Info Package load 'Time Lag'

Hi Experts,
Is there a table which holds information about time lag of a info package run.
If yes which field of dat table gives this information ?
If there is no direct method, is there a indirect method to derive it from any table.
I badly need to get it from a table, coz I need to document this for lot of info packages, and if I do it manually it takes lot of efforts (going to "details" tab of every info package run and all dat stuff..)
Points would be awarded for sure.
Thanks,
Mihir

Hi Mihir,
Check table: RSMONICTAB -- Monitor, Data Targets(Infocube/ODS) Table, request related info and
                   RSMONIPTAB -- InfoPackage for the monitor
and also you will get load details from statistics.
More info at: [BW Useful Tables|http://sapbwneelam.blogspot.com/2007/08/bw-useful-tables.html]
Hope it Helps
Srini

Similar Messages

  • DO we need to run Info Package every time before DTP Process to load the da

    Hi friends,
    IN BW 7.0 do we need to run every time the Info Package before DTP process to load the data into target or only one time we need to run the Info package then from that point onwards we need to run DTP process, Please let me know. basically I am planning to create the process chains so I should put Info package before DTP to load the deltas or full load??
    Thanks a lot,
    Harshan

    Hi,
    When you are loading from source system i.e. datasource to target, you will always have to use an infopackage to load to PSA and a subsequent DTP.
    When loading for instance from DS to Cube, you only need to schedule a DTP.
    I hope this helps you.
    Best regards,
    Olav

  • 0HR_PT_3 Load is taking too much time when i execute the Info package

    Dear All,
    i am working on HR Module.
    i am extracting data from 0HR_PT_3 from R/3 PRD system through info package its taking long time to load data.
    I have checked in RSA3 in R/3 PRD system whenever i extract "0HR_PT_3"  instead of showing records  its showing this error message "Infotype 2002 not read due to lack of authorization" .
    could you please let me know any one have resolve this issue.
    Thanks,
    Venkat.
    Edited by: venkatnaresh7 on Jul 12, 2011 11:49 AM

    hi
    I am facing same issue. did you able to fix this?

  • Info Package in Process Chain taking long time

    Dear All,
    Info Package in Process Chain having 0 records is taking 1 hr 5 mins to complete. Time out time is set to 10 mins.
    Does any one of you know the reason why it is happening like this?
    Regards.

    When the info package status turns to green : final message is :
    No data available
    Diagnosis
    The data request was a full update.
    In this case, the corresponding table in the source system does not
    contain any data.
    System Response
    Info IDoc received with status 8.
    Procedure
    Check the data basis in the source system.
    Diagnosis
         The data request was a full update.
         o   In this case, the corresponding tab
                 contain any data.
         o   System Response
                 Info IDoc received with status
                 Procedure
    Check the data basis in the source system.
    Analysis
    ========
    No data available in the source system for this selection
    No further action necessary
    When the status was red, I checked BD87 and SM58 and there were no entries.
    The corresponding job in sm37 took 869 seconds to complete. Below was the job Log.
    Job started
    DATASOURCE = 0CO_PC_02
    Call customer enhancement BW_BTE_CALL_BW204010_E (BTE) with 0 records
    Result of customer enhancement: 0 records
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 0 records
    Result of customer enhancement: 0 records
    IDOC: Info IDoc 2, IDoc No. 1345319, Duration 00:00:00
    IDoc: Start = 24.10.2011 18:29:54, End = 24.10.2011 18:29:54
    Synchronized transmission of info IDoc 3 (0 parallel tasks)
    IDOC: Info IDoc 3, IDoc No. 1345330, Duration 00:00:00
    IDoc: Start = 24.10.2011 18:44:18, End = 24.10.2011 18:44:18
    Job finished.
    PLease help.
    Regards.

  • ******Creation of a loading selection for cube in info package level

    Hi,
    when we are  scheduling the info package(Infp package name is like XYZ),we want to load past 6 months data from the current date(INFO OBJECT(0CREATEDON) BETWEEN (Sy-Datum - 6 months TO  Sy-Datum),in the selection tab in schedule i want to write the abap routine (type 6).please can any one have this type of code please sedn to me asap.
    this is very urgent.delivery is tomorrow.
    Regards
    lekha

    hi Lekha,
    try
    data: l_idx like sy-tabix,
    l_month(6) type c,
    l_dtlast6month like sy-datum.
    read table l_t_range with key
    iobjnm = '0CREATEDON'.
    l_idx = sy-tabix.
    DELETE l_t_range
    WHERE iobjnm = '0CREATEDON'.
    L_t_RANGE-SIGN = 'I'.
    L_t_RANGE-OPTION = 'EQ'.
    if not work, try
    L_t_RANGE-OPTION = 'BT'.
    BT = between
    current month
    concatenate sy-datum3(2) sy-datum0(4) into l_month.
    L_t_RANGE-HIGH = l_month.
    last 6 month
    clear l_month.
    l_dtlast6month = sy-datum - 180.
    concatenate l_dtlast6month4(2) l_dtlast6month0(4) into l_month.
    L_t_RANGE-LOW = l_month.
    append l_t_range.
    modify l_t_range index l_idx.
    p_subrc = 0.
    $$ end of routine - insert your code only before this line -
    endform.
    Re: routine as selection in infopackage
    Re: routine as a selection in infopackage 2. Paolo Siniscalco and A.H.P
    Re: abap routine

  • How to control data load in Info-Package using ABAP?

    Hello Gurus:
    I am trying to resolve couple of issues. 
    1.  I need to load data DAILY Full Load into a Planning cube.  I have the 0NETDUEDATE   for selection in the
         Info-package.  I am getting data from anothe base A/R cube.  I want to Load Daily ONLY those records
         for which the "0NETDUEDATE" is Greater than "System Date".  I think the logic would be IF 0NETDUEDAT
         .GT. SYS-DATUM, bruing the record. What should be the statement in 'Result' for keeping the record? 
         (I don't know ABAP, so need help here...!)
    2.  Similalry, before loading the data above, I want to delete all the existing records from Planning cube where
         0NETDUEDATE is GT System date (records loaded the previosu day need to be deleted as the amounts may
         have changed).  How can I achieve this selective deletion automatically  in PC??
    Appreciate your feedback very much.
    Thanks... SMaa

    Hi Shruti,
    1) If i understand your requirement correctly you need to load only data which has 0NETDATE greater then sydatum.
    So you can do this in infopackage .Infopackage>Data selection->0NETDATE(field)-->type(colum).here you can selecy ABAP type(6).Now you create ABAP code in this.
    Here in ABAP code you need to specify high and low range ,Also the relation character like GT or BT(between).
    i guess some how ur code will look like this
    $$ begin of global - insert your declaration only below this line  -
    TABLES: ...
    DATA:   ...
    $$ end of global - insert your declaration only before this line   -
        InfoObject      = 0NETDUEDATE
        Fieldname       = NETDUEDATE
        data type       = NUMC
        length          = 0000010
        convexit        = PERI6
    form compute_NETDUEDATE
      tables l_t_range structure rssdlrange
      changing p_subrc like sy-subrc.
          Insert source code to current selection field
    $$ begin of routine - insert your code only below this line        -
    data: l_idx like sy-tabix.
              l_idx = sy-tabix.
              l_t_range-low = sy-datum.
              l_t_range-option = 'GT'.
              modify l_t_range index l_idx.
              p_subrc = 0.
    $$ end of routine - insert your code only before this line         -
    endform.
    i am not sure about coding but you can surely do it it is like specifying the ranges dynamically(you need to try it out)
    (also as mentioned by others you can do this in traansformation routines)but infopackage routine you can directly write in PROD system.
    2) And regarding the Selective deletion you donu2019t have nay process type in Process chain which does this
    But there is function module u201C rsdri_infoprov_delete " which can be used to develop a program( I guess you must be having a existing ZProgram in ur system already available because this is used commonly.
    Other wise you need to develop a ZProgram for this.
    Thanks and Regards
    Arun

  • Initialize Delta Load in Info Package

    Hi,
    I want to create 2 info packages for my load from datasource.
    One with setting " Initialize Delta load with data transfer " in info package for my first load.
    Second info package should be with " Delta Lad " which i am not finding in the second info package i am creating. Can you please tell me how can i get this setting as i am getting only Full or Intialize delta load only.
    Regards
    Syed

    Make sure the following:
    1) DataSource is Delta Enabled
    2) An Init (or an Early Init) has already been done successfully. You should see the entry in RSA7 of the Source ERP
    You should then be able to get the Delta option in the InfoPackage

  • One info package to two cubes- dataloading time on each cube?

    Hi all,
    1.we had  One infosource - one info package - sending data to 2 info cubes.now we need to figure it out how much time is taken for 2 individual cubes
         for ex: data laod time is 10 mins how can we figure out which cube is consuming more time or less time?( acube 7 min and bcube 3 mins )
    2.how do we find out the cubeload time..
        from  psa to transfer str,transfer str to comm str & from comm str  to cube like this we need to make report on time consuming at each phase..( time splits between two stages )
    Thanks and Regards,
    Ramesh.

    ramesh,
    there's no straight way to do this. you're going to have to open the monitoring for that infosource, click on the details tab, go to the processing (data packet)->update rules, and manually compute how long each data package took transferring into a cube. (compare the time of the start of processing update rules and end of processing update rules for a certain data target)
    sorry that there's no other way, but i hope that helps - and since you're new here, don't forget to give out some points to those that help you. =)
    ryan.

  • Data Load (Info package and DTP) performance

    Hi,
    We are planning to perform initialisation expecting 30 million records.
    To improve the data load performance i am planning to increase data package size from default value to double the default value
    Will that improve the performance

    Adjusting the info package size would be helpful...
    But don't go with INCREASING the numbers, It's all depends on the your extract structure size, source system memory settings.
    I would suggest to do some trail in DEV/QUALITY systems with enough data.
    I remember playing in production itself for CRM - 0BPARTNER extractor - we actually reduced the number of records to be extracted per package to improve the performance - we did see the impacts.
    First calculate how much is your current package size by number of records extracted per package now with your extract structure size..and then play around..sure it will help unless you DON'T have any excessive ABAP code user exits.
    Let us know if you need further help on this

  • Is it necessary to create info package for hierarchy  for loading flatfile

    is it necessary to create info package for hierarchy  for loading flatfile  or  mantain hierarchy is sufficient for that please suggest

    Hi,
    there is two ways you can maintain hierarchy data in an master data.
    you can manually maintain the data in an infoobject for hierarchy by selecting that particular infoobject and maintain master data option. here u won't need any infopackage creation.
    but if you are loading through flat file means you have to create and maintain the path for flat file in infopackage maintenance.
    hope this help you
    Regards
    Harikrishna N

  • Lag in Loading Time

    Hello.
    I hope this is the right place to post this...I created a bunch of presentations that lasts about 20-25 minutes each, video files are are progressive downloads. There are also a lot of captions, and jpgs. Each presentation has roughly 20-25 slides. Every time you go to the next slide, it says, "loading" and can take a bit. Is there any way to get rid of that "loading" and have a smoother transition? Is this where I'd use a preloader? Or am I stuck with that "loading" as the presentation, well, loads? Would this be fixed if the videos were set to stream and pulled down? Or do I have to tell the client, "tough, deal"?
    Thanks,
    Mike

    You can change the text "Loading" to say something else, but load time is normally due to LARGE files. One option is to splice your Captivate project into smaller pieces and have one load when another ends (the learner doesnt see the transistion). However, this will not work very well if you are tracking anything in them (variables, quiz info, ect)...Or you can check to make sure you have cleaned our your library of unused items and all the images and video are optimized.

  • Simulate load times

    Hi all,
    Anyone here knows if we can simulate load time in BW?
    Example, i have a DSO that goes to a Cube for reporting.
    I would like to simulate how long 100,000 records will take to get from ECC to the Cube.
    I might later want to test how long 250,00 records will take.
    RSA3 is not useful as it can only test how fast the extractor will take.
    Is such as thing possible?

    Hi Ganesan,
    1) for DSO to Cube Loading:  You have to create a DTP.
       Execute the DTP with Debugging mode (simulation).
       Then in the monitor you can find the time taken.
    2) for Loading from ECC to BI : You have to create Info package.
       But info package does not give any option for simulation.
    cheers.

  • Dump error while creating or double click the info package

    Hello experts,
    I have actived infocube 0FIAR_C03 in BI content. Ago, The creation infopackage have been deleted in the past , today, I  created a infopackage, while I update mode selected u2018initialize delta processu2019, then click save button , the system prompt u2018Deltas already loaded for request  REQU_D64R47LDUSZHY9CBIB86WMLFJ init.selection; no 2. initu2019, I canoti save it for my setting. Why is this?
    Then I have search cause in SDN,  and I have reference OSS Note 852443 to do .
    Note 852443 have mention some table: RSSELDONE、RSSDLINIT、RSSDLINITSEL、ROOSPRMSC、ROOSPRMSF.
    I have to delete that request of record using se16 in these tables: RSSELDONE、RSSDLINIT、RSSDLINITSEL.
    in my BI 7.0 system,   ROOSPRMSC、ROOSPRMSF is no any data.
    I was no found delta queue in RSA7.
    Now . Dump error while creating or double click the info package,  how can I change this?
    Please let me know the solution.
    Thanks for your help.
    Best Regards
    Steve

    Here are some links  which deals with same issue.
    Re: Dump In Infopackage
    Re: Getting into Short dump at the time of selecting InfoPackage to execute for
    Short dump while performing init in infopackage
    Re: Infopackage going into short dump
    Thanks.

  • Dump Error while Creating the Info Package

    Hi,
    I have created Customized ODS and used Generic data sources.I have loaded full Upload to ODS. Created Info Packages for Init delta and Delta for delta loading. I have ran Full Upload and while I am trying to run Init, I am getting the error.
    While I am trying to open the Info Package, I am getting Dump error message.
    Dump error Message :
    What happened?
        The current application program detected a situation which really
        should not occur. Therefore, a termination with a short dump was
        triggered on purpose by the key word MESSAGE (type X).
    While i am trying to Create New Info Package, the systems gives the Dump on the System
    Please help on this issue.
    Thanks,
    Siva.

    Hi,
    Actually, when we want to have delta loads in future, then we can just have one infopackage with init delta infopackage, so that when it runs for the first time, it pulls all the records and from next time onwards it will pull the delta records only.
    But as you have done the full load with infopackage, now just create a delta infopackage, no need of init delta infopackage, this is the reason, its giving dump.
    Hope it has given some insight.

  • Maximum number of selections in an info package

    Hi friends,
    i want to load an ODS with data from MSEG. Due to the great number of records I've to select by
    0ATERIAL. Selection criteria are provided by a routine I'll write for this selection, reading a different
    ODS. Estimated number of records for selection is about 80,000.
    My question:
    Is there any restriction regarding the number of selection criteria of an Infoobject in info packages?
    Will a selection work with 80,000 criteria?
    Any input is highly appreciated.
    Thanks in advance and regards
    Joe

    Hello,
    If I understood correctly...you will compare the values from a DSO and then pass these values in the infopackage selections..
    but how are you planning to do it...will it be interval or single value??
    Also I think you can assign only one value or range in the infopackage at a time for selection through routine...
    More the number of selections more the number of AND in the where clause.
    I am not sure if there is any limitations on where clause but after 100 selection the select queries become complex and overflow the memory...so thats the limitation.
    Thanks