Hi All,
Please clarify  my doubt on Quality inspection during production.
We are using inspection type - "04 - Goods receipt inspection from production" for inspection during production.
Once after inspection if we reject a sub assembly for rework and move the part to block stock, we raise a notification to the concern department.
Now after production does a rework, how can we receive the sub assembly back to unrestricted used through Quality route and reflect the same in my notification.
If there is some other standard process of inspection during production and rework then please throw some light on it.
Thanks & Regds,
Ritesh

QM>Qualty Notif.>Notif. processing>Additional notif. Functions>Define Action Box
In the next pop-up screen select Define functions for the Action box
To research this I would look at notification Q1.  Select Q1.  Double Click on Activities.
Double click on 0035 - post goods movement.
you will see this action uses FM QM06_FM_TASK_GOODS_MOVEMENT_2.  It is configured to run a second module upon saving called QM06_FM_TASK_GOODS_MOVEMENT_STEP2.
Click on the blue information button to read more about these FM's.
Copy these FM's and have an APAB'er modify them for your use.  Add an action to your particular notification using these the new Z FM's.
FF

Similar Messages

  • QM inspection at various quality gates during production

    Hi All,
    We need clarification on how to plan inspection during production at various stages.
    1. How to trigger and use inspection point planning at various inspection stages??
    2. How will the characteristic be activated, processed and closed at various inspection stages??
    3. How to define different characteristic at different inspection stages?
    4. Will a single inspection lot be generated for entire production of a machine or separate lot will be generated at all the inspection stages??
    If possible, please provide the process flow.
    Thanks & Regards,
    Ritesh

    First questions
    1. How to trigger and use inspection point planning at various inspection stages??
    .. QCC0 > Quality Planning > Inspection Planning > General > Define Identifier for Inspection Points
    2. How will the characteristic be activated, processed and closed at various inspection stages??
    .. When user define new inspection point at result recording, system activates the characteristics automatically based on inspection plan.
    3. How to define different characteristic at different inspection stages?
    .. Not possible with inspection point function in SAP standard
    .. You have to define all characteristics at inspection plan or use add characteristic function at result recording.
    4. Will a single inspection lot be generated for entire production of a machine or separate lot will be generated at all the inspection stages??
    .. It depends on production order process because inspection lot for production is generated based on production order.
    Second questions
    1. How can we define partial inspection points within production processes?
    .. QCC0 > Quality Planning > Inspection Planning > General > Define Identifier for Inspection Points
    2. Process to activate and process characteristics at every inspection points?
    .. Yes
    3. Is it possible to allot score against those characteristics during inspection?
    .. Allocation is not possible, only add is possible.
    4. How is partial check points processed and closed?
    .. You can define it in operation header detail of inspection plan.
    5. Is defect recording done at every inspection point or at the end?
    .. Every inspection point
    5. How to summarize the result and close the inspection lot finally??
    .. System summarize the result automatically when you execute usage decision transaction.
    Regards, DoWook Kim.

  • Unit to Be Inspected Tab during Inspection of Production Order

    Dear experts,
    During result recording of inspection lot from GR (QE01), there is a tab named " Unit to be Inspected" whereby users can record characteristics per serial no.. During result recording of inspection lot created during production order, the tab "Unit to be inspected" does not appear. Is there any way to make the particular tab appear in result recording for production order?
    Thanks in advance

    Dear,
    Please check your inspection plan (QP02) ---> Operation --> Select Inspection characteristics ---> click on control indicators --> select Single result in Result Confirmation. --> Save it.
    It is also depend on your sampling procedure. If you take the 10 sample in your sampling procedure then it will appeare for 10 times in result recording.
    -Sandip
    Edited by: Sandipsinh Shaktavat on Mar 6, 2012 12:07 AM

  • QM Inspection in production

    My client has this scenario
    For raw materials
    10% of the samples is inspected during procurement at goods receipt.
    then 100% inspection of the same is done during production.Some times rejections happen at the shop floor.
    First scenario is easy .Please advice me on how to conceive the second scenario.

    Hi..
    To achieve this requirement there are some developments are required.
    e.g.:- One different movement type should be there for handling vendor rejection from production line to transit store.
    One different transit store should be there for handling the rejections.
    Now you can do the transfer posting thru MIGO from production line to transit store. and can select supplier from partner tab.
    Different movement type and storage location would be very helpful for reporting part. And maintain discipline.
    Regards
    Vivek.

  • Component / Semi Finshed rejection during Production

    How can we configure the following Business Scenerios :
    1. Material is Transfer to production floor with reference to BOM /  Production Order from main store
    2. During production - Some material is rejected because found faulty
    3. Rejected Material is sent to Quality for inspection ( the same material is inspected by the Quality at the time of GR ,but may be found faulty in production floor)
    4. Quality Department do the inspection and found some quantity may be used after some rework and remaining quantity is rejected and send to Main stores to return to Supplier
    Pl let us know the steps how this can be configure into the system.
    thanks
    harish

    Hi
    1. Material is Transfer to production floor with reference to BOM / Production Order from main store
    2. During production - Some material is rejected because found faulty
    Solution:Here for the rejected material take back that material through reversal movement type.
    3. Rejected Material is sent to Quality for inspection ( the same material is inspected by the Quality at the time of GR ,but may be found faulty in production floor)
    Issue this material to quality through transfer posting (from unrestricted to quality inspection) using movement type 322.
    4. Quality Department do the inspection and found some quantity may be used after some rework and remaining quantity is rejected and send to Main stores to return to Supplier
    Once it's cleared from quality department here create inspection lot & thorugh usage decision clear that stock as unrestricted stock & again issue that material to production.
    Regards
    Ravi Shankar.

  • Quality samples during production

    Hi gurus,
    I have 2 quires so please help.
    1. I have a requirement that my customer (for costing reasons) wants to monitor the samples taken during production.
    How can we monitor this....I tried to confirm scrap quantity @ the phase of quality, but confirming scrap is not allowed, beside, he needs to know the quality samples separately from the production scrap.
    2. Another problem is the sample size in the inspection lot, lets say it was planned to take 3 samples but actually we took 4 samples, how can we update this number in the inspection lot.

    The exit depends on what you want to actually do and when.  You may find that you need the exit to just kick off a program that runs in batch a few minutes later to do what you want it to to avoid locks.  You could use and of the following possibly.
      QPAP0001      Enhancement - plan reading                                 
      QPAP0002      Enhancement for material/plan assignment, plan selection   
      QPAP0003      Conversion of sample unit of measure to material unit      
      QPGR0020      Customer Exit ExtensionParameter ALE Interface Code Group  
      QPL10001      QM: Inspection lot creation - editing work area on creation
      QPL10003      Sample calculation for inspection lot without plan         
      QPL10004      User subscreen for displaying additional data in insp. lot 
      QPL10007      QM: Inspection lot creation - change QM order type         
    Once the sample size is calculated I don't think there is a way to update it once resutls recordings have started. 
    FF

  • Error during OIM schema upgrade during product ugprade from 9.1.0.2 to 11g

    Hi All,
    We have received following error during product upgrade from 9.1.0.2 to 11g.
    Error occurred during fourth step ( Task 4: Use Upgrade Assistant to Upgrade the Oracle Identity Manager Schema)
    On the screen while running upgrade assistance (ua.bat)
    Following message came on screen.
    Schema Version registry >> succeeded
    Oracle Identity Manager Schema Upgrade >> Failed
    I could see only following error in the log file.
    \middleware_home\Oracle_IDM1/server/db/oim/oracle/Upgrade/Oracle_upg_91_92_x2ell_92.sql
    [2012-06-28T09:34:51.147-06:00] [FrameworkMR] [NOTIFICATION] [] [upgrade.FrameworkMR] [tid: 14] [ecid: 0000JWnikOB6qIvyKWYBSQ1Fv7Zd000005,0] finalize() instance 1 of 2
    [2012-06-28T09:35:00.863-06:00] [OIM] [INCIDENT_ERROR] [] [upgrade.OIM] [tid: 13] [ecid: 0000JWnijRj6qIvyKWYBSQ1Fv7Zd000004,0] UPGCMP-00924: SQL error [{0}]
    [2012-06-28T09:35:00.863-06:00] [OIM] [INCIDENT_ERROR] [] [upgrade.OIM] [tid: 13] [ecid: 0000JWnijRj6qIvyKWYBSQ1Fv7Zd000004,0] [[
    java.sql.SQLSyntaxErrorException: ORA-00955: name is already used by an existing object
    ORA-06512: at line 31
         at oracle.jdbc.driver.T4CTTIoer.processError(T4CTTIoer.java:457)
         at oracle.jdbc.driver.T4CTTIoer.processError(T4CTTIoer.java:405)
         at oracle.jdbc.driver.T4C8Oall.processError(T4C8Oall.java:889)
         at oracle.jdbc.driver.T4CTTIfun.receive(T4CTTIfun.java:476)
         at oracle.jdbc.driver.T4CTTIfun.doRPC(T4CTTIfun.java:204)
         at oracle.jdbc.driver.T4C8Oall.doOALL(T4C8Oall.java:540)
         at oracle.jdbc.driver.T4CStatement.doOall8(T4CStatement.java:202)
         at oracle.jdbc.driver.T4CStatement.executeForRows(T4CStatement.java:1074)
         at oracle.jdbc.driver.OracleStatement.doExecuteWithTimeout(OracleStatement.java:1466)
         at oracle.jdbc.driver.OracleStatement.executeUpdateInternal(OracleStatement.java:2123)
         at oracle.jdbc.driver.OracleStatement.executeUpdate(OracleStatement.java:2067)
         at oracle.jdbc.driver.OracleStatementWrapper.executeUpdate(OracleStatementWrapper.java:306)
         at oracle.ias.mrua.plugin.oim.SchemaUpgrader.loadScript(SchemaUpgrader.java:303)
         at oracle.ias.mrua.plugin.oim.SchemaUpgrader.doUpgrade(SchemaUpgrader.java:139)
         at oracle.ias.mrua.plugin.oim.OIMSchemaUpgradePlugin.doUpgrade(OIMSchemaUpgradePlugin.java:302)
         at oracle.ias.mrua.MRUA.executePlugins(MRUA.java:3672)
         at oracle.ias.mrua.MRUA.internal_driver(MRUA.java:2448)
         at oracle.ias.mrua.MRUA.driver(MRUA.java:1710)
         at oracle.ias.upgrade.gui.UAUpgradeThread.run(UAUpgradeThread.java:390)
    Any Idea ?
    Ritu

    Hi All,
    We are also trying to upgrade OIM 9.1.0.2 which is present in our environment to OIM11g. Request your help.
    Now how do we achieve the upgrade? Should my source of OIM9i software  and target of OIM 11g software  be installed on the same server?
    I did install OIM11g and OIM9i on the same server  and tried to do schema upgrade based on the link:
    Upgrading Oracle Identity Manager Environment
    But during examine phase I get error the below error
    UPGAST 00091- ERROR DURING EXAMINE OF COMPONENETS
    UPGAST 01004- UPGRADE IS UNABLE TO DYNAMICALLY LOAD COMPONENET SPECIFIC SOFTWARE MODULES.
    When i check in the log in internet it says :
    Cause: Repository upgrade framework was unable to dynamically load the Java classes of its component-specific software modules. mrua.xml file might have been corrupted.
    Action: This is an internal error. Verify that the Java classpath has been correctly set, the mrua.xml file is correct, and that the .jar files for all component-specific software modules are present in the jlib directory. Contact Oracle Support Services for assistance
    What is the javaclasspath to be set?how to check if mrua.xml and jar files are fine
    Pls help.Any help is much appreciated.

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Restrict Authorization at Material level during production confirmation

    Hi SAP Gurus,
    I would like to ask if its possible to restrict authorization at Material Level during production confirmation.
    Our scenario is we have SFG and FG which are handled by different group of people but it has the same Order Type. Now we want to restrict authorization such as one department can only confirm SFG and the other department can confirm FG only.
    Is it possible to set authorization at material type or production scheduler level. IF not possible, is there other way except creation of new Order Type?
    Thanks,
    Raymond

    Hi Raymond,
    DO you mean I should create a customized table for this?
    Yes
    Are there no standard way?
    As per my knowledge, you can control through production order type, so you need to create seprate order type for this
    Thanks,
    Sankaran

  • How to consider sample qty of raw material's quality inspection during mrp.

    hi expert.
    i have to consider sample qty of raw material's quality inspection during mrp.
    i am wondering how to implement it.
    is this possible?
    thank you~~!!

    Hi Seung Hyun,
    I think it depends on the sample quantity, whether it is a fixed quantity or it depends to the raw material quantity or requirement from the orders. If it is not fixed, then you can use scrap percentage as suggested by Vivek.
    If it is fixed quantity, then there are several alternatives to follow:
    Include the sample quantity to your safety stock
    Create another material number to distinguish the sample from the original raw material number and include it in the BOM
    Regards,
    Julian

  • Accounting entries during production cycle

    Hi
    Can someone tell me what are the accounting entries that take place during production from one process to another? Where is the accounts configured?
    Thanks

    Anyone?

  • How we may by pass quality inspection during PO creation

    Hi Guru,
    How we may by pass quality inspection via selecting document type in the PO. User create dummy PO in multi level marketing indsutry in order to achieve points & awards during month end. Since all the materials subject to quality inspection, material in dummy PO also falls under quality inspection. For your kind information there is no physical movement or GR for this dummy PO. It's just created in the system as I mentioned the purpose the above. I already created seperate document type to diffrentiate this scenario but looking forward how we may by pass quality inspection for this document type. Or is that any t/code which can by pass quality inspection during PO creation. Please advice. Thank you.
    rgds,
    nantha

    Dear Netto,
    As I said before user need to create dummy PO & must do GR in order to get the rewards & bonuses. User do GR in the system but it doesn't involve material movement. My question is how we may by pass the quality inspection for said GR since physically no goods involved.
    Dear JS,
    For your kind information this material subject to quality inspection & it has been set in material master. I tried one more as per your advice. System post this GR to quality inspection eventhough I change to unrestricted use in PO & GR as well before posting maid. Quality Inspection is auto defaulted for said material. Quality inspection is requirement to most of the goods so I can't change that. I'm wondering how we may by pass this just for dummy PO & GR.
    I believe this clarifies your queries. Thank you.
    rgds,
    nantha

  • Error during Production Order Confirmation

    I get a real wierd error during production Order confirmation.  The error message is
    "Additional items are not allowed
    Message no. ZOAL010"
    Can anyone throw some light on this?
    Regards
    Raj

    it is not std SAP message.
    you can check the user exit for confirmation.
    check in transaction code CMOD/SMOD for CONF*

  • Co products and by products during production process

    hi,
    I have a production scenario where in both co products as well
    by products exists during production process.
    We can maintain co products by choosing the indicator in material master and in BOM but how should i maintain the by products?
    And also, co products and by products produced will undergo further production process with different operations, in this scenario how I can include these operations and products in my production planning? and how the costs are calculated?
    Can any one please help in this regard.
    Thanks and Regards,
    Pavan

    Hi
    For Co-product just by choosing the indicator in material master and in BOM.
    So when ever u confirm the production order co- product GR done automatically through 101 movement type.
    For By-product
    1) u have to enter the byproduct code in the BOM with -ve sign if ur by-product is fixed qty.
    2) If ur by-product is varying qty then u have to post the by product qty through MIGO 531 movement type against the production order.

  • Batch no assigning during production order creation

    Sir,
    We are manitaining the batch management for inut raw materials. During production order creation it is mandatory to assign the batch no for raw materials then only production order releasing is possible.In our case due to batch assignement to production order while order creation,we are facing the lot of problems like batch no not assign for full req qty and also if unavailabilty of stock for particular batch no it will come to COGI.hereby i need experts help for,
    1.I want to determine the batch no during confirmation instead of order creation and also allow to release the production order even batch should be in blank.
    Kindly help
    Regards,
    PS

    Hi
    For Rawmaterials why cant'n you assign Batch nos buring GR of purchase order.
    Then you can do automatic batch determination during confirmation of order for mvrmt type ;261...
    This is  easy  to handle.
    Please check and come back
    Regards,
    srihari

Maybe you are looking for

  • File Association - Opening in wrong program

    Hi, I have a program file (Total Training for Photoshop CS Launchpad) which for some reason is opening up in Photoshop - I guess it's associated with it. but of course photoshop doesn't recognize the file... The file doesn't have an extension but in

  • Re: Very slow or non-existent broadband in the eve...

    I am having the same problem, every evening usually between 9 pm and 10 pm but at other time as well. Slower at other times in the evening as well.  I consider that the problem is serious enough that BT have not fullfilled their part of the contract.

  • Scrolling a movie clip

    Hi, I know that there are a number of threads on similar issues, but these are all confusing me quite a bit so I thought I should start a new thread to get an answer I'll hopefully understand. I have made my sight with specific diameters.  I've got a

  • Personalize Link and Standard User / End User Core Role

    Hi Expert, Need your help in customizing service that appear when Personalize hyperlink click on Portal Right hand side. I understand the Personalize hyperlink appearing from Standard User Role or End User Core Role. I have copied End User Core Role

  • InDesign won't load after update to Yosemite 10.10.3

    I can't get InDesign CC 2014 to load after updating my mac to Yosemite 10.10.3 I have uninstalled and installed InDesign twice now, restarted the computer several times, emptied the trash etc. Nothing helps.