Hi,
I generated an inprocess inspection through 03 inspection type. But inspection characteristics where not there in the routing. Later I created inspection characteristics in routing.
When I tried to assign this task list by resetting sample calculation T Code- QAC3, it is saying confirmation already done.
Could anyone tell me how can I reset sample calculation and re assign my newly created routing.
I want to create an inspection lot with MIC's which I updated later or after confirmation.
I request anyone to help me.

Hi,
Follow the below any case for soln.
Case 1:
Go to CO02 (Production order change mode) enter order number
In order over view screen go to Function -> Inspection lot -> Delete and create and save the order. Now system will create the new inspection lot with new spec.
Case 2:
Go to Result screen for existing inspection lot click add characteristics icon add character one by one and do the result recording .
check and revert back.
Regards,
S.Babusingh

Similar Messages

  • Inspection Time in planning

    Hi,
    We are using CTM mfor Production Planning, inspection time is defined for the product in ECC.
    The code for product before and after inspection activity is same, and no seperate operation is defined for product.
    In ECC we are using standard process in QM for inspection. The issue is I want to capture the inspection time in planning while creating the planned order.
    I can use GR processing time for that, but is this the only option or can anyone suggest an alternate method to model inspection time in APO.
    Thanks & Regards,
    Sanjog Mishrikotkar

    Hi,
    For basic scheduling of Planned Orders:
    the time taken are 1. GR Proc time, inhouse prodn time and opening period defined in the schedule margin key.
    For lead time scheduling of planned orders
    the time taken are 1. Float after production, times from routing, float before production.
    So i think you can map your inspection time with above timings.
    Thanks,
    nandha
    Thanks,
    nandha

  • Inspect and Inspected field in Record Results:Characteristic overview

    hi,
          Can any one explain me the Inspect and Inspected field in Record Results:Characteristic overview screen. How the sample size is determined in Inspected field during lot creation.
    Muthamil

    Dear Muthamil
    This fully depends on the sampling procedure you choose. for eg if you choose 100% sampling procedure and you have lot quantity of 10 items
    Then inspect will be 10 and inspected will be 10.
    SAP gives the definition for INSPECT as  - Predefined sample size that has to be inspected for an inspection characteristic or a partial sample.
    For each inspection plan characteristic you define the amount by which the inspected sample size in the 'Insp.ed' field can deviate from the to-be-inspected sample size in the 'Inspect' field. If a characteristic (partial sample ) is closed the system checks whether the required sample size is adhered to. The characteristic (partial sample) can only be closed if this is the case.
    But for Scope not fixed, larger , smaller scope the inspected field chages based on the result recording
    SAP gives the definition for INSPECTED as   - Number of sample units that have been inspected for a characteristic or a partial sample.
    Hope this explains
    Regards
    Gajesh

  • QM : First inspection lot - inspection plan, other inspection lot another insp. plan

    Hello.
    Is it possible with standard SAP  when it is create the first inspectio lot for material/vendor  ( origin 01) that it takes an inspection plan, and for the next inspection lot that will be created for the same material/vendor ( origin 01) that system takes from another inspection plan ????
    Or have i to user a badi/user-exit?? which?
    Regards.
    Antonio

    Dear Antonio,
    Try this
    1. In material master do not set the auto release indicator for 01 inspection type
    2. Make inspection plant for material with group counter 2
    3. Now you have two different inspection plans with group counter1 &2
    4. Do the GR for same material for two times
    5. Two inspection lots will be generated
    6. Assign inspection plan manually for first inspection lot with first group counter
    7. Assign inspection plan manually for first inspection lot with second group counter
    Please let me know is it working or not
    Regards,
    Jagan

  • Inprocess inspection & 04 Inspection

    Gurus,
    When i am working with both 03 & 04,can i make GR for production order and take the material stock skipping 04 inspection?

    When i am working with both 03 & 04,can i make GR for production order and take the material stock skipping 04 inspection?
    Yes you can skip 04 inspection also.Also you can deactivate post to inspection for 04 inspection type.
    But this is strange that you have activated 03 & 04 but still you want to skip the same.
    Also remember you can use DMR in 04 also & skip the lot.
    You can take mass UD in QA10.
    Also you can use QA41 for scheduling.
    Regards
    Sujit

  • Raw material issue for inspection from inspection lot

    Hello friends,
    My sample size is fixed i.e.75 gm for all  raw material quality testing. I have defined sampling procedure with sampling type "fixed sample". I want that this amount should be decreased from total lot quantity when i am posting it to unrestricted use. i.e. for 10 kg inspection lot quantity, 9.925 kg quantity should be posted .Now, system propose whole quantity for stock transfer from quality to unrestricted after usage decision.
    Waiting for reply!
    Thanks in advance!!

    Dear Kiran
    1)  System doesnot take decimal in samples. if your basic unit is KG and you procure 10kg material system will consider sample amount as 1 kg. it will not take 0.075kg as the sample.
    2) Other option is make the procurement in GMs but that  will be difficult for purchaser to handle
    3) or esle make use of this exit and do the posting based on that
    QEVA0009 - UD: Predefinition of quantity to be posted to sample stock 
    This will help
    Regards
    Gajesh

  • GR durng final inspection - single inspection lot

    Hello Friends,
    In material master there is a key that control inspection lot creation during GR from purchasing is there any similar key for production too
    Like below
    For each purchase order item, batch and storage location
    Thanks & Regards
    Raj

    Dear raju
    Yes, You can use for 04 inspection ,
    'X' An inspection lot for each  order ,batch & storage location- An inspection lot is only created during the first goods receipt for each PO item or production order.
    Regards
    gajesh

  • Set up Calibration Inspection in Inspection Interface

    Hello,
    I’m currently designing an inspection interface “front panel” for a program that detects faults in caps. I’ve been having a look at some of the features that are offered in the interface and I was wondering if there is a way I can perform an edit calibration in the inspection interface. Thanks for any response.

    Actually, the Calibration step in VBAI allows you to dynamically relearn calibrations based on previous points. The simple calibration and point distance calibrations allow you to use previous points to update the calibration. On the second tab of the calibration step, check the relearn option. All calibration types allow you to dynamically adjust the calibration origin/angle based on previous points using the same relearn flag in the calibration step.
    If you want to permantely update the calibration, you can check the "Save Image Calibration to File" option on the first tab of the calibration step.
    Hope this helps,
    Brad

  • Inprocess inspection of Byproduct

    Hi All,
    Is it possible to perform inprocess "03" type inspection for byproduct?
    If yes, then please let me have brief idea.
    Regards
    -Prasad-

    Hi,
    You can not do in-process inspection for Byproduct as inprocess inspection lot can be create only for main material.
    you can have a work around create manual inspection lot for 89 origin and do your inspection. You can also define a new operation in routing for by product inspection though you will not get full functionality of inspection lot but inspection result can recorded.
    Sanjay

  • Goods receipt with inspection points

    hi
    my business process study reveels the following scenario
    i need to do goods receipt inspection with inspection points
    means the finish product say rice
    i given paddy to the miller as a subcontarcting
    iam getting rice as out put
    i need to record inspction results on inprocess as well as at  finish product
    ie while processing from paddy to rice i will made timely inspection points and want to capture the result
    and for final rice also i need to do inspection
    how to achive this
    if i chhose inspection type 04 and freeinspection points
    system not accepting
    plz suggest
    sasikanth

    For my proposal you use 04 inspection lot with early creation of the inspection lot.
    Create an inspection plan with the proper usage for inspection type 04.
    Select free inspection points in the header of the inspection plan.
    Assign your characteristics.  Release the plan.
    Create and release your order.  You should find an 04 inspection lot for it. 
    Select the lot, most work list will give a pop-up showing the two operations.  Double click on the first one.  Then you should get a pop-up asking for the inspection point identification.  Enter in what ever you've set it up to require.
    Record the results.  Repeat previous step as often as you need to.
    Craig

  • Inspection method

    Dear experts,
    I am new to QM.
    What is the effect of inspection method in QM. Can you pls give some inspection methods which probably used for incoming,inprocess and final inspection methods.
    I have gone through F1 help doc. I did not clear.
    Pls help me
    Thanks in advance
    R.D.I

    As said above, You use inspection methods to describe how to carry out an inspection for an inspection characteristic.
    for example: there can be various methods to carry out inspection for a particular characteristics like check resistance. u can check resistance with various methods various equipments. each method will be inspection method master.
    inspection mathods can be used in MIC or directly in insp.plan but single insp. method can be used for single char.
    Using the Inspection Methods, you can:
    Specify how an inspection characteristic should be inspected
    Define the qualifications for inspectors. The specifications in the inspection method take precedence over the specifications in the inspection characteristics.
    Create different versions of an inspection method (for example, with different validity periods)
    Find the desired version of an inspection method with different validity periods by specifying the key date
    Make changes to inspection methods with or without history. You specify the required plant-specific default value for this function in the Customizing application. However, you can also create a new version for a validity period manually. A version management function ensures that all changes are documented.
    Create a where-used list to determine the master inspection characteristics and inspection plans in which an inspection method is used

  • Mass reassign of inpsection plans to materials

    Dear Guru
    Kindly let me know how can be reassign inspection plans to materials in a collective basis.kindly give the tcode along with your comments.
    Thanks in advance
    Nithi

    To actually reassign the plans to new materials you'll need a tool like LSMW, an ABAP, or a third party tool like WinRunner.
    Craig

  • Inspection lot not getting generated for schedule in stability study

    Dear All,
    Need your urgent help to solve a issue. I need to perform inspection of material after specified interval of time for which i am using stability study process. Following are the steps which i have followed :
    1) Create initial sample (physical sample created)
    2) Confirm initial sample
    3) Initial test inspection lot( Inspection lot created )
    4) Complete initial test
    5) Specify storage conditions (Physical sample created with CRTD status)
    6) Create testing schedule( Maintenance schedule is created )
    7) I have scheduled maintenance plan through IP10 tcode. All the calls are getting generated.
    Now i have given manual call in IP10, but inspection lot is not generating.
    Please help to solve this issue ASAP.

    Dear Craig,
    Yes i have activated inspection type 16 to material master.
    Actually issue is solved now, I have missed one step " Store stability Sample".
    Now the lots are getting generated.
    i am closing this thread now.

  • H323 inspect in a single class with match criteria

    Hi, I trying to apply this to make sure only inspect h323 traffic in a single host (that's a Video Conference host), but don't works. Only works when I applied the inspect in the inspection_default class.
    Here is the config:
    access-list 100 extended permit ip host x.x.x.x any
    access-list 100 extended permit ip any host x.x.x.x
    class-map h223_VC
    match access-list 100
    policy-map global_policy
    class inspection_default
      inspect dns preset_dns_map
      inspect ftp
      inspect ip-options
      inspect rsh
      inspect rtsp
      inspect skinny 
      inspect esmtp
      inspect sqlnet
      inspect sunrpc
      inspect tftp
      inspect sip 
      inspect xdmcp
      inspect pptp
      inspect icmp
      inspect netbios
      inspect icmp error
    class h223_VC
      inspect h323 h225
    It´s possible? or is something wrong?
    Thanks a lot for your help

    Hi,
    When you have it in the global policy you only H323 H225 or you also have H323 ras?
    What do you see if you run this commands?
    packet-tracer input tcp 1025 1720
    sho service-policy flow tcp host host  eq 1720
    How do you test it?
    Luis Silva
    "If you need PDI (Planning, Design, Implement) assistance feel free to reach"
    http://www.cisco.com/web/partners/tools/pdihd.html

  • Transfer of results From M.I.C to Batch in case of Long Term Inspection

    Hi Gurus,
    We have maintained long term inspection in the control indicators in the inspection plan and also assigned Class Characteristics to M.I.C.
    We are following these procedure for Result recording.
    1) we are doing U.D and then posting to unrestriced stock
    2) We are doing result recording.
    In our case the result from M.I.C are not transferred to Batch
    and the Status is Long Term Inspection,Short inspection completed and transfer posting completed.We are not getting Status Long Term Inspection completedand the results are not transferred to batch.What might the reason for this.
    Regards
    Amit

    You must redo the UD to have the results transfer.  (Providing of course your setup is correct and the transfer happens for regular characteristics at the first UD)
    I would recommend that you create two UD codes.  The first one might be ALTP - Accepted, Long-term Pending.
    After the LT characteristic is recorded, use QA12 to change the UD to ACC - Accept.  When you save, the resutls should be transferred.