I have a situation where my top level material (FERT) is a MTS item (reorder point planning).  In the BOM is an intermediate (HALB).  Due to the nature of my process I must have a 1:1 relation ship of the HALB to the FERT.  However: as many have pointed out, where I have multiple production orders for the FERT, the MRP behavior is to combine multiple order reservations for the HALB into one planned order, regardless of the individual/collective requirement setting.  There must be a way to get a planned order for each order reservation in this MTS situation.  I know that I am not the only one who has this requirement.  Any advice/expertise would be greatly appreciated.  Thanks.

Mgf,
I believe expert Sundaresan has answered your question - for Baseline SAP.
In addition to Baseline, though, SAP offers several addons that are industry specific, and some of them appear to me to be tailored to industries in which Milliken is a participant.
Check out the standard industry addons in
http://help.sap.com/content/documentation/industry/index.htm
You also might want to consider hiring a consulting company to explore possible SAP solutions for you.
Best Regards,
DB49

Similar Messages

  • Material Master MRP4 Individual / Collective Requirement

    Hi All,
    I would like to ask in case I want to use the Individual / Collective Requirement functionality in Material Master MRP4 view, is it a MUST to set the Strategy Group in MRP3 view to 20 : Make-To-Order Production? Because I find if I dun set this field, nothing happens after I execute MD01 for the MRP Run.
    Another query is in case the Stock Requirement is on two different dates, can I still group them together into one Plan Order or one Purchase Requisition using the selection - 2. Collective Requirement selection?
    Many Thanks.

    Hi,
    I would like to ask in case I want to use the Individual / Collective Requirement functionality in Material Master MRP4 view, is it a MUST to set the Strategy Group in MRP3 view to 20 : Make-To-Order Production? Because I find if I dun set this field, nothing happens after I execute MD01 for the MRP Run.
    Yes Individual / Collective indicator only works for MTO strategies.
    Another query is in case the Stock Requirement is on two different dates, can I still group them together into one Plan Order or one Purchase Requisition using the selection - 2. Collective Requirement selection?
    You can but if the dates are different you have to use Periodic Lot Size.like PK.and all requirements within one period will be grouped together and they will be planned together.
    Check and Revert,
    Santosh Sarda

  • Individual/Collective Requirement indicator in MTS

    Hi Gurus,
    Can you please let me know what is the relevence of individual/Colelctive Requirement indicator from MRP4 view of material..
    for Finished product as well as its sub assembliees in case of make to Stock planing strategies.
    i know how it works in MTO and how depednent requirements can be grouped together or sepated based on this indicator.
    When i tested the same in case of MTS, i found for dfinished product as well as sub assemblies behaviour is always like collective irrespective of MRP4 indicator.
    any thougts lets me know.

    Dear Santhosh,
    MRP-4 as 1 : In individual planning, this indicator is used to display the dependent requirements of a component separately.
    MRP-4 as 2 : In collective requirements, this indicator is used to display the dependent requirements of a component grouped together.
    This Indicator is useful to control the planning of dependent requirements if the main product is being planned with strategy 20 ie; MTO Process.
    Ramagiri

  • Both Individual & Collective requirement for Same material

    Hi,
    Is it possible to have a component as,
    dependent requirement in one B.o.M as individual requirement & in another  B.o.M as collective requirement.
    Suppose we have 2 Production version
    Bill of material 1
    FG (Make to Order)
    SFG2 (Individual planned order)
    Other version is
    Bill of material 2
    FG (Make to Order)
    SFG1 (Individual planned orders)
    SFG2 (Collective planned order)
    Is it possible to have SFG2 as Individual as well as collective requirement, based on B.o.M so that if version one is selected then all individual planned order need to be generated  with reference of sales order& if version 2 selection then a collective planned order to be generated without reference of sales order..
    & In B.O.M Item data how Explosion type can be useful in these scenario.

    Hello
    As far as I know, this setting is only available at the material master and it is not possible to change is at BOM level.
    You can try to use BAdI MD_CHANGE_MRP_DATA to control if the requiremens are assigned to the individual stock or not, from an MRP perspective. Please observer that this BAdI does not change data on the table.
    However, BAdI WORKORDER_UPDATE can be used later to remove the assignment to the invidual stock from the production order components.
    BR
    Caetano

  • What is the functionality of Bom explosion individual/collective  in MRP 4 View

    Hi Experts.Please give idea about what is the use of functionality of BOM explosion Individual/collective in MRP view 4.How this function will work in strategy 10 and 20.
    thanks in advance.

    Hi,
    This is a very generic question...If you explore in forum or net you will get lot of information...
    This is normally used in make to order strategies like 20, 50 etc...
    The individual/collective indicator in the material master record determines
    whether a component is procured for a special customer requirement in the
    individual segment.
    The indicator "1" for individual requirements means that the material is being
    specially manufactured or procured for a sales order. A special individual segment
    is created for each requirement. An individual requirement is only created if the
    higher-level material does not create a collective requirement.
    The indicator "2" for collective requirements means that the material is produced
    or procured for various requirements. You can find these requirements in the net
    requirements segment.
    The indicator "blank" means that the component is to be planned in the same way
    as the higher-level assembly.
    In the above example, two individual segments are created for the shaft for sales
    orders A and B.
    Thanks
    Kumar

  • Individual Collective indicator

    Hi
    Is there any report abt Individual collective indicator
    I need a report regarding  the requirements created on each date for the collective requirement of the material
    I have maintained collective indicator for the material
    Regards
    Anand Srinivasan

    Dear Anand,
    There's no standard report regarding  the individual/Collective Requirements.
    But still if you want the list of materials with 1 - Individual Requirements only or 2 - Collective Requirements
    only,you can get it from the table MARC in T code SE16.
    Regarding your second part of question i'm sure whether you are l;ooking for this,
    If you want the total Requirements for those materials,then go to T code MD73 - give the Requirements
    Plan as * and enter the plant and the date range and proceed.
    Regards
    Mangalraj.S

  • View Reports for individual Collections

    Hello,
    Is there a way to view Reports for individual Collections?  When I review my Usage Reports or look at Reports within the PSM I only get a break down of total user actions per day for the whole site.  I don't see a way to view data for just a single Collection.  It would be extremely helpful to me and my faculty if we could see reports or stats for specific Collections.  For example, if I could see total subscriptions and downloads for HIST1010.  It'd be even better if we could view totals for whole months rather than each day of the month but at this point any data about a whole individual Collection would be great.  Any help in viewing the data in this way is really appreciated.
    Thanks!
    Nikki
    Multimedia Tech
    Roane State Community College

    Hi Syd,
    Thanks so much for your prompt reply.  I was able to use your directions to pull stats for the last few weeks for the faculty member who requested this info. 
    My dream (if Apple is reading) would be to view monthly stats and have that information attached to each course so faculty members could view and sort that information on their own.  This would be especially helpful because as our site continues to grow and I continue to encourage faculty to manage their own content, the ability to access the data on their Collections would provide great feedback on how their ocntent is being used.  Being able to see how frequently the content they're taken the time to make is being used could be empowering.
    Anyway, thanks again for assisting with how to access the data that is currently available.
    Best,
    Nikki

  • Collective and ind indicator in mrp4 view

    Hi, we are using strategy 20 (mto). For header material collective and individual indicator is not maintained. For item it is maintained as 1 (ind). We created one sales order and run md02 for header material. In this case mrp is considering the unrestricted stock and accordingly no pru2019s were generated. We changed to 2 for item material, again it considers stock qty in mrp run so no pru2019s generated. as I understand if ind is 1 for item, it should not consider the existing stock as it is not sales order specific. Please advise why system is considering the existing stock if 1 is set for item material.

    Hi,
      The ind/Coll indicator is used to dispaly the requirements for a particular component in the following manner.
    Individual requirements
    Requirement quantities of the dependent material are stated individually for each header materials reqmnt.
    Collective requirements
    Requirement quantities of the dependent material are grouped together for all the materials.
    Ind/Coll
    All the MTO req are shown separately and MTO are grouped together
    Hope this clarifdies your doubt. This indicator will not control whether the unrestricted stock is to be considered or not.
    Regards
    Ramana

  • What is exactly difference btw individual collective call blank and 1?

    Hello all
    Could you please to help me get ride of that what is exactly difference btw blank and 1 in MTO scenario?
    it is better if you guy can show me a example.
    Thanks

    Hi,
    In case of any requirement through sales order, it will be the special stock categoery E and material should have Individual and Collective Indicator as 1 in MRP4 view .It depends on what item category you are going to use in the sales order .
    In MTS strategy, You can't achieve based on each requirement But you can get the plan order( system will combine all the requirement ) generated.
    Example
    If you have Asembly Material A, and components X,Y & Z for A.
    For MTO
    MRP generates the Planned Order for the Assembly and components with respect to the sale order requriement.
    Fot MTS
    MRP generates the Planned Order for the assembly and components based on the stock requirement.
    Regards,
    Sundhu

  • Individual/Collective in BOM With Phantoms

    Hello All
    Iu2019m working with variant configuration using strategy group 65.
    My BOM has several levels and the first level is always a phantom.
    When exploding the BOM MRP create individual requirements for each component.
    Because the components are used in other finish goods with different strategy I don´t want to set in the mater data the individual collective flag to 2. Instead I create e new explosion type in the BOM to create collective requirements.
    My problem is that MRP bypasses this explosion type from the BOM when the component is phantom which forces me to enter it at the level of the no phantom component.
    Is possible by any means force MRP to only create Collective Requirements for the Components of a MTO ?
    Thereu2019s any chance to force SAP to Look to the explosion type in the phantoms and create only collective requirements?
    Thanks for your comments
    Pedro Coelho

    Dear
    I do not think so it is possible  in Standrad MTO process .
    In MTO process , you can not club all the Depedent  Requirement ( Phantom BOM -componenets ) in to one PR  utlising MRP4 individual and Collective Indicator .
    Basically indiviaul /collective indicator MRP4 as 2 then  PRs or planned orders will be generated during the MRP run for dependent requirements with account assigned to respective WBSE or Sale order
    Where as at header level it will work  like this  : Individual and collective indicator in mrp4 view
    Just check this
    Regards
    JH

  • Individual/collective req ind

    Dear experts,
    I'm using MTO. I have multilevel bom structure. I have faced a problem.
    For example I have a material in level2 followed individually according to customer order. I want the level3 materials to be managed collectively. I'm setting all the materials collective indicator in 3rd level. But sometimes I forget to create the MRP view of the 3rd level material. Then the system plans the requirements of 3rd level according to 2nd level and as the 2nd level followed individully this 3rd level  material is also planned individually.
    My question comes: Is there any way to define the system plan the materials always collectively if mrp view does not exist or if I don not set any indicator.

    Hi,
    Yes you can set the collective/Indual indicator with out MRP view also..
    In the BOM you can set..
    In component details there got a Explosion type for this explosion type in the background setting set as collective requirement and assign the same in the BOM items.
    hope clear..
    Revert me if any issue
    Regards,
    Ravi

  • Individual / collective indicator in MRP 4

    What is the use of this indicator and when to use individual and colloective option ?

    Hi,
    If you maintain Individual requirement seeting in MRP 4 view , always a PR or Planned order is generated aginst the WBS element based on Procurement type setting ( E or F). If a PR is genearated, and is converted to PO and when we do GR of the item , for a valuated stock , Stock and price will be in project stock not in actual cost. ( can see report in T-code GR55. Report Z6P2.)
    If you maintain collective requirement seeting. Always a reservation is created against the network activity. Once the item is issued against the reservation , cost is debited from the activity and item is consumed. No stock.  Cost will booked to actual cost.
    Can check the same by testing with same material ....
    first have seeting as a Individual requirement. Genrate PR , convert to PO , do GR and check MMBE (stock report) and GR55 cost reprot.
    next time same material , change setting to collective requirements, Reservation is created , DO GI against that resevation. Check MMBE ( No stock should be there ) , Check GR55 cost should be booked in actual cost.
    No change in costs. Only change in the flow of qnty and cost.
    Thanks
    Saikishore Ganga
    P.S : Kindly confirm as soon as you try this.

  • Collective requirement of raw material

    How we can create the collective requirement for the raw material i.e. when I run the mrp of two finished product.Raw material AW-122 of the finished products  are common.So instead of two planned order,Can i get one planned order after mrp.
    Regards,
    Sunil Patil

    Hi Sunil,
    Yes it is possible to get one planned order if for that material master in MRP4 screen if you set indicator for Individual/coll. as 2-Collective requirements only then it is done also with this in MRP1 in Lot size also give lotsize keys Fix/weekly/Monthly
    Hope this will help you.
    Regards,
    Rajesh

  • Follow-Up material items in MRP4 View

    Hi All,
    In MRP4 view, in discontinued part, if we set follow-up material, MRP will trigger requests for the follow –up material if the stock of existing material is zero.
    Now there is a requirement, so that even though follow-up material is updated, system should be trigger any requirement for the existing one, though the stock is zero, ie, the follow up material is only for an information .
    Is it possible ? can we do it with  changing the effectively of date in eff.out (set it as future unlimited)
    Thanks for the help.
    Regards,
      Vijesh

    Pls help.

  • Ici in mrp4 view

    My understanding is that by setting 2 in ICI of mrp4 view, it will combine the all pru2019s or planned orders of that particular material and generates single procurement proposal. My doubt is that if the date of procurement is different, then what system will do? I mean if procurement date of one sales order requirement is 20.01.10 and other is 25.01.10, then how system behaves? Will it generate two pru2019s or single pru2019s? what is the reference for system to decide so? Please advice.

    Hi,
    This will be controlled through your lot sizing procedure. If there are two sales orders which have a common component as A and you have two different delivery dates for them then when you run the MRP system will be have as follows,
    1) create 2 PR's/PO of the delivery date for both of them are different and you use EX in Lot sizing
    2) If you use daily/weekly/monthly lot sizing then system will generate the cumulative requirement based on the delivery dates.
    Regards,
    Zoheb Hasan

Maybe you are looking for

  • How can I delete old email addresses from auto complete?

    Hello to everyone on this great forum, I have been having trouble trying to find out how to delete the old typed email history. For an example, if I go to send a picture to Bob, I start typing Bob and it comes up with 3 old emails of his. Not a big d

  • Is Metadata standard from camera maker to camera maker...

    No lens data nor even a field for lens data comes up in Metadata whether I show "all" or "EXIF". I have "unknown" lens for every photo in the database. How can you edit fields or at least see what information is in the file to be viewed if allowed? T

  • Remove Domain from Search indexes

    Interesting dilemma, I've created a site through iWeb, bought the domain from godaddy and hosted on mobile me for now at least. I"m using this site to communicate with friends and family about volunteer work I"ll be doing in an unsecure, developing c

  • Screen sharing in 10.8 slower than in 10.7?

    Hi everyone, I use screen sharing a lot with my 10.7 server and 10.7 clients. I have now set up a fresh installation of 10.8 Server, but screen sharing to it seems way slower on the same connection. It takes around 10 seconds to connect (2-3 seconds

  • OS 9.1 on OS 10.4.4 ...  And we're having issues

    Well I finally transfered over a copy of 9.1 from my old desktop that no longer gets used and I seem to be having difficulties getting OS 9 running. Being that It tells me that it needs to be updated, and then it hangs up in startup. Any ideas what t