Inspection Lot at delivery - include manufacturing date

Hello,
  We have a requirement where for a Product which is being shipped to the customer the manufacturing date of the product on the delivery needs to be within a particular time frame (say 3 - 6 months). If not this is rejected by the customer.
This division does not want to use Batch Managment, this would  be an ideal solution. I was wondering wether is there a way this can be done by using inspections lot during outgoing delivery ? I was tryng to research Inspection lots , QM is not my strong forte I am trying to understand this process.
Any standard or customization suggestions would be welcome.
Thanks for your help in advance.
Jagruti

AKM,
Thanks for the reply back and outlining the different options. Unfortunately we do not have WM in SAP.
Could I request you to elaborate on the last point
"But if you are using make to order (special stock like sales order stock, project stock) you may be able to use material classification to select manufacturing date from material document number "
How can we use material classification in this ?
Thanks,
SAPLEARN

Similar Messages

  • Outbound Delivery without Manufacturing date

    Hi Guys,
    I have activated SLED in Article master.(We are using SAP IS Retail, ECC 6.00)
    At the time of GRN, users have entered manufacturing date to check
    remaining shelf life for an article.
    I have made following customization (using transaction code OMJE)
    (a) 3 No Check at Goods Issue for movement type 601,602, 647 and 648
    In spite of above IMG settings (No Check at at Goods Issue), system
    shows an error message that, Enter the date of production (Message No.
    12018) in transaction code VL02N.
    Pls note that, we don't want system to check SLED at the time of PGI.
    Any feedback....most welcome.
    Regards,
    Muralidhara

    Hi MURALIDHARA,
    Please Check your incompletness procedure.
    I guess u r sending the goods to the store. During stock transfer movement type 641, 603 are used. You will also have to set this indicator.
    Let me know if u r still stuck. I have the solution as i have already configured this process.
    Regards
    Tapan

  • QM Scenario for Automatic Data Transfer to Inspection Lot

    Hi Experts,
    I have explained one QM scenario below. And also mentioned queries that I have in this. Could you please help me out on the same?
    There are 2 SAP systems, A and B.
    Process works as follows:
    -Delivery is created at A with B as recipient.
    -Automatically an IDOC is being created and send out with the quality data of the batch/inspection lot (electronic COA)  
    -In the background a workflow is triggered which transfers the data to the goods receipt from production inspection lot.
    In the system B, a subcontracting plant (DE08) will be created. During the subcontracting the materials provided to the subcontractor in real-life, however in SAP it will be brought to the subcontracting plant on a storage location specific to the subcontractor.
    Now the subcontracting service itself will be simulated by a process order (own order type is ZSUB). During the creation of the process order, a service purchase requisition will be automatically created which is connected to the process order. This purchase order will be transferred to A.
    After processing the purchase order, A will send service to B. B will do the process order confirmation. After process order confirmation an Inspection lot of type 04 will get generated automatically.
    Once the service delivery from A to B is done, the IDoc incl. the QM-data will arrive. Workflow will be triggered by inspection lot status CNF (Confirmed) – I0009. Now the workflow needs to identify the 04-'Goods receipt from production' of the process order and transfer the data into this inspection lot. The connection for this would be the purchase requisition number which is included in the process order. So the connection would be from purchase order number- purchase requisition-process order-inspection lot.
    Workflow template: WS03100078
    Business Object: BUS2045
    I have following queries. 
    1. Do I need to create Z-business object or the standard one will do the job?
    2. If I need to create Z-business object, then what changes will be required in coding?
    3. If I am using standard one, what all settings need to be done?
    4. What configuration needs to be done in the workflow template?
    Thanks & Regards,
    Mrunal

    Dear Swarup,
    The standard BAPI 's BAPI_INSPECTIONPLAN_CREATE Or ‘QAPP_CUST_IP_CREATE are not fulfilling my requirement .I need to create inspectiontion lot in R/3 system , which will invoke a process for creation of sample in another subsystem.But it is not very clear to me what a sample really means in QM, as i am an XI consultant .should a sample contain the recently generated Inspection lot number and its corresponding datas  ?

  • QM-Delivery Inspection lot clubbing

    Dear Gurus,
    Is it possible to club the diiferent deliveris in to one inspection lot.
    For example, presently system creates 1 inspection lot per delivery.
    If user wants next delivery also linked to previous lot and no need of getting a new lot for the current delivery.
    Is it possible.
    Pls advice.
    Siva

    Hi Siva,
    You can use the Control Inspection lot field within the inspection lot default values to determine when the system must create the inspection lot. Eg for each material document or each purchase order etc
    Quality Management -> Quality Inspection -> Inspection lot creation -> Define default values for Inspection Type
    Regards,
    Roderick

  • Vendor code in Stock Transfer Inspection Lot(08)

    Hi Everybody,
    I have noticed that when a Stock Transfer lot is created, the 'Data for lot orogin' tab in the Inspection Lot shows Vendor code in 'Data for goods receipt' section at times and at times Vendor code is not included in this section.
    Please throw some light on the situations under which the vendor code is included and excluded.
    Regards,
    Manish.

    I can't say for sure but I would compare the triggering document.  I.e. Exactly what material movement is used in each case and what type of document triggered it, (I.e. an STO order).  Than look at those documents and see if and why a vendor number is available.
    FF

  • Change of Inspection Lot Specifications at the time of lot creation

    Hi,
    We are using In-process inspeciton.
    At the time of Production Order release an Inspection Lot is created automatically.
    We want the Lot Specification values to be changed based up on the Configuration of the Sales Order.
    Is there any User Exit or BADI  that can be used for this purpose?
    Ramakanth

    Hii,
    Lot specifcation values cannot be changed once inspection lot is created. If u know specification only after creation of inspection lot then u include unplanned inspection charcteristics. Here u can define spec after lot creation also.
    with regards,
    K.Lokesh.

  • Inspection lot, goods movements not possible!

    Hello dear SAP Gurus and friends,
    I am trying to do a stock transfer from Quality to Unrestricted in QA32, but SAP shows error "Please fill delivery note!".
    I have checked the Purchase Order and Delivery Note is filled!
    Can you please help?
    Thanks in advance,
    Adelmo Silva

    Hello,
    I can explain the process better:
    I receive the material from a Purchase Order into my warehouse, mov. type 101. Then the material as quality inspection on goods receipt activated, inspection lot is created and material stays in quality status on stok.
    After that, is time to do the results recording and usage decision. When usage decision is done with OK, I have to move the stock from status Quality to Unrestricted, correct? Here, SAP shows an error that I have to fill the Delivery Note!
    I checked the PO and the Material Movement that is in the Inspection Lot, and Delivery Note is filled! I have made debug on system and bypass the message. Material is now in Unrestricted. I just wanted to know what was the cause of this?
    Thanks and best regards,
    Adelmo

  • Inbound Delivery (DESADV): How to transmit SLED/BBD and Manufacture Date?

    Hello
    We have another challenging task to solve. Here is the scenario (SAP Release ERP 6.0):
    One Lindt company (supplier) sends an outbound DESADV IDoc to another Lindt company (Purchaser). Here the inbound DESADV should create an inbound delivery. Finally, the inbound delivery is replicated to the external WHS partner who does the Goods Receipt against this inbound delivery.
    The outbound DESADV contains all logistical data including SSCC. In particular, the batches have a manufacture date (LIPS-HSDAT) and a SLED/BBD (LIPS-VFDAT).
    SLED = Shelf Life Expiration Date
    BBD = Best-Before Date
    In the outbound DESADV the SLED/BBD is mapped by default into segment E1EDL24/VFDAT. For the manufacture date we implemented an user-exit.
    How does the inbound delivery look like? The batch number appears as "Vendor batch". The SLED/BBD does NOT show up even though the inbound DESADV contains the date in E1EDL24/VFDAT. This inbound DESADV did NOT contain any controlling segment E1EDL19. Adding this segment (QUALF = 'VDT' = Shelf Life Expiration or Best-Before Date) had no effect.
    Here is my assumption why the SLED/BBD does not show up in the inbound delivery created by the inbound DESADV:
    Because we do not yet have the "real" batch (just the "Vendor batch") the system ignores any SLED/BBD. As soon as the external WHS partner sends the GoodsReceipt message (as inbound WHSCON ) the inbound delivery is updated with the "real" batch as well as the SLED/BBD.
    QUESTIONS:
    (1) Why does the SLED/BBD not show up in the inbound delivery created by an inbound DESADV?
    (2) Do we need another user-exit to map the manufacture date into the inbound delivery?
    Once again thank you for sharing your time and expertise with us.
    Regards
       Uwe

    Apply SAP Note
    Note 1576788 - Transfer of exp. date
    (IDOC_INPUT_DESADV1) to inb. delivery
    Here are the correction instructions for your reference:
    =========================================
    FORM DESADV_IDOC_PARSE
    Delta001Context Block 
            IF NOT t_dlgn-vbelv IS INITIAL.
              t_dlgn-posnv = s_dl24-posex.
            ENDIF.
    Delete Block 
            mv s_dl24-brgew t_dlgn-brgew.
    Insert Block 
            mv s_dl24-vfdat t_dlgn-vfdat.                         "n_1576788
            mv s_dl24-brgew t_dlgn-brgew.
    Have fun!
    - Joemil

  • Triggering Repetitive manufacturing inspection lot - insp type 13

    Dear Expert,
    I have activated 13 insp type for my semi-finish material,
    in the routing also for the last operation control key has maintained.
    Finally in the production version also we have selected the the same routing.
    I am not able to create Inspection lot for repetitive manufacturing.
    Please tell me what settings need to be done.
    Thanks
    DON

    Dear DON,
                   Before posting thread please refer to earlier created theards you may find some thing which you were looking for related to your query.
    you will definatly find the solution,If the threads are not there then post the new thread with your query.Our great Gurus will help the needy.
    please refer to
    [In Process Inspection of Repetitive Manufacturing;
    for your repetitive manufacturing
    if this is not enough,follow this as given below.
    MM01/MM02
    Activate inspection type 09 at the time of material creation. AND enter the number of days in the field "Inspection interval" in QM view.
    This field indicates at what frequency in days you need to trigger the recurring inspection lot.
    QA05
    Define a variant for recurring inspection lot generation. Refer the below pasted link for the same.
    Related Thread
    It will trigger the inspection lots according to the date of next inspection date in he Batch.
    QP01
    You need to keep a inspection plan ready to record results for this lot.
    QA32
    Record Results for the inspection lot.
    Perform UD for the lot.
    To create variant through QA05 will not enough. You need to schedule the job, and release them also.
    To check whether you have successfully scheduled the job or not.
    Run QA05, here you will be able to see a line item for the variant you have created. correct?
    1}
    So select that line and click on the button "DISPLAY SCHEDULING", if the scheduling is not carried out, it will through the "Message no. 38001 - No jobs found in the display client" else will show the it will show "Recurring insp: job planning: list of scheduled requests."
    2}
    To schedule the job, select the variant line, and click on the button Schedule, it will lead you to the screen Recurring insp: job planning scheduling; start time.
    here you need to define "Job start date" and "Batch job start time", then click on "Schedule Periodically" and enter the at what frequency you want to replete the job run.
    At the this frequency (e.g. if you select day 1) then it will run the job daily at the time you have entered at "Batch job start time".
    3}
    Then replete the 1} to view your scheduling details. And the job is not released then release them else it will again not run and you will not have the lot.
    Edited by: vijaysap123 on Jan 25, 2010 11:33 AM

  • Inspection Lot created before Post Goods Recept of Inbound Delivery

    Does anyone have experience of an inspection lot being created before a Post Goods Receipt is performed for an Inbound Delivery. This is preventing me from receipting the stock as
    1. When you try to post goods receipt, I receive a warning that the stock can only be moved in QM only
    2. When I try to apply a UD in the inspection lot and post the stock, the stock cannot post as the Handling Units are linked to the Inbound delivery
    Any help would be welcome

    Hi,
    Please clarify whether you want to modify th efield at item or header. Please check the Badi names Starting with LE_SHP* .These BADI' are for Delivery.find the Suitable BADI and Apply it. For custom tab at header BADI is  LE_SHP_TAB_CUST_ITEM
    LE_SHP_TAB_CUST_OVER
    The BADI does not allow the update of data. There is a common trick used to perform the job ...
    - in the BADI, export the data to memory (e.g. in TRANSFER_DATA_FROM_SUBSCREEN)
    - in the old-fashion exit like USEREXIT_MOVE_FIELDS_TO_LIPS, import the data and map it.
    I hope this will resolve your issue. Thanking you.

  • Updating of QM info structures on the basis of inspection lot creation date

    Dear Gurus,
    Our business requirement is as follow:
    Suppose MM has received 10 consignment of a material (Goods receipt) against a material in month of Feb-2008 from a particular vendor.
    Inspection lot statistics in MCXA is updated on the basis of inspection lot generation, which is as per our requirement.
    Suppose this inspection take 2 days for analysis at laboratory.
    Now FI has to make payments for the month of Feb-2008 against this inspection results. They need the value of average quality parameter for the month of Feb-2008. (Average value of all quality parameter for the material of all the inspection lot which are generated in Feb-2008)
    I want that QMIS should update on the basis of Inspection Lot creation date not on the basis of result recording system date.
    I think there should be some configuration settings available for this purpose.
    Please help me out.
    Regards
    Honyal

    Any valuable input are welcome
    regards
    Honyal

  • Reverse a Return Delivery with inspection lot posted (QM)

    Hello experts,
    I want to reverse with transaction VL09 a good movement of a return client delivery with inspection lot. I posted the inspection lot and transferred the material to Unrestricted use (transaction QA11).
    Then I began the cancel Return Process and I transferred the material to Quality (movement type 322) to run VL09 with material in Quality stock, but the system displays  the following error message:
    You cannot cancel GR, since inspection lot is already partly posted
    Message no. QA046
    Diagnosis
    You are attempting to reverse a goods receipt although quantity postings have already been made from the inspection lot. This means that stock for the goods receipt has already been transferred and, for this reason, a cancelation of the document is no longer possible.
    Procedure
    Ensure that the postings in QM (within the usage decision transactions) are carried out.
    Please let me know what can I do to reverse the return delivery.
    Thanks in advance.
    Pablo

    You are trying to do the process which you ahve already transferred through Transaction QA11.
    The role of Cancel return Process has already been done by this transaction as the Stock has already been into Un- restricted.
    Best Regards,
    Ankur

  • Table for Delivery number & Quality inspection lot number.

    Hi Gurus,
    In which table, Delivery Number & Quality inspection lot number  are related?
    Reg.
    Amol

    Hi,
    In LIPS
    If required modify layout and select Inspection lot option
    Kapil

  • Inspection lot problem during inbound delivery

    Hi,
    I am facing following issue during inbound delivery.
    I have activated inspection type 01 in material master for a packing material. Created a PO for the material through ME21N. PO created. Now I am creating inbound delivery through VL31N with reference to PO no and vendor. When I am entering the storage location I am getting the below error..
    Upon investigating the issue system is creating the inspection lot
    But inspection lot is not showing in QA32/QA02.
    checked various threads but not of much use. I am not able to proceed further.
    Kindly help.
    Thanks
    Kumar

    Hi Kumar,
    Plz check in PO history, if GRN is done. If yes then plz check in GRN quantity tab, if inspection lot is created. IN QA32, in dynamic selection enter the inspection lot and click on 'select all inspection lot' and check if it is created in system. If lot is prepared then as per the error message someone from your department must be processing it.
    In Your inbound delivery screen check your tab status overview if it is A: GR not made or C: GR completed.
    Also during inbound delivery  storage location is picked up in inbound delivery automatically from PO you need not to enter it again.
    Plz check else post screen shot of PO history and QA32.
    Regards,
    Priti.

  • Deleted delivery and inspection lot  tracking

    dear all,
    i have an issue please guide me
    the senario is
    At my client , there is a delivery happening in  vl01n i will pick the required quanity  and  send the lot to the QM  for final doc audit then after the QC is passed it will released from the QM then i will do the Post Goods Issue .
    the problem is here in the client    i have created  a delivery document and i have picked the quantity and  issued for the final doc audit report , during that time the goods which have been picked will be in the Scheduled for delivery .
    Now if the quality check fails for( final doc auidit ( ie for pallletization ) or some nails and packing is not done properaly ) it has to go for rework for the final doc auidit .
    If the quantity is rejected and gone for rework.    i will have to delete the delivery document  and create a fresh delivery doccument .
    because only if i delete the delivery document  what ever the quanity is there in the Scheduled for delivery will be  moved backed to the Bonded store .
    and then only it is possible for the goods to be picked and send for QC and after QC pass  PGI will be done
    My problem is  is there any connection can be done from the deleted delivery document and the fresh delivery document
    so that
    i can able to track the inspection lot  generated in the both the deliveries   i.e ( the deleted one and the fresh delivery document for which the PGI is done )
    Based on this i can create a  zreport for the QCheck  , becasue the client wants to  have  a link between the inspection lots generated between the two delivery documents and based on that they wanted to track the inspection lot

    Hi
    regarding  the link between two  delivery documents , as you are deleting the delivery the delivery document  is not there in any table so you wont get the link even in the document flow table. or delivery table .
    So its not feasible to generate link.
    I would suggest a different approach ,pl investigate more before you go ahead,
    You can have   seperate storage locations one with internal QC ,Other FG store and third final dispatch or BSR store.
    When material is transferred from production to quallity store a inspection lot is generated .once it is cleared QM will have stocks in FG store .Materials in FG store should be availble for final audit and only material which is approved in all respects in transferred to BSR store from where it is immediately dispatched. so QM and other departments can always access the stock in QM for internal inspection , rework an dfinal dispatch through store location instead of delivery tracking.
    I hope this helps
    regards
    Mandar

Maybe you are looking for

  • HELP! flash error code #1065 variable TCMText is not defined

    Hi, Im doing a project for uni and trying to create a search bar throughout the flash document for people to find what they are looking for. Followed a tutorial online step by step and then i get this error. #1065 variable TCMText is not defined. I'm

  • At start up I get a white screen then eventually a blinking folder icon with a question mark in the middle

    Help!  As of today, my iMac will not boot up.  When I turn it on I get a blank white screen then, after about a minute, a blinking folder icon with a question mark in the middle.

  • Plz help me in my Analog Clock  !!!

    Hi everyone,this is super007remo.I am in a way of developing an Analog Clock n finished with clock structure and seconds hand.Can anyone help in adding minutes and hours hands ,plzzzzz.Any kinds os suggestions r invited. /*<applet code=time.class wid

  • Can't install latest iOS 8.1.2, "Install Now" button greyed out

    We have a new iPod touch that's running iOS 7.1.2. We're trying to update to iOS 8.1.2. The device is empty (no content, all Settings reset). The "Install Now" button on the Software Update screen is greyed out. The battery is full. We've restarted t

  • Only want english books

    Hello all! I am a new Ipad owner and am really enjoying what I have so far. (I am not so brave as to try an update to OS4 yet). My question here though, is when I search ibook store how can I get it to display only books written in English? Also, whe