Inspection lot creation during GR with respect to Purchase Order

Dear Experts,
Here is my Question
Inspection lot creation during GR with respect to Purchase Order
Inspection type 01 set in the material master
inspection lot will be created during GR for a Purchase order
from my understanding for every GR a inspection lot will be created
No batch Management
but the requirement is irrespective to GR qty and number of times of GR
we need inspection only one inspection lot
For Instance
There is a PO for 1000 kg no batch management
now i do GR for 100 kg for 10 times with different dates
now i need to have only one inspection lot
not 10 inspection lot for each 100 kg
can any one suggest a solution, please advise my understanding is correct
Many thanks
Raj

Dear Raju,
There is a solution for that .The setting can be done two ways, either in the material master or in the configuration
1) Material Master
MM02> QM View> Inspection Setup> 01> Control Insplot> 'X' An inspection lot for each purchase order item/order item 0r  An inspection lot for each material document and material
a) 'X' An inspection lot for each purchase order item/order item
This Means
This setting is limited for use with the inspection lot origins 01 and 04.
An inspection lot is only created during the first goods receipt for each PO item or production order.
b) '1' An inspection lot for each material document and material
If you set this indicator, the system creates only one inspection lot for a material document (in a goods receipt transaction) for each material. This setting is useful, if several purchase orders or partial deliveries are processed for the same material in a goods receipt transaction.
2) You can do this default in the config
SPRO > Quality Management >  Quality Inspection > Inspection lot creation >  Define Default values for inspection type > 01> Control Insp lot
Hope this helps
Regards
gajesh

Similar Messages

  • Quality inspection lot creation during GR for STO

    Dear Friends,
    I have a Scenario for Quality inspection lot creation during GR with respect to STO
    can use inspection type 01
    or is there any other inspection type to create inspection lot during GR for STO
    Thanks & Regards
    Raj

    Dear Friends,
    when i maintain inspection type 08
    Inspection lot is created in GR  Plant
    Thanks for that
    but when i am moving the stock from  Plant  Sloc A to same plant Sloc B one more inspection lot is cretaed (movment type 311)
    if i go to SPRO i can deactivate 311 movement type to avoid creating inspection lot
    but it is client level , i need to restrict only for one plant
    is there any other way to control  just one inspection lot for one GR
    if you are not clear with my writing pls do not hesitate to ask for more information
    Thanks & Regards
    Raj

  • Inspection lot creation during STO return

    Hello Gurus,
    is there a trick to trigger inspection lot creation during STO return ?
    Scenario is the following:
    1 - Creation of STO
    2 - Supplying plant ships materials... stock in transit
    3 - Receiving plant receives materials
    4 - Materials with defects -> Receiving plant add new line with return tick on the same material
    5 - GI from Receiving plant... stock in transit
    6 - Supplying plant receives materials -> Inspection lot has to be created
    I used inspection type 08 on Receiving plant w/o success.
    Many thanks.
    Stéphane

    No inspection lot is created when we return Materials to Vendor (Plant A) even if we maintain Inspection type 02.
    Before STO customizing, Plant B creates a subcontracting purchase order. Next Materials are sending to Vendor (Plant A) and put in "Stock provided to vendor" (Transaction ME2O).
    Vendor (Plant B) creates a Repair request (Sales document / Transaction VA01). Next run VRRE to reveice Materials to repair. Inspection lot is automatically created. The usage decision triggers the creation of Service order to manage all the repairing flow. Last step is to deliver Materials to Plant A and create Repair invoice.
    Repair request supports all repairing flow (inspection lot, service oder...), especialy status (out of warranty or not).
    After STO customizing, I expected the following result:
    1° - Return STO to Vendor (Plant A) / ME21N with return tick
    2° - Plant B ships Materials / MIGO wih 101 (SAP converts in 161)
    3° - Stock in Transit
    4° - Materials receive to Vendor (Plant B) / VL10B
    5° - Creation Inspection lot
    6° - UD triggered Service order creation
    7° - ...Repairing flow with Service order...
    8° - Materials ship to Plant B
    9° - Repair invoice
    10° - Stock in Transit
    11° - Plant B receives Materials
    As I said, there are 2 blocking points:
    - Inspection lot not created when Vendor receives Materials
    - Service order not created automatically (because no Repair request to support inspection lot, service order...)
    Thanks a lot for your help.
    Tell me if you have any questions.
    Stéphane

  • How to create an inspection lot for each line item of the Purchase order?

    Hi,
    How to create an inspection lot for each line item of the Purchase order ?
    In detail if possible.

    Hi
       please check this
    [thread|Create Inspection Lot;

  • Central Sales Tax Amount with respect to Purchase Orders

    Is there any way to get Central Sales Tax amount with respect to Purchase Order Numbers. I need this for report.
    Pls get me table numbers from which i can extract

    Hi,
    Refer report J1I2 - Sales Tax Register
    Here in the selection screen, enter Tax code, CST Condition type, etc...
    Also refer report S_ALR_87012357 - Advance Return for Tax on Sales/Purchases

  • Inspection lot before GR with respect to Purchase Order

    Dear Friends,
    Here is my Question
    If i use inspection type 01 ,Normally there is a inspection lot creation while doing GR with respect to PO
    but my Question is
    we need two inspection lot one is before GR and another is after GR , is there any settings or solution for this
    Thanks in advanace
    Regards
    Raj

    Hi Raj
    you can create inspection lot before GR by using inspection type 0101
    normally this inspection type is used for source inspection
    assign this inspection type 0101 to that material , create quality inforecord for material and vendor
    assign inspection type 0101 in that inforecord, now when P.O gets generated in MM
    you can generate inspection lot W.R.T that P.O through transaction code QI07
    please revert back for any help reqd.
    Thanks
    Vinay

  • Inspection lot creation not required for intercompany Stock transfer order

    Hi Team,
    The client  does not want system to create inspection lots for inter comapny STO. But for intra STO system does not create the inspection lot and thye are happy with it.
    I have have flagged the indicator "QM not active' for the movement type
    101 entry as below at transaction code OMJJ.
    101  B(goods movement for Purchase Order) X(Stock Transport Order)
    Even after flagging the above indicator, system is still creating the inspection lot at the time of GR for InterCC STO.
    Are you aware any other place to control inspection lot creation for Inter company STO.
    Thanks & Regards
    Mangesh

    The ispection types assigned to the material are given below.
    Z05 Goods Return Inspection(copy of 05)
    Z09 Shelf life extension Inspection(copy of 09)
    Z89 Inspection for Quality Assurance(copy of 89)
    Z90 Goods Receipt  for Trading goods( It is a copy of 01 inspection type)
    There is no inspection type 08 active in the material .
    Thanks & Regards
    Mangesh

  • Creating Sales order With Respect To Purchase Order

    Hi Friends,
         Requirement is that in source system for exp Company A
    creating Purchase order now with respect to this purchase order...
    In Target System.for Exp Company B Sales Order Should be created.................
    For this in Source system........i m using message type orders
    when i m creating Purchase Order Idoc Successfully send to reciever......but in reciever idoc coming with error(sales organization,dist channel not found for customer 1000).......
    sales order not getting created automatically..............
    and customer 1000 is automatically coming i dont know how....?
    pls tell me what is the necessary configuration required for vendor,customer.....in source and destination side.....?

    DIDC   1500000000000032795700 03        1A000000001KUS004
          E1EDK01                         INR   1.00000                                                               ZPOR0000600764
          E1EDK14                     0141000
          E1EDK14                     01410
          E1EDK14                     00900
          E1EDK14                     013ZPOR
          E1EDK14                     0111000
          E1EDK03                     01220080122
          E1EDK03                     01120080122
          E1EDKA1                     AG S004
          E1EDKA1                     LF 0006000023
          E1EDKA1                     WE                  D001             Food Park - Kalamboli
          E1EDK02                     0010000600764                               20080122190024
          E1EDP01                     00010 0010 50.000         EA 50.000         EA        5              1         250
              E1EDP20                     50.000         0.000          20080126
              E1EDP19                     001000000000006000006                 ,hjurv Godrej Eazy wash1(curt change)
              E1EDP19                     0031234567891012
          E1EDS01                     002250               INR
    this is my segment detail i u told i hv created see bold char

  • Inspection Lot Creation after UD

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after UD for the same batch number.
    There will be several GR during one shift for one SKU with the same batch number.
    F.E. shift (6 am to 2 pm) at 7 there will be first GR of finished good. Inspection lot is automaticly created and QA at 9 will make UD for this lot. If production will made GR after that a new inspection lot will be created for the same production batch.
    Is there any possibility to make only one inspection lot even if UD is taken.
    Thanks and regards,

    I guess what bothers me is that for your selection of "2" you include date. Our standard SAP system does not include date on that key choice.  Just material/batch/storage location.
    I re-tested one just to be sure.  Created a new process order for 30. Reveived 15.  Got an 04 inspection lot created.  Processed the lot, posted out the 15 to unrestricted and made the UD with an Accept code.
    Then I GR another 10.  These went straight to unrestricted as I expected.  Then I posted the final 5 in a 3rd GR.  Same result.. straight to unresticited.
    I'm not sure why your not seeing the same.  Again, seeing that 'date' in your number # choice is bothersome.  If some modified that to include the date of receipt and included the time stamp in that, then your going to get new inspection lots.
    Are you sure they didn't post it to a different batch on the second or third posting.  And of course, this does refer to the same process order.. correct?  You not using three different process orders for this are you?
    Craig

  • Inspection Lot Creation after GR

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after goods receipt.
    There will be GR once at the end of the shift with batch number. As batch generated during shift will be different, there will be multiple GR entry. But for every material only one result recording per shift is required and not for all batches generated. So, how to avoid creation of so many inspection lot? Automatic Inspection lot creation is required hence no question of manual creation of inspection lot.
    I checked function module ‘QAPP_CUST_IP_CREATE’ for inspection point functionality but its description “You can use the available function module to generate inspection points for the inspection during production already when the inspection lot is created.” Can I use function module ‘QAPP_CUST_IP_CREATE’ for restricting creation of inspection lot after GR?
    Request all Masters to help me in solving this.
    Thanks and regards,
    Devang

    Dear All,
    First of all thanks a lot for your response.
    I checked ‘Control Inspection Lot’ setting but even that can not solve my problem as in our case though GR with confirmation will be once in a shift (though in system shift is not defined) but batches will be different and hence material document will be separate. And requirement is to have single inspection lot per shift even if batches and material documents are separate.
    One option is to have multiple line items for GR in MB31 or MIGO or in COR6N. But all this transaction allows only one line item for GR against process order. So, can you suggest any function module or option to have multiple line items for GR.
    Thanks and regards,
    Devang

  • Inspection lot creation based on "right" inspection plan version

    I manage inspection plan ( inspection lot origin 01 ) with Change number; in this way I have differents inspection plan version based on date.
    When I do a Good Entry based on purchase order , I need that system creates inspection lot version based on the purchase order creation date and not , as now, based on good entry date
    Is it possible ?
    When I create the purchase order I send to vendor also the inspection plan characteristich that have to be maintened ; for this reason I need to find same characterist during good entry inspection
    Regards
    Silly

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Control of Inspection Lot Creation (Lot Summary) in Material Master

    Dear Experts,
    I would like to set the "Control of Inspection Lot Creation" to '1' An inspection lot for each material document and material"
    But according to Help (F1), the lot summary is not supported ship the stock to unrestricted-use for skip lot.
    <If you have made settings for the lot summary, no ship to stock takes place for skip lot. That is to say, the stock type is not immediately changed from "in quality check" to "unrestricted-use".>
    Any idea to solve this problem?
    Thank you very much.
    Regards,
    Wong

    Dear Wong
    If both a skip lot and an automatic usage decision occur, the system performs a ship to stock without posting the material into the quality inspection stock. The ship to stock does not take place during inspection lot summary.
    It seems the '1' An inspection lot for each material document and material" is creating an inspection lot summary by which it is preventing the ship stock movements. I have tested with this and found that this works only for  each material document only
    The solution could be run a program in the backgroud setting the automatic UD so that the skip lots are cleared at the earliest. you can do this with the help of QA17, QA16
    Regards
    Gajesh

  • Inspection lot creation while partial comformation in 03 inspection type

    Hi
    I want inspection to be created while partial confirmation of operation in CO11N in 03 inspection.
    It is happening with release of production order.
    PLz let me know -if anybody can help.
    Regards
    Pooja

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Inspection lot creation for inspection type 05

    Hi Gurus,
    We have finished material FERT & semifinished material HALB.We have assigned insp. type 02 & 05 in material master of matl. HALB.When we create production order for FERT & confirm the order , inspection lot is generated for matl.HALB of inspection type 02.
    Now we are reversing the goods issue by movement type mb1a, movement 262.In customizing for movement 262 inspection lot origin 05 is assigned.
    My problem is that when i reverse the goods issue with mvmt.262, inspection lot is not created for insp. type 05. What should be the reason behind this? or are any changes to be done to above setting?
    Regards
    Ram

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Inspection type 01 - inspection lot creation based on vendor batch number

    Hi Guys,
    this topic has been discussed several times here, but I was not able to find a suitable answer for my question.
    I am facing the folowing requirement:
    I have activated inspection type 01 for a raw material.
    I am receiving a firs goods receipt from vendor A with vendor batch number 0001.
    The system creates its own goods receipt batch number 0546 based on internal numbering.
    A new inspection lot is created.
    I am posting a second goods receipt from vendor a with vendor batch 0001.
    The system creates a new batch number 0547 based on internal numbering.
    A new inspection lot is created.
    I do not want to get the second inspection lot, because I received vendor batch 0001 before and I am assuming it has been inspected or is in inspection.
    Option 1: Post the second goods receipt against the first internal batch number created.
    I am aware of this need at the moment, but a user is not always checking if there is an internal batch with the same vendor received before.
    Can I customize the system to create inspection lots based on the fact that the vendor batch number was received before?
    Or do I have to use an exit and some ABAP code to get the wanted result?
    Thanks for your advice in advance.

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

Maybe you are looking for

  • ITunes 10.5 and Win7 64bit: Airplay button doesn't show up. Please help!

    I am running Win7 and recently installed iTunes 10.5. Before I was using an older version of iTunes which allowed me to stream my music via airplay to my airport express, but I could not access iTunes-store with the old version of iTunes. Since I've

  • Airport Express no longer "sees" remote speakers

    The problem started this morning. I un-slept my computer, opened iTunes 5.0 and it hung while trying to connect to remote speakers, requiring a force quit due to "(not responding)." I opened iTunes again and this time it didn't even see the speakers

  • Powershell does not recognize the path environment variable

    Hi, I am running powershell in ws2012 r2 version and when i attempted to run executable whose path is defined in the env:path variable, it can not run. Here is the output. How do I make the path recognizable in powershell so I dont have to type full

  • Iphone 4 screen locked

    my iphone's screen is locked, it says that is locked, my iphone is like in a mode. Sometimes screen unlocks and when i unlock the screen with my password , screen locks and goes black again. I turn on the voice, that voice says that my screen is lock

  • Moving layers into Group

    I am a web designer and have created a script that puts a browser UI around a Photoshop document. The action places several images and creates several text layers. What I want to do is place all the images then add them into a group called "BROWSER".