can any body give to me solution after   inprocess inspection  lot  i want to change specification is there any provision in sap standard  like  01 and  04 inspection type  we are change specification in  change inspection lot

hi
If results are not recorded and operation are not confirmed then do the following
1. goto change routing / recipe -- change the specification
2. go to prod/process order  --read PP master data
then do RR new spec. get reflected during result recording
regards

Similar Messages

  • SAP QM Inprocess Inspection for a specific Process order type

    Dear All,
    There is a requirement. As no QM type is maintained for FG material in a plant. Now the requirement is there is a specific order type for which Inprocess Inspection  is to be activated for all the FG materials. But at the same tie for all other order types there won't be any inspection for the same set of FG material.
    I tried creation Z03 by copying  03 inspection type. But the problem is source inspection is from Production. So Z03 is not confined to only the specific process order but instead it is generating inspection lot for other Process order also.
    Is it possible to create a scenario where we can attach inprocess inspection to a specific order type only.
    Regards,
    Rahul

    Hi,
    You can assign the in process inspection to Order type in SPRO as shown below in the process order type dependent parameters in Planning tab in COR4.
    Check and revert..
    Thanks
    Kumar

  • Cancellation of UD of inprocess inspection lot

    Hi all,
      Can I not do cancellation of inprocess inspection lot  ?....
    partha...

    Hello,
    If you just want to cancel the insp lot then
    GOTO QA12, enter your insp lot no.
    Select usage decision at left top -> Functions-> Cancel lot. But in this case, if insp lot has been processed & stock have moved to unrest. then it will not show in insp stock after this process.
    If you want to transfer stock from unrest. to insp. stock then you have to cancel GRN no.
    GOTO MB01 enter PO no. & Mov type & select the option unrest. in stock type.
    Try it & confirm back.
    Thanks & Regards,
    Anisha

  • Inprocess inspection lot quamtity & Serial number

    Hello,
    Sr. No. is generated after confirmation of sales order.
    The production order is released & the inprocess inspection lot is generated. Production order quantity is 20.
    Now the question is:
    1. Why the inspection lot quantity always appears as '1'.
    2. If in inspection setup, sr. no. possible is checked, then why (or how) sr no.s can be seen automatically during result recording (inspection unit number) field.
    Regards

    Hi Hemant ,
           In configuration for serial No go to spro ->plant maintenance and cutomer service ->Technical Object--> serial No management -
    >Serial No profile -
    > serial no procedure -
    > Qmsl and mmsl  serial No usage should be 3
    so that what ever serial no assign to the GR will coming in the inspection lot and at the time od ud you can select accepted serial no only
    with regards
    Yashodhan

  • What is the BAPI for Inspection lot change - QA02??

    Hi Guys,
    Can anyone tell me plese, What is the BAPI for Inspection lot change - QA02?
    Thanks

    Hello,
    This BAPI suppose to be able to do that for you:
    BAPI_INSPLOT_SETUSAGEDECISION
    Best regards,
    Marcin

  • Inprocess inspection lot

    Hai gurus,
    I had created a first operation as in process inspection for a halb material,where i had given control key
    as QM01 and assigned MIC and and sampling procedure in routing, when i release the production order
    inspection lot is not created, pls guide me where i had went wrong.
    regards,
    sekar chand

    Hai Mr Tejas,
    Thanks for your valuable ideas and my reply as follows.
    1) maintain in Material Master -
    >QM View--->Inspection Set up as
    03 In-process insp. for production order - Maintained as above
    2)In addition, you need to maintain under Detailed Information on inspection type on same tab page:
    Tick the check box Post to inspection stock and then enter.
    Now on main screen, you will find Inspection setup check box is ticked, further you need to maintain
    -  post to inspection stock  check box not available under  detailed information of inspection type, but available at main menu which i had activated.
    3)Under Procurement Data tab,
    Tick in check box : QM proc. active
    and respective control key in QM Control Key field.
    - i had done as per above reply, but inspection lot not created only production order is created with
    status as ILAS  inspection lot assigned
    waiting for your reply
    with regards,
    sekar chand
    Edited by: sekar chand on Nov 25, 2008 7:29 AM
    Edited by: sekar chand on Nov 25, 2008 7:30 AM

  • Usage decision of Inprocess Inspection lot as per batch

    Dear,
    i am doing result recording to inspection point with partial lot and with batch,
    i have some charactristics which is to be transfer to the batches for that i have to do separate Usage decision with every batches
    Is it possible??
    note i have used 120 inspection point.( with shift wise) and partial lot with batches..
    Regards
    Pravin

    You can mkae a UD for the lot, but not by batch.
    The characteristic data should be transferred to the batch after the valuation of each inspection point however.  So your results should already be copied over long before you make the UD.
    Craig

  • Inprocess Inspection - Change of status INSP to REL

    Hi Friends
    How to change the status of Inprocess Inspection lot from INSP to REL?
    Waiting for the response.
    Thanks
    Sachin

    Dear Sachin,
    Meaning of INSP is  you have done result recording, tell me how system will remove it from system. The status will be INSP for that lot until you give UD. This is best SAP practice.
    The in-process insp  lot is generated once you release the prd. order, so pl check with your PP person whether it works  by technically closing that prd order.
    Other option is apply inspection point to that routing, so if needed you can enter other set of results for record.
    Best Regards,
    Shekhar

  • Inspection Lot quantity change (lot origin 03) when Prod. ord. qty changes?

    Hi,
    it seems that for an inspection lot, with lot origin 03:Production, its Inpsection Lot qty doesnt change when the Production order Total Quantity field changes. Only the Actual Inspection Lot changes.
    How can the Inspection lot quantity field of the Inspection Lot be changed accordingly?
    Should the enhancement PPCO0007 be used?and then LOSMENGE (table QALS) =GAMNG (table AFKO)
    Can it be done?
    Thanks in advance

    Hi,
    In that case, you can do it by :
    - Reread the master data of production order(From Menu Bar).
    - The status of production order will be converted from "Released" to "Created".
    - Release the production order again.
    Thanks
    SUMIT

  • Inprocess  Quality Inspection Lot Trigger

    Dear PP gurus,
                when i Release the Process Order the Inprocess Quality inspection lot is generated.
                Sometimes due to cancellation of order or some breakdown of equipment i have to cancel the order so this lot remains as it is.
                 In other case  lot created of next orders confuses Quality persons with current orders lot as i release the next week orders also.(Batchs doesn't help them !)
                so i wanted to know that is it possible that Inprocess inspection lot is generated only after the Confirmation of Process order.
    Thanx in advance
    ACP

    Hi ACP,
    You can get inspection lot after confirmation after confirmation is possible by following way :
    In Material Master QM view maintain Inspection type as 04 (Goods receipt inspection from production) which now you may have maintained as 03 (IN-process inspection) then only you can have inspection lot generated at the time GR means after your operations have confirmed.
    However if it is necessary to maintain inspection type 03 for you then it is evident that quality inspection lot will be generated with the release of process order.
    Pls. check the same and revert if any doubt.
    Reward if useful.
    Regards,
    Tejas

  • Inspection Lot Created but not shown in QE72, and cannot input result or UD

    Hi Exports,
    I have  Inspection Lot Created by 04-production goods receive, but not shown in QE72, and cannot input result or UD
    Inspection Lot status: CRTD CHCR SPRQ,
      in Business Process of inspection lot showing:
    *Cancel inspection lot
    Assign RMA proc. to insp. lot
    Assign notification to lot RMA
    Batch log indicator required
    Certificate missing
    Change inspection lot
    Change planned lot quantity
    Choose task list for insp. lot
    Confirm Receipt of Certificate
    Create part. lot for insp. lot
    Flag cancellation
    Inventory posting required
    Lock
    Lot for process documentation
    Lot reset allowed
    What is going wrong? 
    BTW, the sampling procedure in Inspection Plan is a read-only field, but empty inside.
    Daniel

    Dear in your case there is no Inspection plan was attached to the lot so attach the plan and make lot status to REL then only you can do Results Recording.
    Inspection plan gets auto assigned to availble inspection plan on respective date if you enabled the inspction with tasklist and automatic assignment boxes in relevant inspection types in MM QM view for this Inspction plant should be made avaialble in stsyem before any lot created which can be created QP01.
    If it is not getting assiged automatically then you can assign it manually by QA02 here go to inspection specification tab click on Task list assignment the go to sample tab and click on sample and SAVE Inspection plan will be attached to inspection plan.
    Once inspection plan is the lot status you can see REL before assignment of a plant it would be CRTD.
    Cheers
    KK

  • Process Order Close with Inspection Lots

    At month end we need to close process orders that have not had their usage decison made, generally the inprocess inspection UD.  Is there any way to close these POs without having to enter a usage decision?

    > Hi
    > You can activate the inspection completed status
    > activated for the inspection lots with out making
    > UD.
    > Regards'
    > YMREDDY
    Your suggested solution to being able to flag the inprocess inspection lot as being completed without making a UD, to allow the process order to be closed, sounded very, very interesting, but we are not familiar with the file/record/configuration parameter you noted.  Is there any way that you might be able to clarify your answer, so that we can have our technical team figure out how to implement that change?
    Thank you very much.....this has had us stymied since we went live.

  • Inprocess Inspection Confirmation

    Dear all,
             I have confirmed 2 yield quantity through inprocess inspection lot. Pleae tell me how to reverse that confirmation.
    Thanx & Regards,
    Harish Parab.

    Dear Harish
    For doing this kindly follow the following steps
    1) Go to the inspection lot QA12  > Input the lot number > Enter > go to EDIT > Reset > Inspection completion> Long term inspection will be active > Lot status will change to LTIN
    2) Please go to QA32 >Select the inspection lot > Go to Results> It will ask for  Long term iInspection>click on Assigned inspection point >  select the inspection point were you earlier confirmed > You will get the RR screen > Save > Pop up screen will come > select No confirmation
    This will cancel the confirmation
    Regards
    Gajesh

  • How to create inprocess insp. lot manually

    HI Team,
    I have requirement to create inprocess inspection lot  as & when  required. What are the settings required to do in QM view insp. type.
    I have tried with "Preferred inspection type" set up, but no inspection lot is allowed to create manually in QA01.
    Then I tried with 03 insp. type "Active". But it generated lot for every production order during release of order.
    But my requirement is to create lot during  inprocess production only when it is rejected.
    Pls suggest me solution.
    Thanks

    Hello Bhushan ,
    You can create a insp lot with 03 origin by putting plant & insp origin in QA01 initial screen ....but I will suggest to use inspection origin 89 with relevant setting as per business requirement as you want to create the lots only when material  is rejected .
    Else you can maintain one more insp type say,0301 with insp origin 03. This will help in classifying the inspection lots  which are created for this process & not standard in-process inspection,
    Can you please explain the business scenerio which demands to create lots only incase of rejections .....as to ascertain whether the product is inline with quality standards we need to inspection the same (which requires inspection lot  for lab processing & tracebility)
    Thanks
    Kaushik

  • Inspection lot status BREQ

    i am getting lot status as BREQ - batch assignment required.
    what does it mean? its not allowing me to do the result recording.
    please help.

    Dear Sandip,
    The status that you have mentioned means that batch assignment is mandatory. When the inspection lot was created probably no batch assignment must have happened. This problem i have seen generally when you are making in process inspection against production order, if the batch assignment is not done in production order then a inprocess inspection lot is created without batch and when you try to record the result it asks for the batch number as the material is batch managed.
    This problem will not occur in case of inspection lot created against  good receipt against purchase order or production order, because during the GR, the batch is a mandatory field, and the system does not allow to save the GR (against production order or purchase order) until unless one keys the batch.
    I hope your query has being clarified. Reward points if you feel so.
    Thanks & Regards.
    Santosh Joshi.

Maybe you are looking for

  • Loosing Sub folders on Ethernet drive

    I hope someone has an anwser for this one. I can mount my Lacie 2TB ethernet drive and see all folders. I can open and work with files. Now the frustrating part. After a random amount of time (2,5,20 minutes) of inactivity on my Imac if I back out to

  • Strange spot in pictures, Strange spots in pictures

    Hi all, I noticed that my iPhone camera takes pictures with some strange spots. Please see the attached picture. It should be a white wall. I already tried to clean the back of the iPhone and I'm also sure that it isn't a problem of the screen/displa

  • Upgrading from BW 3.0B to 3.1C

    Hi, We are in the process of conducting an upgrade from BW 3.0B to 3.1C. As per my understanding technically both these versions are the same. But the difference being that along with 3.1 we have BI_CONT add-ons. Do I have to run through the entire u

  • Merge to HDR Error

    I posted this in the photoshop forum and haven't received an answer. Maybe you guys in the script forum can tell me whats happening. I'm attempting to run the merge to HDR. Everytime I click on save this is the error message I receive. Error 8000: Ca

  • Please help me in launching a web site

    Hi, I am a novice.I am going to launch a shopping site with JSP- for presentation,JavaBeans to implement business logic and database interactions and Oracle 8i as back end.Can anybody explain me the series of steps involved in uploading such a site?.