Inspection Lot  quantity unit is changing to Basic UOM.

Dear All,
In material master, material unit is in MTR(M),for that material i created Production order in NOS
I am confirming that order (TCODE -CO11N) in nos only ,up to last stage of confirmation it is in NOS only
but after confirmation the lot is generating in qa32 that lot quantity unit is basic unit of measure i.e MTR(M).
But i want that lot in confirmation unit i.e 'NOS' .
So,please suggest me to solve this problem.
Is there is any user exit to overcome on this problem.??
Regards,
Sanket.

Hi,
the UOM of QA32(inspection lot) is always similar to the UOM of MM03(material master).
Arunima

Similar Messages

  • Inspection Lot quantity change (lot origin 03) when Prod. ord. qty changes?

    Hi,
    it seems that for an inspection lot, with lot origin 03:Production, its Inpsection Lot qty doesnt change when the Production order Total Quantity field changes. Only the Actual Inspection Lot changes.
    How can the Inspection lot quantity field of the Inspection Lot be changed accordingly?
    Should the enhancement PPCO0007 be used?and then LOSMENGE (table QALS) =GAMNG (table AFKO)
    Can it be done?
    Thanks in advance

    Hi,
    In that case, you can do it by :
    - Reread the master data of production order(From Menu Bar).
    - The status of production order will be converted from "Released" to "Created".
    - Release the production order again.
    Thanks
    SUMIT

  • Inspection lot quantity in manual inspection lot (T.Code-QA01)

    Dear Experts,
    I have activated inspection setup "89" with lot origin '89".I have activated this inspection set up to a material in QM view.
    When i want to create a manual inspection lot through T.Code QA01, the inspection lot quantity is a required field. But i do not want to enter a quantity here. I want to create manual inspection lot without quantity. Is it possible?
    If yes, please suggest how to proceed.
    Your help is highly appriciable.
    Regards
    Vivek

    hi
    Use User Exit :QPL10001
    Description
        You can use this enhancement to change all the fields when creating an
        inspection lot. The function module is only run once.
        You must be careful when using this enhancement since this can lead to
        inconsistencies in inventory management. For example, if you change the
        quantity fields.
    Logic:
    Logic will be when you are using a specific Material say MATNR : xyz .......then disable the Qty field LOSMENGE.
    I hope this will help you
    Regards
    Sujit

  • Inspection lot measure unit

    Hello,
    I am straggling to find out where  from the maintenance inspection lot (source 14) takes the "measure unit" to the inspection lot quantities tab?.
    I find that "The system always selects the base unit of measure from the material master as the unit of measure for the inspection lot quantity"
    But I works with inspection lot type 14 based on function location
    Our BW  team says that those units make them a lot of trouble
    Best regards
    eyal

    Hi,
    As per SAP help, system creates lot for maintenance order and for each piece of equipment.
    My understanding is ,system  always  takes measurement unit in Inspection lot as PC for Inspection type 14
    How ever for materials  i.e ROH , HALB, FERT with inspection types 01,03,04,08 etc etc  it takes from the material master as you mentioned.
    Regards,
    Nitin

  • Can this inspection lot type 06 be changed

    Hi! all
    could you please suggest me on this
    this is related to QM
    When using the standard SAP customer returns process an inspection lot is automatically created. Can this inspection lot type 06 be changed to allow stock to transferred to u201CUnrestrictedu201D or u201CBlockedu201D stock in a similar way as inspection lot type 01.
    regards
    Vikas

    Hi,
    Go to MM02, QM view, here deactivate inspection Type "06" and activate Inspection Type "05" i.e. Inspection for other goods receipt
    And then go to Schedule line category of Return sales (For e.g. DN ) in VOV6 and assign the movement type as 655 instead of 653 and then run the complete new cycle and check.

  • Changing Inspection Lot Quantity

    Hi Guru's,
    Need a small bit of help.
    I created a Sample manually with 11 ea's. I used transaction QPR5 to created an Inspection Lot from this Sample. The Inspection Lot that was generated has a Quantity of 11. (This is not an issue).
    The issue is....I realized that I only have 9 pieces (EA's) and not 11.  I have went into the Physical Sample (QPR2) and changed the amount from 11 to 9.  Of course this doesn't update the Inspection Lot. I went into the Inspection Lot itself (QA02) and tried to correct the actual quantity of the Lot.
    When I went into QE51n. The Inspection Lot is still reflecting the original quantity of 11.
    Can someone please help me fix this? I am hoping I do not have to cancel the Inspection Lot and generate a new one.
    Thanks!

    In inspection test or lot text why are you not putting note - "this insp lot correct qty is 9 not 11".
    This kind of lot are not stock relevant, this are for just record/ audit purpose. So to make clear to auditor you can put note as well. This will resolve your prob.
    I hope this way you can achieve your req.

  • Inspection Lot status not getting changed to LTCA from REL for SubCon scenario

    Dear All,
    For ERSA material 01 inspection type is active with indicator Post to inspection stock only as it can be purchased. No other indicator is set.
    This material can be sent for repairing outside with DAMAGE valuation type (stock provided to Vendor with DAMAGE valuation type).
    For SubCon scenario, Purchase Order with Account Assignment Category F and Item Category L has been created.
    Once GR using MB01 with 101 movement, consumption posting takes place and as Insp type 01 is active Inspection lot is getting created with status REL CALC.
    At this time, DAMAGE stock against Vendor is getting reduced with Qty of 543 movement.
    Now when, reversal 102 with MB01 is done against Purchase Order and details are adopted with reference to 101 material document, reversal is taking place, but at the same time respective material doc's Inspection lot status is not getting changed to LTCA. It remains REL only.
    For 122 return to Vendor using MBRL also, Insp lot status is not getting changed.
    Has anybody faced such issue? Is this standard SAP?
    Kindly throw light on the process, is correct process followed?
    Regards,
    Tanuj Parikh

    Thanks.
    Thru MBST Inspection Lot status changed to LTCA.
    Why system is not cancelling thru MB01? 

  • Inspection lot sample Qty change manual

    Dear Friends ,
    Is there any T Code or procedure to change inspeciton lot sample size in inspection lot
    like how we change the Inspection lot Qty
    Thanks & Regards
    Raj

    Hi
    You can only reset the sample Quantity using qa02>enter inspection lot>click on sample ->save>This will reset the sample(remove task list)
    Now you can change the task list an attach modified sample
    Or
    Assign manual sapme calculation in Inspection type (without inspection task list)
    This will allow you to maintain/enter the manual sample size during lot creation.
    try this

  • Correct actual quantity (QM - Inspection lot)

    Hey,
    I have two questions regarding this topic:
    1) is it possible to correct the actual quantity inside an inspection lot that had already been skipped?
    2) Can I also adjust the number of packaging pieces instead of only the kg's. For example: 10 barrels (1000kg) come in for inspection and 9 barrels (950kg) go out of it.
    Thanks for replying!

    Hello Philippe,
    1) as long as nothin has been inspected in the skip lot and the UD has not been made you could use QAC1 to correct the inspection lot quantity.
    2) using various MM transactions you can change the quantity in a quality inspection, the actual inspection size then has to be adjusted via QAC1. This can only work as long as no results have been recorded. Refer to note <a href="https://service.sap.com/sap/support/notes/485141">485141</a> for details.
    Hope that this information helps resolve your issue.
    Regards
    Isabelle

  • INPROCESS INSPECTION LOT CHANGE SPECIFICATION

    can any body give to me solution after   inprocess inspection  lot  i want to change specification is there any provision in sap standard  like  01 and  04 inspection type  we are change specification in  change inspection lot

    hi
    If results are not recorded and operation are not confirmed then do the following
    1. goto change routing / recipe -- change the specification
    2. go to prod/process order  --read PP master data
    then do RR new spec. get reflected during result recording
    regards

  • Update inspection lot when MIC changes

    Hello Gurus,
    Is there a way to update existing inspection lot when master characterstic changes?
    Any help would be really appreciated!
    Regards,
    Owais

    Hi
    You can change the Existing Inspection plans by doing setting at Cleint level as Replace MIC
    When you cahnge MIC it will give popup of where used.You can change the task lists.
    But this changes will not automatically reflect in an inspection lot.
    for this you have to
    Go to Qa02
    Enter Inspection lot
    Click on reset
    save
    check status of lot CRTD in QA32
    now go to QA02
    enter
    click on Inspection Specification
    selct sample
    save
    check status in QA32 as REL
    Regards
    Sujit

  • Raw material issue for inspection from inspection lot

    Hello friends,
    My sample size is fixed i.e.75 gm for all  raw material quality testing. I have defined sampling procedure with sampling type "fixed sample". I want that this amount should be decreased from total lot quantity when i am posting it to unrestricted use. i.e. for 10 kg inspection lot quantity, 9.925 kg quantity should be posted .Now, system propose whole quantity for stock transfer from quality to unrestricted after usage decision.
    Waiting for reply!
    Thanks in advance!!

    Dear Kiran
    1)  System doesnot take decimal in samples. if your basic unit is KG and you procure 10kg material system will consider sample amount as 1 kg. it will not take 0.075kg as the sample.
    2) Other option is make the procurement in GMs but that  will be difficult for purchaser to handle
    3) or esle make use of this exit and do the posting based on that
    QEVA0009 - UD: Predefinition of quantity to be posted to sample stock 
    This will help
    Regards
    Gajesh

  • Inprocess inspection lot quamtity & Serial number

    Hello,
    Sr. No. is generated after confirmation of sales order.
    The production order is released & the inprocess inspection lot is generated. Production order quantity is 20.
    Now the question is:
    1. Why the inspection lot quantity always appears as '1'.
    2. If in inspection setup, sr. no. possible is checked, then why (or how) sr no.s can be seen automatically during result recording (inspection unit number) field.
    Regards

    Hi Hemant ,
           In configuration for serial No go to spro ->plant maintenance and cutomer service ->Technical Object--> serial No management -
    >Serial No profile -
    > serial no procedure -
    > Qmsl and mmsl  serial No usage should be 3
    so that what ever serial no assign to the GR will coming in the inspection lot and at the time od ud you can select accepted serial no only
    with regards
    Yashodhan

  • Inspection lot creation based on "right" inspection plan version

    I manage inspection plan ( inspection lot origin 01 ) with Change number; in this way I have differents inspection plan version based on date.
    When I do a Good Entry based on purchase order , I need that system creates inspection lot version based on the purchase order creation date and not , as now, based on good entry date
    Is it possible ?
    When I create the purchase order I send to vendor also the inspection plan characteristich that have to be maintened ; for this reason I need to find same characterist during good entry inspection
    Regards
    Silly

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Outbound trigerring for Inspection Lots

    Hi Friends,
    I am working on QM. I have to trigger inspection lots data in the form of an outbound idoc. I need to find out any creation/change in inspection lots data.
    In this scenario the inspection lots will be created/changed when:
    1) there is a creation/change (QA01, 02)
    2) Production orders are released (CO02, 05)
    3) GR done (MIGO), stock posted in QI.
    Has anyone worked on such a requirement earlier? Any suggestions on flow-logic for picking up the inspection lots data in a custom wrapper program?
    Thanks in Advance...
    Birendra Chatterjee

    Hi,
    you should be able to create inspection lots when executing                 
    BAPI_GOODSMVT_CREATE. See for example the attached note 536769 that         
    is about wrong status in the inspection lot created in this way.                                                                               
    Please review your data used for testing this BAPI. 
    Best Regards,
    Arminda Jack

Maybe you are looking for

  • Cyrillic ID3 tags in Music Player

    I have a n82 and love it, but I tried to loaded a cd album which contains Russian ID3, but when i try to view the artist,song,album names in the phones built-in music player all I see is weird characters as though my phone doesn't support non-Unicode

  • Can't install 11.0.1 update in Windows 7 64 bit

    When I run update, I got the following: Adobe setup has stopped working Windows can check online for a solution to the problem Check online for a solution and close the program Close the program Problem signature:   Problem Event Name:    APPCRASH  

  • QM_Class Characteristic

    Dear QM Experts, Can anybody tell me about Class characteristics? Its exact use, its step by step procedure to work out. I followed following steps up till now. But can not understand how exactly the inspection results get transferred to batch class

  • Using Container Object in Java Mapping

    Hi All, I need to use a Container object inside a Java Mapping, just like the one wich is used in the Graphical Mapping. Here is the scenario: I have an Interface Mapping with three steps on it. The first step is a Java Mapping just to put some info

  • Encountering Problems with Basic Sound Tutorial

    Hello everyone, I am encountering problems with a basic sound tutorial. I am absolutely confused as to what the problem may be because the code is so simple, and is essentially copied from the textbook. I am convinced that I have done something very