Hi Guys
We are facing a proble where in the test system a particular function group (CIFI) is complete but in the development system it has some screens and includes missing.
I gues this has happened due to some repair.
Can anybody throw some light on this?
Thanks for all the help
Sameer

You need to check the consistency of function group : check in SE37 menu.
You need to check your transports to check if you transport all version in the logical historical.

Similar Messages

  • Service product replication for test and developement system

    Hi Experts,
    In our scanario service product is created in production system and later manually created in test and developement system.
    Is there is any standard function module avilable to replicate the product master data into test and developement system
    Or Is it possible to use the middleware functionallity to replicate the service product details.
    Please advice on this issue.
    Thanks,
    Senthil .R
    Edited by: Senthil Vadivelan R on Dec 17, 2007 3:46 PM

    You can use the FindFile method in the TS API:
    FindFile Method
    Syntax
    Engine.FindFile ( fileToFind, absolutePath, userCancelled, promptOption = FindFile_PromptHonorUserPreference, srchListOption = FindFile_AddDirToSrchList_Ask, isCommand = False, [currentSequenceFile])
    The function itself returns a boolean which indicates if the file exists or not. 
    Then just use a Call Executable step to run command line string to delete the file.
    Hope this helps!
    jigg
    CTA, CLA
    teststandhelp.com
    ~Will work for kudos and/or BBQ~

  • ESR role in different development, test, and production systems

    Hello,
    I want to know the role of ESR in development, test, and production system. Do I have to install ESR in every seprate installated SAP CE machine??? or should It be centrally and development., test and production systems can use it?? Does software release process effects in the whole landscape??
    does Test and Production system requires ESR??? or all used services are embed into released software SCA files to test and production system???
    Regards,
    Naeem

    Hey,
    as far as I understood the ESR is a design time tool, i think  you don't need to have a productive instance.
    I think it should be installed on your PI systems. And I would prefer to have at least a devel and a test installation, to
    separate services on test machines from those who are running on productive systems.
    as you can't differentiate the services by their name but just by their systems, you should have separate ESR Instances.
    Nevertheless I think it could be possible to run only one ESR....
    Kind Regards
    Christof

  • Remote Test and Demo Systems

    Would like comments from prior users of Remote Test and Demo Systems (or DPA?) where you get remote access to an SAP maintained system for the purpose of testing your application's interfaces with SAP ERP and/or BW.
    - how do you obtain this access
    - how long does this process take
    - what's the cost
    - how well does the system work
    - do you get access to only the built-in data or you can create your own.

    Hello Veeren,
    Hope this helps:
    Q. How to obtain access ?
    Just contact the ICC guys <a href="http://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/sdnservices/icc">http://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/sdnservices/icc</a> and they will help you out with this. We had a lovely experience with the consultants for our XI Content Certification.
    Q. How long does this process take ?
    In our case, it was less than a week.
    Q. What's the cost ?
    We were fortunate to do it during the promotional period and did not have to pay anything. The ICC consultant would help you with the details.
    Q. How well does the system work ?
    The system was quite fast and the access is via ITS / SAP GUI for HTML.
    Q. Do you get access to only the built-in data or you can create your own ?
    Besides the XI Server, it was an IDES system in our case and we were also able to create data.
    All the best for your certification.
    Regards,
    Parag.

  • Test and Demo Systems (DPA)

    Would like comments from prior users of Remote Test and Demo Systems (or DPA?) where you get remote access to an SAP maintained system for the purpose of testing your application's interfaces with SAP ERP and/or BW.
    - how do you obtain this access
    - how long does this process take
    - what's cost
    - how well does the system work
    - do you get access to only the flight data or you can create your own.

    Hello Veeren,
    Hope this helps:
    Q. How to obtain access ?
    Just contact the ICC guys <a href="http://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/sdnservices/icc">http://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/sdnservices/icc</a> and they will help you out with this. We had a lovely experience with the consultants for our XI Content Certification.
    Q. How long does this process take ?
    In our case, it was less than a week.
    Q. What's the cost ?
    We were fortunate to do it during the promotional period and did not have to pay anything. The ICC consultant would help you with the details.
    Q. How well does the system work ?
    The system was quite fast and the access is via ITS / SAP GUI for HTML.
    Q. Do you get access to only the built-in data or you can create your own ?
    Besides the XI Server, it was an IDES system in our case and we were also able to create data.
    All the best for your certification.
    Regards,
    Parag.

  • Test and Dev configuration choosing between servers

    Need to create 2 node setups for Test and Dev utilizing 3 servers
    Server A - 8GB ram, 146GBx2 hd, 4 core 1.2GHz process.
    Server B - same as above
    Server C - 8GB Ram, 146GBx16 hd, 4 Dual corex1.2 GHz process
    What I was thinking was to make Server A and SErver B as the Apps Tier and server C to host the DB tier for both server A and server B
    Server A - Hosting Test App Tier
    Server B - Hosting Dev App Tier
    Server C - Hosting DB tier for TEst AND DB tier for Dev
    There are other combinations also possible. Do let me know if you feel some other permutation might be useful and why?

    Sunil,
    Since you have limitation in space on Server A and Server B, I believe the above should be the best configuration. If your database size is small and/or if you can manage to add more space to Server A and Server B, then I would suggest you have the TEST instance on Server A, C and DEV instance on Server B, C as follows:
    - Test instance: Application on Server C, and Database on Server A
    - DEV instance: Application on Server C, and Database on Server B

  • License for testing and production systems

    Hi Experts
    Can any one help me out on implementing license in my B1 System.
    According to our contract we have licensed following user types:
    User Type
    Licensed
    AddOn Access License    25
    Professional User                5
    Software Development Kit - Development Version 20
    We have Test/development system in one hardware and Production system on different hardware. Please advice me how to request/allocate license for my test/development system and production system.
    We tried creating a Test System in SAP Market place and requested license for test system. While requesting license for production system, it is found that the license is exceeded. In other words, developent system license also counted.
    Please advice me on the best practices of B1 license implementation.
    Thanks and regards
    Ajith G

    Hi,
    Our customer wants to Keep the production data secure. Developers and consultants should not have the access to it.
    Then you have only two options:
    1.Either you should maintain a standalone b1 server for the developers and consultants to test their solutions and scenarios.
    2.Otherwise you can create users in sql studio for accessing only the test database.
    So that as per your requirement
    All configurations and sample data will be kept in a test environment where developers and consultants can do their work.Once everything is correct Admin will do the transfer to production.
    Note:New users can be created in the sql studio under Databases-><Company Db>->Security->Users, Rt.click new user

  • Identification Test- and Production-System in Mapping

    Hi,
    we have a Java-function in a mapping step.
    There we need an identification if it runs in our Test- or Production-system.
    Currently we use a property file in the Java-Package for realizing this.
    But this is not a very good solution. The last time we transport the archive to our production system somebody forgot to change this property file and therefore we had some trouble in our production.
    Does anybody have an idea how we can identify the system name of the XI-system in a Java-Mapping?
    Is there perhaps any constant we can use of the Map input-parameter?
    In the documentation I didn't found anything about this.
    Best Regards,
    Thorsten

    Thorsten,
    Try using System.getProperty("SAPSYSTEMNAME") in your Java function.
    Regards,
    Jaishankar

  • Different SAPlogon screen for prd and dev systems

    Hi!
    I would like to distinguish the SAPlogon screen for production and development systems.
    For example:i logged into to the SAP system by SAPlogon and i want to see in the right top corner of the screen the letter P or D, etc.
    Could you advise me how to do it?
    Thank you!
    Dan

    I think this can be done but little difficult.
    After installing your sapgui, you have to change the picture in the right corner which you can find inside the folder programfiles-sap-sapgui and can search in the picture. If you replace the picture with your picture, you can find it there. But i dont think it can be done seperately for dev, qual and prod systems.
    With Regards,

  • How to find out if J2EE Engine is PROD or TEST or DEV System

    Hi,
    I want to get the system state / system type (even if si PROD or TEST or DEVELOP system) of the J2EE-Engine at runtime, because to use different properties.
    How can I find this information and how can I get this info in Java?
    Thanks for help.
    Sven Rickelt
    we use: SAP Web AS 6.40 SP 13 (Netweaver 2004)

    Hi Gianluca,
    one method I found is "to ask" System.getProperty("j2ee.dbhost") or System.getProperty("SAPSYSTEMNAME"), but I don't know if it is the right way.
    So I must store the servernames in my properties (f.e.
    dev=mypcname
    test=testservername
    a.s.o.)
    but I think there must be a method to configure the server, that I can ask it and the answer is "PROD" or "TEST" and I not must know the servernames...
    Best Regards
    Sven Rickelt

  • Error while generating export datasource in Test and Prod system

    Hi experts,
    I tried to generate export datasorce on a cube in teh testing system so that i can use this as a datasource for another cube. I did this so that i can transport all teh relevnt objects from D to T. But Iam gettin teh following erro msg
    <b>System setting does not allow changes to be made to object ISTD 80CRM_PRI.</b>
    while Prod system produces teh follwoing error msg
    <b>Changes to Repository or cross-client Customizing are not permitted</b>
    <b>Choose 'Display object' or 'Cancel'.</b>
    After i have done this and when i go to the context menu of teh infocube i can see maintain export datasource option.
    Also I couldn't see the infosource generated in Infosources ( FYI I have already done display generated objects under settings)
    Can anyone tell me how to proceed further.
    Thanks,
    DV

    Hi DV,
    Generally export datasource are not included in the request from the test server. It gets generated automatically when (ODS,Cube) based on which the datasource s transported to production / quality .
    I think solution should be try not to include export datasource, infosource ,transfer rules to request from dev server.
    Hope that helps.
    Regards
    Mr Kapadia

  • WebService in Adobe Forms in Test and Production Systems

    Hello Friends,
    I am facing a peculiar problem with the webservice. I have created one Adobe Form in Development system and in that Adobe Form I used one WebService to get the User's Complete Name. Its working fine in Development System. And all the WebDynpro Component's and Applications, RFC Function Module(for WebService), WebService Name were placed in same Request ID and this request is being moved from Development System to Quality system, here all the objects were present except WebService Name i.e. this service can be seen only from SOAMANAGER Transaction but not from SICF Transaction(As given in SAP Note: 1318499). And I came to know that we need to use only SOAMANAGER transaction ONLY in Quality or Production systems.
    But while creating Data Connection in Adobe Form I used SOAMANAGER's generated URL and it got created successfully and while triggering the WebService at Runtime based on some event I am writing JavaScript Code and here I am using the URL where it is generated from SICF Transaction.
    Friends please help me in solving the issue as which URL I need to use in Adobe Form at runtime(i.e. triggering webservice from JavaScript, the URL from SOAMANAGER is not working in JavaScript).
    Regards
    Pradeep Goli

    Hey,
    as far as I understood the ESR is a design time tool, i think  you don't need to have a productive instance.
    I think it should be installed on your PI systems. And I would prefer to have at least a devel and a test installation, to
    separate services on test machines from those who are running on productive systems.
    as you can't differentiate the services by their name but just by their systems, you should have separate ESR Instances.
    Nevertheless I think it could be possible to run only one ESR....
    Kind Regards
    Christof

  • Test and Production system

    Hy all. Our Problem is the following. One of our customers wants to have a Productive and a Test-Instance of Oracle DB and Mobile Server.
    If you create an application, the Mobile Server is creating Tables (CVR$..., CEQ$...) in the schema where the original tables are.
    If we now make a Synchronisation Productive - Test from our original schema (which we use for our normal program) the tables from the Testmobile Server would be overwritten with the tables from the Production Mobile Server. I think this would cause a lot of problems.
    Is anybody here, who had this situation too and who could get me any hint how to handle this?
    Thanks in advance for any answers.
    Holger

    Hello rekounas,
    first of all thanks for your answer. Perhaps I try to describe the situation another way:
    I have two separate databases. One for test environment and one for productive
    environment.
    Case there is no Mobile Server installation at all. If I want to have recent
    data in the test database, our customer takes a dump (from our schema in the
    database) from the production environment and imports it in the test database
    (after dropping the equivalent schema).
    Now, there is a problem with this if there is a mobile Server involved.
    There are two Mobile Server installed with two different Repositories. One in
    the Production system, one in the Test system.
    If we now take our dump and import in the test system, we have the tables from
    the Production Mobile Server (which he generated in our schema while creating
    the application in mobile manager) in the schema from the Test-Mobile Server
    (CEQ$.., CVR$.....).
    I don't think the Test Mobile Server can handle this, can't he?
    I hope I described the problem understandable.
    Regards,
    Holger

  • Install BI Content on Test and Transport

    Hi,
    how do you make sure that something that works on your testsystem will also work on the
    production system? For example if I install some objects from BI Content, and everything works fine on the test system, and now I transport these few installed objects on production system how do I know if everything else was transported before?
    I mean I can compare both systems, but then I have to check each object on test and production system
    to know if everything was transported before...Am I wrong?
    Thanks
    alto

    Hi,
    If it is already live system then you have to compare each object with production system .
    Regards,
    Satya

  • This morning my PB G4 would not get to the password screen after power on.  I have rebooted many times and very loud noises (like a HD spinning/rubbing) emits. Tried the Install disk and it cannot find the hard drive. Ran HW test and got a "Mass storage E

    this morning my PB G4 would not get to the password screen after power on.  I have rebooted many times and very loud noises (like a HD spinning/rubbing) emits. Tried the Install disk and it cannot find the hard drive. Ran HW test and got a "Mass storage Error Code" message.
    Did my HD just crash and unrecoverable?  Time to replace my notebook?

    I believe your hard drive has failed. Hope you have a backup.
    Failing Hard Drive Sounds http://datacent.com/hard_drive_sounds.php
    Listed by drive manufacturer.  Click on the > next to the drive & you will hear the typical failure sound.
    How to Tell When Your Hard Drive is Going to Fail
    http://www.lifehack.org/articles/technology/how-to-tell-when-your-hard-drive-is- going-to-fail.html
    Grinding And Clicking – Symptoms Of A Failing Hard Drive
    http://pcperformancetools.com/getdata/grinding-and-clicking-symptoms-of-failing- hard-drive.html
    Failing Hard Drives
    http://losangelescomputerhelp.com/computer_networking_news/failing-hard-drives.h tml
     Cheers, Tom

Maybe you are looking for

  • 'This document contains a link to an asset being upscaled'

    When opening two separate Muse sites I have received the warning message, 'This document contains a link to an asset being upscaled. You should resize it smaller, or relink to a larger asset using the Assets panel'. However, none of the assets that t

  • Performance Issues after an Upgrade

    Hello! We are experiencing performance issues after we upgraded to a new version of Hyperion (11.1.2.1). At this point, I am not too sure about the actual causes for this degrade in performance but I am trying to narrow down the causes and need your

  • SSRS 2008 R2 Map doesn't render (won't display when you preview it)

    I'm trying to create a map where it displays the count of people in my DB for each state. There are 126,000 records in the dataset.  I've looked at a dozen videos and gone through step by step instructions to make sure I'm not missing something.  The

  • Safari 5.0.5 is now showing up on my Software Update list

    I know I can download it on Apple's website, but that doesn't solve the problem. Is there anything I can do to "force" Software Update to find new updates? The funny thing is the same problem is happening on 2 different Macs: a 24" late-2009 iMac and

  • Multiple copies of mailing list groups in Groupwise

    We are running GroupWise 7.0.3 HP 4 client. We have a user who had 4 copies of her mailing list groups in Groupwise. We had her clean up address books, deleteing all but the last entry worked for cleaning. However, when she tries to copy that address