Inspection lot not getting generated after PurcGR

Hi,
Inspection lot not generated after doing GR for a purchase order. what could be the reasons?
for the first 2 puchase orders, Inspection lot was created. however, for the 3rd Purchase order of 100qty, i did GR for 50 qty only. after then for new purchase orders, the material status has become unrestricted and directly going to stock.
Inspection type 01 is mainted in material master
QM info record has been maintained.
please clarify

Hi Nagaraj,
Try the following.
1. Check the inspection set up in the Material Master record for inspection type 01 whether 'post to inspn stock' is selected. If not, select it.
2. Check in Customizing for 'QM in Procurement' in 'Define QM system' activity, 'certified QM system - skip' is marked(Actual QM system). If this indicator is selected no inspection lot is created even if there is an active inspection type. This is valid if you maintain a target QM system in QM view of Material Master (Purchase data).
3. Check in IMG set up :
Quality Inspection -> Inspection lot creation -> Inspection for goods movement  - whether inspection lot origin 01 is specified for movement type 101 and also ensure that QM is active for this movement type.
Please revert after trying these options.
Regards,
Swati

Similar Messages

  • Inspection lot not getting generated for schedule in stability study

    Dear All,
    Need your urgent help to solve a issue. I need to perform inspection of material after specified interval of time for which i am using stability study process. Following are the steps which i have followed :
    1) Create initial sample (physical sample created)
    2) Confirm initial sample
    3) Initial test inspection lot( Inspection lot created )
    4) Complete initial test
    5) Specify storage conditions (Physical sample created with CRTD status)
    6) Create testing schedule( Maintenance schedule is created )
    7) I have scheduled maintenance plan through IP10 tcode. All the calls are getting generated.
    Now i have given manual call in IP10, but inspection lot is not generating.
    Please help to solve this issue ASAP.

    Dear Craig,
    Yes i have activated inspection type 16 to material master.
    Actually issue is solved now, I have missed one step " Store stability Sample".
    Now the lots are getting generated.
    i am closing this thread now.

  • Inspection lot not getting generated by Z inspection type

    Hi,
    I created a inspection type Z1 , copying the inspection type 01. I guess I maintained all the required configurations or conditions.
    I maintained the inspection type Z1 in the QM view of a material with status Active, but I am not able to do MIGO, neither the stock type is coming as Quality Inspection automatically in both the Purchse Order creation and MIGO. As a reslut, the inspection lot is not getting generated.
    I am also not able to create a manual lot but QA01, Its giving error as "Inspection type Z1 not maintained for material X" .
    Thanks in advance for your valuable suggestions.
    Regards
    Kunal

    Dear check preffered inspection type in material master QM view and do the GRN.
    Check and Revert.
    Cheers
    KK

  • Inspection lot not getting generated during SD delivery

    Hi QM experts,
    I am working on QM in SD function. I activated inspection type 10 in the material master in QM view as shown below.
    I created a QM info record SD through QV51 for the combination of customer and Sales organization and assigned the material and quality inspection as before delivery as shown below.
    Now I created a sales order for the material with sales organization and when I making the delivery system is allowing delivery and no inspection lot is generated and delivery is also not stopped. am i missing something..can u please guide..
    Thanks
    Kumar

    Hello,
    You have activated 10 and 11 both , any specific reason ?
    If you activated 10, then system will allowed you delivery check QM customization---> During Shipping. have you assigned inspection type against Delivery type in customization ?
    Regards

  • Inspection lot not getting cancelled after the inbound delivery is created

    Hello,
    The scenraio is like this.
    1. Material was procured in plant A.
    2. Using the stock transfer purchase order, transferred the material from Plant A to Plant B.
    3. Outbound delivery was created, Handling units were assigned and Post Goods issue was done.
    4. As soon as this was done, inbound delivery got created automatically in plant B and Handling units were assigned.
    5. Inspection lot was created with origin "08".
    6. Now I want to reverse all the transactions, so I did as mentioned below.
    7. Handling units were deassigned from the inbound delivery and inbound delivery was successfully deleted.
    8. Now tried to do the reverse post goods issue and got the error "Handling unit XXXXXX cannot be reversed"..Goods movement cannot be reversed for handling unit XXXXX because it has been changed or assigned to object since the last goods movement posting".
    The issue is that as soon as the inbound delivery is deleted, the inspection lot status should change, which has not changed. So kindly let me know how to make the system cancel the inspection lot as soon as the deassignment of handling units is done in inbound delivery or the inbound delievry is deleted.
    Regards,
    Narendra Bora

    Hello,
    Can anyone please reply.
    Regards,
    Narendra Bora

  • 09 inspection lot not getting generated

    Hi Friends ,
    I have one material batch for which next inspection date is 7.6.2014 . I have activated 09 inspection type in material master . Now when I am executing QA07 for the material  with checkbox " To insp. stock at lot creation" selected and with initial run in days = 4 . System shows following msg in green :
    "No batches found for processing"
    But it should create a lot for the above batch because inspection date is 7.6.2014 . Stock also exist
    Regards

    Please go through the following steps & maintain the same
    > Batch management should be active against material.
    > Next inspection date should be maintained.
    > Inspection interval should be maintained according to next inspection date.
    > UD must be completed for the previous inspection lot.

  • Integration with EWM-Inspection lot not getting created

    Hi,
    Inspection lot not getting created after GR is done.
    The scenario is Storage location is connected to external warehouse management,so after the GR is done in the legacy system via interface it is updated in ECC.so while checking the material document inpection lot is not created.
    Can anyone please tell me the necesaary check points and integeration steps  between WM and QM in this case .
    Thanks in advance.......

    Hi,
    Since you didn't say much, I assume you are creating stock into ECC via LSMW using 561 movement. Now to get inspection lot for these batches/ docs, you need to activate inspection type 05.
    Go to material master QM view, assign and activate inspection type 05.
    Additionally, create a respective inspection plan/ task list for the material(s) to carry out RR and get the consistent inspection lots.
    ntn

  • Integration with QM-Inspection lot not getting creating

    Hi ,
    Inspection lot is not getting created after GR is posted.
    Scenario:Storage location is connected to external warehouse management.
    Can anyone please explain the necessary check points and  Integration steps needed to be followed for inspection lot creation.

    Hi,
    Since you didn't say much, I assume you are creating stock into ECC via LSMW using 561 movement. Now to get inspection lot for these batches/ docs, you need to activate inspection type 05.
    Go to material master QM view, assign and activate inspection type 05.
    Additionally, create a respective inspection plan/ task list for the material(s) to carry out RR and get the consistent inspection lots.
    ntn

  • Salary statement not getting generated after Upgrade

    Hi all,
    We have recently Upgraded to NW 7.4 SP6 from 7.01 SP9 . we are using two standard ESS applications for HR i.e Leave Request and Salary statement.
    Leave Request application is working fine but salary statement is not getting generated with an error message.
    The ESS /MSS Components installed are as follows.
    BP_ERP5***
    1000.1.0.18.0.20100828050255
    BP_ERP5COM
    1000.1.0.19.0.20110829150538
    BP_ERP5ESS
    1000.1.41.11.0.20120402111759
    BP_ERP5MSS
    1000.1.51.7.0.20130923050751
    SAPPCUI_GP
    1000.633.0.1.0.20120427113021
    SAP_ESS
    1000.633.0.1.1.20120802180711
    SAP_MSS
    1000.630.0.1.0.20120427113023
    while generating the salary statement we get the following error

    Search OSS note for those cubes. This should be a known SAP issue. We too had similar issue (though i dont remember now which statistic cube it was) and got resolved after next upgrade.
    Abhijit

  • Inspection lot not getting create for 01 Insp type after Intransit

    Hi Qm Gurus,
    I have a Material 'A' which is producing in the plant IN05 and transferring to IN06 plant. We have Scheduling agreement PO for this. After Scheduling Agreement we are doing Transferring the Goods thro 351 GI Movement type. So now the parts will be there in transit.
    So now when I receive this goods in IN06 thro 101 MT, Insp lot is not getting create, it goes to Unrestricted. If I create a std PO for the same when I receive the goods thro 101, it is posting into Insp lot. But after 351 & if I do 101 material is not going into Inspection. Pls advise.
    I checked the Insp type 01 Active for IN06, Quality info record is fine, Quality plan also fine. Pls let me know whether i am missing something?

    Hi ,
    Please activate inspection type 08 stock transfer ..
    If this inspection type is active then during stock transfer lot gets generated.
    Also check QM active for this perticular movement in custamizing setting.
    Regards
    SANIL

  • Inspection lot not getting created

    Dear MM guru's...
    SUB: Quality inspection lot neot creating.
    when i am do GIR, system is not creating Inspection lot for the material,
    i have maintained the QM view in material master and assigned the inspection type aslo, then why system is not creating an Inspection lot for quality inspection, is there any extra settings need to be maintaied in QM.
    Regards
    SARFRAZ

    There is a small check mark which says "active " for each inspection type you maintained in QM view .Make sure you have checked this .If you have not ,then there is no way a lot will be created .
    Please let me know on any furthur doubts coz as far as i know this is a common mistake every person new to QM does .If this not the issue then get back to me .
    regards
    Naik

  • Schedule Lines are not getting generated after MRP run.

    Hi,
    I have an issue where a SA exists for the parent material with item category L (subcontracting). The parent material has a valid BOM and some sub components as well. I see in CS03 that BOM is fine with validity dates for the parent material. A valid source list also exists for the parent material where SA is present as the source of supply with MRP indicator as 2. Now when i run MRP for the parent material using MD02 (NETCH), with indicators as below:
    Create pur.req.  2
    Schedule lines   3
    Create MRP list  1
    Planning mode   1
    i don't see any schedule lines in MD04. Instead it creates a PR that too without any source of supply.
    In master data for the parent material MRP type is PD with Procurement type F and special procurement key 30. I have checked and every thing seems to be fine still MRP run doesn't create schedule lines.
    Any help is appreciated. I can give more info if required.
    Thanks.

    Dear Rakesh,
    Scheduling agreement:An outline agreement against which materials are procured at a series of
    predefined points in time over a certain period.
    1.For this you have to first use ME31L for creating scheduling agreement and then ME38 for maintaining scheduling agreemnet
    schedule.
    2.Ensure in the source list after maintaining the material,vendor combination the setting for MRP relevancy is set to 2 - Record
    relevant to MRP,Schedule line generated automatically.
    Moreover you have to use value 3 for delivery schedule line which is one of the MRP control parameter while taking MRP run.
    So for the materials for which scheduling agreement exists,schedule lines will be generated.
    Check and revert back.
    Regards
    Mangalraj.S

  • PR,s not getting generated after MRP run

    Dear All,
    I'm running MRP through MD51 for WBS element where RM's are attached to WBS.
    It is MTO scenario where no stocks of RM's are maintained. I have checked all relevant settings of Masters.
    After running MRP through MD51, system is not proposing PR's for RM's but when i run the MRP for independent FG (MD02 & MD03) system is proposing PR's.
    Please suggest & help.
    Thanks in Advance.
    Shaiz

    Little confused on your statement
    System is not proposing PR's for RM's but when i run the MRP for independent FG (MD02 & MD03) system is proposing PR's.
    I would like to Know, whether the FG is attached with WBS or RM?

  • EWM with QM -Inspection label not getting printed after usage decision

    Hi Experts,
    We checked configuration settings related to this but we could not find missing configuration. Right now we are not able to print label after we take usage decision. Please let us know your inputs on this.
    We are using /SCWM/QINSP for usage decision.
    Thanks & Regards,
    Prashant

    We changed the printer name in condition record and we could print the label.
    Regards,
    Prashant

  • LMDB extended sid list is not getting generated after sld sync

    Hi,
    We have upgraded Solution Manager  to 7.1 sp4. In solman_setup - setup lmdb we have successfully sync sld with lmdb.
    But we can not see extended sid list in lmdb. This is causing problem for further steps of solman_setup.
    Please provide suggestion to solve this problem.
    Thanks & Regards,
    Yogesh Cheulkar

    Dear Yogesh
    The LMDB take the system from SLD
    so you have system in SLD?
    the job you need to check is : SAP_LMDB_LDB_0000000001
    check the RFC connection: LMDB_SyncDest1
    Please check my blog
    http://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/wlg/28645%3Fpage%3Dlast%26x-order%3Ddate%26x-maxdepth%3D0
    Regards
    Naor Shalom

Maybe you are looking for

  • New macbook pro, safari won't open and repair disk permissions did nothing to help

    Safari starts, blue bar moves about an inch in search bar, then stops. Then nothing. Tried repairing disk permissions to no avail. Safari still doesn't open. Whatever os x that is installed on new macbook pro's, since just bought on Sunday 10-14-12,

  • Error while using UTL_FILE.FOPEN

    sir, when i write procedure using utl_file.fopen i am getting error as it must be declared PLS-00201. what mistake, i am doing. yours dr.s.r.bhattachar

  • Problem with Footnotes

    Hello to everyone! I am having a problem using footnotes in InDesign. I place a word file (62 pages) in a text box, which containes footnotes. The problem is that in InDesign the footnotes start from number 2 (it should start from number 1 as in the

  • Quarter Patch Confusion

    Hi All, Client has requested to apply a second quarter patch. However the quarter patch is yet released now. As per the oracle doc, The quarter patches dates are following. From the below patches which one is the 2nd quarter patches. 17 July 2012 16

  • Newly installed After Effects CS6 won't launch.

    Error: "You can't use this version of After Effects with the current version of OS.  Using Mac OS 10.9.4  Adobe system requirements as follows: Mac OS X v10.6.8, v10.7, or v10.8**  All other applications in Production Premium launch and function as n