Incorrect routing in REM Backflush

Hi Experts,
While doing REM Backflush, after clicking "Actual activities", system is showing previously deleted operations and not showing the added newly added operations, hence these activities are coming in Actual cost.
Where as in preliminary cost estimation, consider the operation correctly .
REM profile is defined with " Post Activities  -  Using data from prelim. costing f. product Cost collector "
Thanks.
Kiran

Dear Himakar,
A rate routing is a routing for repetitive manufacturing. It enables you to easily reproduce the lean
production process.In the rate routing, the production rate per operation is defined (production time
according to a base quantity). *Set-up time is not usually defined, since no changes to setup are
planned.*
So its not required to mention any value for set up time ,so that its not considered for costing and the
other processes.
http://help.sap.com/erp2005ehp_04/helpdata/EN/60/c6c50f146347e1933b4c15144ec31b/frameset.htm_
Check these links,
Re: Very Strange: SET UP  time is not calculated Automatically Even for sta
Re: Set up time not coming while confirming in MFBF
Regards
Mangalraj.S

Similar Messages

  • Problem in REM Backflush in Repetetive Mfg

    Hi
    i got the following error when i try to run the REM BACKFLUSH in repetitive process. (MFBF)
    " Update control of movement type is incorrect (entry 131 _ _ _ F)
    Message no. M7226
    Diagnosis
    The system could not find entry 131 _ _ _ F in any of the movement type control tables."
    if any body having any idea kindly guide me
    Thanks in advance
    siva

    Hi,
    Good afternoon and greetings,
    Please go through the following OSS Notes
    Note 216633 - MB01: Error M7 226 for automatic PO
    Please reward points if found useful
    Thanking you,
    With kindest regards
    Ramesh Padmanabhan

  • REM Backflush

    HI GURUS,
    I have craeted production version (MOD1)and done product cost collecter ,also complete mfbf (rem -backflush).
    My new requirement is,
    i have changes bom item and in rate routing i have changes some opeartios and activity types which assigned to MOD1 prod.version.
    Now i want do product cost collecter amd mfbf transition with MOD1 version with new changes,can i do .
    is it possible....

    Dear Manoranjan,
    In my understanding even if your product is a standard cost estimated material,whenever there is some change in the
    BOM/Routing/Rate routing of this part,as explained our other forum friend use T Code MF30 to a preliminary cost estimate or else
    goto KKF6N,after entering the part code,plant,select the production version,click on change mode and the cost calculator ikon and
    then save the data.
    This is a must to do activity once after there are some changes in BOM/routing.
    Check and revert.
    Regards
    Mangalraj.S

  • Background Job in COGI(REM Backflush error handling)

    Hi Everyone.
    I have one question.
    Our company use REM Backflush .
    And Our REM profile setting is next.
    - Use GI Backflush at GR posting
    - Don't use report point backflush
    - Create cumulated and individual postprocessing record
    In this circumstance, we use T-code COGI to process backflush error.
    When I execute the COGI in online, There is no problem
    <b>But, After I make a job for background in sm37, When I execute background gob for COGI, There is a problem. In real, Background gob is will executed. But COGI errors remain as before.</b>

    Hi,
    Actually you should use
    Transaction          MF47
    Program              RMSERI11, for post process record.
    For post processing , manually entry like storage location and Batch number(if batch management is enabled) is required , if the post process record is created according to this error.
    And hence it is not possible to correct all the records by background job.
    Thanks
    Thamizh

  • Routing in REM

    Can we use normal routing,   in REM, if we can use normal routing y  we should use Rate routing
    In rate routing production line is to be used,  there are no of work centres with different operations
    then wt is this production line,,,,  what is the line hirarchy  pl let me know
    i want a  scenario steps where production line  is used in rate routing 
    thanks all

    Dear Himakar,
    A rate routing is a routing for repetitive manufacturing. It enables you to easily reproduce the lean
    production process.In the rate routing, the production rate per operation is defined (production time
    according to a base quantity). *Set-up time is not usually defined, since no changes to setup are
    planned.*
    So its not required to mention any value for set up time ,so that its not considered for costing and the
    other processes.
    http://help.sap.com/erp2005ehp_04/helpdata/EN/60/c6c50f146347e1933b4c15144ec31b/frameset.htm_
    Check these links,
    Re: Very Strange: SET UP  time is not calculated Automatically Even for sta
    Re: Set up time not coming while confirming in MFBF
    Regards
    Mangalraj.S

  • Missing parts in REM backflush

    Hi Gurus....
    While doing a REM backflush using MFBF, a problem occurs such that a few of the component materials which are part of a BOM header material are missing. Ideally any material which is a bulk material will not appear in that list. In this case the material is not a bulk material also. While posting the document as well as while reversing the document, the missing materials never appear in that list.Please advice on the same.

    Dear alapati naveen,
    Please clear thse doubts,
    1. Are you using a REM profile with reprocessing allowed?
    2.If so means while doing assembly backflush,the system posts document for GR(131 movement for the
    header material) and GI (261 movement for the BOM component's) for the material which has sufficient
    stock to fulfill the requirement and the materials(component's) where there's a deficit of stock in that
    storage location or plant goes to MF47(Reprocessing List).
    3.In MB03 you can see the list of materials for which full posting has been made sucessfully,it might be
    either GR or GI.
    4.So you are saying partial GI has happened and so check in MF47 whether that one material other
    than the bulk material lies here or not.
    Check & revert back.
    Regards
    Mangalraj.S

  • Activity used for confirmation- REM backflush

    Hi friends,
    I am working on a Z report for getting cost of extra activity posted (Activity backflush) in REM backflush MFBF. Details are available in AFRU but I am not getting table for actual  'Activity type' used for confirmation.
    I need this data for each (confirmation number + counter) or Document log.
    Please help.
    Thanks & Regards,
    Sandeep

    Hi R Brahmankar ,
    Information available in S026, S227 & in MCRI & MCRJ is not wrt (Confir. number + counter) or Doc. logwise.
    I couldn't use the FM. What are the input parameters for this FM?
    Pl help.
    Sandeep

  • Table for MFBF-REM Backflush

    Dear All,
    Can anyone please tell me me the table for MFBF-REM Backflush
    Regards
    Prashant

    Hi,
    What data you are looking for?
    However below are the tables used in REM.
    SAFK         RS Header Master Data
    S025           LIS -- Run Schedule Quantities
    S026           LIS -- Material Usage
    S028           LIS -- Reporting Point Statistics
    CEZP          Reporting Point Document Logs
    CPZP          Reporting Points - Periodic Totals
    The list is not exhaustive. Let others also add.
    Regards,
    Rohit.

  • Component quantity control in PP-REM backflush

    Hi all,
    We are fancing the following scenario: a FERT material X is "produced" just packing toegheter 4 units of other FERTs materials X1..X4, without restriction of quantities from each material Xn in the pack. That means a unit of X can be made from 1 unit X1, 1 unit X2, 1 unit X3 and unit X4; and another unit of X can be made of 3 units X2 and 1 unit X4. The only restriction is a unit of X must contain 4 units of Xn.
    Is there a way to control this packing scenario through REM backflush? I've created BoM, routings and production version for material X, but i can't find where to control components quantities as descrived.
    Thanks in advance for ideas o guidelines in this issue...
    mr.

    Dear Manuel,
    1.I'm not sure how this can be addressed through packing materials,but assume you have created 2 different BOM one
    containing 1x1,1x2,1x3,1x4 and the other one containing 3x2 and 1x4.
    2.Create 2 different production versions one assigned with alternative BOM 01 and the second production version containing
    second alternative BOM 02.
    3.Create REM profile allowing to backflush using preleminary cost estimate using T code OSP2 and error correction mandatory.
    4.Create 2 different product cost collectors for each production version.
    5.While backflushing the system picks the BOm components as per the production version and allow to confirm the product.
    Check and revert
    Regards
    S Mangalraj

  • Incorrect routing selection in LTP

    Hi Experts,
    We are facing issue in LTP. We are doing budget planning for 2015, for some of the materials the production routing is read when transferring planned activities to cost centers instead of the costing routing. In our planning scenario we have the settings that the costing routing should be taken before the production routing (OPU5).
    Can anyone please tell me what parameters need to check in this case? As for some materials its working fine for some materials its picking incorrect routing. Masterdata is same for both materials.
    BR,
    Pankaj

    Hi Ayoub,
    All the 4 routings are valid from Oct.2014 to 31.12.9999.
    The Order date is from Apr.2015.
    I've made another test with 2 routings created with ECN and the order chose one without asking me what to choose. I don't know the criteria used in this functionallity.
    Thanks,
    Caio.

  • Default Valuation type in REM backflush.

    Hi,
    In the configuration for split valuation (OMWC), for valuation category H (HALB), a batch HM has been defined as - Default: valuation type "in-house production" (DVT InhPr).
    This means, for inhouse manufacture, system proposes this valuation type as default.
    When, I create a production order for a material with this valuation type, system proposes valuation type HM for the given plant.
    Where as, while doing REM backflushing for a material with this valuation type, system does not propose valuataion type automatically.
    Why is it so?
    Is there any other setting?
    Is there any note for this?
    Thank You,
    -Madhavi.

    Hi,
    Apply following  BADI
    Goods Movements in Backflushing (Repetitive Manufacturing) BAdI RM_BFLUSH_GOODSMVT
    Regards,
    Sanjay

  • The track listing is incorrect on the REM Warner Bros. Box Set. However, no-one appears to be doing anything about it. Do iTunes or WB even know it's incorrect? Am I the only one who's noticed?

    the track listing is incorrect on the REM Warner Bros. Box Set. However, no-one appears to be doing anything about it. Do iTunes or WB even know it's incorrect? Am I the only one who's noticed?

    Don,
    To be a good citizen, you may wish to contact Warner Brothers and alert them to the error.  That will allow them to verify it, and advise the iTunes Store (as well as other music download stores) of the corrections.
    You also have the option of advising the iTunes Store directly via their feedback page, but be aware that Apple is unlikely to take a fan's input to overrule info that they received from the label.  So contacting WB is probably more effective.

  • Rate routing in REM

    Hi all,
    I am working on REM and I am bit confused about scheduling and capacity data to be entered in workcenter (production line)
    Specially the formulas to be entered in both the tab for REM.
    1.I want to capture only Machine and labour time . suggest  the std actvity type , std value key and the formulas related to activity type for both scheduling and capacity defined for REM in the system
    2. my second doubt is unlike in std routing I cant define all the operation in Rate Routing I have to define one operation for one production line. but how to define the so many operations used in one production line.
    3. can I use any control key or is there any specfic control key is there for REM
    4. How user will withdraw the material from store for production . like in discrete we have GI.
    Regards
    Mona

    Dear Monalisa,
    1.First understand how a formula works during capacity and scheduling by checking the formula in the work center,for some
    base quantity,operation quantity and processing time and then choose the relevant one.
    2.normally PP01 is used for inhouse produced operations.
    3.In a REM scenario if required the materials(raw materials or the components) will be staged using T.Code -MF60(to
    accumulate the stock in the production storage location from which the components should get backflushed).Using this the
    system creates a stock transfer reservation for 311 movement for the missing parts.
    Input can be the planned orders or production orders or else directly for the BOM explosion with the required quantity of the
    header material.Once the stock transfer reservation is done,the same can transferred using MF65.
    Kindly check these threads,
    Re: Pull list - MF60
    Re: Question about mf60
    Re: Repetitive manufacturing
    Regards
    Mangalraj.S

  • REM Backflush Materials With Serial Number

    Hi all,
    We decideed to trace some materials with serial number. I have created serial number profile and assigned to the materials. But in REM confirmation SAP does not support backflushing materials with serial numbers. Cause of product cost collector i can not consume the material manually within inventory management.
    How can i consume the materials with serial number in repetative manufacturing ?
    Regards,
    techmaster,

    Hello
    Please check note SAP note 100621.
    This note states that repetitive manufacturing does not allow to use serial numbers on the components.
    BR
    Caetano

  • HR data in REM backflush posting

    Hello,
    I am working in REM scenario and have this REM back flush situation -
    During Activity back flush the actual timings needs to be posted against the individual activity.
    Is it possible to post these activities against personnel ID which are maintained through HR mini master in REM through MFBF ?
    (In discrete we can post the actual hrs against individual personnel ID in CO11n)
    I will really appreciate any inputs and suggestions.
    Thank you in advance.

    HI
    Check the REM profile assigned to your material and also when you Backflushed the QTY then do post with correction system will explode the BOM and then fetch the qty required then you can edit them there and then save it. you wont be able to see the header material on the next screen but you can see the document generated in MB51or MIGO
    Check and revert
    Regards
    Anupam Sharma

Maybe you are looking for

  • Multiple Users syncing data on Numbers spreadsheet

    What's the best way for multiple users to share a numbers spreadsheet and upkeep of data? Thanks! I know- I'm pretty new at this.

  • How can I create a new User with the Java API like OIDDAS do?

    Hello, I'm currently working on an BPEL based process. And i need to create an OCS user. So far I can create an user in the OID. But I cant find any documentation about given this user an email account,calendar and content function etc. Did anybody k

  • Creating a new database in a new Oracle home

    Hi, I'd like to add a new database using dbca, but I want it in a different Oracle Home to the other databases on the server. I notice that in the dbca I do not get an option to specify a new Oracle home. I assume it is because this tool is only for

  • Download Oracle 8i

    Hi Can anyone provide me a link to download Oracle Database Server 8i (8.1.7.4). It was not found on Oracles download site.

  • Pen Tool Icons Missing in CC 2014 Windows 7

    I have just noticed that I'm not seeing the Join/Add to Existing Path icon is missing in CC 2014.  The little chain link icon second left in the illustration below.  As far as I can tell, all the other icons are OK.  I tried my Pre-2014 installation