Infoobject change in Production

Hi
We are in production. Now i want to change an infoobject Material Number, by attaching another char, Marketing Line as Nav.Attribute. Marketing line gets its data from a derivation, not extracted directly from R/3 like other chars (material no,...)
so will this impact my Production objects anyway ?
because i am just adding a object. not deleting it.
Anything can go wrong ?
thanks
venkat

Hello,
I believe not.
You just add a new characteristic as a nav. attribute and feed that attribute by a non SAP extractor.
Then you can use that nav. attribute whatever you want (in InfoProviders and queries).
Diogo.

Similar Messages

  • 0MATERIAL's attribute infoobject change

    Hello All,
    Currently 0MATERIAL infoobject has attribute ZXYZ (CHAR 60) and data is populated in it.
    This ZXYZ is already used as navigation attribute in lot of Infoproviders.
    Now I want to replace all the actual values in ZXYZ. And also I want to change the datalength of ZXYZ (from say 60 chars to 10 chars).
    I followed some procedure and it's working, still want to confirm if it's safe to change an infoobject property from 0MATERIAL.
    Steps I followed in Development:
    1) Nullify the values sitting in ZXYZ attribute of 0MATERIAL. (So now ZXYZ master data can be deleted)
    2) Deleted master data from ZXYZ infoobject.
    3) Change the length from CHAR 60 to CHAR 10 for ZXYZ infoobject.
    While changing the length, it asked me to adjust several database tables where ZXYZ was used. One of the table was /bi0/PMATERIAL which is a master data table for 0MATERIAL.
    Database Utitility will adjust the tables when any of the field property from that table is changed.
    Do any one of you see any issue if i transfer these change to Production?
    I have not done this earlier, so if anyone has done it earlier, please share your experience?
    Thank you,
    Sarkar

    Somehow it screwed up the material P table. It shouldn't have happened ideally.
    But after opening the Q system and trying to activate the infoobject manually, system poped up a message to activate and adjust the P table, gave a warning it may completely or partially delete the data in P table and i continued.
    All records in P table (attributes) were missing, SID's for those material were still available. Reload of these materials works fine since SID's are still available.
    I'm not going to send this High Risk transport to Production.
    Regards,

  • Infoobject change for extracting texts data.

    Hi BW guys,
    Here is my requirement.
    I have one info object 'salesmen', which is already used in some other ODS & Cube's.
    Now I want to extract texts data for the object 'salesmen', for that I will need to change my infoobject (changes are : adding credit control are object under compounding).
    But while i am activating the info object again it is giving errors.
    Error messages:
    1) InfoObject XXXXX (or ref.) is used in data targets with data -> Error:
    2) Characteristic XXXXX: Compound or reference was changed
    3)InfoObject XXXXX being used in InfoCube XXXX (contains data)
    etc....
    But i don't want to delete the data in any data target.
    Is there any way to solve this problem?
    Thanks in advance......

    Hi,
    If you have not many cubes and ODSs with this salesman, you can consider another, beter, but more time-consuming way.
    1. Create a new IO for your salesman, add a compounding attribute as you want.
    2. Load master data for the new IO.
    3. Create copies of your infoproviders.
    3. In each of them delete an old salesman IO and insert a new one.
    4. Create export datasourses for old cubes.
    5. Create update rules for new data targets based on old ones.
    6. In URs map your new IO with the old one. All other IOs should be mapped 1:1 (new<-old).
    7. Reload data targets.
    That's all.
    The way I proposed earlier is less preferrable. Because anyway you'll have to change loaded into data targets data. And in this case it's better to change data model as you want.
    Best regards,
    Eugene

  • Assembly to order: change in sales order with change in Production order

    I want to activate change in the sales order data when a production order(which is created w.r.t the sales order) data is changed (Strategy 82 used); I have de-activated "No Update" for the corresponding requirement class 201; also the material for which SO created ,is not a part of any Delivery group.
    But when I am changing the production order (date/qty.), SO isn't getting updated accoringly.
    Please tell me the reason why it isn't happening!!

    Hi
    The sales order requirement can be made as the production order receipt once you save the order in the system.
    so it is possible to change the receipt according to the sales order reqmt if any changes made in the sales order,
    in every entry or changes in the sales order ( if you use the stategy 82) . in back end system explode the BOM and the create the production order as per the order reqmt,
    even while you do the changes mad in the sales and save that time sytem re explode the BOM once again and change the production order qty.
    but if you change the production order , system not re run or explode the BOM , Routing . such setting is not made in the system . so obviously updation will not happen for the sales order .
    Edited by: raj on Jun 9, 2009 11:22 AM

  • BADI for changing the product cost

    Hi All,
    My requirement is to change the product cost when the costing engine is running via ck11n or ck40n. Iam looking for user exits and BADI's for this requirement.
    I did look into the BADI DATA_EXTENSION_CK but this particular BADI does not have export or changing parameters. Can anyone suggest any user exit or BADI's for this requirement. I also looked into other BADI's like
    CK_KALAMATCON2_CI
    COSTINGRUN_CK
    COST_APPORTION_CK
    CO_PROD_COSTING_CK
    DYNPRO_EXTENSION_CK
    ORDER_COSTING_CK
    QUANTITY_STRUCT_CK
    SUR_STOCK_TRANSF_CK
    VALUATION_CK
    But none of them served the purpose. Plz help...Thanks in advance...
    Regards,
    Nirmal.

    Hello,
    Will this help?
    Product costing with Enhancement (Valuation variant with User Exit)
    Cheers,
    TD

  • CO-PA Realignment: Changes in Product Hierarchy

    Hello all,
    We have changed the product hierarchy on some of our materials and we want to realign the PA data to reflect the same.
    Our product hierarchy which we have three levels is maintained in KES1. There are no derivation rules. KES1 is updated manually everytime any changes occur.
    For example:
    OLD
    Product: 1-189-01
    Hierarchy 1: 100
    Hierarchy 2:A7300
    Hierarchy3: B56220
    So on the material master the prod hierarchy is 100A7300B56220
    NEW
    Product: 1-189-01
    Hierarchy 1: 125
    Hierarchy 2:A7500
    Hierarchy3: B56120
    I tried using KEND for realignment and this does not change anything. Any help, how to proceed with the realignment is appreciated.

    Hi Anusha,
    Did u also update PH level in KES3 - in specific hierarchy variant ? Also would like to know how did u reset the operating concern
    Thanks,
    Samik (SAP MM)

  • IDoc creation on save and change of production order

    I am looking for a way to create, and send if possible (if not I'll send with a batch job), on the save (creation and change) of production orders.  This will be a modified LOIPRO iDoc.  Currently we have a customer exit on the save of the production order but because it is before the save we must predict the number of the prod order.  This has worked but now we are creating one production order per line item in a sales order (automatically) so this is causing us to predict the same production order number twice.  We need a way to automatically create and send an iDoc for all production orders for given plants.  Right now the solution we are looking at is creating an output type and running through those output types a few times a day, sending them down to the Shop Floor system (proprietary system). 
    Is there anything setup in SAP that we can utilize?
    Regards,
    Davis

    Hi Rick,
    Follow the below sample steps for changing component quantity:
    DATA:
        l_methods TYPE bapi_alm_order_method,
        it_boperations TYPE STANDARD TABLE OF  bapi_alm_order_operation_e WITH HEADER LINE,
        it_components TYPE STANDARD TABLE OF bapi_alm_order_component_e WITH HEADER LINE,
        it_components1 TYPE STANDARD TABLE OF bapi_alm_order_component WITH HEADER LINE.
    1. Call BAPI :BAPI_ALM_ORDER_GET_DETAIL , it will give existing order component details.
    CALL FUNCTION 'BAPI_ALM_ORDER_GET_DETAIL'
        EXPORTING
          number        = <production order number>
        TABLES
          et_operations = it_boperations
          et_components = it_components
          return        = it_bapiret2.
    2. Move it_components to components table compatibel to BAPI "BAPI_ALM_ORDER_MAINTAIN".
    LOOP AT it_components.
    MOVE-CORRESPONDING it_components TO it_components1.
    _*"Note here while moving change the component quantity"*_
    APPEND it_components1.
    CLEAR it_components1.
    ENDLOOP.
    3. Build the methods table for change production order :
    it_methods-refnumber = v_refnumber.
                it_methods-objecttype = 'COMPONENT'.
                it_methods-method = 'CHANGE'.
                it_methods-objectkey = v_objectkey.
                APPEND it_methods.
    "Note v_refnumber has 1 to 1 relation ship with the components table, if you want to change First component in it_components1 then you have to enter value '1' here for v_refnumber.
    it_methods-method = 'SAVE'.
            APPEND it_methods.
    4 . Call
    CALL FUNCTION 'BAPI_ALM_ORDER_MAINTAIN'
              TABLES
                it_methods   = it_methods
                it_component = it_components1
                return       = it_bapiret2.
      CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'.

  • TWO Changes In Production System

    Hi , there are two changes in Production system,
    one is there is a report i have to do some modification in PROD,for this have to do in DEV,QA,PROD Respectively , here whether i have to use old request to new one , is this is the right practice or not,
    second in  transfer rules there is a conversion routine , i have to do some modification , How can i do like once again DEV,QA,PROD
    Hope u understand the problem
    With Regards
    MAHI

    Hi,
    Normally we dont have any authorization for changing the objects directly in production.
    You need to make the required changes in Dev and then move to Quality and then to Production. Hence you need to create a new requrest for all the changes you made in Dev and move to Quality and then to Production.
    Hope this helps.
    Regards,
    K.Manikandan.

  • How track changes in production order which is already Read PP master data

    Hi Gurus,
    Due to some unavoidable reason my client has to do Read PP master data time and again, now my client having a requirement that want to see what has been changes in Production Order.
    We already created 1 report for that which tracks whatever has been changed in Production Order but having a constraint in it.  That It could not be able to distinguish to which order READ PP MASTER DATA done.
    So my query is how to map that in report. As sytem Status directly changed to CRTD phase.
    Any table which can track the changes once the order been through with READ PP MASTER DATA?
    As there are huge number of Production Order so we can go and open each order to see the Status changes in each and every order.
    Hope to get a reply soon.
    Regards,
    Sap User

    Hi,
    A suggestion:
    Change the specification as, log changes at each save instead of Read PP Master Data, as the changes would become effective only upon save. So if this is acceptable then 2 options, 1. Go with OCM feature or 2. Refer note - 390635
    Revert if you face any issues.
    Regards,
    Vivek

  • Vendor name is deleted after the approver changes the product category.

    Hello,
    We have implemented workflow WS14000044(Completion by Purchaser) and
    WS14500015(Item-Based Main WF).
    At workflow WS14500015 level, when the approver changes the product
    category, the vendor name is deleted.The previous validation allows the
    PO creation , But the PO is created without vendor.
    Furthermore under transaction process purchase orders 'BBP_POC' the
    purchaser can not access in change mode to the vendor field in order to
    add a vendor.
    How can we give access in change mode to the vendor field for purchaser in transaction 'BBP_POC' ?
    Regards,
    Lina

    Hi,
    Which SRM version are you working on?
    Please see if the foll notes help:
    <b>801591 Source determination after item change</b>
    881346 Vendor incorrectly deleted
    873972 Sources of supply in the shopping cart with catalog items
    908178 Transferring reference: Deleted vendor
    Note 829652 - Completion workflow in shopping cart: Vendor
    789087 Changed product category: Vendor not deleted
    BR,
    Disha.
    <b>Pls reward points for useful answers.</b>

  • Mass change on production order (assembly type) to put deletion flag status

    Dear all,
    I've make a mass change on production orders to settle the status DLFL through the Tcode CO78.
    Some of the production orders  are "assembly order" type. Those could not be up-dated with the DLFL because there are linked to customer order. The customers orders are closed.
    What can I do to change the status for this kind of production orders. It is necessary for me to be able to put the DLFL status in order to improve the process of production closure done each month.

    Hi kiran 
    Thanks for the response. As I cannot put deletion indicator on the Assembly order directly, Do we have to put deletion indicator on the sales order item?. If so, Can we put a deletion indicator after the sales order was delivered and invoiced. What exactly have you guys done to put deletion flag on the production order.

  • Changing a production order with CLOI_CHANGES_UPL_31

    Hello All,
    I try to change a production order with the function CLOI_CHANGES_UPL_31 with RFC in .Net.
    The header data is working fine, and i can change the date with this function. But if i try to change the position data i got no message back, but the date is not changed. Is there any customizing to do? And what about the Field "METHOD"?
    Best Regards,
    George

    check the SUCC_CODE - suceess code field, is it configured properly?

  • Code changes in Production system.

    Hi all,
    Due to the unavailability of the development and quality i want make code changes in production system.
    Please tell me is this possible and also i want know that does it effect or not?
    Regards,
    Ramprasd

    Hi,
    For editing in PRD system, u need to get authorization for editing. To get auth object, contact basis.
    But proper way to edit a code is modifying in DEV, then transport it to QAS & PRD.
    Regards,
    Prem

  • Changes in Production Orders

    Hi gurus,
    I want to track changes made by end users in the production orders in a report format. Which will tell what was old value and what is new value.
    What needs to be done for this?

    Dear
    Changes in Production Order can be  traced through following ways :
    1.Order Change Management :
    Frist a Overall profile should be configured in SPRO > PRoduction>Shop Floor Control > Operations>Change Management for Production Orders-->Define Overall Change Profile.
    Create a Change Number CC01 with Release Key
    In Object Types select/tick "Actv", "object", "MgtRec",
    You get the Change Number by Saving .
    Use this Change Number to Change BOM or Routings
    Then Release the Change Number useing Release Key till then you don't find the Change of BOM in Production Order.
    Then go to Oder Change Process T Code :- COCM
    Tick Change Number and Select the Change Number & Execute
    Select the Production Order, click on Procurement element icon you get another screen select and execute again.
    You get an Pop-Up screen. "Determine changes, Check changes, Change Original Order.
    you see the changes in BOM for Production Order i.e. after COCM.
    Then Confirm the Changes in Production Order then New changes will be Active in production Order.
    Use COCM1 to find out the details or CO03--Extra --change
    Please check link  : http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PPSFC/PPSFC.pdf
    2.To  get the changes in Production Order apply SAP Note 390635.
    3 .You can use T.code AUT10 to check the changes made to production orders in specified period.
    Regards
    JH
    Edited by: Jiaul Haque on Nov 28, 2010 2:11 PM

  • Changes in production order/Process order

    Hi Experts,
    Very much hopeful that I will get solutuion of below:
    How or where to see changes done in production / process order.
    e.g Suppose I have created one production order. Then release it in CO02. Then I changed order quantity from 100 to 200 ( Earlier it was 100 ). Then I delete one BOM component from order. Then I changed finish date of order.
    Pls tell me how to track these changes. What configuration need to track these changes. Please tell me step by step procedure.
    I have read related thread in sdn itself but not satisfied.
    Please help.
    Regards,
    Vipul

    Hi,
    For tracking in changes of Production / Process Order, you need to activate Order Change Management (OCM). After activating the same, you can view changes of Production  order in CO02 / CO03.
    for more details of OCM go through following link :
    [Order Change Management (OCM)|http://help.sap.com/saphelp_erp60_sp/helpdata/en/a5/63198843a211d189410000e829fbbd/frameset.htm]
    Hope this helps.
    Regards,
    Tejas

Maybe you are looking for

  • Recovery mode is not work

    Hi, I'm trying to go to the recovery mode of my Muvo TX usb 2.0, but it is not working. Is de procedure for the Muvo TX the same as the Muvo 2? I read the topic about the recovery mode, but?I can't succeed. Or does someone has another solution for my

  • Can someone help with settings on WRT54G on a bridged modem?

    I have a motorola 2210 modem, and I know that in order for you to bridge it, you have to go to 192.168.1.254 and change the PPP settings. Now, can someone who ahs done this walk me throught the modem and router setup in order of what they did. I just

  • Can't get rid of first line indent

    I am fairly new to InDesign. I have a text box in which I want to have 3 centered tabs. The first line, whether tabbed to 1st tab stop or not, is indented approximately 1/2 inch. No indent displays in the paragraph format window or in the tab stops w

  • Mobile Procurement

    We are going to install a demo of the mobile procurement. But i can't find any good information on witch release to use. We have SRM server 5.0, EBP 4.0 running on a WAS 6.40. And MI 2.5 Is the mobile procurement 3.0 released? Where can I find the do

  • Adjusting Volume Levels in Track Volume Editor Question

    I have started to experiment with the track volume editor available in the track mixer ... I set some graph points and adjusted the volume of a track in various areas .. It all worked great ... Then I noticed I did not have access to the track volume