Inspection lot for rework order

Hi QM Experts,
I have a question about the rework order.
For the original order i use inspection type 03.
After found the defect, i create the rework order using CO07.
My question is how to create the inspection lot to check the rework order ?
Thanks in advance,
Helly

Hi Helly,
I guess you are using a specific order type for the 'Rework'. Check the configuration under IMG:
Quality Management > Quality Inspection > Inspection Lot Creation > Inspection for Manufacturing Order.
For your plant/order type combination check assignment of 'Inspection Type' on the 'Planning' tab (it's near the bottom)
Hope that helps.
Colin

Similar Messages

  • Inspection Lot for Process Order without Header Material

    Guys,
    We have an scenario that we create a Process Order without Header material using T code CORO. Is it possible to assign or create  a Inspection lot for Process order?
    Regards,
    Senthilraja

    Hi
    Please refer
    QPL10004 User subscreen for displaying additional data in insp. lot
    Regards
    Sujit

  • Inspection Lot For Calibration Order

    Dear All,
    I want to create a Calibation Order for equipment. I have craeted a general task list, assign master inspection charaterstic in the operation using the control key QM01.
    Now I am assigning this task list directly to the order and releasing the order. A inspection lot is being created, but I am not able to make entry for the results for that inspection lot.
    Status is showing CRTD PASG.
    Pl tell the possible reasons for that
    Thanks
    Mudit Gupta

    Dear Mudit,
    Please follow the step if you have not done this.
    T-code QP02> Select the operation the Press Inspection characteristics (push button)>In the field master inspection characteristics field enter MIC which you have already created>Save
    If this is already done then
    QA02>Press tab Inspection Specification>Now press Task List Specification (Push Button).
    With T-code QE17 you do recording after that u can do UD
    Regards,
    Kaushal rai

  • Inspection lot for production order lot and not for single pieces

    Dear all,
    I have a production order , for example, for 12 pieces / serial number . Material is produced in lot , in this case 3 lot of 4 pieces.
    Pieces in a lot are linked toghether in a grap.
    Production order create an inspection lot where I can store quality data for every pieces / serial number.
    I need to store quality data at lot level ( for example the grap weight );
    Is it possible ?
    Regards

    Can you not create Char/MIC like weight & attach the task list to the inspection lot?

  • Inspection lot for sale service order

    Dear all,
    Is it possible to create inspection lot for service order created in sale and distribution?
    I have a sale document type against which services are sold. I want when service order is created inspection lot trigger.
    Thanks to all.

    I believe the service order is simply a different type of maintenance order.  You should be able to create inspection lots for these in a similar fashion as used in maintenance orders.  I.e inspection types 14 are used.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/2d/352264448c11d189420000e829fbbd/frameset.htm
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/e9/92b917f6dc11d19296ab92e885eaaa/frameset.htm
    There are many places in the services help files that mention using inspection lots.  The two above are just a couple of them.
    FF

  • Enhancement-One inspection lot for early lot and serial profile

    Hi,
    I have a requirement shown below.
    Can anyone guide me to proceed this Enhancement from the start?
    Inspection lot for production order is created at production order release, when the finished good has a serialnumber profile assigned in the materials master and the serialnumbers are captured in the handling unit assigned to the production order, the system will create another inspection lot.
    <i>Required system enhancement:</i>
    Only 1 inspection lot per production order should be generated.
    <b>NB.</b> Without this enhancement both inspection lots created for the production order have to be closed to be able to close the production order.

    Please try with sub-routine: userexit_move_field_to_lips or userexit_save_document of include: MV50AFZ1.
    I guess clearing LIPS-QPLOS for specific conditions would do the trick for you..
    <b>Reward points</b>
    Regards

  • How to create an inspection lot for each line item of the Purchase order?

    Hi,
    How to create an inspection lot for each line item of the Purchase order ?
    In detail if possible.

    Hi
       please check this
    [thread|Create Inspection Lot;

  • Customer number not in the inspection lot for a make to order scenario

    Hi All,
    I know that standard SAP will get the Customer number into Insp. lot only for insp. types 10/11/12.  I am wondering if someone know a way to get the customer no. into insp. lot for insp. type 04 where the material is make-to-order scenario and the Production/Process order has the Sales order and customer no. without activating User-exit.  The quality users want to be able to see the customer no. in insp. lot without having them to go to process order. 
    It makes no sense to me why the customer no. is not brought into insp. lot when that is available in the Prod/process order, which can further be used to select the customer specific insp. plans for 04 insp. type Insp. lot without using Variant configuration.
    Any light on this topic is appreciated.
    Thanks.

    Hi Srikant,
    I guess.........
    Normally the inspection lot refers the triggering document that are the trigger cause for them.
    - Inspection type 01: - Purchase Order and GR material document.
    - Inspection type 03: - Pro. Order Number
    The same way...
    The inspection type 10\11\12 are purely related to the SD, and directly integrates QM and SD. Hence in the inspection lot for the inspection types directly integrated to SD, it will furnish the Sales order number \ Customer.
    But the inspection type 04 is purely have it's relation to Production process. So it will have the details related to integrations it has i.e. the "Pro. Order." Hence it integrates QM-PP, it have the data related to PP (Pro Order), not the SD's one.
    But I think one way you can achieve it,
    Assign the Customer number also to the inspection plan along with the Material. So I think at the time of assigning the inspection plan to the inspection lot, it will refer the Customer number also and will display the Customer number along with Task list Group\Group Counter, in the inspection specification screen in QA03/02
    Regards,
    Shyamal

  • What are the settings for  rework order  quality inspection

    HI,
    Iam doing production order confirmation at the GR time some oprations are rejected.that operations i want too rework order CO07 process without GR ,i want to Quality inspection in REWork order.
    What are the settings for rework order Quality inspection?

    Refer beautiful document
    http://wiki.sdn.sap.com/wiki/display/HOME/ReworkInProduction

  • One inspection lot for multiple materials of purchase order line items

    Hi All,
    My client requirement is one inspection lot for multiple materials of purchase order line items.
    Please share your thoughts.
    Thanks in advance for early reply.
    Regards,
    Jishu

    I totally agree with Amol.
    I don't think I would touch that development nor would I ever tell a client it could reliably be done through development.
    Knowing what I know about the table structures, I don't think you could create any development for this that could use a significant amount of the existing tables and functionality.  I think you'd have to create all your own Z tables and basically rebuild the functionality.  Tying it back in with SAP data will be difficult.
    You're even looking at all custom screens for your results recording and UD as well.  And if you have follow-on functions like batch classification requirements, batch determination, COA publication, results copy functions, use of DMR and sampling procedures, physical samples, quality notifications, etc. etc.. you could be looking a whole lot of development.
    Craig

  • Insp.lot after rework order confirmation

    Dear all,
    My client requirement:
    they want insp.lot when they confirm rework order.I can activate inspection to 531 mvt.type.but they are using 531 for other purposes also.so can i do any setting in Rework order type so that it should create inspection lot.
    it is urgent plz reply soon
    thx&regds
    prasad

    Hi,
    It is possible to generate inspection lot of inspection lot origin 03 if you configure in OPL8 transaction. It is used for inprocess inspection and its not stock relevant.
    As you want to generate inspection lot for By porduct ( 531 Mtype) above config setting will not work for you. I suggested new movemet type as you mentioned that 531 mtype is used for some other purpose.
    You also mention the if user forget to enter the custom movement type . As they need to confirm the by product they need to user 531 or custom movement type. you can remove the authorization for 531 movement type so that they can not use this.
    Regards
    Sanjay

  • Inspection lot with Production Order

    Hi friends,
    I am PP consultant and need some help in setting up a scanario of Production order with inspection lot.
    I need to setup a scenario where a inpspection lot is created from production order manually (not at the time of release). The purpose is to post few quantity of production order to scrap storage location. Inspection lot needs to be created only in certain production orders where some of the quantity has to be declared as scrap and that needs to be rejected with usage decision.
    can any one please suggest the overview of such scenario.
    Regards,
    Rohit

    Dear Rohit,
    You want to create a manual inspection lot only for the purpose of Scrapping and also want it to be done with Usage Decision.
    You can not use inspection type 89, as it is not stock relevant (Inspection type for Miscellaneous inspection),
    There is one another solution with inspection type 08( inspection for Material Movement), but it might look Lengthy.
    1. Release a Production order. say 100 qty.
    2. If during process, 10 is scrap, then perform Partial Confirmation of 10 Qty.;  Stock will be in Unrestricted.
    3. Now, through MB1B, transfer 10 qty from Unrestricted to QI.
    4. As you have inspection type 08 active, System will create an Inspection lot for 10 Qty.
    5. You can post this whole 10 qty to Scrap while giving Usage Decision.
    I think, in your process, Scrapping is not done frequently, that is why you do not want inspection lot at every production order.
    in that case this solution may solve your problem.
    regards,
    Amol
    Edited by: Amolbook on Jan 12, 2012 3:13 PM

  • Creation of one inspection lot for more than 1physical sample

    hello SAP,
    we have one common question.I have created 3 physical sample 20000006,2000007,2000008 and now i want to create one inspection lot for these 3 physical sample through QPR5 Transaction but system is generating each inspection lot for each physical sample which is wrong process. this is common scenario for most of the industry.SO please clarify and provide the solution

    Hi,
    I hope this solution gives some way out for you to solve your problem . I assume the sample is for  the same material , phy. sample type and category
    Create a new physical-sample drawing with refernce to :
    Using this function, you can create a new physical-sample drawing (with one or more physical samples) that references:
    An inspection lot
    A production order or process order
    A production version
    You use this function to create physical samples that have not been planned in a sample-drawing procedure and which you can draw from a production process according to your specific needs. In an inspection during production, for example, you can draw physical samples from the process on the basis of time or quantity (for example, a physical sample every three hours or for every 1000 liters of material produced). You can freely specify the inspection-relevant operations in which you want to inspect the physical samples for the new physical-sample drawing.
    please do let us know wether you were able to create one inspection lot .Or else please ellaborate the question step wise t-code and functions Will try to find a solution .
    cheers
    kp
    source of information : SAP

  • Inspection lot for certificates

    Hi
    Is it possible to generate inspection lots for goods receipt inspection for a purcahse order only on absence of quality certificate .
    Thanks

    Sankar,
    You can do this by selecting the appropriate value for the field "Control without certificate" for the required certificate type in the configuration settings.
    Here's the path  QM->QM in procurement->Define certificate processing. For the certificate type(which you have assigned to the material) select the appropriate value.
    Hope this helps.
    Award me the points if this info is helpful
    Prakash

  • Inspection Lot for Inhouse Operation Not Creating

    Dear Friends,
          My process is Like this, in production Order Out of ten operation eight operation are subcontracting Process.I am getting inspection Lot for this eight operation by maintaining inspection type 0130.But i am not getting inspection lot for inhouse operation by maintaining inspection type 03 also.So Please tell me what setting i have to do to get inspection Lot for inhouse operations.
    Your Valuable solution is important for me...
    Regards,
    M.M.S

    Hi Mohammed,
    Check Inspection type maintained in Material master, it must be checked for "active". If it is active then system will create inspection lot as soon as you release your order.
    Regards,
    Shyamal

Maybe you are looking for

  • AME CC 2014 Problems

    I've got a couple of problems with the latest Media Encoder, build 8.1.0.122. 1) Nothing moves from the Queue to Encoding. If I click on the "play" button to start encoding files, nothing happens. A blue line under the button, but the files do not en

  • Ideas Update available now

    Adobe Ideas 2.7 is here! Our new update includes several user-requested features to the free iOS application that lets anyone create freeform vector illustrations on their iPad, iPhone or iPod Touch. Here's what's new: Stylus Support – Ideas now incl

  • Edge 2014.1.1 Coordinated Preloading functionality is dead ?

    Hello, I used the versions of Edge prior to 2014.1.1 and i have see that the Coordinated Preloading functionality does not exist anymore. This is a problem, I need to create a pause between the preloading and the play of slide. Thanks

  • Problems running Premiere Pro CS6 on my Mac

    My system is Mac OS X 10.6.8 and Premiere Pro is version 6.0.1 Everything on my computer is updated to the latest versions required by Snow Leopard 10.6.8. When I hit play in Premiere Pro it runs for 10-16 frames and then stops. No matter if it is a

  • ICal Postgres issues

    Afternoon Apple Community. I'm having some issues with iCal Server after upgrading from 10.6 to 10.8 server. Not too sure what's going on but I'm having issues with iCal Server since the upgarde on one particular use...mine! Nothing can be added or r