Hi QM experts,
Inspection type 08 is asigned to the material. bue when we did a 322 mvt the system didn't create the Inspection lot but the stock posted to Qulaity inspection. All the movements happened on 3 years back.
Not possible to cancel the material documents because all already archived.
I want to scrap the material. Kindly advise to fix the Issue.
I can't perform 551 and 553 because i am getting error Mvt. only possible with QM.
Regards,
Senthil

Dear Senthil
Try to move the material to unrestricted by 321 movement type and try to do 551.
Other wise please activate 0800 inspection type by using QA08. It will create a lot for existing stock in QI. DO the stock posting after that
Please let me know your findings
Regards
gajesh

Similar Messages

  • Inspection lot generation during 322 movement type

    Hi Experts
    whenever we clear inspection lot from Quality we are having one issue first time user has given wrong UD code as Accepted,but that wasactually wrong,what he does is he will reverse the Lot through 322movement type,And again actually the material had to be sent for reprocess as shade is not matching,
    So the user will send the same material for Reprocess to Storage location-PF09.
    while doing 322 a new inspection lot is getting generated.while doing 322 movement why system is geenerating a new lot.Can we not make 322 in same inspection lot.
    Regards
    sandeep Patil

    Hi sandeep,
    You would have maintained inspection type -08 for making 322 movement type as otherwsie i dont think its possible to reverse the material to quality stock
    As you have maintained inspection type -08 so it will cerate a new inspection lot to execute 322
    Hope i have made it clear
    Regards,
    SVP

  • Inspection Lot not created after mvt 322.

    Dear All,
    I'm facing a problem : after a movement 322 no Inspection (QM) bach was created in QAVE...
    In MMBE WM stock view I've got the lot number (quantity 1, stock type Q), and the storage bin which match with the inspection lot.
    When trying to take the UD (QA11), the following error message appear :
    MMBE :
    Do you have any clue ?
    Regards,

    Hello Amol,
    Thanks for your answer.
    I gonna check QALS tomorrow as I don't have access to the system right now.
    I need to make some clarifications to my previous message, in fact ten inspection lots was generated under the same material document which had 10 items (via MB1B).
    9 Inspection lots has been accepted (321) and successfully put into the free stock by the quality, I only have this lot remaining coming from the same document as other ones.
    Material Master/Quality Mgmt and inspection types for this article/Plant has not been changed and are correctly set...
    I cannot use MB1B, mvt code 321 to move this QI stock to the free stock as QM is activated... I'll get something like "Change the inspection stock of material 0000000 in QM only".
    I thinks that, to clean the stock, the only option i've got is to make an inventory from Q stock (mvt 713).
    I'm trying to find out what are the root causes of this problem for this not to happen again....
    Thanks again for your help,
    Kevin
    PS : Just checked QALS table this morning, indeed, the inspection lot does not exist.
    So, i've got no trace of it in QM, but I'm able to find it in WM...
    Message was edited by: Kevin Bou

  • Inspection lot status with force UD

    How can i get list of inspection lot in which material is release forcefully. Is there any transaction code for this or Z development required
    AYK

    Dear AYK
    If I have understood your question correctly you want inspections lots which has been passed as
    1) Normal Accepted
    2) Accepted with Deviation ( Force fully !!!)
    3) Accepted but quarantine
    Its matter of UD code design and same should get selected in Selected set
    In QMIS reports you can search inspection lots having specfic UD code
    Hope you are looking for the similar solution.
    Regards
    GIRISH

  • Inspection lot 08 with reference to a process order

    Hi Dear gurus:
    I need to create a special lot class 08 (stock transfer), with reference to an order process.
    Any good idea would be apreciated.

    Hi
    As you must be aware that the process order is associate with 03 inspection type.
    This is customize setting which we maintain at order type level.
    But 08 is mainly created when you transfer the stock from one storage location to other.so 08 inspection lot origin is not attched with the process order type.
    With reference to proces order a lot of 08 can only be created if you transfer  lot from one storage loc to other.
    I hope this will add some value.
    Regards
    Sujit

  • 311 mvt should not genearte Inspection lot in production

    Hi,
    I have strange issue in QM:
    In quality When I am doing stock transfer with mvt 311, no Insp lots are getting generated, where as in Production When I am doing stock transfer with mvt 311, Insp lots are getting generated.
    I have checked Settings for MVT 311 ( Deactivate QM), Here in Quality as well as in Production for Mvt 311, QM deactivated check box is unchecked.
    I donu2019t know why inspection lots are getting generated in Production.
    Can you please help me in this regards.
    Thanks
    Utsav

    hi dear
    first of all against 311 it is the standard seeting, that when ever u go for a stcok transfer against this mvt type. inspection lot genrated with 08 type.
    in your dev server, if u checked in Quality Management--> Quality inspection-> Goods movement node--> Activate /Deactivate quality lot node and check for 311 mvt type, than u will find the Quality Not Active indicator . it is sure that particular that indicator in set. while on PRD it may not be there that's why u have a lot against ur posting.
    If that indicator is not set than lot will be their otherwise no lot. secondly if u activate 08 in your material master than during stcok transfer definitely a lot is there.
    so check it properly.
    regards

  • Inspection Lot with Zero stock posting qty

    Dear QM Consultants,
    We have come across following scenario,
    1.     Repetitive manufacturing
    2.     Material has inspection type 04 and Z04. Preferred inspection type is not ticked. Z04 inspection type has been assigned to inspection lot 04.
    3.     Production GR done by 131 movement
    4.     Inspection lot generated with reference to 131 movement type. Lot for inspection type 04 is created.
    5.     Inspection lot qty in QA32 it shows correctly as that of GR qty.
    6.     But when we click on UD, in stock posting tab, qty to be posted it shows as ZERO. So no qty is available for stock posting.
    Has anybody came across such scenario? Is this any bug? Any SAP note for this?
    Best Regards,
    Anand Rao

    Dear Sujit, Thanks for so prompt reply,
    Basically this is a complex case,
    1.     See we have set Posting Proposal in Usage Decision as u2018To unrestricted useu2019 in selected sets for usage decision. That means we need not every time go to stock posting tab. The moment we select ACC UD code it automatically posts the stock to unrestricted use.
    2.     Now, what has happed, by 131 movement declaration, backflush happened with 261 movement for child parts.
    3.     Inspection lots with inspection type 04 were created. (Here we did not note whether the stock was posted in quality inspection or in unrestricted use)
    4.     Now the requirement is to cancel 131 movement document. Kindly note UD were not given up to this moment.
    5.     Now through MFBF, user did document specific reversal. As a result of which and as per my knowledge 132 movement should happen and 262 should also happen. At the same time inspection lot status should be set to LTCA. But in actual case 132 movement happened and 262 did not. Surprisingly inspection lot did not set to LTCA status. It remained in REL mode only.
    6.     After this document specific reversal, user gave UD to these inspection lots without noticing where the stock was lying.(in unrestricted or in quality inspection). So the lot status set to UD   ICCO SPCO STUP after giving usage decision.
    7.     Now while doing reverse engineering that why 262 movement did not happen, we came to know that no 321 movement happened for the inspection lots which were generated with reference 131 movement document
    8.     Also, qty to be posted it shows ZERO as explained in my earlier post.
    9.     When we display 132 movement document through MIGO, in where tab it shows stock type as Quality inspection. That means stock was lifted from QI for 132 movement.
    In short  it cannot be predicted where the stock was actually posted whether in QI or in unrestricted use. But yes the post to inspection stock tick has been ticked in material master.
    Can you help further in this regard?
    Best Regards
    Anand Rao

  • Inspection lot with stock tab for sale return from customer.

    Dear,
    In our organization there are two scenarios,
    1)     Make to order- Strategy group -20
    2)     Make to stock- Strategy group -10
    I have maintained 05 inspection types in QM view for sale return inspection from customer.
    1) In make to order scenario Inspection lot created with inspection stock tab which is OK.
    2) But in make stock scenario no inspection lot is generated.
        Remember I donu2019t want inspection lot without inspection stock tab as per insp. type-06
    So please suggest me, what can I do for getting inspection lot with stock tab for make to stock scenario.
    Regards
    Shabbir Kureshi

    Hi
    QCC0>Quality inspection>Inspection lot creation>Inspection for shipping>Assign Inspection Lot Origin to Delivery Type-->aganist delivery type Enter 05 inspection lot origine
    Also in OMJJ check whether QM in active for mnt type 651
    Regards
    Sujit

  • Inspection lot per HU instead of batch in inter company stock transfers

    Hello,
    We are testing intercompany stock transfers and we face the following problem when we check inspection lots created at the receiving plant: one inspection lot is created for each HU, while we want one per batch.
    We multiplied tests with many combination on  material settings on inspection type 01 (which is inspection type used on inspection lot):
    u2022     with or w/o u201CInsp. for HUu201D
    u2022     u201CControl inspLotu201D: blank, 1, 2 or X
    without success!
    Letu2019s me precise that inbound delivery is created automatically from goods issue at issuing plant because we activated SPED functionality (then Hus numbers are directly taken from outbound delivery to inbound delivery).
    Also we noticed something that could help understand the problem:
    1.     when issuing plant picks HUs into the warehouse, they confirm TO via RF transaction (LM61). As a result, outbound delivery as a main item and there is a split by several sub items, as many as HUs confirmed
    2.     when we test the picking confirmation out of a non RF transaction (LT12), there is a main item but only sub items per batch (qty is then aggregated)
    What is maybe interesting to notice is in the first case, inspection lot at receiving plant is created per HU while in the second case, it is created per batch!
    Second behavior is what we require but RF pick confirmation is mandatory for us!
    Is there any chance to change QM behavior in that case?
    Thank you,

    Dear Gajesh,
    thanks for your replay. It is very helpful.
    Option A
    1) The finish goods would be are already release and that does not go with our Q-policy.
    2) Does this mean, I have an inspection lot at the point of time of GR from production to warehouse and another inspection lot at the time of delivery. That would mean I double my work?  And the time of delivery happens one day after GR from production but the Q-results still need some more days. I do not see how this should work.
    Option B
    1) What do you mean by multiple GR to the warehouse storage location?
    Where do I have to activate the copying option for the inspection lot?
    Here I see the problem still existing. The result of the MIC has not been found out yet, the UD can not be done and I do multiple goods movement to the warehouse. What is the lelp? If I could make several stock transfer from the q-stock within the inspection lot that would be the best.
    May I am thinking wrongly but the best would be to keep the stock in the q-stock. Does a suitable BAPI exist where I could program a logic to it or what do you think?
    Thanks for your feedback,
    Best regards,
    Heinz

  • Mass change in Inspection lote, when assigning UD Code.

    Dear all,
    curently we are facing an issue of having to mass change inspection lotes when assigning UD code.
    The senario is as follows:
    using the tcode QA16 I can mass assign UD code for various inspection lotes using the option "in background". The requisition of the client is, however, to enter also a description text, for all the lotes treated. I an use the tcode QA16 and run a UD manual option, that lets me enter a long text for each inspection lote, along with assigning UD code. That is not acceptable, since there are daily hundrets of lots, we are talking about. That makes the manual option very time consuming.
    Anyone had a similar issue? What I am looking for here is some exit, or other type of solution that allows me basically replicate the long text (the same for all treated lots) for various lots automatically. I was thinkig of QA16, making some necessary adjustments, but I not sure if it will serve for this purpose.
    Any suggestions will be highly appreciated,
    best regards,
    Anna

    Hi,
    I think you would need to go for BDC to achieve this. Since this is required on daily basis, you should run BDC to enter the long text against the UD for each batch. This should work.
    ntn

  • For the Inspection lot status is CRTD instead of REL status

    Dear Experts,
    Today I have observed strange behavoir of the system.
    For the Finished material 04 insp type, Every day we used to generate inspection lots automatically with MB31for 101 mov type.
    generated inspection lot status will be REL bydefault. Today we observed system status is CRTD.
    I have checked any material master/Inspection plan been change or not, but it was not changed.
    Please suggest how this behavior happen suddenly.
    Regards
    Don

    Dear Don,
                    Check in SPRO for inspection type configuration. Some body has changed the 'Task list usage' for Inspection type.
    If you are using '1' and if there is other one except '1' then system will create inspection lot in CRTD status.
    You need to change it manually in QA02 and assigne plan.
    Thanks and Regards
    Harriesh.

  • Process order batch number not reflecting in corresponding inspection lot

    Hi QM gurus,
    I am working on inprocess inspection for production. I am creating process order during that time batch no is generated automatically by the system. Now process order is released during this time Inspection lot generated with inspection type 03. Now the problem is in the inspection lot, process order batch number is not reflecting. I have checked all the master data seetings. All seems to be fine. what could be the problem. any settings missed can anybody help me out.
    Thanks
    Vinameath

    Hi Vinameath,
    Go to the Master Recipe (C202) of this Process order/Material. Go to Recipe Header tab and click on the Quality Management Header button.
    Now,go to the Partial Lot Assign field and maintain the value " 0 Partial Lots not supported " and save.
    Then create a new process order and in all probabilities, the batch should appear on the in-process inspection lot.
    Hope this helps you!
    Regards,
    Vinodh

  • Update of Order Changes in Inspection Lots

    Hi all,
    Is it possible to update production order changes in an inspection lot automaticaly with inspection lot origin 04?
    I know this is possible with inspection lot origin 03, but we use 04 in our company.
    Thanks in advance,
    B.
    Edited by: Brian O'N on Jul 21, 2010 2:06 AM

    Did you ever find a solution for this?  We have a similar requirement where we need to see the change history for our batch master characteristics.

  • Manual Inspection Lot Sales Order Reference

    Dear All,
    I have GRN a material and make a Manual Inspection Lot. Then i did the results recording and usage decision.
    1. Can we make a Sales Order reference to a Manually created Inspection Lot?
    2. Can we make a Purchase Order reference to a Manually created Inspection Lot?
    Regards,
    DTD

    We cannot create an inspection lot (QA01) with reference to either Purchase Order or Sales Order.
    Instead we can enter Vendor or Customer Number in the Inspection Lot and capture the Sales ORder Number or Purchase Order Number in Short Text Field.
    Best Regards,
    K. Raghavendra Nayak

  • Batch Mandatory in inspection lot

    Hi,
    I need to have a batch as mandatory while creating inspection lots manually with inspection type 89. As of now batch field is not mandatory.
    Please suggest.
    Thanks,
    Kalyan

    Hi ,
    Manual Inspection lot batch field is not mandatory .It is not possible during creation of lot .
    But at the time of UD system will ask you batch & not allow you to proceed further .
    If you want at time creation of lot please cheke with abaper that any user exit can be possible
    Regards
    SANIL