Inspection lot on transfer postings

Hi colleagues,
I would like to know your opinion about a problem that I don't know how to solve.
Is it possible to create an automatic inspection lot on transfer postings between different storage locations?
By the moment, we're creating the automatic inspection lots when we do the goods receipt from the purchase order. For this purpose we're working with Inspection type 01 on the material master (quality management view). Due to a special requirement we are not going to create the inspection lot on the goods receipt but when the goods are transferred to another stroage location.
I've changed the Inspection type on the material master from 01 to 08 - Stock transfer inspection, but nothing happens (no inspection lot created) when a transfer posting with 311 movement type is done.
Thanks very much in advance and good luck,
J

Hi
Precisly 08 inpsection type has been defined for the same.
I presume that you are doing stock posting through MB1B/MIGO t code & 311 mvt type
Now if you have activated 08 inspection type it will create a Stock relevent Inspection lot with 08,whenever you are transfering material from one storage location to other.
Check the following setting
Qcc0->Quality Inspection->Inspection lot creation>Inspection for goods mvt->Deactivate Quality Inspection for a Movement Type--> check here whether for 311 QM mvt is deactivated here
I hope this will add some value
Regards
Sujit

Similar Messages

  • Standard report to check transfer quantity from inspection lot

    Hi All,
    Upon good receipts using movement type 101, an inspection lot will be created automatically in the system.
    After that, inspection results and usage decision will be done.
    So at the end, if I display that particular inspection lot using QA03, in the "Insp. lot quantities" tab, when I click at button "Mat. doc", I will be able to display the transfer material document stating transfer from which storage location to which storage location and how much is the quantity.
    For reports checking purpose, I need to check every Inspection lot created and then have to know the final destination and how much is the quantity. It doesn't make sense if I have to click one by one from QA03.
    Please advice whether there is a standard report for this or any other way possible.
    Thank you.

    Hi,
    I have checked your suggestion, but QA33 failed to accomodate my request.
    I want to show the material documents created from the inspection instead of the material document during good receipt.
    So, I want to link inspection lot, goods transfer material document created and the quantity transfered from the inspection.
    Please help again. Thanks.

  • Resetting a sample for an inspection lot

    How to reset a sample to an inspection lot, and transfer stock to inspection lot.

    Try using the transaction codes QAC2 and QAC3 for both of your queries.
    or open the inspection lot in change mode and assign the sample you would like.
    Hope this helps you.

  • Vendor code in Stock Transfer Inspection Lot(08)

    Hi Everybody,
    I have noticed that when a Stock Transfer lot is created, the 'Data for lot orogin' tab in the Inspection Lot shows Vendor code in 'Data for goods receipt' section at times and at times Vendor code is not included in this section.
    Please throw some light on the situations under which the vendor code is included and excluded.
    Regards,
    Manish.

    I can't say for sure but I would compare the triggering document.  I.e. Exactly what material movement is used in each case and what type of document triggered it, (I.e. an STO order).  Than look at those documents and see if and why a vendor number is available.
    FF

  • Inspection lot with 01 origin for stock transfer (Intra company STO)?

    Hi Sap Gurus,
    As per standard SAP configuration for 101 movement type, 08 is the inspection type used for stock transfers (Intra company STO). But, there is a requirement from business to use 01 for Intra STO. Is it possible to get an inspection lot with 01 origin while GR to the delivery created for Intra STO ( Stock transfer B/n plants from same company code)?.
    Thanks in advance
    Venkat V

    Hi All,
    Thanks for your replies..
    Its STO Purchase order between two plants under same company code. System triggers movement type 101 with movement indicator B - Goods movement for Purchase order and Receipt indicator X - Stock transport order. Here system expects inspection lot origin 08 as per standard SAP configuration(OMJJ).
    I just wanted to check, is it possible to get inspection lot from 01 origin for this type of stock transfers. If anyone who worked on this area, please share your inputs. 
    Thanks in advance
    Venkat V

  • QM Scenario for Automatic Data Transfer to Inspection Lot

    Hi Experts,
    I have explained one QM scenario below. And also mentioned queries that I have in this. Could you please help me out on the same?
    There are 2 SAP systems, A and B.
    Process works as follows:
    -Delivery is created at A with B as recipient.
    -Automatically an IDOC is being created and send out with the quality data of the batch/inspection lot (electronic COA)  
    -In the background a workflow is triggered which transfers the data to the goods receipt from production inspection lot.
    In the system B, a subcontracting plant (DE08) will be created. During the subcontracting the materials provided to the subcontractor in real-life, however in SAP it will be brought to the subcontracting plant on a storage location specific to the subcontractor.
    Now the subcontracting service itself will be simulated by a process order (own order type is ZSUB). During the creation of the process order, a service purchase requisition will be automatically created which is connected to the process order. This purchase order will be transferred to A.
    After processing the purchase order, A will send service to B. B will do the process order confirmation. After process order confirmation an Inspection lot of type 04 will get generated automatically.
    Once the service delivery from A to B is done, the IDoc incl. the QM-data will arrive. Workflow will be triggered by inspection lot status CNF (Confirmed) – I0009. Now the workflow needs to identify the 04-'Goods receipt from production' of the process order and transfer the data into this inspection lot. The connection for this would be the purchase requisition number which is included in the process order. So the connection would be from purchase order number- purchase requisition-process order-inspection lot.
    Workflow template: WS03100078
    Business Object: BUS2045
    I have following queries. 
    1. Do I need to create Z-business object or the standard one will do the job?
    2. If I need to create Z-business object, then what changes will be required in coding?
    3. If I am using standard one, what all settings need to be done?
    4. What configuration needs to be done in the workflow template?
    Thanks & Regards,
    Mrunal

    Dear Swarup,
    The standard BAPI 's BAPI_INSPECTIONPLAN_CREATE Or ‘QAPP_CUST_IP_CREATE are not fulfilling my requirement .I need to create inspectiontion lot in R/3 system , which will invoke a process for creation of sample in another subsystem.But it is not very clear to me what a sample really means in QM, as i am an XI consultant .should a sample contain the recently generated Inspection lot number and its corresponding datas  ?

  • Transfer of Results from IDOC to Inspection Lot

    Hello experts,
    Following scenario:
    Inbound IDOC (QCERT) from vendor with inspection results is supposed to populate the inspection lot, which is being created at GR for PO.
    QM in procurement is active and QM control key and ceritificate type populated in material master record. We also activated workflow, which is supposed to execute the transfer from IDOC to the inspection lot automatically as soon as inspection lot gets status CROK.
    This works only under certain circumstances in the following order:
    1. Inbound IDOC received
    2. Q-certificate created automatically from IDOC with intial status "2 - Certificate received"
    2. GR posting for PO
    3. Manual setting of status "5 - Certificate filed and inspected"
    4. Inspection lots receives status CROK and the results are being transferred to the inspection lot
    This is okay as a start, but not ideal. We would like to have the following behaviour:
    1. Automatic setting of status "CROK" for inspection lot in order to transfer the results as soon as certificate and inspection lot are available.
    2. If the IDOC is being received after GR for PO, there is no connection in the Q-certificate to the inspection lot, i.e. the transfer of results will never take place, but it should.
    Can anybody help and knows, if this is feasible in SAP standard?
    Many thanks!
    Martin

    With IDOC Type Quality01 there is no reference to inspection lot, but in IDOC type Quality02 there is
    a inspection lot reference in segment E1EDLIN-E1CCI01, you will have to find out the logic to auto
    populate the lot # , please consult developer if its possible
    Thanks
    DD

  • Automatic IDOC Transfer to Subsystem if Inspection lot is created

    Hi there,
    i am searching for a solution how to automaticaly create an IDOC when an inspection lot is been created on goods reception. This IDOC is been sent to a CAQ Subsystem.
    In the external Subsystem the testing of the goods will be done and the result will be sent back to SAP.
    Can this be done with simple customizing?

    Do you have any inspection type setup for material in plant B? If yes then you would be not able to transfer stock in QI without creating an inspection lot. If inspection type is active in material master of plant B(destination) then system would through you error message saying - "transfer stock in QM only". The reason is you would not have an option to move stock from QI using 321 (QI to UNR) in plant B if QM is active. 321 managed by an insp lot.
    If inspection type is not setup in material master at plant B then you would be able to post stock in QI without creating an inspection lot. Then move stock from QI to UNR using 321 (MB1B).
    Hope this clarify you.

  • Inspection lot shouldn't create for Transfer posting(311) sloc specific

    Dear Expert,
    i need expert advice on this issue.
    here specific to one plant when user is doing transfer posting through movement type 311, user doesn't want inspection lot (specific to storage locations ).
    Here specific to that Material quality is active. and business want quality active for other all plants.
    i tried the T code OMJJ, if i deactive the quality here than this will applicable to all plants.
    here v can deactive the quality at plant level through Material Master but here business wants to restrict at sloc level only.
    b'coz if v deactive at plant level than quality will skip at the time of GR.
    so how we can control the inspection lot creation for movement type ( 311 ) and storage location combination.?
    pl. guide me on this
    Thanks
    h shah

    Thanks a lot

  • Transfer vendor COA data in the inspection lot

    Hi All,
    When the goods receipt purchase order (transaction MIGO) is saved inspection lot is created. In the MIGO we have designed custom screen which has inspection characteristics (fields QAMKR-KURZTEXT, TOLGRENZE, SOLLSTPUMF, QERGDATH).
    Now using the inspection lot number created I have to transfer vendor COA data in the inspection lot (which have to be shown in QE01/ QE11/ QE51N).
    Please let me know FM or BAPI to do this (should update all fields mentioned above).
    Thanks in advance
    Satish

    Hi Sandra,
    Iam not sure about the option to change the Vendor Batch but i can Suggest the other option. i.e Cancellation of GR and creating the new one.
    1. First remove the 01 inspection type in Quality Management tab in Material master,
    2. Go to goods receipt in MIGo and put 102 movement type and do the reversal.
    Now the stock is in the order level. and you can do the GR again.
    Activate the QM tab before doing the 2nd GR.
    revert back for clarifications if any.

  • Inspection lot for stock transfer

    Hello All,
    My requirement is that when i will do movement 301 from plant A to B then system should create inpsection lot. System should not create inspection lot instead of 301 mov type. If i assigned inpsection type 08 in material master it will create lot for each stock transfer posting. My requirement is that system should create lot for mov type 301 when i transfer from plat A to B.
    Also it should not create lot if I transfer stock from A plant to C.
    Please guide me on this issue.
    Regards,
    Mayura

    should create lot for mov type 301 when i transfer from plat A to B.
    Also it should not create lot if I transfer stock from A plant to C.
    Well If you do not maintain 08 inspection type in plant C for that material it will not create lot in plant C.whereas in plant B if you maintain it will create.
    Apart from this there is one more way
    Copy 301 in OMJJ say Z31. Now for this inactive QM in customization.Whenever you do 301 from A to B it will create lot.
    but when you do A to C with mvt type Z31 it will not create inspection lot.
    I hope this makes sense

  • Stock transfer Inspection lot

    Hi,
    We have  assigned inspection type 08 to all materials and create new movement type Z11 to activate QM for stock transfer and same has been working smoothly. Also we had deactivated QM for movement type 311 and not for 413. Our ppc dept. had allocated stock to sales order resulting in inspection lot in QM but quantity in unrestricted stock. So we had given UD of all such lots w/o quantity posting.But it shows in MD04 and in our customized report in QM.
    Pl. guide me how resolve the problem.
    Regards,
    Rakesh Patel

    hi,
    first u check the in SPRO,
    QM not active indicator is ticked or not.
    If it is ticked against ur mvt type than lotwill be there but without tck posting.
    if it is not ticked than lot will be their along with stck posting.
    in std, against 311 ticked is not there and if u customized z11 than check it, as well check against another one what u have mentioned in ur post.
    Regards

  • 08 - STOCK TRANSFER INSPECTION LOT

    Here i have the one  busines requirement  one of my product  i sent to one plant to another plant means i am following STO process GI for  sending  plant and GR for  Receipt Plant  my  query is  i activated inspection type 01 & 08 in receipt plant  i am expecting  lot will be create in 01  but  i am getting inspection lot 08 what steps i missed in config level  can any body know kindly suggest me

    hi,
    when u go for the STO,
    u need to create a STO Purchase order. when u r using 301 ({Plant to Plant ) than system check the inspection type assigned in OMJJ along with useful indicators.
    WHen u go for this the inspection type will be 08 , if this inspection type activated in your material master than lot will come.
    in MM its a two step transfer posting.
    Regards

  • Inspection lot transfer posting

    Hi Experts,
    I am trying to do QAC2 for the inspection lot for which UD is not done.
    But I am getting error as "You cannot make a quantity transfer posting for insp. lot xxxxxxxxx
    Message no. is Message no. QA068.
    But the stock is still in quality.
    So can anybody guide me on this?
    Thanks,
    Sachin

    Hi Nehal,
    This is auto generated lot.
    And the lot status showing is Usage decision has been made.
                                                    Plan/specification assig
                                                   Insp. characteristics cr
                                                   Sample calculated
                                                    Short-term insp. complet
                                                  All inspections complete
                                                  Stock posting completed
                                                   Statistics updated
                                                     Handling units assigned
    So is it possible to do transfer posting when the stock is in quality to some other storage location?
    Thanks,
    Sachin

  • Batch data transfer from batch classification to inspection lot.

    Hi Gurus,
    My client requirement is that the results he enters in batch classification should get transfer to inspection lot in QM.The results in batch classification will be maintained by prod. person.
    These results should be visible in QM lot and Q.M person should be able change these results and these changed results should get reflected in Batch classification.
    for eg.
    Production person will enter width in batch classification. for eg 1200mm.This value should be visible to QM person in QM lot and it should be modifiable and if modified by QM person(for eg 1300 mm) , the changed value should be updated in batch classification.
    Is this scenario possible in std. SAP and if possible pls. provide the information as early as possible.
    thanks in advance.

    My guess is your having a production person perform an in-process test themseleves or entering in a vendor provided value for the characteristic.
    Why not just set up a separate operation in the inspection plan for the production person?  Set up a workcenter for the operation and do security at that level so the production person can only record against his/her workcenter.
    Create a second operation for the lab with there own workcenter.  Make the characteristic required for the production operation and optional on the lab operation.
    Allow the lab access to both workcenters.
    The lab can now review any data enterred by production, and if necessary, record a new value in there own operation. 
    The UD copies the last recorded result to the batch, (std SAP).
    Craig

Maybe you are looking for