INSP LOT WITH CRTD  CHCR STATUS

I have created inspection lot for sample management (insp type 15).
Quality plan for that is with usage 9.
but still lot is created with status CRTD  CHCR .
what may be the possible reasons?
Message was edited by:
        sandip raut

In Quality plan at header, i have maintained
usage 9,
status 4,
lot size 0-9999999999,
insp point 200,
assigned the sample drawing procedure
and i have assigned one quantitative inspection charracteristic for which i have not assigned any sampling procedure.
is it mandatory to assign the sampling procedure to characteristic?
also i have checked the dates of the Q.plan and inspection lot.
all dates are same.
still lot is CRTD.
when i am tryimg to assign the quality paln through QA02,and clicking the "Task list/spec" tab,nothing is happening.neither system is assigning the plan nor giving any message like "no plan exist"
please help.
its urgent,please reply soon.
Message was edited by:
        sandip raut
Message was edited by:
        sandip raut
Message was edited by:
        sandip raut

Similar Messages

  • Quality Management - Insp lot with status CRTD CHDR SPRQ

    I am not able to do usage decision for Insp lot with status CRTD CHDR SPRQ but I can do usage decision for status REL CALC SPRQ.
    Can anybody know why ?

    Hi
    pl check the lot is assigned for inspectioon plan ore not.
    got QA02 check in inspecion specification TAB.
    If there is noe inspection plan (group)
    you need to create a inspection plan, and then come to QA02
    then you need clickon TAsk list/spec button in insp.specification tab.
    Pl check and try
    -ashok

  • How to differentiate the insp lots with same lot origin

    Hi,
    My client is
    1. Procuring a  Finished good directly ( same way as Raw material is being procured ) & then sale it.
    2. In another scinarion the same material may be produced at Vendor's end ( Sub contracting )
    3. In another scinario this is in house produced material.
    Now the requirement is seperate tracking / list for each case.
    Inspection type 04 can be activated to address the 3'rd case.
    But how to segregate 1'st & 2'nd case from each other ???
    I have created one new inspection type Z01 for lot origin 01. Similarly insp type 01 is also activated.
    If Z01 insp type is marked as preferred insp type, then system always consider this insp type.
    How to differentiate inspection type Z01 & 01  at incoming inspection stage ????
    regards,

    Dear Gajesh / Roderick
    Thanks for reply & Sorry for the delayed reply from my side.
    Gajesh as per your suggestion i used the break point in user exit QAAT0001 & after that i have executed PO & MIGO transaction, But after executiing it did not stop at a particular break point.
    AM i doing some thing wrong???? or any alternate solution is there??
    Roderick,  i have explored the status profile but found to be use fulll for changing stage one time only.  i.e. between 0101 to 01. But here i want to choose the inspection type base on PO type.
    Kindly suggest further action.
    Once abain thanks.
    regards,
    Singh
    Edited by: Singh15667 on Jul 24, 2009 10:54 AM

  • Insp lot- results recording

    Hi, activated qm for procurement. po generated and gr done and insp lot no taken from md04. pls note that the sys status here is crtd, chcr, sprq shows in MDO4 for that insp lot details.while searching same insp lot no in qe51n, it gives the message "no entries found". pls advise how tosolve and to do rsults recording.

    Hi,
    Check Whether you have created the Inspectionplan for that material(QP01 for creation). If not create it.
    And Check In Material master -
    > Inspection type deatiled view whether auto. Assignment Check box is selected or not. If not , Select it.
    Now Onwards  the Created Inspection lots will be released Status and you can do result recording for them.
    For Existing Lots with CRTD Status do the following steps.
    1) Create Inspection Plan(QP01)
    2) QA02 -> Inspection lot change> Insp.Specification Tab> Click On Task list/specification push button> It will Auto matically assign the Inspection plan and then Inspection lot get convert into Release Status. Then Save it.
    Noe you can do the result recording for it.
    Regards
    Praveen

  • How to create inprocess insp. lot manually

    HI Team,
    I have requirement to create inprocess inspection lot  as & when  required. What are the settings required to do in QM view insp. type.
    I have tried with "Preferred inspection type" set up, but no inspection lot is allowed to create manually in QA01.
    Then I tried with 03 insp. type "Active". But it generated lot for every production order during release of order.
    But my requirement is to create lot during  inprocess production only when it is rejected.
    Pls suggest me solution.
    Thanks

    Hello Bhushan ,
    You can create a insp lot with 03 origin by putting plant & insp origin in QA01 initial screen ....but I will suggest to use inspection origin 89 with relevant setting as per business requirement as you want to create the lots only when material  is rejected .
    Else you can maintain one more insp type say,0301 with insp origin 03. This will help in classifying the inspection lots  which are created for this process & not standard in-process inspection,
    Can you please explain the business scenerio which demands to create lots only incase of rejections .....as to ascertain whether the product is inline with quality standards we need to inspection the same (which requires inspection lot  for lab processing & tracebility)
    Thanks
    Kaushik

  • Inspection lot status CRTD CHCR SPRQ

    Dear Expert
    I created inspection plan for a material and generated inspection lot after GR from PO. But it's status is coming as CRTD CHCR SPRQ, release status is not coming, pls suggest where i want to look for this?.

    Hello,
    I am having a similar issue with inspection lots. The information provided has been very helpful, but I have not been able to resolve my issue. Forgive me if my terminology is not clear as SAP is very new to me. Here goes:
    When my inspectors try to enter an inspection lot with transaction QE01, they receive the error "The function you selected cannot be carried out."  When you click the detailed info button, a transaction analysis box appears with the following info:
    Influence of System Status on Transactions
    Stat       Description         Influence
    CRTD    Created             Disallowed 
    If you click on status display instead detailed info, there is a system status tab  with CRTD, PREQ, CHCR & SPRQ. All four options are checked, but to the right of the first two there is a grayed out piece of paper with an arrow. It appears the system is checking for these features, but they aren't properly set up.
    As of now, we have no inspection plans, so material is simply checked to drawings and specifications and and an accept/reject usage decision is entered by receiving inspectors. My immediate concern is to get the material released that is stuck in inspection. If I click on the inspection task list, there is no task list created for the material.
    Our receiving inspection supervisor was the only one trained in QM and he left the company this week. Is anyone familiar with this error?I'm desperate for a solution.
    Regards,
    N. King

  • I can change system status without canceling lot,,"CRTD CHCR SPRQ"

    HI
    A insp lot have (System status) "CRTD CHCR SPRQ" system can not allow for any recording at the lot,, But Question is that i want to change status without cancleing this lot, Have any idea for this lot status.. "CRTD CHCR SPRQ"
    thanks Expert
    regards
    kazz

    Hi kazz, i can't tell if your issue was resolved but if not then you should check the 'valid from' date on the ECM used to setup the inspection plan.  this is assuming that you are using ECMs to create inspection plans and maintain revisions on the material.  the valid from date on the ECM used to create/assign the inspeciton plan to the material must have a date that is equal to or before the valid from date on the ECM used to assign the revision to the material.
    for example,
    ECM 123 has a valid from date of 01.01.2013 and was used to assign revision A to the material
    then the ECM used to create/assign the inspection plan to that same material must have a valid from date of 01.01.2013 or prior...otherwise SAP will not find a valid inspection plan that's valid on the date for the inspection lot and revision of the material in the inspection lot.
    hope this helps!
    nicole land

  • QA32 with status CRTD CHCR

    dear all
    In  one Material system status CRTD CHCR shown in origin 04 (Shipping inspection) trans code QA32 while it is reqired REL CALC SPRQ for result recording.
    what may be the reason?
    regards
    roshan

    Hi,
    Please go & check you have not made the inspection plan for the required material. Go and make it in QP01. After that you will get the required statuses.
    Then when ou do result recording you will get the result RREC & then you will get the result SPRQ(stock posting required.
    Please go & check.
    If helpful award points.

  • CRTD CHCR SPRQ-how to do result recording for that lot.

    Hi All,
    i am having issue.
    i did  GRN,lot is created with this status-CRTD CHCR SPRQ
    i tried for Result recording but  error is showing.
    Then came to know QP01 is not assigned for that material.
    then i created the QP01,but still i am not able to to Result Recording to that Lot.
    is any way to do that.without cancell the lot can we do.
    Regards,
    siddharth shanker

    Hi,
    Your lot is at created status so you need to relesed lot. May be insection plan /task list has not been assigned to lot.
    In Qa32 go in inspection lot Change ( Or T code -QA02 ) .where in tab Inspection specification tab click on task list/speci where you can assign plan theri ( You can assign plan with usage that you have created plan  )
    Save transaction.
    refresh QA32 then try result.
    Regards
    SANIL
    See QP02 with what usage you have cretaed plan.
    as earlier I told you in QA02 tasl inspec tab  in usage field select same usage by which you have created inspection plan.in QP01.
    Regars
    SANIL
    Edited by: Sanil Vadke on Mar 29, 2010 8:40 AM

  • Posting goods from quality to unrestricted status CRTD CHCR......

    Hi Guru's,.
    I have one issue.
    In QA32 my lot is in CRTD CHCR SPRQ. I have not made quality plan for that.in MM01,quality view i activated inspection type 01.
    now in mmbe stock is showing in quality.
    i want to do transfer posting from quality to unristricted stock.i dont want to use quality plan assign to that lot.
    I tried MB1B movemet type 321. i am getting error Change the inspection stock of article 1111030200267 in QM only.
    Is any way to do that,transfer posting.
    Regards,
    siddharth

    Hi,
    As your lot has been at CRTD status you need to released by assigning inspection plan.
    In QA02 --change inspection lot or in QA32 select lot line item & click on inspection lot so that you can be able to enter in change lot.
    In which you can assign your inspection plan ,you will find icon  inspec tasl list ,click on same icon.so that you will get message inspection plan assigned , .If system wont allowe you then same screen usage ( You have to select same usage by which you created inspection plan.)
    Save the transaction & refresh the QA32 screen
    Regards
    SANIL

  • Cancellation of Inspection Lot with Status LOLK

    Lot with Origin 08 has the status "ICCO SPCO BRRQ LOLK". Stock has been scrapped through movement type 713 from the quality inspection area but the lot is still is displaying in QA32.
    When we are trying to remove the status LOLK through QA12 system is not allowing to enter into screen and giving message "This function cannot be carried out."
    How to cancel or remove this lot?

    Hi,
    status LOLK means Lot locked for batch record
    So go to QA32 and select the relevant inspection lot and go to the Usage decision tab.
    Click the menu bar " Usage Decision" and go to
    Functions-block for batch record---deselect
    Then save the lot and come again  to functions--- cancel the lot.
    By doing this you can cancel your lot
    How to cancel or remove this lot?
    Hope your problem will sorted out
    Give a try and confirm
    Regards
    Hari

  • Want to do mass processing for inspection lots with status SPRQ

    Hello,
    My company using early lot creation for 04 inspection type. We have thousands of inspection lots with status "UD   ICCO SPRQ PRII PRSI STUP". Now due to SPRQ status, system is not closing process orders associated with thousands of inspection lots.
    Is there any transaction where I can do mass processing of inspection lots to change the status "SPCO" from "SPRQ"?
    Thanks
    Bhavesh

    Dear Bhavesh
    You may have to modify the standard program to do so. Modify this program RQEVAI30.
    This can help you
    Regards
    gajesh

  • How to cancel Rep. manufacturing Insp Lot

    Dear All,
    I have inspection lot with Inspection Type 13 [Rep. Manufacturing], which is having CRTD PASG status.
    When I go to menu
    Insp Lot---->functions -
    > Cancel this has deactivated/Hide mode.
    Please suggest how to cancel this lot
    Regards
    Honyal

    Dear,
    You can used QAC1 to correct the inspection lot quantity.
    Make the inspection lot quantity to 0. This can be one of the way.
    OR Change inspection Lot QA02 / Inspection lot / function /cancel lot and save it
    Or go to QA02 enter the lot no then chage the status to REL.
    Regards,
    R.Brahmankar

  • Error while Releasing the Stock from Quality-CRTD CHCR SPRQ

    Hai Experts
                          While releasing the stock from Quality i got  error like function cannot be caried out,
    The Material Status CRTD CHCR SPRQ.
    Thanks
    Rajakarthik

    Rajakarthik
    It looks like the status you mentioned are of inspection lot.
    CRTD mean created status of inspection lot.
    CHCR means characterstics required. in your case the the material master inspection view says characterstics required however your inspection plan does not have any cahracterstics.
    assign the characterstics to inspection plan & both the status of inspection lot will change. you will be then able to process the inspection lot to move the stock from quality to unrestricted.
    Regards
    Mahesh

  • QI Stock without Insp Lots

    Hi QM Champs,
    My problem is that as per requirement of my client i mapped Inventory Posting VMENGE08 to post Other Quantity( NON-Valuated stock ) to Un-restricted use stock with movement type 311 from Q stock specified in QM config. This scenario is running fine in development and quality Servers, but after Live when i look at the posting done at VMENGE08 are gone to Quality Inspection Stock and there is no Inspection Lot for that.
    Is there anything gone wrong ??
    Sanjeev Sehgal

    My guess is that in your develpment/quality systems, the tick box for "QM inactive" is ticked on for MT 311 while in production it is not.
    Please check that in config for material movements.
    If you look via QA32 for lots with a CRTD status I suspect you'll find some '08' inspection lots sitting out there.
    You might have the material mastes set up differently.  It might be possible that you have the 08 inspection type set up in production, but not in the development/quality systems.  And it may be that the 08 SHOULD be set up for other business processes so that doesn't mean that is really wrong.  Only the business would know that.
    Craig