Inspection lot settings for customer order returns

Hi
The course material for CS states the following :-
+++++++++++++++++++++++++++++++++++++++
The serviceable item undergoes a technical check when the goods receipt is
Posted(repair orders) . You can use inspection lots in Quality Management in the technical check. The system automatically generates an inspection lot for the technical check for a returns goods receipt. <The system does this if you have made the corresponding settings in the material master of the serviceable item.>
+++++++++++++++++++++++++++++++++++++++
what settings are required & where in the material master ?
Thanks
Edited by: Isabelle Britten on May 7, 2008 12:08 PM

You must have the 05 inspection type activated in the material master.  You'll find this in the QM view of the material.  Click on the button labelled "insp. setup".
In the next screen add inspection type 05.  Make sure the "Active" box is clicked on at the end of the record line.
Craig

Similar Messages

  • What are the settings for  rework order  quality inspection

    HI,
    Iam doing production order confirmation at the GR time some oprations are rejected.that operations i want too rework order CO07 process without GR ,i want to Quality inspection in REWork order.
    What are the settings for rework order Quality inspection?

    Refer beautiful document
    http://wiki.sdn.sap.com/wiki/display/HOME/ReworkInProduction

  • Can we obtain Inspection lots against a Process Order / Production Order

    Can we obtain Inspection lots against a Process Order / Production Order  on time basis i.e hourly or day wise against the same order

    HI
    i think there is no this option.Like Plant maintenance ther is no scheduling tool.
    or you have to go with stability studies...
    -ashok

  • Inspection Lot number on Process Order

    Hi Experts,
    There's an Inspection Lot field in process order in Assignment Tab, but it doesnt reflect the number of the Inspection Lot of the Material.  What am i missing?
    Thanks,
    Kumar

    hi kumar
    that inspection lot no is assigned to process order when you have maintained inspection type 03 ie inprocess check in material master . when you release process order you can see inspection lot is generated and that inpsection lot no you can on that field.
    Regards
    Pravin

  • Automatic Inspection Lot Creation for HUs (storage Loc.) in WHS

    Hi All,
    can someone guide me through customizing/with end result expected from client. How can I setup this configuration.
    The requirement is all Chem.Raw Materilas are subject to Quality inspection with HU managed storage Loc. with WMS.
    Good Receipt is posted Via Vl31n into Quality Stock. Subsequently a Transfer Order will be created & confirmed to transfer of materials from 902 interim storage type to destination storage type and bin. (due to lack of space in the Whse).
    Now expected is that when Usage decision made (Quality Managment) the stock type should change from Q to Unresticted within the same bin and same storage type and material should be made available to issue for orders.
    Also when GR is done 101 mvt. an inspection lot should generate automatically in Whse under the quant.
    Most appreciate your help.
    Regards
    Chandra

    Hi Chandra,
    Generally WM movement type '309' is assigned for posting change (Sap standard setting). This movement type is generally assigned against 321 IM movement type.
    Modify the settings for WM movement type '309' as below:
    Path: LE -> WM -> Activities -> Transfers -> Define Movement types
    - Automatic TO X (activate)
    - Activate 'To item can be confirmed immediately'
    - Activate 'propose confirmation'
    - Activate 'post to same bin'
    This should solve your problem.
    On your other question
    Generally the inspection lot is assosiated with the WM
    stock and Quant if the stock Quality stock is posted to bins directly.
    Please display the Quant using LS23 and let me know your findings.
    Regards
    Madhu

  • Inspection lot creation for inspection type 05

    Hi Gurus,
    We have finished material FERT & semifinished material HALB.We have assigned insp. type 02 & 05 in material master of matl. HALB.When we create production order for FERT & confirm the order , inspection lot is generated for matl.HALB of inspection type 02.
    Now we are reversing the goods issue by movement type mb1a, movement 262.In customizing for movement 262 inspection lot origin 05 is assigned.
    My problem is that when i reverse the goods issue with mvmt.262, inspection lot is not created for insp. type 05. What should be the reason behind this? or are any changes to be done to above setting?
    Regards
    Ram

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Inspection Lot creation for the 103 movement type

    <<Don't ask for or offer points>>
    Dear Experts,
    we have the requirement of Creating the Inspection lot for the 103 movement type. we have done all the necessary settings for 103 movement type (in OMJJ and under the node   Quality Management --> Quality Inspection -->Inspection Lot Creation -->Inspection for Goods Movements) but still I am unable to achieve the results. Same is happening for 105 movements.
    Kindly let us know what settings need to be done in order to achieve the same.
    Full points will be awarded for the reply
    Regards.
    Edited by: Matt on Sep 18, 2011 4:44 PM

    Hi,
    If you have activated two inspection types (eg 01, 0101) of same inspection lot origin (01), in material master you should  have a preferred indicator set for the inspection type for which you want to be selected when you perform goods receipt.
    This check box is available in the inspection type set up in the Material master.
    Also check whether the post to inspection stock indicator is set for the material (in the inspection type), then only material will be posted to inspection stock.
    Please confirm, what happens to the stock after making MIGO. check in MMBE and confirm
    Go through the link and maintain the necessary settings. I think default settings for 01 type should work.
    http://help.sap.com/saphelp_470/helpdata/en/2d/350e4d448c11d189420000e829fbbd/content.htm
    Regards
    Hari

  • Source inspection - inspection lot skip for certified vendor

    Hii,
    I have a requirement in which during source inspection, the inspection lot should not be created if the Vendor is certifed. I have made the following settings:-
    1. In Vendor Master, maintained the Actual QM system in control-reference data.(QM system marked for skip in customizing)
    2. In Material Master-
        - Activated QM Proc- QM control Key -Delivery release
        - Target QM system
        - Inspection type for source inspection activated in inspection set up
    3.In Quality Info Record for Vendor,Material,Plant combination-in Inspection Control tab-
        - Maintained the existing QM system & validity
        - Selected 'No Inspection' in Insp. control
        In Vendor source inspection tab maintained the inspection type & lead time.
    Inspite of the above settings, I can see this PO (for vendor,material,plant) in the source inspection worklist(QI07).
    Please suggest as to which setting I might be missing.
    Thanks!!!
    Regards,
    SV

    Hi,,
    You have to go T code QI07
    where give input Vendor ,Material plant,
    Delivery dateopening peroid
    Then execute the transaction .
    Select line item click oninsp lot & save.
    Where you have trigger lot for the same then only lot will get genarated.
    Regards
    SANIL
    This confugaration required if you have option if lots get rejected.
    Quality management-QM logistics-QM procurement -Control key
    Define control key;
    GR/Source inspection control;
    GR for rejection; three option is available
    1.source inspection has no effect on goods receipt
    2.Creation of new inspection  lot
    3.Goods receipt not allowed
    Regards
    SANIL
    Edited by: Sanil Vadke on Mar 12, 2010 7:29 AM

  • No inspection lot created for new inspection type created

    Hi all,
    We create a new inspection type which is based on a copy-version of an existing inspection type. These inspection type has a inspection type origin of standard SAP 04 (i.e. Goods Receipt from Production).
    Question 1 - we bumped into problem when come to testing in which when perform goods receipt, there is no inspection lot created, may I know why?
    The following fields of this new inspection type are all checked; those not specified, are not flagged.
    1 - Insp with task list (flagged); Automatic Assginment (flagged); Check Chars (flagged); Skip Allow(flagged); Automatic UD(flagged); Serial Number Poss (flagged).
    Question 2 - for this kind of inspection type with origin 04, do i need to perform a goods receipt against a production order or purchasing order? How do I perform a GR against a production order?
    Thanks.

    Hi Tuffy,
    Possibly you might not have ticked on preferred inspection type in material master. This could be one of the reasons. Try to do GR after ticking this.
    The setting you have mentioned (flagged parameters)are seems to be correct. But lot generation is governed by preferred inspection type.
    If you have assigned this newly customized inspection type to lot origin 04, then it would be used against production order and not the purchase order.
    There are several ways to carry out GR against production order. It depends on the scenarios which you follow
    1.     MB31 101 movement
    2.     You may use backflush so while confirming order through CO11N auto GR is posted
    3.     In case of repetitive manufacturing scenario generally GR is done by MFBF transaction
    Regards,
    Anand Rao

  • Inspection Lot generation for Movement type 101-O

    Hi
    I would like to know, which config / Master data need to generate Inspection Lot for Movement type 101-O.
    I enter subcontract vendor number and set 'SC Vendor' indicator in purchase order delivery address tab and I created QM data in Material Master.(Insp.Type 01)
    While doing GR with reference to purchase Order, stock is Posted to Material provided to vendor - Quality inspection stock. But Inspection Lot
    is not generated.
    Pl suggest me, What should i do to generate Inspection Lot.
    Thanks in Advance.
    RRS

    hi
    Soln 1) Just check whether Inspection is active for 101 - O in SPRO settings if not, activate the same.
    Path: Inspection Lot creation/Inspection for Goods Movement
    Soln 2) As you flag "SC Vendor" in PO and make GR all stocks will be shown against the Vendor.
    From your question I assume that you would like to do inspection for materials coming from Subcontactor end to your Plant:
    If this is the case you dont flag "SC Vendor" in PO, make a normal Goods Receipt for the Subcontracting PO, based on Insp setup in Material Master for 01 Insp type Insp lot will be created.
    Regards
    DC

  • Route determination for sales order returns

    Folks,
    I would need to have route determination for a sales order return (RE order). Currently a route is determined but this is the route for delivering to the customer. I've setup a new route for returns and maintained the determination. Despite above settings, the return route is not determined. Any suggestions?
    MdZ

    Folks,
    I would need to have route determination for a sales order return (RE order). Currently a route is determined but this is the route for delivering to the customer. I've setup a new route for returns and maintained the determination. Despite above settings, the return route is not determined. Any suggestions?
    MdZ

  • Inspection lot of cancelled process orders

    Hi Gurus,
    I would like to ask if there is an easier way of knowing if the order of an inspection lot was cancelled. Right now the business is on early lot creation, meaning once the order is created an inspection lot is also created. The problem is when the order is cancelled there is no way of knowing it through QA32 unless you go to the order itself.
    Is there an easier way of knowing what orders are cancelled (TECO without confirmation)?
    Thank you for your help!
    Eva

    Hi,
    But they don't really cancel process orders. They use TECO.
    Thank you.

  • Error while doing PGR (post goods issue for sales order return)

    Hello Gurus,
    I'm trying to do PGR for a sales order return. But system shows the following message: "Shortfall below the specified stock level or quantity amounting to 100 UN". (Message number : M7021)
    I've made some searches in SD forum but I didn't fnd appropriate answers.
    What does it mean ? How can I fix it ?
    Thank you,
    Bahia.

    Hi
    "Special Stock E not supported (check your entry)".
    This means your sales order (in your case the returns order ) is created with an item category which is marked with special stock indicator E  in VOV7 and the system is checking for that special stocks and it is not finding that
    When you mark any item category  with special stock indicator it can be E or Q or W ( it can be anything ) system will check for that particular stock category and not the general unrestricted stocks
    For you mistake can be two things
    1. Right now REN or RENN is wrongly marked with special stock indicator E  in VOV7
    If so remove that and try a fresh cycle
    2.The process you are right now doing is returns
    The original sale would have happened with special stock indicator E marked in its item category
    That means it is special stock
    That stock you might be trying to take it into general stocks now
    In that case right now you need to mark REN or RENN with special stock indicator E
    Note whenever you put your hand in VOV7 create a fresh order cycle and test and dont test it with already created order
    Note touching requirement classes are all big things to do in a project and not advisable lot many mistakes we can correct itself if we know order type ,item category and schedule line category
    Regards
    Raja

  • Inspection lot creation when Service order is released

    Hi,
      When i release a service order i need inspection lots to be created automatically.I get a error ''No Insp lot was generated release order anyway''.I have maintained inps type 14 in the maint order type SM03 and inspection type for origin with 'Insp Type 14' and also task list type 'Q'.Any more setting's needed?
    Thanks in advance.

    Amit,
    Please open a new thread for your query.

  • Inspection lot generation for 343 movement type.

    Hi,expert,
    My client's requirement is to generate inspection lot when a specific type of material is transferred from block stock of a storage location to unrestricted stock of another storage location i.e. movement type- 343, can anybody please explain how to generate the inspection lot and what are the settings, master data to be maintained? thanks in advance.
    rgds
    rajib

    Hi Rajib,
    In first place you need to have Quality infor record for material and vendor create through QI01 t code.
    QM must be activated for mvt type 343 in SPRO --> QM --> Qual Insp --> Insp Lot Creation --> Inspection for goods movements.
    Check the box "QM Proc. Active" in Mat master in Quality tab.
    Activate inspection type 08 in mat master.
    Then do the transfer posting you will get mat doc number.
    Go to display mode of mat doc,
    You will find Ins lot number created in Quantity tab at item level of material document.
    Thank You,
    Anand K

Maybe you are looking for

  • OC4J and Message Driven Bean

    Hi I suppose OC4J doesn't create a MessageDrivenContext, that is a 'com.evermind.server.ejb.MessageDrivenHome'(=message_driven_con text.toString() ). The code is : message_driven_context.setRollbackOnly(); and the errors are: 1)java.lang.IllegalState

  • ODBC Error when migrating from SQL Server 2008 to SQL Anywhere 12

    Hello community, i have the following requirement: I need to migrate a Database with some Demo data into a SQL Anywhere 12 Database. The SQL Anywhere 12 Database is part of the SAP BusinessObjects Enterprise XI 3.1 SP7 installation and came with the

  • To get a real length of an array

    if there is an array not full,how do i calcuate how many elements in an array are?? for example: ARRAY A={"A","B","NULL","NULL"}; HOW TO FIND THE LENGTH IS "TWO" THANKS IN ADVANCE

  • A.Ball credits not loaded

    I bought extra credits for the A.Ball game, was charged on my credit card but no credits were added to the game. Please advise.

  • HT1386 bad sync lost ipod downloads

    i have lost all my downloads...bad sync doing an itune upgrade. Can I retreive my ipod info.....please help