Inspection lot for a cost center purchase

Hello ,
After the results recording , it is not possible to go any good movement in the UD screen . Why SAP is not recommending one more goods movement for a cost center purchase ?
Thanks for your help
JN

Hi
Stock posting screen is for MRP type of PO's.When it comes to cost center like K then it will affect the UD screen as cost center should flow from PO & some one who is taking UD should not able to change it,As it is not under quality perview.It is part & parsal of MM.
Now When you reject such now RD takes place.wHAT YOU CAN DO IS ,REVERSE THE MATERIAL DOCUMENT.This can be done by MBST or MB01 or MIGO.This will reverse & you can again do Migo.
This route is followed by samp as consumption immediatly takes place after GR is created.Then why you reject material when already comsumed.??
Regards
Sujit

Similar Messages

  • One inspection lot for multiple materials of purchase order line items

    Hi All,
    My client requirement is one inspection lot for multiple materials of purchase order line items.
    Please share your thoughts.
    Thanks in advance for early reply.
    Regards,
    Jishu

    I totally agree with Amol.
    I don't think I would touch that development nor would I ever tell a client it could reliably be done through development.
    Knowing what I know about the table structures, I don't think you could create any development for this that could use a significant amount of the existing tables and functionality.  I think you'd have to create all your own Z tables and basically rebuild the functionality.  Tying it back in with SAP data will be difficult.
    You're even looking at all custom screens for your results recording and UD as well.  And if you have follow-on functions like batch classification requirements, batch determination, COA publication, results copy functions, use of DMR and sampling procedures, physical samples, quality notifications, etc. etc.. you could be looking a whole lot of development.
    Craig

  • How to create an inspection lot for each line item of the Purchase order?

    Hi,
    How to create an inspection lot for each line item of the Purchase order ?
    In detail if possible.

    Hi
       please check this
    [thread|Create Inspection Lot;

  • Customer number not in the inspection lot for a make to order scenario

    Hi All,
    I know that standard SAP will get the Customer number into Insp. lot only for insp. types 10/11/12.  I am wondering if someone know a way to get the customer no. into insp. lot for insp. type 04 where the material is make-to-order scenario and the Production/Process order has the Sales order and customer no. without activating User-exit.  The quality users want to be able to see the customer no. in insp. lot without having them to go to process order. 
    It makes no sense to me why the customer no. is not brought into insp. lot when that is available in the Prod/process order, which can further be used to select the customer specific insp. plans for 04 insp. type Insp. lot without using Variant configuration.
    Any light on this topic is appreciated.
    Thanks.

    Hi Srikant,
    I guess.........
    Normally the inspection lot refers the triggering document that are the trigger cause for them.
    - Inspection type 01: - Purchase Order and GR material document.
    - Inspection type 03: - Pro. Order Number
    The same way...
    The inspection type 10\11\12 are purely related to the SD, and directly integrates QM and SD. Hence in the inspection lot for the inspection types directly integrated to SD, it will furnish the Sales order number \ Customer.
    But the inspection type 04 is purely have it's relation to Production process. So it will have the details related to integrations it has i.e. the "Pro. Order." Hence it integrates QM-PP, it have the data related to PP (Pro Order), not the SD's one.
    But I think one way you can achieve it,
    Assign the Customer number also to the inspection plan along with the Material. So I think at the time of assigning the inspection plan to the inspection lot, it will refer the Customer number also and will display the Customer number along with Task list Group\Group Counter, in the inspection specification screen in QA03/02
    Regards,
    Shyamal

  • Block goods receipt if open inspection lot for source inspection (SAP QM)

    hello!
    i would like to block the goods receipt for a purchase order item, if there is an open inspection lot for source inspection. i know how to block, if it rejected, but not what to do in this case.
    thanks!
    matthias

    Hi matthias,
    can you tell me how to block GR if inspection is rejected in source inspection??? as you said u know. please let me know.
    Thanks!!
    vinay

  • BW report authorization for restrict cost center

    dear all,
    i have problem on BW report authorization for restrict cost center.....when i execute the query, after selection screen, appear error message 'you cannot change zv_cctr for characteristic 0COSTCENTER during query'.
    note : zv_cctr is variable restriction for costcenter, type processing = customer exit.
    below the customer exit :
    WHEN 'ZV_CCTR'.
        IF i_step = 2.
          DATA : gt_mstuidvscc TYPE TABLE OF  ztbw_mstuidvscc,
                 gs_mstuidvscc TYPE  ztbw_mstuidvscc,
                 wa_final2(10) TYPE c.
          SELECT * FROM ztbw_mstuidvscc INTO CORRESPONDING FIELDS OF TABLE gt_mstuidvscc
            WHERE userid = 'sy-uname'.
          LOOP AT gt_mstuidvscc INTO gs_mstuidvscc.
            wa_final2 = gs_mstuidvscc-kostl.
            l_s_range-opt = 'EQ'.
            l_s_range-high = wa_final2.
            APPEND l_s_range TO e_t_range.
          ENDLOOP.
        ENDIF.
    Regards,
    Tony

    i defined variable as ready for input and mandatory.
    regards,
    Tony

  • Automatic creation of inspection lot for Expired Batches

    Hi All,
    I am in one trouble and need some help in above scenario.
    I am able to create inspection lot for batches about to expire, but how to create inspection lots for batches which were already expired or which next inspection date already missed?
    Master data like '09' inspection type, inspection plan is already maintained.
    Second question, is QA07 also affect on special stocks like vendor stock or project stock etc?
    Immediate response will be appreciated.
    Thanks

    Hi
    To meet you above mentioned requirement you have to modify the program RQAAAS10 as per your logic both to create lot for Expired Material and to consider project stock or vendor stock as In standard SAP these stock are not considered.
    regards
    Manish

  • Creation of one inspection lot for more than 1physical sample

    hello SAP,
    we have one common question.I have created 3 physical sample 20000006,2000007,2000008 and now i want to create one inspection lot for these 3 physical sample through QPR5 Transaction but system is generating each inspection lot for each physical sample which is wrong process. this is common scenario for most of the industry.SO please clarify and provide the solution

    Hi,
    I hope this solution gives some way out for you to solve your problem . I assume the sample is for  the same material , phy. sample type and category
    Create a new physical-sample drawing with refernce to :
    Using this function, you can create a new physical-sample drawing (with one or more physical samples) that references:
    An inspection lot
    A production order or process order
    A production version
    You use this function to create physical samples that have not been planned in a sample-drawing procedure and which you can draw from a production process according to your specific needs. In an inspection during production, for example, you can draw physical samples from the process on the basis of time or quantity (for example, a physical sample every three hours or for every 1000 liters of material produced). You can freely specify the inspection-relevant operations in which you want to inspect the physical samples for the new physical-sample drawing.
    please do let us know wether you were able to create one inspection lot .Or else please ellaborate the question step wise t-code and functions Will try to find a solution .
    cheers
    kp
    source of information : SAP

  • Get Name for CO Cost Center Group and BGD Processing

    Hi,
    I use these function modules to get the cost center group nodes in the CO hierarchy.
    If I pass it a value that is in two controlling areas
    if prompts another screen to pick which controlling area we want to look in.  My problem is when I try to run this report in the background it gets hung up on this screen waiting for input. any ideas on how to get around this.
    here is the reference code.
    thanks
    Please note that the following logic is parts of SAP example report
    RGSEX001.
    Get the internal Set-ID from the external name of the set
    Selection of sets can be restricted to a specific set class or
    to sets matching a specific table field.
    See documentation of function module G_SET_GET_ID_FROM_NAME
    If the set class, subclass and setname is known, function module
    G_SET_ENCRYPT_SETID should be used alternatively (see RGSEX020)
        CALL FUNCTION 'G_SET_GET_ID_FROM_NAME'
             EXPORTING
                  shortname = w_set
                  old_setid = w_setid
             IMPORTING
                  new_setid = w_setid.
    Read the complete hierarchy (set and all subsets)
        CALL FUNCTION 'G_SET_TREE_IMPORT'
             EXPORTING
                  setid              = w_setid  "Set-ID, not the Setname!!!
                  no_table_buffering = ' '
             TABLES
                  set_hierarchy      = it_hierarchy
                  set_values         = it_values.

    Hi!
    For reading cost center hierarchy you can try K_HIERARCHY_TABLES_READ.
    It returns near the same info as one you've mentioned, works well for single controlling area and I hope in case of ambiguity it will raise one of exceptions provided. Give it try.
    Regards,
    Maxim.

  • Using the tcode:S_ALR_87013611, no report data  for the cost center

    Hi,Friends.I need a help.
    In the tcode FB60,i entered the following data and then posted the vendor inovice sucessfully.
    data:
    ( Note: G/L acct:55020141 is also a primary cost element)
    In the tcode:S_ALR_87013611,I entered the following data and executed.
    but the result is:{Report contains no data. Check the selection log}.
    data: { Controlling Area: C999, Fiscal Year: 2010, From Period:1, To Period:12,Plan Version:0,
            Or value(s):2001}
    (Note: Cost center:2001 belongs to Controlling Area: C999) 
    please tell me how to do,so that using the tcode:S_ALR_87013611, I can see the report data  for
    the cost center 2001.
    sincerely                      WenYao Ma
    Edited by: wenyao ma on Mar 22, 2010 1:09 PM

    thank you,friends.
    I just solved it.
    Solution:
    1) Maintain Controlling Area
       path:spro>Controlling>Organization>Maintian Controlling Area>Maintain Controlling Area.   tcode:OKKP
    In the {Activate components/control indicators}cost center should be 'component active'
    2) Maintain Number Ranges for Controlling Documents
       path:spro>Controlling>Organization-->Maintain Number Ranges for Controlling Documents.   tcode:KANK
      Element { COIN CO Through-postings from FI} should be assigned to one group.

  • No accounting document created for distributed cost center and asset

    Hi experts,
    Why there is no accounting document created during GR for distibuted cost center and asset?
    Thanks

    Sorry guys, there's nothing to do with the config of the account assignment. The postings are ok for single cost center or single asset. SAP system message (info messsage) " Goods receipt for distributed cost center will be non valuated" are given when you are trying to unticked the GR non valuated.
    If someone could explain what is the logic behind that behavior.
    Thanks again.

  • GRN With 2line items(material,batch same)one inspection lot for 2line items

    Dear Experts
    As and when we make a GRN with 2 line items and same batch number we enter no. of containers differently but only the number from the first line item is flowing into the Inspection lot origin.We are creating only one inspection lot for 2 line items as the batch number is same for the items.
    1. In material master i have given 01 inspection type ( with control inslot.. Each material document,batch, storage location) :---
    this is the reason system is creating only one inspection lot.
    i am entering manually same batch number for 2line items...
    Here my problem is ... while giving UD... SYSTEM IS PICKING ONLY FIRST LINE ITEM NO.OF CONTAINER... IT HAS TO BE BOTH LINE ITEMS CONTAINERS.... IT IS PICKING BOTH LINE ITEMS QUANTITY... NO.CONTAINER ONLY IT IS NOT PICKING....
    Waitting for  experts reply

    Hi,
    As per your query if you put in MM forums then you will get the reply immly.
    Anil

  • Creating inspection lot for vendor returns

    Hi All,
    In Subcontracting, components are sent to vendor using Mov Type 541, if vendor returns the components without any value addition we recieve the goods with Mov type 542.
    Now, when we recieve the goods using 542 customer requires that the material has to be posted to quality inspection and a lot has to be created.
    I have already tried with inspection type 08 but its not working.
    Any ideas how it can be done?
    Regards
    Naveen Goveas

    Hi Naveen,
    You have come across a common problem in later releases of SAP. Ram is nearly right in the settings for control of inspection lots for goods movements. In the standard system movement type 542 has no inspection lot origin assigned, so even if you have maintained an inspection type for your material there is no "trigger" for the inspection lot creation from that movement type. Unfortunately, you cannot change the inspection lot origin settings for movement types. The only choice you have is to create (as a copy) a customer defined movement type (one which already has the appropriate inspection lot origin assigned) and use that instead. You have to also be careful about the 'Quantity' and 'Value' updating strings for your new movement type.
    Hope that helps.
    Colin

  • Inspection lot for certificates

    Hi
    Is it possible to generate inspection lots for goods receipt inspection for a purcahse order only on absence of quality certificate .
    Thanks

    Sankar,
    You can do this by selecting the appropriate value for the field "Control without certificate" for the required certificate type in the configuration settings.
    Here's the path  QM->QM in procurement->Define certificate processing. For the certificate type(which you have assigned to the material) select the appropriate value.
    Hope this helps.
    Award me the points if this info is helpful
    Prakash

  • Inspection Lot for Inhouse Operation Not Creating

    Dear Friends,
          My process is Like this, in production Order Out of ten operation eight operation are subcontracting Process.I am getting inspection Lot for this eight operation by maintaining inspection type 0130.But i am not getting inspection lot for inhouse operation by maintaining inspection type 03 also.So Please tell me what setting i have to do to get inspection Lot for inhouse operations.
    Your Valuable solution is important for me...
    Regards,
    M.M.S

    Hi Mohammed,
    Check Inspection type maintained in Material master, it must be checked for "active". If it is active then system will create inspection lot as soon as you release your order.
    Regards,
    Shyamal

Maybe you are looking for

  • When Installing iTunes I get an Error Message About A Registry Key

    It gives me this error message: Could not open key: HKEYLOCALMACHINE\Software\Classes\QuickTimePlayerLib.QuickTimePlayerApp\CLSID. Verify that you have sufficient access to that key, or contact your support personnel. I can't find that error listed a

  • BPC for Excel: Are multiple key ranges really possible?

    Hi Experts, in a training document I found to possibility of multiple key ranges, to make an input schedule sheet more attractive or insert rows with excel formulas etc. For example: ColKeyRange: EVRNG(H13:J13;M13:O13) RowKeyRange: EVRNG(G15:G20;L15:

  • What is the maximum temperature for a macbook generic processor to operate?

    Right now the temperature for my cpu is 185 degrees Fahrenheit. Is that bad? Whats the highest temperature a Macbook can properly operate?

  • Easy Setup

    Hello, I'm trying to figure out which easy setup format to choose. I initially had a dvd with vhs footage. Via Toast I converted it to an mpeg-4 format(640x480). 29.97 fps. In the drop down list I don't see mpeg as an option. I've been constantly ren

  • Number of Rows Updated/Deleted/Inserted

    Hi To audit what rows inserted , deleted and updated in a particular table i am using the below code . However is there a way i can just get the count of rows inserted , updated and deleted based on date or user . Also please tell me how can i get th