Individual purchase order with subcontracting material

Hi all,
I've implemented a individual purchase order in a sale order by means of 'TAB' category item. The material has been set as 'subcontracting'.
When I create the sale order, a purchase requisition is automatically created with M imputation and special stock 'E'.
Once I create, the purchase order with reference to purchase requisition, I set 'L' category item. Then I save the purchase order.
In order to simplify the flowchart, the vendor has enough stock to manufacture the required material.
Then, Tx. MIGO, stock input with reference to purchase order.
For the FERT material --> movement 101 E + is set.
For the component --> movement 121 E - is set.
How can I obtain 121 'O' - movement for components in order to decrease SC vendor stock?
Thank you very much in advance for your support.
Best regards,
Alberto Ramos.

Dear Charlie,
Thank you very much for your response. As you comment, I made a mistake with the number of movement. Certainly the movement for raw material consumption is 543.
I have executed the flowchart you describe. In your case, an independent subcontracting purchase order is done. This flowchart works correctly (with the results you comment. Actually the raw consumption are related to mov. 543 O -).
The problem is when purchse order is related to a sales order. That is:
1. Sale order TA with only one position material A. Category item 'TAB'.
2. Material master for material A --> MRP 2 view --> Special procurement field: 30 - Subcontracting
3. An automatic purchase requisition is created (thanks to 'TAB' category item, schedule line, ...)
4. Tx. ME21N --> I create a purchase order with reference purchase requisition:
    4.1. Account assignment category field is set to 'M' from sales order / purchse requisition
    4.2. I manually set Item category field to 'L' for indicating subcontracting (I don't force this to be 'L' from sales order / purchase requisition because I need to use the same flowchart for subcontracting and not subcontracting materials)
5. Tx. MIGO
    5.1. For Fert material the system executes mov. 101 E +  (as in your description)
    5.2. For raw materials the system exectures mov. 543 E - ( instead of 543 O -). I would like to obtain the reduction of subcontracting stock, because this material is in my center but povided to SC manufacturer.
Should I do a 'Subsequent adjustment' by means of Tx. MIGO the movement are:
  - FERT material 121 E - (depending on adjustment)
  - Raw materials 543 E - (again 'E' instead of 'O' which is the result I would like to obtain).
I will very much appreciate your comments.
Thank you again,

Similar Messages

  • "Individual Purchase order" with supersession

    have a scenario "Individual Purchase order" with supersession
    i face this problem
    When using the old transactions ME22n, we can replace the material with the
    new in supersession however; we cannot create an outbound delivery as
    it refers to the old material in ATP.
    We can re-run product selection in delivery, however SAP says the
    following:
    "For interchangeable parts to be considered in sales order processing
    for availability check there has to be the reason for substitution
    0009. The value for the field Outcome has to be B."
    "Note that copy routine 110 is only supported when you use outcome A
    and usage PSEL for deliveries"

    Is their any solution

  • Individual purchase order with Consignment

    Hi,
    advantage and disadvantage individual purchase order with Consignment.
    would you advise a individual PO with consignment?
    Thanks

    this 2 ar diffrent thing and have to used at diffrent place
    venfdor consignment  will be used when vendor is keeping his mateiral in our pant but its not our stock. when ever we use it then its ours stock
    ind PO is when ever u do gr all stock is ours and its valuated at our plant .
    so each one can me use as per the senerio.
    if there is vendor consignment senerio then u can use std PO functionaly and vise vers
    hope i have correctely understod ur ?
    reward if usefull

  • Can we recieve goods for purchase order with out material master data in PO

    I have service PR for doing the services. I will  give the material which is not accounted ( no material in the PO)and raise PO with reference to production order. but once the service is done,that product will become a  material ( master data available) I have to receive the  final product.Can we do the GR for this product. If so ,could you please explain the scenario

    Hi Sankarkumar
    When you are issuing the material for servicing your existing inventory for the material  will be affected how you are plannignto handle that? You are receiving a different material once the serviceing is done then again yoour inventory will be affected for the new material.  If you do not intend to issue material in SAP then why are you worried when you are bringing the new material into SAP after servicing is over?  It is a subcontract scenario in a normal situation. But since you do not want then you can do a Service PO from the reqn and later use receipt without PO for bringing material in. Just speak to your finance guys how to set right the debit/credit amount resulted due to this transaction.
    Regards
    Sam

  • Individual purchase order - Accounting entry  with account assignment M

    I want to use the individual purchase order with account assignment M .
    Can someone please tell me what would be the correct accounting entry during GR and during delivery?
    Process is
    Order -> pruchase req -> purchase order -> Goods receipt - > Delivery-> Billing
    During order creation system asks for a consumption account against GBB-VKA
    On GR the below entry is posted .
    Dr GBB-VKA consumption
    Cr WRX GR/IR .
    Is this correct ??
    If so what is the entry after delivery goods issue .

    Hi Hitesh
    I am now wondering if this is possible
    When PO has acct assignment to CC or IO, GR hits consumption
    With Wbse, it can hit to stock account. Am wondering whether it will hit stock account if the PO has acct assignment to sales order...
    I have seen sap notes for this scenario and my memory says I have seen the GR hitting consumption in those notes. There was an issue in scn where price diff upon invoice in such a scenario was not hitting vprs. For that there was sap note.
    Let us hear from others
    Let me tag some stalwarts here. Waman Shirwaicar Szymon FIN Maslowski arturo senosain G Lakshmipathi
    Br. Ajay M

  • Subcontracting Purchase order with Sales order Reference

    Hi friends,
    I am facing a problem during GR of Purchase order with Acc. Assignment E and Item Cat L i.e. purchase order is MTO and of Subcontracting.
    During GR, system is purposing movement type 543 E instead of 543 O for BOM components. Please suggest how can I get the correct movement type during GR. I would like to appreciate for your kind response.
    Kraheja.

    Hi
    Go to SPRO->Logistic general->Tax on goods movement->India->Movement types.
    Here you will find the group of movement types check which movement types is mantained for the out side movement groups or inward movement.
    also check the Material Master in MRP view if the collective requirements (02) is mantained.
    Regards
    Sujoy

  • How to enable VSF cosumed with Individual purchase order(TAB)

    Hi, SAP guru.
    I want VSF consumed with individual purchase order (TAB).
    Could you give me the instrunction please?

    I explain here in detail.
    (In material master, srgategy group is '40'.)
    When you create a sales order with item category 'TAN', this sales order consume 'VSF'.
    and you change this item category to 'TAB', the consumption or allocation disappear.
    I want this TAB to be kept consumed with VSF.
    Could you give me the possibility and the instruction.
    For example;
    1. Intial
                                        Requirement
          Nov-1st    VSF      100
    2. When you create SO with TAN (10 pcs), SO consumes 10 of VSF.
                                        Requirement
          Nov-1st    VSF      90
          Nov-1st    SO        10
    3. And you change item caetgory to 'TAB',  VSF is back to 100.
                                        Requirement
          Nov-1st    VSF      100
    --- Cstock    SO (TAB)
          Nov-1st    PReq       10          
    What I did
          Requirement class '050' and 'KEB'    (OVZG)
                           VPZUO  is '1'  (I think sap standard)
        => It suppose that SO cousumes VSF, as VPZUO is same as ZUVKZ of PIR.
          Schedule line category 'CB'      (OVZ8)
                            Check 'Availability check for sales' (ATPPR) and  'Transfer of requirements' (BEDSD)
         =>  SO is displayed in MD04, but not consume VSF.
    3'. And you change item caetgory to 'TAB',  VSF is back to 100. SO doesn't consume it.
                                        Requirement
          Nov-1st    VSF      100
    --- Cstock    SO (TAB)
          Nov-1st   SO           10
          Nov-1st    PReq       10

  • WHATS THE FLOW OF A PURCHASE ORDER WITH REGARS TO MATERIAL MANAGEMENT ?

    WHATS THE FLOW OF A PURCHASE ORDER WITH REGARDS TO MATERIAL MANAGEMENT ?

    Hi
    see the MM flow with related Transaction codes
    MM Cycle:
    Purchase Requisition-> Staff in an orgn places Pur requisition for want of some goods/products - ME51
    Request for Quotation(RFQ)-> The Purchase dept in the orgn calls/requests for the quotation for the products against which PR was raised. - ME41
    Vendor Evaluation->After receving the RFQ's, after comparison a Vendor is finalised based on the terms and conditions.
    Purchase Order(PO)-> Pur order was issued to that vendor asking him to supply the goods/products -ME21N
    Goods Receipt Note(GRN)->Vendor supplies the material/Products to the orgn-
    MB01
    Goods Issue (GI)  -> People receives their respective itesm for which they have placed the Requisitions
    Invoice Verification-> ALong with the Material Vendor submits a Invoice for which the Company Pays the amount - .MIRO
    Data to FI -> data will be posted to FI as per the vendor invoices
    you better go through all these links u will get all the info what ever u need
    for mm
    http://www.sapgenie.com/abap/tables_mm.htm
    http://www.sap-img.com/sap-download/sap-tables.zip
    http://www.allsaplinks.com/material_management.html
    http://www.training-classes.com/course_hierarchy/courses/2614_SAP_R_3_MM_Invoice_Verification_-_Rel_4_x.php
    http://www.sapfriends.com/sapstuff.html
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSMAT/PSMAT.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CAARCMM/CAARCMM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MYSAP/SR_MM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOMDMM/LOMDMM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMMM/BCBMTWFMMM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMIVMVAL/MMIVMVAL.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMWMLVS/MMWMLVS.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMISVE/MMISVE.pdf
    Reward points if useful
    regards
    Anji

  • Purchase Order with Invoice Plan

    Hi,
    I need to understand working with Invoicing plans for a Purchase Order. Especially the service PO for the rents and other related services.
    How the PO is linked to the Invoice Plan and how the process happens in SAP?
    Thanks in advance!

    Creating an Invoicing Plan  
    The following procedure describes how to create an invoicing plan with the pre-Enjoy ordering transactions (ME21, ME22, ME23).
    The procedure described is also applicable u2013 with certain restrictions u2013 to the Enjoy purchase order (ME21N, ME22N, ME23N).
    If you are using the Enjoy purchase order, you will find:
    ·         The Invoicing Plan button and the indicators for GR-based invoice verification (GR-Based IV), service-based invoice verification (Srv.-Based IV), evaluated receipt settlement (ERS), and invoice receipt (Inv. Receipt) among the item details on the Invoice tab page.
    ·         The account assignment among the item details on the Account Assignment tab page
    ·         The Goods Receipt and GR Non-Valuatedindicators among the item details on the Delivery tab page
    Prerequisites
    Vendor Master Record
    Before you can use the invoicing plan with automatic settlement, the Evaluated Receipt Settlement Delivery indicator must be set on the Purchasing Data screen in the vendor master record.
    (If you wish to enter invoicing dates manually, this is not necessary.)
    Purchase Order
    ●     We recommend using a framework order (that is a purchase order with a validity period and a reason for rejection). The invoicing plan can adopt the validity period specified in the PO header.
    ●     PO items for which you wish to use an invoicing plan must have account assignment irrespective of whether a material with a master record, a material described by a short text, or an external service is involved.
    ●     The GR/IR control facility must be set up in such a way that no goods receipt (or, in the case of services, no service entry) is expected - only an incoming invoice. If you wish to have automatic settlement, you must also set the Evaluated Receipt Settlement indicator.
    If you nevertheless wish to allow service entry sheets for the item (e.g. for information purposes only), you must set the GR Non-Val. indicator.
    Customizing
    Under Purchase Order à Invoicing Plan in Customizing for Purchasing, you can maintain data such as the desired invoicing plan types, date categories, and date descriptions.
    Procedure
           1.      Create a purchase order with account assignment (framework order).
    Click  to access the item overview (or the overview of service lines if you chose item category D for services).
           2.      Enter the desired material or service, the quantity, and the price.
           3.      Select the desired item and click  Account Assignments to access the account assignment screen. Enter the account assignment for this item.
           4.      Click  to access the item detail screen. Check that the GR/IR control indicators are set correctly on the item detail screen.
    ○     The GR and GR-Based Invoice Verification or Service-Based Invoice Verification indicators must not be set.
    ○     IR must be set.
    ○     You must set ERS if you wish to have Evaluated Receipt Settlement.
    ○     If you wish to have service entry sheets purely for information, for example, allow non-valuated goods receipt (i.e. select the GR Non-Val and GR indicators).
           5.      Choose Item ® Invoicing Plan. A window appears, in which the invoicing plan types predefined in Customizing are suggested. Choose the desired invoicing plan type and click  Continue.
    You can use the following invoicing plan types:
    ○     Periodic Invoicing Plan
    ■      You use the periodic invoicing plan if the total value of the PO item is to be invoiced in each period.
    ■      The system creates the invoicing dates automatically on the basis of the settings in Customizing.
    ■      The invoicing date and the amount to be invoiced are shown for each settlement period (e.g. month). In the case of the periodic invoicing plan, the amount represents the total value of the PO item.
    ■      You can change the suggested dates and block individual dates for automatic invoicing if necessary.
    ■      You can enter the start and end dates for the invoicing plan.
    ■      With the Dates from and Dates to fields, you can determine that an invoicing plan does not contain invoicing dates extending over the entire validity period of the purchase order but only for a certain period within that validity period. (E.g. within a validity period from 1.1. to 12.31, only dates within the period 1.1. to 06.30.)
    ■      With the Horizon field, you control how far into the future dates can be created. If you enter a date rule that adds six months to the current date here, invoicing dates will be created for just half a year in advance in each case.
    The system automatically creates new dates if you change the invoicing plan or when you invoke the transaction for Updating Periodic Invoicing Plans. See Generating Further Invoicing Plan Dates
    ■      The In Advance indicator allows you to specify whether the invoice is to be created with regard to a prior or subsequent period. (E.g. at the beginning of February, either in advance for the month of February or in arrears for the month of January).
    ■      In addition, fields with information on the existing invoicing plan are displayed (e.g. the calendar upon which the date determination process is based).
    ○     Partial Invoicing Plan
    ■      You use the partial invoicing plan if the total value of the PO item is to be invoiced in several partial amounts.
    ■      You get an empty date overview in which you can manually enter the desired dates.
    ■      If you work with a reference invoicing plan, the system automatically generates dates in accordance with the reference plan.
    You have the following options:
    ●      You create a reference invoicing plan in Customizing for the invoicing plan type.
    ●      You enter an existing invoicing plan as reference plan directly in the invoicing plan for the PO item.
    ■      You can flag a date in field B (Billing/Invoicing Rule) as follows:
    ●      As a down payment (percentage or value)
    ●      As an invoicing date (percentage or value)
    ●      As a final invoice
           6.      Click  to return to the item overview.
           7.      Click  to save the purchase order item with the invoicing plan.
    You can then start the automatic invoice creation process during invoice verification.
    For more information, refer to the section Settlement of Amounts Due Under Invoicing Plans.
    Once assigned to an item, the invoicing plan type (e.g. partial invoicing plan) cannot be changed. If you wish to assign a different invoicing plan type, you must delete the item and create a new one.
    Generating Further Invoicing Plan Dates  
    If you have assigned a periodic invoicing plan to a PO item but have not initially defined invoicing dates covering the entire validity period of the purchase order, you can generate further dates in due course.
    You have created a PO item with a periodic invoicing plan for a certain planned procurement. The purchase order is valid from 1.1. to 12.31. When creating the invoicing plan, you specified one invoicing date per month for the first half of the year. You have not yet planned any dates for the second half of the year because you do not wish information from the invoicing plan to be passed on to purchase order commitments at this stage, for example.
    By mid-June, it is clear that the PO is to proceed as envisaged, and you therefore wish to schedule invoicing dates for the remainder of its validity period.
    Procedure
    To schedule further invoicing dates, proceed as follows:
    Choose Purchase order ® Follow-on functions ® Period. invoicing plan
    Specify the purchase orders for which invoicing dates are to be generated in the invoicing plan and perform the function.
    A log can be created if desired.
    Result
    The system adds further dates on the basis of information such as the validity period or horizon from Customizing, the purchase order, and the invoicing plan.
    regards,
    indranil

  • Third Party and Individual Purchase Order

    <b>Can anybody please send me the steps to configure the Return Process for both Third Party and Indvidual Purchase Orders.</b>

    dear sunil
    THIRD PARTY SCENARIO
    in third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
    Process Flow
    the processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.
    Processing Third-Party Orders in Sales
    Third-party items can be created automatically by the system, depending on how your system is set. However, you can also change a standard item to a third-party item during sales processing manually.
    Automatic third-party order processing:-
    if a material is always delivered from one or more third-party vendors, you can specify in the material master that the material is a third-party item. During subsequent sales order processing, the system automatically determines the appropriate item category for a third-party item: TAS. To specify a material as a third-party item, enter BANS in the Item category group field in the Sales 2 screen of the material master record.
    Manual third-party order processing
    In the case of a material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing. For a material that you normally deliver yourself, you specify the item category group NORM in the material master.
    If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
    If address data for the ship-to party is changed in the sales order in third-party business transactions, the changed data will automatically be passed on to purchase requisition and also to the purchase order ,if one already exists. In the purchase order, you can display the address data for the ship-to party in the attributes for the item.
    You can only change the address data for the ship-to party in the sales order for third-party business transactions, and not in the purchase order.
    Processing Third-Party Orders in Purchasing
    when you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
    Purchase orders are created from purchase requisitions in the usual way. For more information about creating purchase orders, see the Purchasing documentation. During creation of the purchase order, the system automatically copies the delivery address of your customer from the corresponding sales order. In a sales order, you can enter purchase order texts for each third-party item. When you create the corresponding purchase order, the texts are automatically copied into the purchase order. The number of the purchase order appears in the document flow information of the sales order.
    All changes made in the purchase order are automatically made in the sales order as well. For example, if the vendor confirms quantities and delivery dates different from those you request and enters them in the purchase order, the revised data is automatically copied into the sales order
    you process third-party items by creating a normal sales order. In overview for the order, you can then overwrite the default item category (TAN in the standard system) with the special item category for third-party items: TAS
    Billing Third-Party Orders
    If relevance for billing indicator for the item category has been set to B (relevant for order-related billing on the basis of the order quantity) in Customizing, the system includes the order in the billing due list immediately. If, however, the indicator has been set to F (relevant to order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list until an invoice from the vendor has been received and processed by the purchasing department. In the standard system, item category TAS (third-party order processing) has been given billing-relevance indicator F.
    In the first case, the third-party order is considered to be completely billed only when the invoiced quantity equals the order quantity of the sales order item. In the second case, each time a vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order is considered to be fully invoiced until the next vendor invoice is received.
    If you have activated billing-relevance indicator F for item categories in Customizing, billing can refer to the goods receipt quantity instead of the incoming invoice quantity.
    You can control whether the invoice receipt quantity or the quantity of goods received is relevant for billing in Customizing for copying control for billing at item level.
    FOR YOUR PROCESS Individual Purchase Orders WELL GIVE THE RIGHT SOLUTION
    Individual purchase orders are used when your customer orders goods from you that are not in stock and must be ordered from one or more external vendors.
    Process Flow
    During sales order entry, the system automatically creates a purchase requisition item. The purchasing department creates a purchase order based on the requisition and the vendor ships the goods directly to you (unlike third party order processing, where the vendor ships directly to your customer). You then ship the goods to your customer. While the goods are part of your inventory, you manage them as part of the sales order stock. Sales order stock consists of stock that is assigned to specific sales orders and cannot be used for other purposes.
    Process Flow for 3rd Party Sales
    Customize the third party sales in summary:
    Prerequisites for 3rd party sales,
    Purchasing org,
    purchasing group,
    assign the Purchase org to company code
    assign Purchase org to plant,
    should not maintain the stock in material, it should be trading goods,
    1. Create Vendor XK01
    2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
    7. Goods receipt MIGO
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing *--
    SD - 3rd party sales order Create Sales Order
    VA01
    Order Type
    Sales org, distr chnl, div
    Enter
    Sold to
    PO #
    Material
    Quantity
    Enter
    Save
    SD - 3rd party sales order View the PR that is created with a third party sales order
    VA01
    Order Number
    Goto Item Overview
    Item ->Schedule Item
    SD - 3rd party sales order View the PR that is created
    ME52N
    Key in the PR number
    Save
    SD - 3rd party sales order Assign the PR to the vendor and create PO
    ME57
    Key in the PR number
    Toggle the "Assigned Purchase Requisition"
    Execute
    Check the box next to the material
    Assign Automatically button
    Click on "Assignments" button
    Click on "Process assignment"
    The "Process Assignment Create PO" box , enter
    Drag the PR and drop in the shopping basket
    Save
    SD - 3rd party sales order Receive Goods
    MIGO_GR
    PO Number
    DN Number
    Batch tab , click on classification
    Serial Numbers tab
    Date of Production
    Flag Item OK
    Check, just in case
    Post
    Save
    SD - 3rd party sales order Create Invoice
    MIRO
    Invoice Date
    Look for the PO , state the vendor and the Material
    Check the box
    Click on "Copy"
    Purchase Order Number (bottom half of the screen)
    Amount
    State the baseline date
    Simulate & Post
    Invoice Number
    *Invoice blocked due to date variance
    SD - 3rd party sales order Create a delivery order
    VL01N
    In the order screen , go to the menu Sales Document , select "Deliver"
    Go to "picking" tab
    State the qty and save
    SD - 3rd party sales order Create a billing document
    VF01
    Ensure that the delivery document is correct in the
    Enter
    Go to edit -> Log
    Save
    rewards pls
    siva

  • Make to Order and Individual Purchase Order ( MTO & IPO)

    Hello Gurus,
    1. Can anyone let me know what is Make to order (MTO)and Individual purchase
        order (IPO) and the Differences between both?
    2.  What is the purpose of MTO and IPO and where it is used.
    I would be thankful if anyone can provide me the meaning of both.
    Prashant V.T (PVT)

    Hi Prashant,
    MTO : Make to Order means the Production of the Material starts after getting the sales Order.
    Means once the Sales Order raised for any particuler customer then based on that order production / procurement takes place, and the stock what ever produced will be restricted for that Order only. The Stock cant be used for any other orders.
    where as IPO is different.
    IPO : Individual Purchase Order is like Third Party Sales but with a difference. In Third Party Sales, after getting the Sales Order a Purchase Order is raised to vendor and vendor will supply directly to the customer, and the Ordering compnay will raise the Invoice to the customer once the customer received the stock from vendor.
    IPO is similer but the difference is vendor will send the stock to the company instead of direclty sending to the customer. And the actual compnay will take the stock and do the delivery / shipping/ invoice to the customer.
    MM T.codes MIGO, MIRO plays crucial role in these type of scenarios.
    Hope this gives you some idea.
    REWARD IF HELPFUL.
    Regards,
    Praveen

  • Goods receipt for purchase order with account assignment 'K'

    Hello All,
    There are couple of purchase orders with acc.*** "K". On doing the GR for these PO's they have been done with mvt type 103 & mvt typ 105.
    I understand that material has been directly consumed to the respective cost center.
    How do track the internal movement for these materials??
    I need to view the stock for these materials at the cost center as in MMBE the stock is seen as ZERO.
    All these materials are with QM proc ACTIVE. So a goods receipt is done 105, then the inspection lot is cleared. However, in this case as the material is directly consumed, it is NOT displayed in QA32.
    Is the above procedure correct??? Is it better to receive stock against mvt type 101 & then do a 201 mvt ??
    Request your inputs.....
    Regards,
    Manoj Reddy

    Account assignment inventories are not maintained. To maintain a report for cost center receiving/issuing you need to make a customized report with help of ABAP.
    Other way is to pull report in MB51, with selection criteria COST CENTER and it will give you result of stocks available on cost center. For stocks received on cost center, you can pull report with cost center and movement 101.
    201 is used for goods issue to cost center from warehouse, the stock you receive from PO against 101 is directly charged to cost center, so no need to issue later to cost center.
    Edited by: Afshad Irani on May 17, 2010 2:17 PM

  • Excise Invoice Number through Purchase Order no. or Material Document no.

    Hi,
    Is there any report through which I can find Excise Invoice Number (J1IEX) with the help of either Purchase Order no. or Material Document no.?
    Can anyone provide some idea in this regard?
    Thanks in advance

    Using transaction code J1I7,You canfind excise invoice no in report,with purchase order no. or Material document no. as inputs.

  • Create another purchase order for a material ordered in full

    Hello friends,
    I have a little MM question for you.
    I've created a purchase requisition with a material A and quantity 100 UN
    I've then created a purchase order in reference to this PR.
    This PO has been released.
    Is it possible, in standard SAP, to create another purchase order in reference to the same purchase requisition for the same material and the same quantitiy ?
    How does SAP control that ? (customizing path ??)
    Regards,
    Bahia.

    Dear,
    Is it possible, in standard SAP, to create another purchase order in reference to the same purchase requisition for the same material and the same quantitiy ?  Yes it is possible in SAP
    How does SAP control that ? (customizing path ??): SAP controls in that way, when ever you create purchase requisition with a material A and quantity 100 UN...Now PO created and released...
    Now again if you try to create PO wrt PR, you can observe this time you will get all deatils in PO without quantity...reason behind that is, you have already released an order for full qty w.r.t. that PR...So this time qty field will be empty..You have to manually enter this field.
    Now the same you can see in the the PR status in ME53N Tcode.
    Regards
    Utsav

  • Error message while creating production order with KMAT material strategy25

    Hi PP Gurus I am running variant configuration cycle...Strategy 25, Custermer Req KEK (KMAT Matrl)
    Sales order & MRP Picked the components correctly as per the dependencies
    written. So Planned order generated against sale order.
    When I tried to convert planned order to Production order...I am getting the
    below error message..
    Error Message:
    You cannot make an assignment to make-to-order stock Message no. CO684
    Diagnosis The component cannot be allocated to an individual stock because
    make-to-order production and engineer-to-order production cannot be executed
    with this order.
    A possible cause is that you are trying to create an order with reference to a
    sales-order/project, where an account assignment to a sales order/project is not
    allowed in the settlement profile that is assigned to the chosen order type.
    This is inconsistant.
    System response The following responses are possible:
    Order processing is cancelled.
    The system resets the special stock indicator back to the original value.
    Procedure Choose another order type.
    I used order type with SD1 as settelement profile.
    OVZG: default 046, settlement profile = SD1
    OPJH: Settlement profile = SD1
    Plz through some light on this if u have worked on Variant Configuration/MTO
    settlements.
    Question:
    1) Is creation of production order with KMAT material supported by SAP?
    2) If yes, why the above error occurs?
    Waiting for Ur reply
    With Best Regards

    Dear R.Brahmankar,
    I have check on the note, but it is not relevant to ecc6. The current system default setting is :
    Standrad setting for reqt class 046
    Special Stock E
    Acct Assgt Cat. M
    Valuation M
    Settlmt Profile SD1
    However if I change the Acct Assgt Cat. from M to E. It resolve the problem. I would like to know is this the right solution?
    Config in Acct Assgt M
    Consumption Posting = E
    Config in Acct Assgt E
    Consumption Posting = '  '
    In F1 key of Consumption Posting field it shown following:
    To flag the sales order item as cost- and revenue-carrying, enter an "E" (settlement via sales order).
    If you do not wish to flag the sales order item as cost- and revenue-carrying, do not enter anything.
    Dependencies
    If you are working with nonvaluated sales order stock, always flag the sales order item as cost- and revenue-carrying.
    If you are working with valuated sales order stock:
      In the case of complex make-to-order production, flag the sales order item as cost- and revenue-carrying
      In the case of sales-order-related mass production, do not flag the sales order item as cost- and revenue-carrying
    Should we change to E?
    Regards,
    Ong

Maybe you are looking for

  • File and bubble sort problem

    hey, I'm in a bit of a pickle. I'm trying to read from a file then bubble sort the file then write that to another file. Any suggestions how I can go about this. I've managed to read from the file, but have no idea how to bubble sort it. Any useful s

  • Forgot password - HP SLATE 500

    Hello all, can you please help me here. I have an HP slate and I forgot the main password to it. I dont have a password recovery disc and unlike a full computer /laptop, the HP slate does not have an F8 button to interrupt startup. please help best r

  • Difference between W_AP_XACT_F and W_AP_INV_DIST_F

    Hello: We have procurement and financial modules enabled in our BI apps. We have a requirement to create Payments by Department report. For this report there are 2 options, either use W_AP_XACT_F or W_AP_INV_DIST_F. Now the problem is data is not mat

  • Water in iPod

    Hi, I, being the klutz that I am, left my iPod in a gym bag with a leaky water bottle. Not a good idea my friends. My iPod won't turn on. I read that I can't repair this under warranty. So...I'm assuming that I have to dry it out. But I would like to

  • REP-1212: Object  is not full enclosed by its eclosing object body

    hi am in oracle report 11gR2 am geting this error when running my report REP-1212: Object  is not full enclosed by its eclosing object body