Inspection lot creation after receipt of certain quantities?

Gurus,
My user requires the creation of an inspection lot of 1 piece after the receipt of 200 pcs in stock as a kind of audit. This is not a goods receipt feom production as it will be done for each piece. .but was is needed is an event to create a lot woth piece for after receiving 200 pcs ( these receipts most provably will be on different days & in different material documents)
Can I apply this requirement through sap standard or user exit ar abap?
Thanks in advance,

Hi,
Rephrasing it,
each piece will be assigned to a batch in a one to one relationship
One piece represent one batch, Correct? And when GR is done against production for this batch, you get an inspection lot. QA personal do the inspection and material moves to Unrestricted stock.
Beside, the goods receipt from production that will be performed as mentioned, the user may re-inspect one piece already present in the unrestricted use as a kind of audit. the user wants this auditing lot to be generated automatically for every 200 pieces instead of creating it manually.
After the initial inspection is over and material is lying into Unrestricted, user would again inspect each of them and need automatic creation of inspection for every 200th piece/ batch. Correct?
Is this what you are looking for?
If that is the case, I don't think automatic lots can be created since there is no movement involved. User is simply doing retesting but nothing in system then how would SAP understand that an inspection lot is required?
Even if some development is done to generate an inspection lot for every 200th batch received into Unrestricted, you would still need an inspection type to be activated against the material and some movement to be triggered.
ntn

Similar Messages

  • Inspection Lot Creation after UD

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after UD for the same batch number.
    There will be several GR during one shift for one SKU with the same batch number.
    F.E. shift (6 am to 2 pm) at 7 there will be first GR of finished good. Inspection lot is automaticly created and QA at 9 will make UD for this lot. If production will made GR after that a new inspection lot will be created for the same production batch.
    Is there any possibility to make only one inspection lot even if UD is taken.
    Thanks and regards,

    I guess what bothers me is that for your selection of "2" you include date. Our standard SAP system does not include date on that key choice.  Just material/batch/storage location.
    I re-tested one just to be sure.  Created a new process order for 30. Reveived 15.  Got an 04 inspection lot created.  Processed the lot, posted out the 15 to unrestricted and made the UD with an Accept code.
    Then I GR another 10.  These went straight to unrestricted as I expected.  Then I posted the final 5 in a 3rd GR.  Same result.. straight to unresticited.
    I'm not sure why your not seeing the same.  Again, seeing that 'date' in your number # choice is bothersome.  If some modified that to include the date of receipt and included the time stamp in that, then your going to get new inspection lots.
    Are you sure they didn't post it to a different batch on the second or third posting.  And of course, this does refer to the same process order.. correct?  You not using three different process orders for this are you?
    Craig

  • Inspection Lot Creation after GR

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after goods receipt.
    There will be GR once at the end of the shift with batch number. As batch generated during shift will be different, there will be multiple GR entry. But for every material only one result recording per shift is required and not for all batches generated. So, how to avoid creation of so many inspection lot? Automatic Inspection lot creation is required hence no question of manual creation of inspection lot.
    I checked function module ‘QAPP_CUST_IP_CREATE’ for inspection point functionality but its description “You can use the available function module to generate inspection points for the inspection during production already when the inspection lot is created.” Can I use function module ‘QAPP_CUST_IP_CREATE’ for restricting creation of inspection lot after GR?
    Request all Masters to help me in solving this.
    Thanks and regards,
    Devang

    Dear All,
    First of all thanks a lot for your response.
    I checked ‘Control Inspection Lot’ setting but even that can not solve my problem as in our case though GR with confirmation will be once in a shift (though in system shift is not defined) but batches will be different and hence material document will be separate. And requirement is to have single inspection lot per shift even if batches and material documents are separate.
    One option is to have multiple line items for GR in MB31 or MIGO or in COR6N. But all this transaction allows only one line item for GR against process order. So, can you suggest any function module or option to have multiple line items for GR.
    Thanks and regards,
    Devang

  • Manual Inspection lot creation

    Hi,
    In our scenario, there is customer inspection which is done after the final inspection.
    For this I have configured manual inspection lot creation after the final inspection.
    I expect that if a lot exists for a Sales order, it should not allow PGI for delivery.
    How can I set this?
    Regards
    Ramakanth

    With manual inspection, it may not be possible.But it possible by using standard inspection type 10.For this activate the insp type 10 in material master QM view and create the master data (insp plan). or you can use the same inspection as used for 04 insp type.For this do necessary config changes.Also in QM config, assign insp lot origin 10 to the delivery type used by SD(Std is LF).
    Vishal
    Edited by: VISHAL JONNALWAR on Aug 20, 2010 11:08 AM

  • Early Inspection Lot Creation on Goods Receipt

    I work for a company that melts steel into batches referred to as Heats.  Each of these Heats are processed through various steps to create tubing.  In the tubing operations multiple Heats are applied to production orders but the integrity of each Heat is always maintained.  If we do a Goods Issue for 6 Heats into a production order, we expect to do a Goods Receipt of 6 Heats from that production order and inherit all of the Heat related characteristics for each Heat processed.  At certain points we do laboratory tests for chemisties and properties of each Heat.  These tests are run while the order is being processed through other operations but need to be recorded against the batch.  We are thinking that we need to do Goods Receipt Inspection with Early Inspection Lot Creation.  It looks like this method will create a single Inspection Lot upon release of the Production order.  Is there a way to create multiple Inspection Lots that will correspond to Heat batches prior to the actual Goods Receipt?

    6 partial GR (Heats) are done against 1 production order? Then, you will have one inspection lot and one usage decision for the entire lot (03 / 04: Goods Receipt Inspection with Early Inspection Lot Creation.).
    Think this: Each heat can be one sample/ inspection point each, in case of early goods receipt. So, if you have 6 samples: 3 pass and 3 fails, then do the Usage decision on 3/6th of the quantity at the end of the test: this needs to done manual stock psting while doing the UD.
    So, you do the inspection at the sample levels, but not at multiple inspection lot level.
    There is a way to create mutiple inspection lots on partial GR for the same process order.
    The logic lies like this, if your previous inspection lot is reset on usage decision, then you will get a new inspection lot when doing a partial GR.
    If the UD is not reset case:
    (a) Usage decision open: It will increase the QI stock in the same inspection lot. This means no new inspection lot creation.
    (b) Usage decision done: It will post to unrestricted, thinking that the rest of the sample is OK!! So, again no new inspection lot creation.
    This I tried on 04 inspection type. I am not sure on 03. Hope this helps!!

  • Add Inspection chaterstics to recipee After Inspection Lot Creation

    In recipe I didnu2019t Enter Inspection Characteristics and inspection lot is created. Now I enter inspection Characteristics in Recipe with inspection points .Now I want to Attached Inspection Characteristics to Created Inspection lot. ?Is there any way to Attached Recipe characteristics after Creating inspection lot.?

    Hii,
    Option 1:
    It is possible to attach MIc to craeted Inspection lot using Unplanned Inspection characteristics. First Create MIC  with complete copy model, then atach same MIC in Results recording : characteristics overview screen of Inspection lot.
    Option 2:
    Check whther the relavant Inspection lot Process order is partially confirmed and delivery made. If not, then u can make changes in Master receipe and the same can get reflected in the same Inspection lot. After chages in Receipe goto cor2-->master data -->slect relevant Pv's.
    Else, If Process order is confirmed and delivery made , u cannot chage the inspection lot, then go with option 1 solutuon.
    with regards,
    K.Lokesh.

  • Inspection Lot creation for the 103 movement type

    <<Don't ask for or offer points>>
    Dear Experts,
    we have the requirement of Creating the Inspection lot for the 103 movement type. we have done all the necessary settings for 103 movement type (in OMJJ and under the node   Quality Management --> Quality Inspection -->Inspection Lot Creation -->Inspection for Goods Movements) but still I am unable to achieve the results. Same is happening for 105 movements.
    Kindly let us know what settings need to be done in order to achieve the same.
    Full points will be awarded for the reply
    Regards.
    Edited by: Matt on Sep 18, 2011 4:44 PM

    Hi,
    If you have activated two inspection types (eg 01, 0101) of same inspection lot origin (01), in material master you should  have a preferred indicator set for the inspection type for which you want to be selected when you perform goods receipt.
    This check box is available in the inspection type set up in the Material master.
    Also check whether the post to inspection stock indicator is set for the material (in the inspection type), then only material will be posted to inspection stock.
    Please confirm, what happens to the stock after making MIGO. check in MMBE and confirm
    Go through the link and maintain the necessary settings. I think default settings for 01 type should work.
    http://help.sap.com/saphelp_470/helpdata/en/2d/350e4d448c11d189420000e829fbbd/content.htm
    Regards
    Hari

  • Inspection lot creation not required for intercompany Stock transfer order

    Hi Team,
    The client  does not want system to create inspection lots for inter comapny STO. But for intra STO system does not create the inspection lot and thye are happy with it.
    I have have flagged the indicator "QM not active' for the movement type
    101 entry as below at transaction code OMJJ.
    101  B(goods movement for Purchase Order) X(Stock Transport Order)
    Even after flagging the above indicator, system is still creating the inspection lot at the time of GR for InterCC STO.
    Are you aware any other place to control inspection lot creation for Inter company STO.
    Thanks & Regards
    Mangesh

    The ispection types assigned to the material are given below.
    Z05 Goods Return Inspection(copy of 05)
    Z09 Shelf life extension Inspection(copy of 09)
    Z89 Inspection for Quality Assurance(copy of 89)
    Z90 Goods Receipt  for Trading goods( It is a copy of 01 inspection type)
    There is no inspection type 08 active in the material .
    Thanks & Regards
    Mangesh

  • Inspection lot creation during STO return

    Hello Gurus,
    is there a trick to trigger inspection lot creation during STO return ?
    Scenario is the following:
    1 - Creation of STO
    2 - Supplying plant ships materials... stock in transit
    3 - Receiving plant receives materials
    4 - Materials with defects -> Receiving plant add new line with return tick on the same material
    5 - GI from Receiving plant... stock in transit
    6 - Supplying plant receives materials -> Inspection lot has to be created
    I used inspection type 08 on Receiving plant w/o success.
    Many thanks.
    Stéphane

    No inspection lot is created when we return Materials to Vendor (Plant A) even if we maintain Inspection type 02.
    Before STO customizing, Plant B creates a subcontracting purchase order. Next Materials are sending to Vendor (Plant A) and put in "Stock provided to vendor" (Transaction ME2O).
    Vendor (Plant B) creates a Repair request (Sales document / Transaction VA01). Next run VRRE to reveice Materials to repair. Inspection lot is automatically created. The usage decision triggers the creation of Service order to manage all the repairing flow. Last step is to deliver Materials to Plant A and create Repair invoice.
    Repair request supports all repairing flow (inspection lot, service oder...), especialy status (out of warranty or not).
    After STO customizing, I expected the following result:
    1° - Return STO to Vendor (Plant A) / ME21N with return tick
    2° - Plant B ships Materials / MIGO wih 101 (SAP converts in 161)
    3° - Stock in Transit
    4° - Materials receive to Vendor (Plant B) / VL10B
    5° - Creation Inspection lot
    6° - UD triggered Service order creation
    7° - ...Repairing flow with Service order...
    8° - Materials ship to Plant B
    9° - Repair invoice
    10° - Stock in Transit
    11° - Plant B receives Materials
    As I said, there are 2 blocking points:
    - Inspection lot not created when Vendor receives Materials
    - Service order not created automatically (because no Repair request to support inspection lot, service order...)
    Thanks a lot for your help.
    Tell me if you have any questions.
    Stéphane

  • Inspection type 01 - inspection lot creation based on vendor batch number

    Hi Guys,
    this topic has been discussed several times here, but I was not able to find a suitable answer for my question.
    I am facing the folowing requirement:
    I have activated inspection type 01 for a raw material.
    I am receiving a firs goods receipt from vendor A with vendor batch number 0001.
    The system creates its own goods receipt batch number 0546 based on internal numbering.
    A new inspection lot is created.
    I am posting a second goods receipt from vendor a with vendor batch 0001.
    The system creates a new batch number 0547 based on internal numbering.
    A new inspection lot is created.
    I do not want to get the second inspection lot, because I received vendor batch 0001 before and I am assuming it has been inspected or is in inspection.
    Option 1: Post the second goods receipt against the first internal batch number created.
    I am aware of this need at the moment, but a user is not always checking if there is an internal batch with the same vendor received before.
    Can I customize the system to create inspection lots based on the fact that the vendor batch number was received before?
    Or do I have to use an exit and some ABAP code to get the wanted result?
    Thanks for your advice in advance.

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Updating of QM info structures on the basis of inspection lot creation date

    Dear Gurus,
    Our business requirement is as follow:
    Suppose MM has received 10 consignment of a material (Goods receipt) against a material in month of Feb-2008 from a particular vendor.
    Inspection lot statistics in MCXA is updated on the basis of inspection lot generation, which is as per our requirement.
    Suppose this inspection take 2 days for analysis at laboratory.
    Now FI has to make payments for the month of Feb-2008 against this inspection results. They need the value of average quality parameter for the month of Feb-2008. (Average value of all quality parameter for the material of all the inspection lot which are generated in Feb-2008)
    I want that QMIS should update on the basis of Inspection Lot creation date not on the basis of result recording system date.
    I think there should be some configuration settings available for this purpose.
    Please help me out.
    Regards
    Honyal

    Any valuable input are welcome
    regards
    Honyal

  • Inspection lot creation during GR with respect to Purchase Order

    Dear Experts,
    Here is my Question
    Inspection lot creation during GR with respect to Purchase Order
    Inspection type 01 set in the material master
    inspection lot will be created during GR for a Purchase order
    from my understanding for every GR a inspection lot will be created
    No batch Management
    but the requirement is irrespective to GR qty and number of times of GR
    we need inspection only one inspection lot
    For Instance
    There is a PO for 1000 kg no batch management
    now i do GR for 100 kg for 10 times with different dates
    now i need to have only one inspection lot
    not 10 inspection lot for each 100 kg
    can any one suggest a solution, please advise my understanding is correct
    Many thanks
    Raj

    Dear Raju,
    There is a solution for that .The setting can be done two ways, either in the material master or in the configuration
    1) Material Master
    MM02> QM View> Inspection Setup> 01> Control Insplot> 'X' An inspection lot for each purchase order item/order item 0r  An inspection lot for each material document and material
    a) 'X' An inspection lot for each purchase order item/order item
    This Means
    This setting is limited for use with the inspection lot origins 01 and 04.
    An inspection lot is only created during the first goods receipt for each PO item or production order.
    b) '1' An inspection lot for each material document and material
    If you set this indicator, the system creates only one inspection lot for a material document (in a goods receipt transaction) for each material. This setting is useful, if several purchase orders or partial deliveries are processed for the same material in a goods receipt transaction.
    2) You can do this default in the config
    SPRO > Quality Management >  Quality Inspection > Inspection lot creation >  Define Default values for inspection type > 01> Control Insp lot
    Hope this helps
    Regards
    gajesh

  • Auto Inspection Lot Creation.

    Dear Expert,
    I have created new inspection type as Z01 by copying the 01 and I have maintain Inspection Lot Origins and Assign Inspection Types under 01. After that I have assigned my new inspection type Z01 to material master and activated it with material post to quality. Up to this it is working fine but after GRN system is not creating the lot. Even thou material is posting to the quality stock but no lot is in QA32.
    But if I Create the lot wih QA01 it working fine and I'm able to do the UD also. But for no automatic lot generated for purchase order.
    Please provide the details how to resolve this issue?
    Thanks and Regards,
    Manish

    Dear Manish
    These are the procudural steps when going to create a new inspection type
    1) Maintain task list usage - SPRO> QM> Quality Planning > Inspection Planning> General> Define task list usages
    2) Maintain inspection type - SPRO> QM> Quality Inspection > Inspection Lot Processing > Inspection Lot Creation > Maintain inspection types (for eg Z89) - Also maintain the task list usage here
    3) Maintain Quality inspection lot origins and assign inspection types - SPRO> QM > Inspection Lot Processing > Inspection Lot Creation > Maintain inspection lot origins and assign inspection types
    4) Define default values for inspection type - SPRO > QM> Quality Inspection > Inspection Lot Processing > Inspection Lot Creation > Define default values for inspection type
    5) please check for any user exits in MIGO which have been used which is creating any issues.
    Regards
    gajesh

  • Automatic inspection lot creation  upon reaching the next inspection date

    Hi qm experts,
    I have this scenario; my client wants to make an automatic inspection lot creation as well as posting to quality inspection stock of certain materials upon reaching its next inspection date defined in the msc2n transaction; how shall i make the inspection set-up of this materials??Thanks
    Regards,
    Matildo, Edsel F.
    QM Consultant

    Ok, you have me confused.  You want to do this as a one time thing?  I thought you want it to look every day, or every week, for batches that have reached their next inspection date?
    If its a one time thing, then yes, just run QA07 one time.  It only looks at unrestricted inventory.  Do not set up any parameters in the bottom half of the screen for expiration date.  If you do, any of those that have reached expiration date will be moved to blocked stock and no inspection lots created.
    If you want this to run regularly, you, or someone, needs to use QA05 to set up the batch job to run on a regular basis witht the approriate "days" value for how often your running it and how far in advance of the inspection date you want lots created.  And of course tick on "to inspection stock".
    There is no "automatic creation" as I think your thinking.  You either run QA07 once a day, or once a week or as often as you want to.  OR you set it up in a batch job (QA05) to be run once a day, once a week or as often as you want to.
    When the batch job is running, it 'appears' that the lots get created automatically.  But it is the QA07 program being run in batch that is creating them.
    Craig

  • Inspection lot creation while partial comformation in 03 inspection type

    Hi
    I want inspection to be created while partial confirmation of operation in CO11N in 03 inspection.
    It is happening with release of production order.
    PLz let me know -if anybody can help.
    Regards
    Pooja

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

Maybe you are looking for