i assigned 03 inspection to a material but forgot to assign inspection characteristics, lot has been created at the time of the creation of production order. now i want to do the inspection but there is no assigned characteristics. i have assigned characteristics to that material in routing but how to get the effect on that lot to get the characteristics without changing order
is there any option plz guide me

Dear Nasir,
You have to try to read the Production Order master data through Production Order --> Functions --> Read Master Data. This is the way you can reset your lot Because In process inspection lot is attached with Production / Process Order. Other wise cancel the production order and create the new one. I hope this will work.
Best Regards,
Ibne Khalil

Similar Messages

  • In inprocess inspection lets say the production order qty is 20. i would want only 1 no. to be inspected while inprocess inspection is configured. kindly guide. Regards,Mathew

    In inprocess inspection lets say the production order qty is 20. i would want only 1 no. out of the 20 to be inspected while inprocess inspection is configured. kindly guide.
    Thanks in Advance
    Regards,
    Mat

    Hi Mathew,
    Create sampling procedure with fixed sample and give sample size = 1. Assign this sampling procedure for the characteristics of the in-process materials in Routing/Master Recipe etc. For sample size calculation at-least one characteristic should be required characteristic for the Material.
    Thanks&Regards,
    kumar

  • Inprocess inspection mapping

    Hi,
    I am working on inprocess inspection. Requirement is like this.
    Material is having 6 operations. During the 3rd operation two inspection characteristics need to be checked at regular intervals. So I have activated inspection type 03 in the material master QM view and i have assigned these two inspection characteristics to 3rd operation in the routing of the material. Now these inspection characteristics need to be checked repeatedly after completion of production of 25 Units till the end.   so in the routing header i have assigned Insp. Points as 990 Test point: Container, date and in the routing in the 3rd opeartion details in the QM inspection points tab I have activated qty related and given qty interval as 25 units and Insp.pointCompletion as automatic valuation based on inspection point definition.
    Now I have created a production order for the material 150 units and released the order and inspection lot got generated.
    Now confirmed the first and second opeartions with full qty as 150 units with CO11N transaction. Now when I do the partial confirmation for 3rd operation for qty 25 untis system should Automatically generate inspection point and allow for results recording of the inspection lot and when i do again partial confirmation of 25 units next time it should create another inspection point and allow RR and this should go on till total confirmation of 150 untis ( total 6 inspection points 125/25=6 for the inspection lot). How to map this.. I am unable to proceed further. Actually how it is generally mapped in the system. Kindly guide me.
    thanks
    Vinamrath

    Inspection points are never automatically generated unless you develop specific FM's and config them into the inspeciton point identifier configuration.  If you go to the FM area of the inspection point identifer you can get quite a bit of help on these and there is internal documentation on the SAP example FM's for this.  I think all the example FM's start with QAPP if I remember correctly.
    Typically you would manually create the inspection point in the 03 inspection lot and enter in the qty of the material being inspected. 
    FF

  • Inprocess inspection reassigning inspection plan

    Hi,
    I generated an inprocess inspection through 03 inspection type. But inspection characteristics where not there in the routing. Later I created inspection characteristics in routing.
    When I tried to assign this task list by resetting sample calculation T Code- QAC3, it is saying confirmation already done.
    Could anyone tell me how can I reset sample calculation and re assign my newly created routing.
    I want to create an inspection lot with MIC's which I updated later or after confirmation.
    I request anyone to help me.

    Hi,
    Follow the below any case for soln.
    Case 1:
    Go to CO02 (Production order change mode) enter order number
    In order over view screen go to Function -> Inspection lot -> Delete and create and save the order. Now system will create the new inspection lot with new spec.
    Case 2:
    Go to Result screen for existing inspection lot click add characteristics icon add character one by one and do the result recording .
    check and revert back.
    Regards,
    S.Babusingh

  • Inspection plan for inprocess inspection

    Hi QM Gurus
    please let me know can I use an inspection plan for inprocess inspection
    Thanks
    TR

    Dear,
    Inspection Plan is similar to routing, which will indicate what are all characteristics need to be checked / inspected when you receive a material. Is a master data. Once the inspection lot is created we will check the inspection plan and perform the inspection and give the defects recording and usage decision for the inspection lots.
    So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
    when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1.
    Regards,
    R.Brahmankar

  • Exit For Inprocess Inspection

    Hi All,
    I have an issue regarding in-process inspection. With the inspection type 03 , when process order is created immediately
    inspection lot is created .In this case the system will allow me to carry out conformation after each operation results according.
    i need an exit  like after confirmation only , i should be able to do results recording.How to achieve this . Please let me know is it possible ti achieve through any User Exit.
    Regards,
    Madhu.

    Dear,
    Inspection Plan is similar to routing, which will indicate what are all characteristics need to be checked / inspected when you receive a material. Is a master data. Once the inspection lot is created we will check the inspection plan and perform the inspection and give the defects recording and usage decision for the inspection lots.
    So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
    when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1.
    Regards,
    R.Brahmankar

  • Inspection characteristics based on material and goup counter

    Hi,
        Do we have some function module which would give us inspection characteristics based on material and group counter. I have gone through many posts in this regard but find answers to get inspection characteristics based on inspection lot number.
    I do not want to get into quality at all. Is there a FM to get the inspection characteristics based on material and group counter or any related tables would be of gr8 help. T-code QP03 takes material and group counter as input and displays the inspection characteristics. Any input in this regard would be of great help.

    Hi,
    Use tables MMAPL , MAPL and PLMK as per your requirement.
    Thanks,
    Vijay

  • How to progammatically get Inspection Characteristics from Inspection Plan

    How do I programmatically get Inspection Characteristics from an inspection plan? I am currently getting inspection characteristics from inspection lots via a QM-IDI RFC call (QIRF_SEND_REQUIREMENTS_GET_DAT2), but if the Inspection Characteristic is not in an inspection lot, I don't get it via the RFC call. What BAPI/RFC/IDOCS mechanism can I use from an external subsystem (VB.NET app) to get inspection characteristics (Spec Limits, Target, Operation, Activity) associated with a material in an inspection plan?
    Thanks,
    Ed

    The problem is the SAP system that my external subsystem (VB.NET application using QM-IDI) is interfacing with does not have inspection lots (and the customer is not willing to add inspection lots), so the QM-IDI RFC that I'm using (QIRF_SEND_REQUIREMENTS_GET_DAT2) does not return the inspection characteristics (spec limits, etc) that I require. My customer creates a reference (QP11) with inspection characteristics, then attaches the reference to a Material (QP01). When I try to get the inspection characteristics for the material via QIRF_SEND_REQUIREMENTS_GET_DAT2, I don't get the inspection characteristics because there is no inspection lot associated with the material and inspection characteristics.
    The design is for my external subsystem to do the Material Inspection Characteristic valuation, and then send the valuation results back to SAP. Is there a way to get Material Inspection Characteristics and then send the results back given the SAP setup I described above?
    Thanks,
    Ed

  • Date format in Master inspection characteristics

    Hi All
    I have a requirement where my user wants to enter the date format in the master inspection characteristic. For example we want to add date of manufacture and the date of expiree as a inspection characteristics and during the results recording they want to enter this characteristics in a date format.
    MY question is can we have a master inspection characteristic with a date format, if so what all the settings are required.
    Please suggest.
    Thanks,
    Quantum.

    >
    quantum wrote:
    >Can i use characteristics in the inspection plan instead of the master inspection characteristics. I am using Work bench transaction code CWBQM to create an inspection plan.
    Direct characteristic you can't use in inspection plan. If you want to use characteristic in IP then create chara. (CT04), then assign this charac. as class chanr.(QS21) in MIC. Now you can use this MIC in inspection plan.
    Hope this helps.
    Thanks!!!

  • Cancellation of UD of inprocess inspection lot

    Hi all,
      Can I not do cancellation of inprocess inspection lot  ?....
    partha...

    Hello,
    If you just want to cancel the insp lot then
    GOTO QA12, enter your insp lot no.
    Select usage decision at left top -> Functions-> Cancel lot. But in this case, if insp lot has been processed & stock have moved to unrest. then it will not show in insp stock after this process.
    If you want to transfer stock from unrest. to insp. stock then you have to cancel GRN no.
    GOTO MB01 enter PO no. & Mov type & select the option unrest. in stock type.
    Try it & confirm back.
    Thanks & Regards,
    Anisha

  • Add inspection characteristics to production order created via CO07

    Hi, all.
    We're creating production orders to perform production rework on assemblies using transaction CO07. 
    We have a requirement to inspect and make a usage decision on the reworked assembly.
    Since there is no material at the header level for CO07 orders, the system isn't allowing us to do an inspection because it has no material master QA view to reference.  Although the control key is marked for in-process inspection, the production order still won't allow it.
    I can't add "unplanned inspection characteristics", not can I manually create an inspection lot using QA01. 
    Is there a way to manually force in an inspection for an operation on a CO07 order?
    Thanks.
    Sarah

    Hi,
    We cannot do a inspection for a production order unless it has material assigned to it and the material got QM inspection type relevant to that.
    regards,
    Lenin. A

  • LSMW to Load - Equipment Task List/Operations/Inspection Characteristics

    Hello Experts,
      Any suggestions on standard LSMW load program for this. The Standard batch Input - 0470/IBIP program does not have the option to load Maintenance Package and Inspection characteristics.
    Any other suggestions please.
    Thanks

    Hi Ananthram,
    instead of using the standard batch input program, you could also create a new recording that performs exactly the tasks you need. Mark "Batch-input-recording" and click on Overview. From there, you can start recording your transactions.
    I hope this helps and solves your issue.
    Marc

  • Create Inspection Characteristics

    Hello Gurus,
    I'm developing a program to create Inspection Characteristics from a file (excel).
    I'm using the BAPI <b>BAPI_INSPECTIONPLAN_CREATE</b> but i don't know how to fill the parameters.
    Anyone can help me, please.
    Thank in advance.

    Kindly go to SE37.Enter the name of BAPI n then execute.
    Click on each field coming  and execute. This was you can test your inputs. You can also save your test data .
    This will validate that ur BAPI is o.k n you can ask you Technical team to write a program n assign a transaction to it.

  • QM Inspection Characteristics table

    Hi,
    I am designing Inspection Report for QM Module, the thing is i am unable to find the tables for the data
    1. Characteristic Specifications
    2. Characteristic Results 
    like Characteristic Related complete data. And also can any one tell me what is the relation between Operation & Charaterisitics in the Inspection Processing?
    Like the table used for that !!
    Waiting for ur reply....
    Regards,
    Srinath

    Hi,
    Following is the list of related tables.
    QALS - Inspection lot record : This is the table where you can get all the inspection lot numbers
    QAMV - Characteristic specifications for inspection processing
    QAMR - Characteristic results during inspection processing
    QASR - Sample results for inspection characteristics
    QASE - Results table for the sample unit
    QASE and QASR give the results for individual samples and partial samples
    To get the operation for the particular characteristic, call function module QEEA_READ_SINGLE_OPERATION
    Pass AUFPL from QALS, VORGLFNR from QAMR and PRUEFLOS from QAMR to the function module as shown below.
    The FM returns the value of operation VORNR in structure e_qapo.
    call function 'QEEA_READ_SINGLE_OPERATION'
         exporting
              i_aufpl            = <fs_qals>-aufpl
              i_plnkn            = <fs_qamr>-vorglfnr
              i_prueflos       = <fs_qamr>-prueflos
         importing
              e_qapo_wa    = e_qapo
         exceptions
              not_found       = 1
              others             = 2
    Hope you'll find this useful.
    Regards
    Radhika

  • Config settings for Decimal places in Master Inspection Characteristics

    Hi,
    can any body tell me where to do the configuration settings for decimal places  in master inspection characteristics
    i want my limits to be 1.234
    i want 3 decimals after point
    Regards,
    Raj

    Hi,
    Please go through the below link.
    http://www.freesaptutorial.com/how-to-create-master-inspection-characteristic-in-sap-qm-module/
    While creating the MIC in QS21 after entering the control indicators you will get Quantitative data screen.
    In that screen you can enter the decimal places, UOM, target, lower limits etc
    Regards
    Hari