INFORECORD VALIDITY EXPIRES TO BE CONTROLED IN PO

Sir,
ply help me if the validity of inforecord expires in a po.i want to control in a po.
the issue is i have already made all fields grey in a po so price will automatically willbe taken from inforecord
but in case validity expires without intimation it will be taken from last po which i dont want...
ply help me for the solution
regards
amey

Hi,
As you mention validity period of info record get expire then system will pick the price from last PO ,it is standard procedure.
As po is time independent document, so it can't store the conditions for a valid time period.If system does not have the valid inforecord then system searches for the other documents like contract, quotation etc or schedule agreement depending on the document type settings and then referece it in the PO.If system didn't find anything then price will be populated from Last PO.
To avoid to do so :
Please extend the validity period of Info record.
You can create new condition record for the same.
AMIT

Similar Messages

  • JRE Cache ignores the "Expire" and "Cache-Control: no-cache" directives.

    My applet is using HttpURLConection to retrieve data from a server with Caching enabled. The cache contents are "revalidated" (via "if-modfied-since") each time the applet is started. However, subsequent requests to retrieve the same resource are always read from the cache with no validation even if the resource has expired.
    The server is sending a valid "Expires:" tag and "Cache-Control: no-cache" tag in the response; but, the JRE refuses to recheck for an updated version of the resource even after the file has expired.
    The JRE does seem to understand the "Cache-Control: no-store" tag; but, this is inefficient (no caching at all) when I'm tring to get it to not refetch the resource unless there's a change. Is there some other tag that the JRE is expecting to see?

    I have a similar problem except that I want my pages to not cache at all. The server is setting the Cache-Control: max-age to 0 and the Expires to "now" but JRE seems to ignore these settings, but only sometimes. Sometimes pages are fetched from cache and sometimes from the server.
    In my applet I'm using a normal URLConnection like this:
    URLConnection uc = new URL("http://<server>/method").openConnection();
    uc.connect();
    InputStream is = uc.getInputStream();
    is.read();When my request headers look like this:
    accept-encoding: gzip
    Host: <server>
    Cache-Control: no-cache
    Pragma: no-cache
    User-Agent: Mozilla/4.0 (Windows XP 5.1) Java/1.6.0_13
    Accept: text/html, image/gif, image/jpeg, *; q=.2, */*; q=.2
    Connection: keep-alivethe page will not be cached and is requested again but this time without the accept-encoding, Pragma and Cache-Control. The adding (and removal) of the headers seems to happen inside the JRE, though. I'm not explicitly setting them.
    The response header of the first request looks like this:
    HTTP/1.1 200 OK
    Date: Wed, 20 May 2009 12:55:07 GMT
    Server: Apache/2.2.11 (Win32) mod_jk/1.2.26 PHP/5.2.8
    Cache-Control: max-age=0
    Expires: Wed, 20 May 2009 12:55:07 GMT
    Vary: User-Agent,Accept-Encoding
    Content-Encoding: gzip
    Keep-Alive: timeout=120, max=79
    Connection: Keep-Alive
    Transfer-Encoding: chunked
    Content-Type: text/html;charset=iso-8859-1When the request is made with this header:
    User-Agent: Mozilla/4.0 (Windows XP 5.1) Java/1.6.0_13
    Host: <server>
    Accept: text/html, image/gif, image/jpeg, *; q=.2, */*; q=.2
    Connection: keep-aliveThe response headers looks like this:
    HTTP/1.1 200 OK
    Date: Wed, 20 May 2009 12:55:07 GMT
    Server: Apache/2.2.11 (Win32) mod_jk/1.2.26 PHP/5.2.8
    Content-Length: 1016
    Cache-Control: max-age=0
    Expires: Wed, 20 May 2009 12:55:07 GMT
    Vary: User-Agent,Accept-Encoding
    Keep-Alive: timeout=120, max=83
    Connection: Keep-Alive
    Content-Type: text/html;charset=iso-8859-1And in this case the JRE sometimes fetches the request from the server and sometimes from cache. I have not been able to determine how the JRE decides to refresh, or why it sometimes sends an accept-encoding and Pragma header and sometimes not.
    any help would be appreciated.
    Alex

  • Inforecord validity

    Dear all,
    my client using validity in inforecord, he wants report that shows all the expired inoforecords.
    is there any standard report that shows the validity period of the inforecord (expired validity dates)
    Regards
    venu

    hi,
    > Check the table AO17...here see for the validity field as DATBI.....
    ME1M does show for the Validity period...but show for the 'Valid to' but not expired one...
    You can see here ...
    Hope it helps...
    Regards
    Priyanka.P

  • Background job cancelled due to user validation expired

    Hi Experts,
    One background job is cancelled due to user (owner of the job) validation has been expired. This job is executing for every 1 Hr.
    I don't want to change the user id validation at this movement.but i want to change the owner of the job.
    Please let me know how can change the owner of this background job.
    Regards,
    Reddy V.

    Hi kaushal,
    Thank you for your valuable information.
    I Followed the same below mentioned steps.i.e  I changed the user name and after this i deleted this job from old user. But now this job is not executable with new user id.
    i.e In SM37 T.code > Entered the job name and New user name>Selected all job status but it showing below message
    No job matches the selection critera.
    Please let me know how can i execute the same jod with new user id.
    Regards,
    Reddy V

  • Inforecord Validity to be changed

    Sir,
    Ply help me out in changing te "Valid to" fileld which is in inforecord
    Field Name "EINE-PRDAT"
    Regards
    Amey

    Hi Amey ,
    Inorder to change the validity to in Pur.Org Data 1 , u need to click on Conditions button.
    Then change the valid t , save the changes .
    This will automatically get updated in the Pur.Org Data screen.
    Regards
    Ramesh Ch

  • Validation Account in Process Control

    Hi,
    Every time I try to enter in Process Control in a application in HFM 9.3.3 receive this error:
    "Cannot perform process flow action because the Validation Account is invalid. ALL cannot be specified as a top member for the Validation Account."
    Can anyone help me, please?
    Thanks

    In fact, they are clear, but in all accounts the property SubmissionGroup is set with 1 as default. And the other apps that work in this same environment have an account assigned to the property ValidationAccount. The question is: Isn't it mandatory to have an Account assigned to this property to access ProcessControl?
    Thanks again.

  • Auto E-mail- if condition record validity expires.

    Dear Friends,
    Is there any way to configure in the system to mail automatically when the validity of the condition record expires.
    Regards,
    Hari.

    Passage of time is not an event.  You will have to schedule a program that runs every day (or week or minute or..) that compares SY-DATUM to the TO-DATE of the condition record. If any are found to have expired, you can email those condition records.

  • Function for column validation in SQl Loader control file.

    Hello Gurus,
    We have an requirement to create a function to validate all date and number columns in control file, and return 0/1 accordingly to valid_column which is last column . I have developed the function which accepts the number and date type columns as parameter and return Y/N. My question is, is there any way so that the function could be created without passing any parameter to it?
    If yes, then how to call the function in control file?
    I have been searching since a while on Google to find out any solution but could find out.
    Using Oracle 11g Enterprise Edition Release 11.2.0.1.0
    Thanks!
    Edited by: Sush on Jul 5, 2012 2:23 AM
    Edited by: Sush on Jul 5, 2012 4:16 AM
    Edited by: Sush on Jul 5, 2012 7:28 AM

    Hi Srini,
    I have gone through this document and i couldn’t find out any solution. That’s why i was seeking help from you Gurus.
    Thanks for your help, i think i have learnt few new things abt SQL Loader by studying this document :)
    Thanks!

  • Maintain Validity Date for Mitigation Control Assignment to Users Virsa 5.2

    We have over 1,000 SoD's all mitigated.  The val;idity date for these mitigation controls needs to be updated.  Does anyone know a way to perform a range of updates so it is not necessary to update each user assigned to a Mitigation Control.

    The only way to do that currently would be to download the table information, edit in Excel and re-upload the table.
    Not for the faint of heart, but doable.
    Frank.

  • Is "AutoPostback" property valid for Radio button control in RCDC

    Hi,
    I have been trying to add "Autopostback" property to a radio button control, but it doesnt seem to be working.
    Below is the code:
    <my:Control
    my:Name="Activation"
    my:TypeName="UocSimpleRadioButton"
    my:Caption="{Binding
    Source=schema, Path=ADActivation.DisplayName}"
    my:Description="{Binding
    Source=schema, Path=ADActivation.Description}"
    my:AutoPostback="true"
    my:RightsLevel="{Binding
    Source=rights, Path=ADActivation}">
    <my:Properties>
    <my:Property
    my:Name="TrueText"
    my:Value="ADActive"/>
    <my:Property
    my:Name="FalseText"
    my:Value="NotActive"/><my:Property
    my:Name="SelectedItem"
    my:Value="{Binding
    Source=object, Path=ADActivation, Mode=TwoWay}" /></my:Properties></my:Control>
    Dolly

    Dolly,
    What do you expect the AutoPostback property to do?
    AutoPostback: This is an optional,
    Boolean-type attribute. The default value is false.
    If set to false, refreshing
    the page may not refresh the control. For information about AutoPostback,
    look for the Microsoft ASP.NET UI control property of the same name. -- FIM RCDC Reference
    According to MSDN:
    Set this property to true if the server needs to capture the selection as soon as it is made. For example, other controls on the Web page can be automatically filled depending on the user's selection from a list
    control.
    This property can be used to allow automatic population of other controls on the Web page based on a user's selection from a list.
    Blain Checkley illustrates its use with his blog post: http://identityminded.wordpress.com/2011/10/14/fim2010-semi-dynamic-rcdc-operations/
    David Lundell, Get your copy of FIM Best Practices Volume 1 http://blog.ilmbestpractices.com/2010/08/book-is-here-fim-best-practices-volume.html

  • Validity period mitigating control

    Hi,
    I checked this forum but didn't find any helpful thread for my question. We are using GRC version 5.3. Is there any SAP report or tables available that would show history of mitigating controls per user? In running the Compliance Calibrator for a user, SOD issues were present that we didn't expect because we thought existing mitigating controls were applied and that we were  regularly monitoring this user for the associated risks. We thought that the problem might be that the validity period might have expired, but our corporate security group currently doesn't even show the mitigating control for the user. I wanted to look at the history of the mitigating control for the user to see if I could validate their claim.
    Thanks,
    John

    Hi,
    First of all, there's a special forum for GRC: "Governance, Risk and Compliance".
    Check under RAR-> configuration tab:
    Default expiration time for mitigating controls (in days) 
    When assigning a mitigating control to a risk, you must specify the validity period of the controlIf the End Date is left blank, the value in this option is used to calculate the end date of the validity period; the default value is 365 (days)
    Check also under CUP->configuration->mitigation.
    You'll be able to find the documentation for this configuration parameters in the corresponding Config Guide.
    Regarding Mitigation controls per user, I guess you can just check RAR -> Mitigation tab.
    Cheers,
    Diego.

  • Mitigation control ID validity extension -easy way

    I work in GRC AC 5.3. All Mitigation control IDs have a validity expiration on same date in near future. Our GRC has many mitigation control IDs with mitigated users. How can I change the valid to date in convenient way?
    It may be extended for all mitigated users separately/individually, but it will take huge time.

    You can download all of them in a text file, make changes and upload it back via the import/export utility under mitigation tab,
    Alpesh

  • Help needed to take control back from sqlplus for expired password

    Hi,
    I am executing the following line for Oracle 11g in Windows from my application
    sqlplus -L "aaaa"/"aaaa" @connectonly.sql >>"D:\tempDBlogs\connectonly.log"
    connectonly.sql file contains the following code:
    whenever sqlerror exit 1
    whenever oserror exit 2
    exit
    This piece of code executes fine for both correct & incorrect userid & password and gives proper messages. Now the problem is when password of the user in DB gets expired. The controls waits for user input. But my problem is I am runinng this code from an application which waits for sqlplus.exe to end, as it can't proceed without validation. But sqlplus runs as background process and the command prompt never comes to user. Moreover I dont want to give the user the option to change DB password from my application front end.
    So I need to find a way so that if password is expired sqlplus will return the control and will not wait for user input. Or atleast my application gets to know that the password is expired so that it can kill sqlplus process.
    Can somebody help me in this.

    interesting question. I tried something on unix and this seems to work. I simply piped a line through this which leads to an error with the expire-prompt and doesnt do any harm when there is no such prompt:
    oracle@oracle:~$ echo "" | sqlplus brost/secret @test.sql
    SQL*Plus: Release 10.2.0.1.0 - Production on Tue May 19 10:18:36 2009
    Copyright (c) 1982, 2005, Oracle.  All rights reserved.
    ERROR:
    ORA-28001: the password has expired
    Changing password for brost
    New password:
    Retype new password:
    ERROR:
    ORA-00988: missing or invalid password(s)
    Password unchangedSomething similar should be possible on windows. Of course, the real solution would be flag for sqlplus that makes it absolutely non-interactive.

  • CoCd validation in controlling area

    Hi Gurus,
    I want to activate CoCd validation checkbox in the controlling area using OKKP.
    This controlling area I want to change is active for some years.
    When i try to do it, I get a critical warning message although it's possible (because the co.area is active).
    I have also the option to do it as of date, and open a new record from 2010 year with this indicator.
    What option is preferred?
    Can you see any problem with any of these options?
    Thanks
    Ofer

    HI Eugene,
    Thanks
    This is the messege I get:
    Critical transport: Control indicator in controlling area
    Message no. KT364
    Diagnosis
    You want to transport the control indicators in controlling area . These indicators include All currencies. Transporting this indicator can result in serious data inconsistencies in the target system, if:
    As a result of the transport, the indicator is changed in the target system and
    In the target system, you already planned or made account assignments to CO objects (cost centers or orders for example).
    Procedure
    If the target system already contains transaction data for CO objects from the controlling area, you should carry out the transport only if this does not change the indicator in the target system.
    You can check the indicator in the Implementation Guide under:
    Controlling -> General Controlling -> Production Start-Up Preparation -> Set "Update All Currencies" Indicator.
    Choose Display indicator.
    Note
    Not that the entries displayed are the fiscal years as of which the indicator is active or inactive. This status holds until a new entry is made.
    Examples
    The target system already contains control indicators for 1994, 1997 and 2003. The following validity periods then exist:
    Control indicator for year Validity period All currencies
    1994 1994 - 1996 X
    1997 1997 - 2002 X
    2003 2003 - 9999 X
    If the source system also contains an entry for the fiscal year 2000, for which the indicator is inactive, transporting the indicator would lead to the following:
    1994 1994 - 1996 X
    1997 1997 - 1999 X
    2000 2000 - 2002
    2003 2003 - 9999 X
    In other words, for the period 2000 - 2002, the indicator would not be active in the target system.
    Procedure for System Administration
    Thanks
    Ofer

  • Table control Validation

    I have worked in CT04 transaction. In that if we specify the character type (Eg . Characetr Foramt) & enter the number of characetrs as 3 means in value tab it wont allow as to enter value greater than 3. It wont show any error message but it restrict the cursor(the cursor wont move at all)
    I want to do this kind of validation in my table control.
    I debugged the program also But not able to get it.
    Main program is SAPLCTMV and screen number is 1200.
    The table control field is CAWN-ATWRT.
    Can any one help me to solve this problem.
    Thanks in advance.

    write the code on PAI of ur screen to popup a error message if some condition for a particular field of Table control fails as follows -
    PROCESS AFTER INPUT.
    LOOP AT ITAB2.                "ITAB2 is the table for table control.
        module read_table_control.
      ENDLOOP.
    module read_table_control input.
    if itab1-pernr eq '00000022'.
        message w000(000) with 'Enter other value than 22'.    "this is error message
    else.
        MODIFY itab2 FROM itab1 INDEX tabcontrl-current_line.
    endif.
    endmodule.                 " read_table_control  INPUT

Maybe you are looking for

  • Cannot install Office 2013 during task seqeunce after installing R2

    Hi, Since we installed SCCM 2012 R2, I have not been able to install Office in my baseline captures using a task sequence (64-bit OS). Ronni Pederson suggested using an Application rather than a Package but in his example, the application is being pu

  • Question: Quick Look in Finder; problems with alpha channels

    Hi "Quick look" in Finder is great for quick presentations of a folders selected contents but it only works with images that contains no alpha channels or masks. Is there any way to work around this to display say PhotoShop documents with alpha chann

  • Object builds not working correctly

    I have three objects that I would like to have dissolve out sequentially. Object one is set to dissolve out on click. Object 2 is set to go out automatically after build 1, and object 3 is set to go out automatically after build 2. Deliver is set to

  • Changing withholding tax base

    Hi Friends, Need your help again. Using T. Code FB09, i can change WHT base as long as the invoice is not cleared. However, how to change WHT base where a particular invoice has been cleared? I have actually made some changes to configuration(OB32) w

  • Fusion-icon error: glxinfo not installed. [SOLVED]

    Hi,  I am running gnome at the moment and I am trying to get compiz and emerald started.  I type into the terminal: [semperfiguy: ~]$ fusion-icon * Detected Session: gnome * execution of "which glxinfo" failed * Error: glxinfo not installed! And I ge