Inprocess inspection of Byproduct

Hi All,
Is it possible to perform inprocess "03" type inspection for byproduct?
If yes, then please let me have brief idea.
Regards
-Prasad-

Hi,
You can not do in-process inspection for Byproduct as inprocess inspection lot can be create only for main material.
you can have a work around create manual inspection lot for 89 origin and do your inspection. You can also define a new operation in routing for by product inspection though you will not get full functionality of inspection lot but inspection result can recorded.
Sanjay

Similar Messages

  • Cancellation of UD of inprocess inspection lot

    Hi all,
      Can I not do cancellation of inprocess inspection lot  ?....
    partha...

    Hello,
    If you just want to cancel the insp lot then
    GOTO QA12, enter your insp lot no.
    Select usage decision at left top -> Functions-> Cancel lot. But in this case, if insp lot has been processed & stock have moved to unrest. then it will not show in insp stock after this process.
    If you want to transfer stock from unrest. to insp. stock then you have to cancel GRN no.
    GOTO MB01 enter PO no. & Mov type & select the option unrest. in stock type.
    Try it & confirm back.
    Thanks & Regards,
    Anisha

  • In inprocess inspection lets say the production order qty is 20. i would want only 1 no. to be inspected while inprocess inspection is configured. kindly guide. Regards,Mathew

    In inprocess inspection lets say the production order qty is 20. i would want only 1 no. out of the 20 to be inspected while inprocess inspection is configured. kindly guide.
    Thanks in Advance
    Regards,
    Mat

    Hi Mathew,
    Create sampling procedure with fixed sample and give sample size = 1. Assign this sampling procedure for the characteristics of the in-process materials in Routing/Master Recipe etc. For sample size calculation at-least one characteristic should be required characteristic for the Material.
    Thanks&Regards,
    kumar

  • Inprocess inspection mapping

    Hi,
    I am working on inprocess inspection. Requirement is like this.
    Material is having 6 operations. During the 3rd operation two inspection characteristics need to be checked at regular intervals. So I have activated inspection type 03 in the material master QM view and i have assigned these two inspection characteristics to 3rd operation in the routing of the material. Now these inspection characteristics need to be checked repeatedly after completion of production of 25 Units till the end.   so in the routing header i have assigned Insp. Points as 990 Test point: Container, date and in the routing in the 3rd opeartion details in the QM inspection points tab I have activated qty related and given qty interval as 25 units and Insp.pointCompletion as automatic valuation based on inspection point definition.
    Now I have created a production order for the material 150 units and released the order and inspection lot got generated.
    Now confirmed the first and second opeartions with full qty as 150 units with CO11N transaction. Now when I do the partial confirmation for 3rd operation for qty 25 untis system should Automatically generate inspection point and allow for results recording of the inspection lot and when i do again partial confirmation of 25 units next time it should create another inspection point and allow RR and this should go on till total confirmation of 150 untis ( total 6 inspection points 125/25=6 for the inspection lot). How to map this.. I am unable to proceed further. Actually how it is generally mapped in the system. Kindly guide me.
    thanks
    Vinamrath

    Inspection points are never automatically generated unless you develop specific FM's and config them into the inspeciton point identifier configuration.  If you go to the FM area of the inspection point identifer you can get quite a bit of help on these and there is internal documentation on the SAP example FM's for this.  I think all the example FM's start with QAPP if I remember correctly.
    Typically you would manually create the inspection point in the 03 inspection lot and enter in the qty of the material being inspected. 
    FF

  • Inprocess inspection in process industry

    Hai Gurus,
    I have one scenario.
    My Final product is Rectified Spirit which follows the following sequence of operation.
    1) Milling - Corn is made powder and mixed with water to form slurry 1
    2) Cooking - Slurry is mixed with enzymes and sulfuric acid to form slurry 2
    3) Fermentation - The slurry 2 is Fermented by adding yeast/lime and kept for 48 hrs to under go
                              fermentation and form fermented slurry 3
    4) Distillation - The fermented slurry 3 is heated and liquefied to form Rectified spirit  
    The addition of enzymes/sulphuric acid/yeast/lime in various above stages is based on the % of sugar.
    drawn for every 2hrs in a shift .
    Also temperature and pressure is maintained at each stage .
    How to Map  sap for  production and QM factor.
    with regards,
    sekar chand

    Hi sekhar ,
    Here you can try inspection point 200 .In recipe header qm tab keep inspection point 200 .& then for inprocess keep sampling procedure with sample management radio button on .In this case when you create process order for inprocess inspection lot will get generated for that you can check as many physical inspection point .so in your case you can check the sample till you get suger % .
    Just cheke & get me back .if my understanding is correct or not .
    For you can checke every 2 hr sample can add other material s
    SANIL
    Edited by: Sanil Vadke on Jun 10, 2009 11:20 AM

  • Inprocess Inspection - Change of status INSP to REL

    Hi Friends
    How to change the status of Inprocess Inspection lot from INSP to REL?
    Waiting for the response.
    Thanks
    Sachin

    Dear Sachin,
    Meaning of INSP is  you have done result recording, tell me how system will remove it from system. The status will be INSP for that lot until you give UD. This is best SAP practice.
    The in-process insp  lot is generated once you release the prd. order, so pl check with your PP person whether it works  by technically closing that prd order.
    Other option is apply inspection point to that routing, so if needed you can enter other set of results for record.
    Best Regards,
    Shekhar

  • Inprocess inspection in REM

    i just want to know as in discrete mfg, when we are creating production order, system is automatically generating the lot for inprocess inspection for the quanity equal to the production order quantity (with inspection type 03).And for this i have to set the inpscetion type 03 in material master and in routing ca01,i need to maintain the inspcetion characteristic.
    same way if i want to use inspection type13 in REM,when system will gerate the lot automatically?or i will have to create the lot manually?
    what will the inpscetion lot quantity?
    what master data i will have to create?

    please read the help file
    http://help.sap.com/saphelp_erp2005/helpdata/en/5f/1faba54aee11d189740000e8322d00/frameset.htm
    Creating Inspection Lots
    Use
    To link the quality inspection in the production process to repetitive manufacturing, you first have to create the inspection lot.
    Prerequisites
    See the prerequisites under, quality inspection in the production process.
    Procedure
    In the SAP overview tree, choose Logistics ® Production ® Repetitive manufacturing® Backflush ® Inspection lots for prod. versions. The system displays the Inspection Lot Processing screen.
    Enter a material and, if necessary, a plant and a production version and choose Execute. The system displays the screen entitled, Processing Inspection Lots for Production Versions. The green flag indicates the materials that are relevant to Quality Management.
    Expand the material row and select the production versions which do not yet have an inspection lot number.
    You can set the indicator manually or you can choose Selection of versions w/o inspection lot. The system then automatically selects the production versions which do not yet have an inspection lot.
    Choose Create inspection lot.
    Result
    The system creates the inspection lots for the production versions.
    The light which was red until now (= no active inspection lot exists for any of the production versions) or yellow (= an inspection lot exists for one or more of the production versions) switches to green (= an inspection lot exists for all versions) the next time you access the screen Processing Inspection Lots for Production Versions.
    I hope u understood

  • Inprocess inspection lot quamtity & Serial number

    Hello,
    Sr. No. is generated after confirmation of sales order.
    The production order is released & the inprocess inspection lot is generated. Production order quantity is 20.
    Now the question is:
    1. Why the inspection lot quantity always appears as '1'.
    2. If in inspection setup, sr. no. possible is checked, then why (or how) sr no.s can be seen automatically during result recording (inspection unit number) field.
    Regards

    Hi Hemant ,
           In configuration for serial No go to spro ->plant maintenance and cutomer service ->Technical Object--> serial No management -
    >Serial No profile -
    > serial no procedure -
    > Qmsl and mmsl  serial No usage should be 3
    so that what ever serial no assign to the GR will coming in the inspection lot and at the time od ud you can select accepted serial no only
    with regards
    Yashodhan

  • Inprocess Inspection & result recording

    Hi all,
    We are implementing QM.
    The requirement of client is to carry out inprocess inspection(preferable without inspection plan) including result recording & defect recording & that to with quiet ease.
    Help me with the basic settings.
    Also to have the relevant report to analyse the inspection activities.
    We are using developed T code for operation confirmation, in the back end it is co11n only. So also elaborate the consequences of the same if any.
    Mangesh

    Ramanuj/ Murali,
    Thanks for your reply.
    Let me explain the process in details.
    We are having around 10 operations.
    We need to carry out inprocess inspection for 8 operation starting from 3rd operation.
    The inspection to be carried out is like length- 5 cms, shape- ok or not ok, if not ok then what is the defect, assay- 90%, if below 90% then defective like this.
    I have assigned inspection type 03 in QM view in the material master.
    Inspection lot is also getting created.
    I am stuck up at result recording & defect recording.
    So kindly guide me how to map this in details.
    Efforts would be appreciated.
    SmanS

  • INPROCESS INSPECTION DETAILS

    Hi experts
                 I am new to the forums.
                 I have a scenario for inprocess inspection.There are 5 processes -->1. Mixing 2.heating 3.colour check 4. addition  5. Ph value check. The quantities of the 5 process are 100,150,150,200 & 200 respectively.How can I frame the inprocess check that I will involve all the 5 steps and conform the final quantity. Your guidance will be highly appreciated. Thanks in advance.
    Pranav

    Dear Pranav,
    You have mixed up the thing little bit here. See One part is about QC operations
    Second one is Confirmation of quantity and third one you introduced is BOM.
    So pls have explanation over it.
    Above all one thing is sure that you need to create BOM for it and the BOM will be linked with routing via the Production Version. Use trx code C223
    1. Mixing - here 2 components with weight 100 (say 50 +50 kg) mixed -no qc inspection
    Don't assign any MICs to these phase / operation.
    There is a functionality called Component assignment, in routing, assign the relevant component to this operation. So system will ask to issue these only while you will be supposed to confirm this phase in CO11n
    2. Same heated (same qty inside reactor -100 kg) -no qc inspection
    Don't assign any MICs to these phase / operation.
    Here no any component assignment is required, as per your description.
    3. Colour check - here qc inspection needed (qty same=100 kg)
    Assign the relevant MICs to this operation.
    4.addition- new material extra 100 kg addition (total 200 kg) -no qc inspection
    Assign the material that is intended to add, in the component assignment for this phase / operation.
    5. ph check - ( final 200 kg inside reactor) here also qc check needed
    Assign the relevant MICs to this operation.
    Now what I would suggest is you keep one more phase like (additional Step 6) for keeping the final yield confirmation in PP control. Or if dont wish to do such them keep it be as it is. Put the control key that makes the auto Goods receipt against the order, to this operation.
    I think this will make your scenario bit more clear.
    Pla revert if further assistance required.
    Regards,
    Shyamal
    Edited by: Shyamal Joshi on May 20, 2009 11:42 AM
    Good point put by Keeti there, you must go with the sample management.

  • Inprocess Inspection Confirmation

    Dear all,
             I have confirmed 2 yield quantity through inprocess inspection lot. Pleae tell me how to reverse that confirmation.
    Thanx & Regards,
    Harish Parab.

    Dear Harish
    For doing this kindly follow the following steps
    1) Go to the inspection lot QA12  > Input the lot number > Enter > go to EDIT > Reset > Inspection completion> Long term inspection will be active > Lot status will change to LTIN
    2) Please go to QA32 >Select the inspection lot > Go to Results> It will ask for  Long term iInspection>click on Assigned inspection point >  select the inspection point were you earlier confirmed > You will get the RR screen > Save > Pop up screen will come > select No confirmation
    This will cancel the confirmation
    Regards
    Gajesh

  • INPROCESS INSPECTION LOT CHANGE SPECIFICATION

    can any body give to me solution after   inprocess inspection  lot  i want to change specification is there any provision in sap standard  like  01 and  04 inspection type  we are change specification in  change inspection lot

    hi
    If results are not recorded and operation are not confirmed then do the following
    1. goto change routing / recipe -- change the specification
    2. go to prod/process order  --read PP master data
    then do RR new spec. get reflected during result recording
    regards

  • Inprocess inspection reassigning inspection plan

    Hi,
    I generated an inprocess inspection through 03 inspection type. But inspection characteristics where not there in the routing. Later I created inspection characteristics in routing.
    When I tried to assign this task list by resetting sample calculation T Code- QAC3, it is saying confirmation already done.
    Could anyone tell me how can I reset sample calculation and re assign my newly created routing.
    I want to create an inspection lot with MIC's which I updated later or after confirmation.
    I request anyone to help me.

    Hi,
    Follow the below any case for soln.
    Case 1:
    Go to CO02 (Production order change mode) enter order number
    In order over view screen go to Function -> Inspection lot -> Delete and create and save the order. Now system will create the new inspection lot with new spec.
    Case 2:
    Go to Result screen for existing inspection lot click add characteristics icon add character one by one and do the result recording .
    check and revert back.
    Regards,
    S.Babusingh

  • PP-QM Inprocess inspection

    Please help me on solving inprocess inspection issue.
    My client needs following --
    They want to generate QM lot through inprocess inspection when and only when operation before that is completed. And also It should not allow to record the result before confirmation of the operation which is prior to Inspection in routing.
    I have checked in control keys for routing but I could not find the soln.
    Thanks & Regards,
    Sharabh

    Hello,
    So if I rephrase the question (and if the question is about plant maintenance, which I am not sure), you want to be able to do inspections on an equipment/ func.loc. after the related operations/orders are completed.
    Am I right?
    Julien.

  • Re: Inprocess inspection

    Dear Experts
       For materials if 03 inspection type is checked and for the same material if a process order is created and released an inprocess inspection lot is triggerred with lot origin 03.
    But i wanted the lot to be created only at the time of confirmation of that particular phase and not at the time of release.
    Pl help me
    regards
    Surender

    Hai
      If 04 is selected it will create inspection lot only when you do the GR and not when we confirm the order.
    The problem is after releasing the order an inspection lot is generated immaterial of whether we do production or not in legacy.
    By any means if we have to stop that order then the inspection lot remains as such and you can do result recording.
    Surender

Maybe you are looking for

  • Mail.app stopped downloading new messages from pop3

    Hello, I met this on both the latest Tiger and Panther: came after two weeks away and had no new mail. Strange. The Mail.app logins to pop3 server, sends a password, looks for the new messages, and that's all. Nothing is downloaded. When I checked th

  • Lots of hang ups when using iPhoto in full screen mode

    Has anyone else got this problem or a solution? I find that iPhoto hangs up or give strange action when in ful screen mode. The other day, for example, I had two iPhoto windows showing, one in full screen and one normal window on the desk top! Anothe

  • Mystery of mysteries. Can't get rid of "Glossary" text on Favorites tab.

    I consider myself relatively well-versed in chm file compiling and chm related issues, but this one has me stumped... System Specs; RH 9 now (initial English help in background below was compiled using RH 7) Windows 7 64-bit First, the background --

  • HTTP/Servlet problem

    Hi, This question may sound a little bit stupid but i 'm new with HTML and servlets... I am trying to do the following: I have a FORM: <FORM NAME=\"form\"> in which there is a button: <INPUT TYPE="BUTTON" NAME="searchSession" VALUE="Search" onClick="

  • ICal Time Zone

    Whenever I make a new calendar event in iCal on my iPhone (3GS with iOS 4.1) it posts the event to iCal as being in Central Timezone. My phone is set to automatic time (I live in NJ and the time displayed on the phone is correct). I have to manually