. I want to put all these 3 data providers value in horizontal table. I already have veritcal but to see the comparision I need to have horizontal table. I tried to drag and drop 1 of the data provider in 1st row and

  • HD WorkFlow, Having Real Time Issues

    Hey I've captured 422 ProRess, I need to know is there a quicker way of working with it in realtime Mulitclip editing, other than conforming back down to HDV. I'm experiencing a lot of dropped frame issues. In HDV I could cut realtime mutlclips but n

  • Unable to download the latest version of iTunes (11.1)  for Windows XP

    I am trying to download the latest version of iTunes (11.1)  for Windows XP.  When I click on download from the Apple iTunes Support site (http://www.apple.com/itunes/download/ ), no file is downloaded from Apple.  What gives?  And yes, I did check t