Inspection lot for recurring inspection was created without user decision
A manual inspection lot was created for recurring inspection. When reporting results QE51, the user decision option is disable, therefore I can not move the batch from Quality Inspection to Unrestricted.
I still don't see how you are manually creating the lots. From the way you described it, the qty. is already in QI and you are then manually creating an 09 using QA01. If this is what you are doing, the manually created 09's will NOT be linked to the inventory in QI and they will not be able to be used to move the stock out of QI. NO MANUALLY CREATED inspection lots, (i.e transaction QA01), EVER control stock. To control stock, the inspection lot must have been triggerred by another event or transaction that caused the lot to be created., (QA07, GR, stock transfer, delivery creation, etc...)
What I don't know, is how you got the material into QI in the first place. How was the material moved into QI? When stock is moved into QI that should trigger an inspection lot. If QM is active for a material you shouldn't be able to use standard stock movements to place the material into QI. If you moved it and then activated QM you should get errors when activating an inspectoin type unless you have followed specific procedures for creating 08 lots for exisitng QI inventory.
So I think we are still missing some informaiton.
FF
Similar Messages
-
Block goods receipt if open inspection lot for source inspection (SAP QM)
hello!
i would like to block the goods receipt for a purchase order item, if there is an open inspection lot for source inspection. i know how to block, if it rejected, but not what to do in this case.
thanks!
matthiasHi matthias,
can you tell me how to block GR if inspection is rejected in source inspection??? as you said u know. please let me know.
Thanks!!
vinay -
Inspection Lot for Inhouse Operation Not Creating
Dear Friends,
My process is Like this, in production Order Out of ten operation eight operation are subcontracting Process.I am getting inspection Lot for this eight operation by maintaining inspection type 0130.But i am not getting inspection lot for inhouse operation by maintaining inspection type 03 also.So Please tell me what setting i have to do to get inspection Lot for inhouse operations.
Your Valuable solution is important for me...
Regards,
M.M.SHi Mohammed,
Check Inspection type maintained in Material master, it must be checked for "active". If it is active then system will create inspection lot as soon as you release your order.
Regards,
Shyamal -
Enhancement-One inspection lot for early lot and serial profile
Hi,
I have a requirement shown below.
Can anyone guide me to proceed this Enhancement from the start?
Inspection lot for production order is created at production order release, when the finished good has a serialnumber profile assigned in the materials master and the serialnumbers are captured in the handling unit assigned to the production order, the system will create another inspection lot.
<i>Required system enhancement:</i>
Only 1 inspection lot per production order should be generated.
<b>NB.</b> Without this enhancement both inspection lots created for the production order have to be closed to be able to close the production order.Please try with sub-routine: userexit_move_field_to_lips or userexit_save_document of include: MV50AFZ1.
I guess clearing LIPS-QPLOS for specific conditions would do the trick for you..
<b>Reward points</b>
Regards -
Customer number not in the inspection lot for a make to order scenario
Hi All,
I know that standard SAP will get the Customer number into Insp. lot only for insp. types 10/11/12. I am wondering if someone know a way to get the customer no. into insp. lot for insp. type 04 where the material is make-to-order scenario and the Production/Process order has the Sales order and customer no. without activating User-exit. The quality users want to be able to see the customer no. in insp. lot without having them to go to process order.
It makes no sense to me why the customer no. is not brought into insp. lot when that is available in the Prod/process order, which can further be used to select the customer specific insp. plans for 04 insp. type Insp. lot without using Variant configuration.
Any light on this topic is appreciated.
Thanks.Hi Srikant,
I guess.........
Normally the inspection lot refers the triggering document that are the trigger cause for them.
- Inspection type 01: - Purchase Order and GR material document.
- Inspection type 03: - Pro. Order Number
The same way...
The inspection type 10\11\12 are purely related to the SD, and directly integrates QM and SD. Hence in the inspection lot for the inspection types directly integrated to SD, it will furnish the Sales order number \ Customer.
But the inspection type 04 is purely have it's relation to Production process. So it will have the details related to integrations it has i.e. the "Pro. Order." Hence it integrates QM-PP, it have the data related to PP (Pro Order), not the SD's one.
But I think one way you can achieve it,
Assign the Customer number also to the inspection plan along with the Material. So I think at the time of assigning the inspection plan to the inspection lot, it will refer the Customer number also and will display the Customer number along with Task list Group\Group Counter, in the inspection specification screen in QA03/02
Regards,
Shyamal -
Creating inspection lot for vendor returns
Hi All,
In Subcontracting, components are sent to vendor using Mov Type 541, if vendor returns the components without any value addition we recieve the goods with Mov type 542.
Now, when we recieve the goods using 542 customer requires that the material has to be posted to quality inspection and a lot has to be created.
I have already tried with inspection type 08 but its not working.
Any ideas how it can be done?
Regards
Naveen GoveasHi Naveen,
You have come across a common problem in later releases of SAP. Ram is nearly right in the settings for control of inspection lots for goods movements. In the standard system movement type 542 has no inspection lot origin assigned, so even if you have maintained an inspection type for your material there is no "trigger" for the inspection lot creation from that movement type. Unfortunately, you cannot change the inspection lot origin settings for movement types. The only choice you have is to create (as a copy) a customer defined movement type (one which already has the appropriate inspection lot origin assigned) and use that instead. You have to also be careful about the 'Quantity' and 'Value' updating strings for your new movement type.
Hope that helps.
Colin -
Inspection Lot for Process Order without Header Material
Guys,
We have an scenario that we create a Process Order without Header material using T code CORO. Is it possible to assign or create a Inspection lot for Process order?
Regards,
SenthilrajaHi
Please refer
QPL10004 User subscreen for displaying additional data in insp. lot
Regards
Sujit -
How to create an inspection lot for each line item of the Purchase order?
Hi,
How to create an inspection lot for each line item of the Purchase order ?
In detail if possible.Hi
please check this
[thread|Create Inspection Lot; -
Restrict to create lot for 08 inspection type
Hi,
In our busibess scenerio we are creating Inspection lot through 08 inspection type with movement type 322(from unrestricted to Quality) but we want to restrict 311 movement type to create Inspection lot for the same material. I have deactivated configuration setting for the movement typy 311 but still it is creating inspection lot. Kindly advice me the correct process to restrict lot in QA32.
Regards
NeelDear,
You can also try that remove inspection type from material master.
Sandip -
Inspection lot for external service
Hi Gajesh/ Sujit/shyamal/ all
we are planning to use service master for external vendor's service, i have couple of questions
please share your experience, if anyone of you come across this kind of requirement
1. is it possible to create an inspection lot for external service?
2. we want to capture / validate the vendor's external service, weather it is accepted or not? sometime we need to enter quantitative value also
3. is there any setting or config for assign /create inspection lot for service master?
what I know is without material master we cannot create inspection lot but i don't know about service master.
thanks
SamiGajesh,
thanks for quick response.
2 business req. are as follows
1. vendror is performing periodic service, MM side external service order (service contract/PO)created, bsaed on thatPO vendors performing service.
service entry sheet they are capturing man hours and date of service.
business wants quality of service to be captured in QM inspectiion lot.
2. production order ---> routing -- operation ---> vendor & service PO number assigned external work --> now inspetion lot will be created for that material/production order.
how can we link service master, service entry sheet and inspection lot?
how to map for this req.?
again is't possible to create inspection lot for service master?(without material master)if your answer is yes, then where/how can we assign inspection type ? which inspection type?
thanks
Sami -
Inspection Lot for co-product & By Product
Dear Friends,
How to manage inspection lot for Co- products in production
Is there any specific inspection type
Thanks & Regards
RajHi raj
531 Goods receipt from by-product from the order
The goods receipt of a by-product usually refers to an order, but it can be entered without a reference.
If a component is entered with a negative quantity in the order, a reservation item is created with 531 (instead of 261). The receipt of a by-product can be entered when the component for the order is withdrawn from stock or it can be entered as another type of goods receipt.
Possible special stock indicator: E, Q
Acivate 05 inspection type for Co-product.
You can also try this by MB1C transaction.against producton order
Also check the mvt type 545 and 581
Check this will work
Regards -
Automatic creation of inspection lot for Expired Batches
Hi All,
I am in one trouble and need some help in above scenario.
I am able to create inspection lot for batches about to expire, but how to create inspection lots for batches which were already expired or which next inspection date already missed?
Master data like '09' inspection type, inspection plan is already maintained.
Second question, is QA07 also affect on special stocks like vendor stock or project stock etc?
Immediate response will be appreciated.
ThanksHi
To meet you above mentioned requirement you have to modify the program RQAAAS10 as per your logic both to create lot for Expired Material and to consider project stock or vendor stock as In standard SAP these stock are not considered.
regards
Manish -
Creation of one inspection lot for more than 1physical sample
hello SAP,
we have one common question.I have created 3 physical sample 20000006,2000007,2000008 and now i want to create one inspection lot for these 3 physical sample through QPR5 Transaction but system is generating each inspection lot for each physical sample which is wrong process. this is common scenario for most of the industry.SO please clarify and provide the solutionHi,
I hope this solution gives some way out for you to solve your problem . I assume the sample is for the same material , phy. sample type and category
Create a new physical-sample drawing with refernce to :
Using this function, you can create a new physical-sample drawing (with one or more physical samples) that references:
An inspection lot
A production order or process order
A production version
You use this function to create physical samples that have not been planned in a sample-drawing procedure and which you can draw from a production process according to your specific needs. In an inspection during production, for example, you can draw physical samples from the process on the basis of time or quantity (for example, a physical sample every three hours or for every 1000 liters of material produced). You can freely specify the inspection-relevant operations in which you want to inspect the physical samples for the new physical-sample drawing.
please do let us know wether you were able to create one inspection lot .Or else please ellaborate the question step wise t-code and functions Will try to find a solution .
cheers
kp
source of information : SAP -
One inspection lot for multiple materials of purchase order line items
Hi All,
My client requirement is one inspection lot for multiple materials of purchase order line items.
Please share your thoughts.
Thanks in advance for early reply.
Regards,
JishuI totally agree with Amol.
I don't think I would touch that development nor would I ever tell a client it could reliably be done through development.
Knowing what I know about the table structures, I don't think you could create any development for this that could use a significant amount of the existing tables and functionality. I think you'd have to create all your own Z tables and basically rebuild the functionality. Tying it back in with SAP data will be difficult.
You're even looking at all custom screens for your results recording and UD as well. And if you have follow-on functions like batch classification requirements, batch determination, COA publication, results copy functions, use of DMR and sampling procedures, physical samples, quality notifications, etc. etc.. you could be looking a whole lot of development.
Craig -
GRN With 2line items(material,batch same)one inspection lot for 2line items
Dear Experts
As and when we make a GRN with 2 line items and same batch number we enter no. of containers differently but only the number from the first line item is flowing into the Inspection lot origin.We are creating only one inspection lot for 2 line items as the batch number is same for the items.
1. In material master i have given 01 inspection type ( with control inslot.. Each material document,batch, storage location) :---
this is the reason system is creating only one inspection lot.
i am entering manually same batch number for 2line items...
Here my problem is ... while giving UD... SYSTEM IS PICKING ONLY FIRST LINE ITEM NO.OF CONTAINER... IT HAS TO BE BOTH LINE ITEMS CONTAINERS.... IT IS PICKING BOTH LINE ITEMS QUANTITY... NO.CONTAINER ONLY IT IS NOT PICKING....
Waitting for experts replyHi,
As per your query if you put in MM forums then you will get the reply immly.
Anil
Maybe you are looking for
-
Sending photos by email - Iphoto beginner
I select a photo and click 'share', but the email option is greyed-out. What am I not doing, or doing wrong? Thanks
-
Lost wireless connection from WRT54G
I've been using my wireless router for about a year without issue, but now I can no longer connect wirelessly. I'm on a MAC OS 10. I am able to connect wired. I've used the article "Encountering difficulty connecting a wireless computer/s to the Inte
-
Has anyone actually used the Apple USB "rescue" drive on a 2011 MBA or Mac Mini?
I am getting conflicting information as to whether the $69.00 Lion USB "Rescue drive" will function on a mid 2011 MacBook Air or a Mid 2011 Mac Mini. (Yes, I know it will work on the 2011 MacBook Pros). 1) The local Apple Store Genius Bar personell s
-
My 2 yr old iphone 4 died a few days ago and after researching on the web, I eventually found something that worked for itunes to recongnize it (I opened itunes, held down sleep and home button at the same time, attached usb, let go of the sleep butt
-
Shutting down and restarting always ask for password in xfce4.4
I'm having this problem, I have the sudoer file setup correctly as per the wiki instructions but this does not fix things. If I do 'visudo' in terminal and then try and restart or shutdown my computer it doesn't ask me for my password. But if I just