Dear Expert,
i need expert advice on this issue.
here specific to one plant when user is doing transfer posting through movement type 311, user doesn't want inspection lot (specific to storage locations ).
Here specific to that Material quality is active. and business want quality active for other all plants.
i tried the T code OMJJ, if i deactive the quality here than this will applicable to all plants.
here v can deactive the quality at plant level through Material Master but here business wants to restrict at sloc level only.
b'coz if v deactive at plant level than quality will skip at the time of GR.
so how we can control the inspection lot creation for movement type ( 311 ) and storage location combination.?
pl. guide me on this
Thanks
h shah

Thanks a lot

Similar Messages

  • Inspection lot not getting create for 01 Insp type after Intransit

    Hi Qm Gurus,
    I have a Material 'A' which is producing in the plant IN05 and transferring to IN06 plant. We have Scheduling agreement PO for this. After Scheduling Agreement we are doing Transferring the Goods thro 351 GI Movement type. So now the parts will be there in transit.
    So now when I receive this goods in IN06 thro 101 MT, Insp lot is not getting create, it goes to Unrestricted. If I create a std PO for the same when I receive the goods thro 101, it is posting into Insp lot. But after 351 & if I do 101 material is not going into Inspection. Pls advise.
    I checked the Insp type 01 Active for IN06, Quality info record is fine, Quality plan also fine. Pls let me know whether i am missing something?

    Hi ,
    Please activate inspection type 08 stock transfer ..
    If this inspection type is active then during stock transfer lot gets generated.
    Also check QM active for this perticular movement in custamizing setting.
    Regards
    SANIL

  • Inspection lot should be created only for particular vendor

    Hi
    Can anyone please help in achieving the below scenario:
    *Material  has been assigned to the inspection type A (one time inspection) has been set as preffered and active  in the inspection set up in the material master.
    *Quality level has been created for material and vendor  such that inspection should be carried out when next stage is 1 and no inspection should carried out when next stage is 2.
    *Tasklist   has been assigned with material and vendor .
    Material can be supplied by different vendors,For this material,  inspection should be done only for one vendor  and for other vendors there should  not be any inspection to be done and no inspection lot should be created.i.e Inspection lot should be created only for one vendor say AA whereas now inspection lot is getting created when  goods receipt is done for the purchase order  with other vendor BB.
    My requirement is  the inspection lot should not be created when goods receipt is done with other vendors say BB  except AA.
    Is there any other way other than using quality info record to achieve this.
    I can try with DMR  but the thing is there should not be inspection lot created  while posting GR.
    can anyone suggest me any other way to achieve this requirement.

    There are user exits when you create an inspection lot.  One of those could be used to suppress the inspection lot.  Have you looked at these?  Have you researched any QM user exits yourself yet?  This isn't the first time this specific question has been asked over the years.
    It's not hard and there are lists of QM user exits available all over the internet.
    Please do some research.
    You can also assign vendors to inspection plans with a DMR that requires one inspection, and than after that creates all skip lot inspections which you automatically close by a batch job.  The first lot can be manually forced closed.  Thereaftter all receipts would be skipped.  Not 100% but pretty darn close.  This requires that you know which vendors to assign to which plan.  Probably as much data maintenance as maintaing the Q-info records.
    And yes.. your client needs to come up with better reasons than "I don't wanna..".  It's part of a consultants job to convince them.
    Craig

  • Inspection lot with 01 origin for stock transfer (Intra company STO)?

    Hi Sap Gurus,
    As per standard SAP configuration for 101 movement type, 08 is the inspection type used for stock transfers (Intra company STO). But, there is a requirement from business to use 01 for Intra STO. Is it possible to get an inspection lot with 01 origin while GR to the delivery created for Intra STO ( Stock transfer B/n plants from same company code)?.
    Thanks in advance
    Venkat V

    Hi All,
    Thanks for your replies..
    Its STO Purchase order between two plants under same company code. System triggers movement type 101 with movement indicator B - Goods movement for Purchase order and Receipt indicator X - Stock transport order. Here system expects inspection lot origin 08 as per standard SAP configuration(OMJJ).
    I just wanted to check, is it possible to get inspection lot from 01 origin for this type of stock transfers. If anyone who worked on this area, please share your inputs. 
    Thanks in advance
    Venkat V

  • Possibility of Stock posting when the inspection lot is in created status?

    Dear,
    Is it possible to do stock posting when the inspection lot is in created status?
    Please help. Yor suggestion will be appriciated.
    Regards
    Vivek Deshpande

    hi
    In standard the creation status wont allow to post the material ,another way is change the system status CRTD in BS22 and allow inventory posting( i haven't checked)
    regards
    thyagarajan

  • Inspection lot cannot be created

    Dear All,
    By mistake i activated inspection type 01 in material master. then po raised. grn made and lot goes to inspection. then we regularise quality flow and clear lot. now i deactivated inspection type 01 from material master. also modified schedule agreement line item stock type in GR/IR control male blank which was earlier X. now fresh PR / schedule line updated and while doing MIGO system giving error " Inspection lot cannot be created"
    What to do ?
    Vijay Vadgaonkar.

    Hi Vijay,
    Check if Post to Inspection stock is checked in material master Quality view , also check if Q info record is still active for vendor material combination to avoid this further
    For exsisting issue reverse the GR activate the inspection type again and do the GR and clear through QM
    Thanks
    Diwakar

  • Inspection lot not being created against inspection type 10 or 02

    Hi
    We need to inspect material at the time of goods being delivered to material. I did the following steps:
    1. in SPRO, Assign Inspection Lot Origin to Delivery Type, against Delivery Type LF we mentioned insp. origin 10 
    2. Assigned insp. type 10 in material master QM view
    3. Created Sales Order using the same material code
    4. Created Outbound Delivery against Sales order, but when we press button for Post Good Issue, the system issues the message "Status of inspection lot 100000000004 / partial lot 000000 does not allow good issue" BUT NO INSPECTION LOT IS BEING SEEN WHEN WE USE QA32/QA02. I have also seen the QALS table using SE16 and no record for inspection 100000000004 is seen.
    Please also note that
    1) other inspection lots are being created and processed normally such as inspection origin 01, 14, 15, etc.
    2) each time we try again to create delivery and press post good issue button, IL number is incremented say 100000000005, then 100000000006, 100000000007, so on.
    3) the issue is the same for insp. origin 02
    Please reply
    Chris

    Hello,
    Check if this is helpful to you.
    qm in sd

  • Goods delivery error for transfer posting

    I have created a P.O for transfer posting for a material from Plant 2000 to plant 3000.where in my account assignment I have mentioed the WBS element.
    created the delivery document---VL10B and outbound delivery VL01N.
    during PGI, system gives error that no WBS element has been assigned.I went to item level and in financial posting TAB page I could not locate the same WBS number in the filed, which is not editable too.the movement type is 641.
    Please advcie what other things to check.
    Zinni

    Check your delivery type which  copy control and  how this value is passing.I think through some routine it is populated.Check the routine in VOFM transaction.

  • Bapi for Transfer posting with clearing

    Hello,
    please let me know the bapi for Transfer posting with clearing for transcation F-04 or FB05.
    quick reply wil be helpfull.
    Thanks,
    ram

    Hi
    I don't know in release greater than 4.7, but there isn't that BAPI.
    There's a BAPI to post a document, but the clearing is an internal transaction so I don't believe there's a BAPI for it.
    Anyway you can try to create one using the std BDC RFBIBL00: it suppoerts that transaction.
    Max

  • Inspection lot to be created if thge delivery is cancelled

    Hi All,
    Our client's requirement is whenever the delivery is cancelled with movement type 602 the inspection lot should be created and the material should be placed in the quality inspection stock.
    We have activated inspection type 06 in QM view.
    How to achieve this?
    SmanS

    Hi,
    Instead of activating 06( not stock relevant ), activate 05(stock relevant) inspection type & In cutomizing " Deactivate Quality Inspection for a Movement Type" - 602 QM should be active.

  • Integration with EWM-Inspection lot not getting created

    Hi,
    Inspection lot not getting created after GR is done.
    The scenario is Storage location is connected to external warehouse management,so after the GR is done in the legacy system via interface it is updated in ECC.so while checking the material document inpection lot is not created.
    Can anyone please tell me the necesaary check points and integeration steps  between WM and QM in this case .
    Thanks in advance.......

    Hi,
    Since you didn't say much, I assume you are creating stock into ECC via LSMW using 561 movement. Now to get inspection lot for these batches/ docs, you need to activate inspection type 05.
    Go to material master QM view, assign and activate inspection type 05.
    Additionally, create a respective inspection plan/ task list for the material(s) to carry out RR and get the consistent inspection lots.
    ntn

  • No inspection lot can be opened for this material and vendor

    dear sir
    i m facing this error while  doing gr. also how to confirm certificate
    plz guide me
    No inspection lot can be opened for this material and vendor

    Sujit/Raj
    I got th similar error. I closed the issue as Raj said because there was an open inspection lot. Im still nto able to figure out the background or root cause for thi.
    The QIno record doe not have release Qty active and release date is 12/31/9999. Then why we have to close the previous inspection lot before recieving another. It seems like there is a condition or something that tells Inspection are to be done in stages and hence previous or pending inspection lot needs to be closed. But where i this condition coming from, where should i check.
    I created PO and performed GR. I noticed if i perform GR and if the Inpection lot has status REL SPCO SPRQ IRCH then this happens. If the status is just REL SPCO SPRQ  then I'm able to do multiple reciepts and this error does not show up.
    Any idea or suggestions?

  • Inspection lot with stock tab for sale return from customer.

    Dear,
    In our organization there are two scenarios,
    1)     Make to order- Strategy group -20
    2)     Make to stock- Strategy group -10
    I have maintained 05 inspection types in QM view for sale return inspection from customer.
    1) In make to order scenario Inspection lot created with inspection stock tab which is OK.
    2) But in make stock scenario no inspection lot is generated.
        Remember I donu2019t want inspection lot without inspection stock tab as per insp. type-06
    So please suggest me, what can I do for getting inspection lot with stock tab for make to stock scenario.
    Regards
    Shabbir Kureshi

    Hi
    QCC0>Quality inspection>Inspection lot creation>Inspection for shipping>Assign Inspection Lot Origin to Delivery Type-->aganist delivery type Enter 05 inspection lot origine
    Also in OMJJ check whether QM in active for mnt type 651
    Regards
    Sujit

  • No inspection lot can be opened for this material error is coming during GR

    dear friends,
    no inspection lot can be opened for this material error is coming during GR. what is the cause for this and how to solve it. please suggest me
    regards,
    Krishna

    Hi,
    i think you have maintained the quality view and activated the inspection. but you have not created any inspection lot task list for the material and plant. thsi you can create through QP01 there maintain the material and plant. then enter in inspection plan give usage 5 and status 4. save it and try to check it with QA32 and see the lot. it should be released then only you can give usage decision.
    regards,
    Adwait Bachuwar

  • Materialo slip no not updating when creating the transfer posting(MB1B 313)

    Hi all
    I have a problem in  updating material slip no when creating the transfer posting(MB1B 313).
    when creating the MB1B if i put the mat slip no manually then system updating in the material doc.
    But when system creating the transfer posting(through auto Jobs) the material slip no not updating in the material doc.
    this is started to happen only after i deleted the condition records(ZDRL) for printing the doc for a relavent storage location.Kidly let me know is there any relation between ZDRL and the material slip updating.
    Thanks
    Manju

    hi krishan,
    Pl ensure that there is any release strategy, or in the transfer posting enter the plant and m.type also storage location in the application tool bar click with reference to PO, and enter the po number and try to proceed. it will work.
    Regards,
    nagarajan

Maybe you are looking for

  • Any way to override default printer settings into a PDF

    Hi -- I work for a large organization that has lots of computers and printers and prints a lot of forms and documents.  We are moving towards more digitization of documents and records including printing forms as needed as opposed to having large set

  • Need iphoto help please

    Hello. I am currently running 10.5.4 on my 1.8ghz single processor g5. I just purchased a new mac pro, and I would like to copy my photos from my old iphoto to my new iphoto. (I do not have the new computer set up yet-I would like first get some idea

  • Photo Album Won't Play on Internet

    CS4 created a photo album, it plays fine in my browser from my hard drive, from our local server and from a memory stick. I have uploaded the entire site to our internet server but the index.html file is solid black and doesn't run the album. Why?? H

  • Safe to leave phone (turned off) in multimedia dock for several days?

    If my Droid X is turned off and I do not need to use it (literally do not need to turn it on) for several days, is it okay to leave it in the multimedia desktop dock (or whatever it is called)? Similarly, is it okay to leave it plugged in to the wall

  • EC-PCA: Different assessment rules by materials

    One of objective of our PCA implementation is to split values by brands. It is possible with the use of profit center (PC) assignment in material master. But... We have some materials which can't be unambiguously assigned to PC. I.e. when one materia