Inspection lot status CRTD CHCR SPRQ

Dear Expert
I created inspection plan for a material and generated inspection lot after GR from PO. But it's status is coming as CRTD CHCR SPRQ, release status is not coming, pls suggest where i want to look for this?.

Hello,
I am having a similar issue with inspection lots. The information provided has been very helpful, but I have not been able to resolve my issue. Forgive me if my terminology is not clear as SAP is very new to me. Here goes:
When my inspectors try to enter an inspection lot with transaction QE01, they receive the error "The function you selected cannot be carried out."  When you click the detailed info button, a transaction analysis box appears with the following info:
Influence of System Status on Transactions
Stat       Description         Influence
CRTD    Created             Disallowed 
If you click on status display instead detailed info, there is a system status tab  with CRTD, PREQ, CHCR & SPRQ. All four options are checked, but to the right of the first two there is a grayed out piece of paper with an arrow. It appears the system is checking for these features, but they aren't properly set up.
As of now, we have no inspection plans, so material is simply checked to drawings and specifications and and an accept/reject usage decision is entered by receiving inspectors. My immediate concern is to get the material released that is stuck in inspection. If I click on the inspection task list, there is no task list created for the material.
Our receiving inspection supervisor was the only one trained in QM and he left the company this week. Is anyone familiar with this error?I'm desperate for a solution.
Regards,
N. King

Similar Messages

  • I can change system status without canceling lot,,"CRTD CHCR SPRQ"

    HI
    A insp lot have (System status) "CRTD CHCR SPRQ" system can not allow for any recording at the lot,, But Question is that i want to change status without cancleing this lot, Have any idea for this lot status.. "CRTD CHCR SPRQ"
    thanks Expert
    regards
    kazz

    Hi kazz, i can't tell if your issue was resolved but if not then you should check the 'valid from' date on the ECM used to setup the inspection plan.  this is assuming that you are using ECMs to create inspection plans and maintain revisions on the material.  the valid from date on the ECM used to create/assign the inspeciton plan to the material must have a date that is equal to or before the valid from date on the ECM used to assign the revision to the material.
    for example,
    ECM 123 has a valid from date of 01.01.2013 and was used to assign revision A to the material
    then the ECM used to create/assign the inspection plan to that same material must have a valid from date of 01.01.2013 or prior...otherwise SAP will not find a valid inspection plan that's valid on the date for the inspection lot and revision of the material in the inspection lot.
    hope this helps!
    nicole land

  • CRTD CHCR SPRQ-how to do result recording for that lot.

    Hi All,
    i am having issue.
    i did  GRN,lot is created with this status-CRTD CHCR SPRQ
    i tried for Result recording but  error is showing.
    Then came to know QP01 is not assigned for that material.
    then i created the QP01,but still i am not able to to Result Recording to that Lot.
    is any way to do that.without cancell the lot can we do.
    Regards,
    siddharth shanker

    Hi,
    Your lot is at created status so you need to relesed lot. May be insection plan /task list has not been assigned to lot.
    In Qa32 go in inspection lot Change ( Or T code -QA02 ) .where in tab Inspection specification tab click on task list/speci where you can assign plan theri ( You can assign plan with usage that you have created plan  )
    Save transaction.
    refresh QA32 then try result.
    Regards
    SANIL
    See QP02 with what usage you have cretaed plan.
    as earlier I told you in QA02 tasl inspec tab  in usage field select same usage by which you have created inspection plan.in QP01.
    Regars
    SANIL
    Edited by: Sanil Vadke on Mar 29, 2010 8:40 AM

  • Error while Releasing the Stock from Quality-CRTD CHCR SPRQ

    Hai Experts
                          While releasing the stock from Quality i got  error like function cannot be caried out,
    The Material Status CRTD CHCR SPRQ.
    Thanks
    Rajakarthik

    Rajakarthik
    It looks like the status you mentioned are of inspection lot.
    CRTD mean created status of inspection lot.
    CHCR means characterstics required. in your case the the material master inspection view says characterstics required however your inspection plan does not have any cahracterstics.
    assign the characterstics to inspection plan & both the status of inspection lot will change. you will be then able to process the inspection lot to move the stock from quality to unrestricted.
    Regards
    Mahesh

  • Quality Management - Insp lot with status CRTD CHDR SPRQ

    I am not able to do usage decision for Insp lot with status CRTD CHDR SPRQ but I can do usage decision for status REL CALC SPRQ.
    Can anybody know why ?

    Hi
    pl check the lot is assigned for inspectioon plan ore not.
    got QA02 check in inspecion specification TAB.
    If there is noe inspection plan (group)
    you need to create a inspection plan, and then come to QA02
    then you need clickon TAsk list/spec button in insp.specification tab.
    Pl check and try
    -ashok

  • INSP LOT WITH CRTD  CHCR STATUS

    I have created inspection lot for sample management (insp type 15).
    Quality plan for that is with usage 9.
    but still lot is created with status CRTD  CHCR .
    what may be the possible reasons?
    Message was edited by:
            sandip raut

    In Quality plan at header, i have maintained
    usage 9,
    status 4,
    lot size 0-9999999999,
    insp point 200,
    assigned the sample drawing procedure
    and i have assigned one quantitative inspection charracteristic for which i have not assigned any sampling procedure.
    is it mandatory to assign the sampling procedure to characteristic?
    also i have checked the dates of the Q.plan and inspection lot.
    all dates are same.
    still lot is CRTD.
    when i am tryimg to assign the quality paln through QA02,and clicking the "Task list/spec" tab,nothing is happening.neither system is assigning the plan nor giving any message like "no plan exist"
    please help.
    its urgent,please reply soon.
    Message was edited by:
            sandip raut
    Message was edited by:
            sandip raut
    Message was edited by:
            sandip raut

  • For the Inspection lot status is CRTD instead of REL status

    Dear Experts,
    Today I have observed strange behavoir of the system.
    For the Finished material 04 insp type, Every day we used to generate inspection lots automatically with MB31for 101 mov type.
    generated inspection lot status will be REL bydefault. Today we observed system status is CRTD.
    I have checked any material master/Inspection plan been change or not, but it was not changed.
    Please suggest how this behavior happen suddenly.
    Regards
    Don

    Dear Don,
                    Check in SPRO for inspection type configuration. Some body has changed the 'Task list usage' for Inspection type.
    If you are using '1' and if there is other one except '1' then system will create inspection lot in CRTD status.
    You need to change it manually in QA02 and assigne plan.
    Thanks and Regards
    Harriesh.

  • Recurring inspection lot status "created" changed automatically to "Release" without change history

    Dear Experts,
    I observed that for few materials recurring inspection lot (inspection lot origin 09) status from "CRTD CHCR SPRQ" to "REL  CALC SPRQ PRSI" changed automatically without manual interruption.
    I have thoroughly checked the change documents in status management, but the there is change history found.
    can anyone help me understand the root cause of the issue?
    Regards,
    A.Suresh

    Hi
    Pls check this link
    QM - Recurring Inspection (type 09)
    Inspection type 09 process
    Note : System status CRTD because there is no Insp.plan master data for particular material
    Check & create Inspection plan for material & also check the Material master QM view Insp.set up tab.
    Suppose if already created Insp.plan for material,then you need to assign Insp.plan manually in QA32 select the insp.lot line & click change Insp.lot icon in Header ,click spec.& save
    Then system status change from CRTD to REL.
    Thanks in advance

  • Posting goods from quality to unrestricted status CRTD CHCR......

    Hi Guru's,.
    I have one issue.
    In QA32 my lot is in CRTD CHCR SPRQ. I have not made quality plan for that.in MM01,quality view i activated inspection type 01.
    now in mmbe stock is showing in quality.
    i want to do transfer posting from quality to unristricted stock.i dont want to use quality plan assign to that lot.
    I tried MB1B movemet type 321. i am getting error Change the inspection stock of article 1111030200267 in QM only.
    Is any way to do that,transfer posting.
    Regards,
    siddharth

    Hi,
    As your lot has been at CRTD status you need to released by assigning inspection plan.
    In QA02 --change inspection lot or in QA32 select lot line item & click on inspection lot so that you can be able to enter in change lot.
    In which you can assign your inspection plan ,you will find icon  inspec tasl list ,click on same icon.so that you will get message inspection plan assigned , .If system wont allowe you then same screen usage ( You have to select same usage by which you created inspection plan.)
    Save the transaction & refresh the QA32 screen
    Regards
    SANIL

  • QA32 with status CRTD CHCR

    dear all
    In  one Material system status CRTD CHCR shown in origin 04 (Shipping inspection) trans code QA32 while it is reqired REL CALC SPRQ for result recording.
    what may be the reason?
    regards
    roshan

    Hi,
    Please go & check you have not made the inspection plan for the required material. Go and make it in QP01. After that you will get the required statuses.
    Then when ou do result recording you will get the result RREC & then you will get the result SPRQ(stock posting required.
    Please go & check.
    If helpful award points.

  • Inspection lot status to be fetched into BW

    Hello,
    First of all; I am aware that, there are many forums/discussions with regard to fetching of Inspection lot status. I have gathered the points as well.
    Our requirement is to, to extract the Inspection lot status into BW as we are already staging the Inspection lot numbers.
    I got 2 ways to do this,
    1) There is a BAPI FM in ECC to get the Inspection lot status. "BAPI_INSPLOT_GETSTATUS".
    2) Else, we can take QALS-OBJNR & pass it to JEST to get the status numbers. And this needs to be passed to TJ02 for descriptions.
    However, I have doubts about how to extract this status into BW. (As I need to filter out the status' LTCA, CRTD, ICCO).
    1) Can we have an extractor based on the Function module & get data into BW? Is this possible, because since it is a BAPI FM; I wanted to have a clear picture on how to get it.
    2) Can I build a view on top of JEST & TJ02; And apply selection conditions of whatever is necessary & extract it into BW?
    And I don't want to stage the complete data in BW side for JEST & TJ02, as I noticed that there is uncertainly huge amount of data in JEST.
    So, any inputs on how to stage the status into BW will be very helpful for me. Please let me know, if I have missed out any documents/links regarding the same.
    Thanks again,
    Vikranth.

    Dear Madhav
    Here is my approach for this requirement
    1) Create  infoobject for each of the status you required for the inspection lot. (It can be flag indicator kind of info object
    2) Make these status navigational attribute of Inspection lot infoobject
    3) Create a generic datasource on QALS . You can use createdon and changedon so as to manage a pseudo delta. Append the datasource extract table with Z fields required to capture your Inspection lot status
    4) Write a Exit in the source system to fetch up the status field for each inspection lot from the JEST table. You can hardcode the status field for eg If Qlot has status I0002 then mark the corresponding append field with X.
    5) Map the append datasource field to the Inspection lot info object through transformation.
    Hope its clear for you
    Regards
    Gajesh

  • Table for Inspection Lot status

    Hi,
    In which table is the inspection lot status stored?
    Kindly suggest.

    Bapi
    BAPI_INSPLOT_GETSTATUS
    Tables
    JEST
    TJ02T
    1. Goto table QALS with PRUEFLOS = inspection lot
    2. Goto table JEST with OBJNR = QALS-OBJNR
    You will receive one or more records of status. Then - table TJ02T.

  • Inspection Lot status not getting changed to LTCA from REL for SubCon scenario

    Dear All,
    For ERSA material 01 inspection type is active with indicator Post to inspection stock only as it can be purchased. No other indicator is set.
    This material can be sent for repairing outside with DAMAGE valuation type (stock provided to Vendor with DAMAGE valuation type).
    For SubCon scenario, Purchase Order with Account Assignment Category F and Item Category L has been created.
    Once GR using MB01 with 101 movement, consumption posting takes place and as Insp type 01 is active Inspection lot is getting created with status REL CALC.
    At this time, DAMAGE stock against Vendor is getting reduced with Qty of 543 movement.
    Now when, reversal 102 with MB01 is done against Purchase Order and details are adopted with reference to 101 material document, reversal is taking place, but at the same time respective material doc's Inspection lot status is not getting changed to LTCA. It remains REL only.
    For 122 return to Vendor using MBRL also, Insp lot status is not getting changed.
    Has anybody faced such issue? Is this standard SAP?
    Kindly throw light on the process, is correct process followed?
    Regards,
    Tanuj Parikh

    Thanks.
    Thru MBST Inspection Lot status changed to LTCA.
    Why system is not cancelling thru MB01? 

  • Inspection Lot Status (CROK)not updating for Certificate Reciept

    Hi
    I want to inspect vendor materials on the basis of thier Quality certificates
    1) Config Set up:
    a) Certificate type :YA72
    Cert for each PO  item :checked
    Certificate Check reqd:  :Checked
    Enhance cert processing: Checked
    b) Control key :0005 ( Delivery release ,Certificate)
    2) Material Master (QM View)
        QM Procurement : Checked
       Control Key :0005
       Certificate Type :YA72
    3) Goods Recipt
        MIGO < Purchase Data<Cert Reciept :Yes
        Inspection lot is created
    Question : Inspection lot status is not updating for Certificate Recived or not
                      My understanding is Inspection lot status should be :CROK -Certificate Recieved                                                                               
    CTCM-Certificate Missing
    Pls correct my understanding in case i am missing something
    Thanks in advance

    Is the status in the GR document have the cert field set as 5?
    Since you set the "certificate check required" you must do an explicit check of the cert.  I included below the help screen from this indicator in SPRO.
    You should be able to review the status of your cert in transaction QC53.
    FF
    Explicit Inspection of GR Certificate Necessary
    If you set this indicator, at goods receipt the system will generally perform as described in the field "Control without certificate".
    This means that even if you confirm the certificate receipt at goods receipt, and thereby set the status "2 - Certificate received", the system will still perform as specified in the field "control without certificate". See Control without certificate.
    You must explicitly check the content of the certificate recieved at goods receipt and set the status "5 - Certificate filed and inspected ", before, for example, the inspection lot status will be set to CROK.
    You can confirm that you have checked the content of the certificate in the certificate transaction or when making the usage decision.
    Note
    If you have set the indicator and chosen an unsuitable setting in the field "Control without certificate", the goods receipt can be generally blocked.
    This security function is generally used at electronic certificate receipt to check the accuracy of the certificate contents.

  • Inspection Lot Status UD ICCO SPCO ORRQ

    Hello Experts,
    Please share your thoughts on the System Status "UD ICCO SPCO ORRQ". Not sure on why the Lot getting the status ORRQ "Order record required"
    What is the Condition in which the system triggers this Status? how to complete the inspection processing once we get this status? Is it a Particular Configuration setting that expects a Process Order Record?
    Is there any setting in Production that sets the Inspection Lot status as ORRQ.
    Appreciate your quick response.
    Regards
    Raja

    hi,
    Check ur MM- QM view whether QM order is assigned or not. if QM order is assigned then process your order and confirm it and provide the settlement also against that order. Or check any other order is opened against that lot or not Like PP order or PM order which is controlled by ur QM- status profiles.
    once ur order closed technically ur inspection process completed.
    Regards

Maybe you are looking for

  • Public Constructor in atg

    Hi , i was going through the doc Public Constructor , why constructor without args is needed in creating a nucleus component. i create a component like Test.java name; getxx(); setxx(); Test.properties name=Kavi when i went to dyn/admin im able to se

  • AS 10.1.2.0.2 to 10.1.3

    I use As 10.1.2.0.2 and i would like to update to 10.1.3 xx How can i do that? I want to do that because i would like to use features of **Jheadstat** If make this change will influence another component? (portal ,metadata repository e.t.c) thanks Ed

  • Task related information

    I am trying to add my custom object as related information in the task page. I have done the whole application customization>related information layout> and created the new layout, then went in to step 5 and made the custom object related info layout

  • Developing a WS Client

    Hey, I am completely new to javax-ws. I have to create a WS client which interacts with a WS by sending/receiving a SOAP message. End goal of this application is to convert a java object into a SOAP message, send SOAP message to WS, get back SOAP res

  • System account appears to be locked

    I'm trying to access an Oracle 10g database (running on HP-UX) from my Windows XP laptop. I've installed the Instant Client, the ODBC driver, and set up the tnsnames.ora file. However, when I try to test my ODBC connection using the system account I