Inspection lot with Production Order

Hi friends,
I am PP consultant and need some help in setting up a scanario of Production order with inspection lot.
I need to setup a scenario where a inpspection lot is created from production order manually (not at the time of release). The purpose is to post few quantity of production order to scrap storage location. Inspection lot needs to be created only in certain production orders where some of the quantity has to be declared as scrap and that needs to be rejected with usage decision.
can any one please suggest the overview of such scenario.
Regards,
Rohit

Dear Rohit,
You want to create a manual inspection lot only for the purpose of Scrapping and also want it to be done with Usage Decision.
You can not use inspection type 89, as it is not stock relevant (Inspection type for Miscellaneous inspection),
There is one another solution with inspection type 08( inspection for Material Movement), but it might look Lengthy.
1. Release a Production order. say 100 qty.
2. If during process, 10 is scrap, then perform Partial Confirmation of 10 Qty.;  Stock will be in Unrestricted.
3. Now, through MB1B, transfer 10 qty from Unrestricted to QI.
4. As you have inspection type 08 active, System will create an Inspection lot for 10 Qty.
5. You can post this whole 10 qty to Scrap while giving Usage Decision.
I think, in your process, Scrapping is not done frequently, that is why you do not want inspection lot at every production order.
in that case this solution may solve your problem.
regards,
Amol
Edited by: Amolbook on Jan 12, 2012 3:13 PM

Similar Messages

  • Inspection Lot on Production Orders using HU

    Hi Experts:
    I'm trying to notify using production orders some HU. I was reading the help.sap.com and it says:
    1. An inspection lot is never created, if the indicator Inspection for HU is not set in the Inspection setup of the material master (Quality Management view) for storage locations requiring HUs.
    2. In general, it is not possible to create the inspection lot at goods receipt in storage locations requiring HUs.
    That's confuse me.
    In the system I have the following information:
    a. Create my order and release.
    b. My material have inspection 04. I marked the indicator Inspection for HU on Quality Management view.
    c. I used Tx COP1 to create my HU
    d. I notify my production using COWBHUWE
    If I checked my MMBE the quantity is on Quality Status. But I don't have my inspection Lot.
    I create my Inspection plan with indicator 5.
    Someboday can tell me why the inspection lot isn't create?
    I checked the configuration:
    In Customizing for Handling Unit Management (Inventory Management), the respective movement type is not deactivated for quality inspections. The indicator QM not active is not set.
    In the (respective) material master record, the corresponding inspection type is created and activated for the respective goods movement, and the indicator Inspection for HU must be set.
    Thxks

    Sorry firefighter I'm going to explain more in detail.
    1. I tested my integration process QM-PP-HU on a Storage Location without HU.
    The results were:
    a. Hu created
    b. Inspection Lot Created
    But when I did the DE the units from the HU were moved, but the HU still in Q status.
    So I changed my test.
    2. I tested my integration process QM-PP-HU on a Storage Location with HU
    The results were:
    a. Hu created
    b. Inspection Lot Not Created
    In this case, I marked on Material Master the HU Indicador on 04 Class (Quality Management View)
    That's my problem.
    Addittional I tested a MM-HU process using 01 Inspection Class.
    1. I create a Purchase Order Me21N to a Storage Location with HU
    2. I create the Delivery using HU
    3. The system create the Inspection Lot and made the DE (reference to the HU)
    My problem is stilling the PP-QM-Hu on Storage Location with HU

  • Inspection lot for production order lot and not for single pieces

    Dear all,
    I have a production order , for example, for 12 pieces / serial number . Material is produced in lot , in this case 3 lot of 4 pieces.
    Pieces in a lot are linked toghether in a grap.
    Production order create an inspection lot where I can store quality data for every pieces / serial number.
    I need to store quality data at lot level ( for example the grap weight );
    Is it possible ?
    Regards

    Can you not create Char/MIC like weight & attach the task list to the inspection lot?

  • 04 inspection lot with status SPST

    Dear Experts,
    We are using Handling Unit (HU) functionality in FG material,
    1. We create HU's (say 50 HU's) using tcode COWBPACK,
    2. On creation of HU, an inspection lot of type 04 is created for 50 HU's.
    3. In regular scenario, we do GR of all 50 HU's using tcode COWBPACK,
    4. All 50 HU's are posted in to unrestricted & UD is given using tcode QA32 & status UD SPCO.... is updated in inspection lot,
    5. The HU posting in unrestricted can be happen before GR also (which observes no problem),
    But in rare scenario, we need to cancel / delete the some of HU's at that time following steps are involved -
    1. We create HU's (say 50 HU's) using tcode COWBPACK,
    2. On creation of HU, an inspection lot of type 04 is created for 50 HU's.
    3. HU posting in unrestricted is done for 45 HU's (System status SPST is updated in inspection lot),
    4. Balance 5 HU's are deleted from system using tcode HUMO,
    5. UD is given to inspection lot & status UD SPST.... is updated in inspection lot.
    Now the problem is, after settlement & variance calculation of production order when we try to update status CLSD (Close) in production order the system give an error "Inspection lot 040000XXXXXX for order XXXXXXXX has not yet been completed" this is due to system status SPST is there instead of SPCO.
    As the 5 HU's are deleted hence the stock posting can not be completed. Even we can not cancel the inspection lot due to status SPST.
    Please suggest how to resolve this issue to update the status CLSD in prodction order.
    Thanks in advance,
    Leena.

    See if these OSS notes help you
    Note 622758 - Stock posting cannot be completed (HU)
    Note 532946 - HU lots: Status SPST f.stock proposal in usage decision code

  • Inspection lot with 01 origin for stock transfer (Intra company STO)?

    Hi Sap Gurus,
    As per standard SAP configuration for 101 movement type, 08 is the inspection type used for stock transfers (Intra company STO). But, there is a requirement from business to use 01 for Intra STO. Is it possible to get an inspection lot with 01 origin while GR to the delivery created for Intra STO ( Stock transfer B/n plants from same company code)?.
    Thanks in advance
    Venkat V

    Hi All,
    Thanks for your replies..
    Its STO Purchase order between two plants under same company code. System triggers movement type 101 with movement indicator B - Goods movement for Purchase order and Receipt indicator X - Stock transport order. Here system expects inspection lot origin 08 as per standard SAP configuration(OMJJ).
    I just wanted to check, is it possible to get inspection lot from 01 origin for this type of stock transfers. If anyone who worked on this area, please share your inputs. 
    Thanks in advance
    Venkat V

  • Creation of Recurring Inspection Lots with Serial numbers

    Hello,
    We have the following scenario at our client :
    <i>MIGO_GR</i> is used to create GR for materials with Serial number requirement. The serial numbers can be generated automatically or manually entered on the screen. At this point of time, the Shelf Life expiry date & Next Inspection date are calculated based upon the Production date. The Batch gets created with Next Inspection date, Inspection Lots are created and the Serial numbers are assigned by the system. The stock moves into QI.
    The stock is moved from Quality restricted to Unrestricted stock via <i>QA11</i>. The serial numbers are handled by the system or can be managed on screen.
    Transaction <i>QA07</i> (Deadline Monitoring of Batches) is used to create Recurring Inspection. QA07 gives error message IO304 that "<b>Only 0 serial numbers entered instead of 1</b>". The problem is that system doesn't pick up the corresponding serial numbers.
    OSS # <u>497845</u> mentions that Transaction QA07 can not handle serial number. The serial numbers are very critical to the business process.
    Has anyone come across this situation before ? Please suggest solution or workaround. I tried using BAdI "<b>INSPECTIONLOT_UPDATE</b>" & was able to create Inspection Lots with serial number assignment, also manipulated Batch to change the Next Inspection date. The problem is Material Movement (322) Document does NOT get created.
    Also tried implementing BAdI as per OSS # <u>608830</u> but doesn't give desired results.
    Any help is greatly appreciated.
    Best Regards,
    Homiar Kalwachwala.

    Hello all,
    Just wanted to bring this on top to be noticed.
    Would appreciate any help, suggestions...
    Regards,
    Homiar.

  • Inspection lot with inspection type 03 - Using Inspection plan

    Dear friends,
    I want to create an inspection lot at the time of production order release (ideally - insp type 03). But I want to use inspection plan as a task list instead of routing for that lot.
    Is it possible?
    Best Regards,
    Avinash

    Hi Swapnali,
    Was expecting this re-question.
    We are at a stage where system is already ready. The routing master data contains large number of alternatives and huge number of parallel sequences. We were looking for a solution in which we would make an inspection plan without touching routing master data. Second I want to create the lot at the time of order release (basically one lot per production order) so don't want to use insp type 04.
    In config, I assigned task list type Q in front of lot origin 03 (Maintain Inspection Lot Origins and Assign Inspection Types).
    But still system is picking the routing and not inspection plan. Is there a way out?
    Regards,
    Avinash

  • Inspection Lot with Zero stock posting qty

    Dear QM Consultants,
    We have come across following scenario,
    1.     Repetitive manufacturing
    2.     Material has inspection type 04 and Z04. Preferred inspection type is not ticked. Z04 inspection type has been assigned to inspection lot 04.
    3.     Production GR done by 131 movement
    4.     Inspection lot generated with reference to 131 movement type. Lot for inspection type 04 is created.
    5.     Inspection lot qty in QA32 it shows correctly as that of GR qty.
    6.     But when we click on UD, in stock posting tab, qty to be posted it shows as ZERO. So no qty is available for stock posting.
    Has anybody came across such scenario? Is this any bug? Any SAP note for this?
    Best Regards,
    Anand Rao

    Dear Sujit, Thanks for so prompt reply,
    Basically this is a complex case,
    1.     See we have set Posting Proposal in Usage Decision as u2018To unrestricted useu2019 in selected sets for usage decision. That means we need not every time go to stock posting tab. The moment we select ACC UD code it automatically posts the stock to unrestricted use.
    2.     Now, what has happed, by 131 movement declaration, backflush happened with 261 movement for child parts.
    3.     Inspection lots with inspection type 04 were created. (Here we did not note whether the stock was posted in quality inspection or in unrestricted use)
    4.     Now the requirement is to cancel 131 movement document. Kindly note UD were not given up to this moment.
    5.     Now through MFBF, user did document specific reversal. As a result of which and as per my knowledge 132 movement should happen and 262 should also happen. At the same time inspection lot status should be set to LTCA. But in actual case 132 movement happened and 262 did not. Surprisingly inspection lot did not set to LTCA status. It remained in REL mode only.
    6.     After this document specific reversal, user gave UD to these inspection lots without noticing where the stock was lying.(in unrestricted or in quality inspection). So the lot status set to UD   ICCO SPCO STUP after giving usage decision.
    7.     Now while doing reverse engineering that why 262 movement did not happen, we came to know that no 321 movement happened for the inspection lots which were generated with reference 131 movement document
    8.     Also, qty to be posted it shows ZERO as explained in my earlier post.
    9.     When we display 132 movement document through MIGO, in where tab it shows stock type as Quality inspection. That means stock was lifted from QI for 132 movement.
    In short  it cannot be predicted where the stock was actually posted whether in QI or in unrestricted use. But yes the post to inspection stock tick has been ticked in material master.
    Can you help further in this regard?
    Best Regards
    Anand Rao

  • Add inspection characteristics to production order created via CO07

    Hi, all.
    We're creating production orders to perform production rework on assemblies using transaction CO07. 
    We have a requirement to inspect and make a usage decision on the reworked assembly.
    Since there is no material at the header level for CO07 orders, the system isn't allowing us to do an inspection because it has no material master QA view to reference.  Although the control key is marked for in-process inspection, the production order still won't allow it.
    I can't add "unplanned inspection characteristics", not can I manually create an inspection lot using QA01. 
    Is there a way to manually force in an inspection for an operation on a CO07 order?
    Thanks.
    Sarah

    Hi,
    We cannot do a inspection for a production order unless it has material assigned to it and the material got QM inspection type relevant to that.
    regards,
    Lenin. A

  • Configure another Inspection Type for Production Order

    Hi QM Gurus,
       I have one scenario, my client wants to have another inspection type for inspection lot origin goods receipt from production because they have this requirement that for some materials they need to have a status profile that will be active for inspection type standard 04. And there are also some materials from goods receipt from production that does not need status profile. Since the only thing that we could assign as specific status profile is to its inspection type. Hence, i need to create another inspection type for lot origin goods receipt from production aside from inspection type 04 that will create automatic inspection lots with different status profiles.I try this in configuration but no inspection lots has been made for new inspection type assigned to LOt origin 04 and also assigned in the material master inspection set-up. How will i do this???
    Thanks.
    Regards,
    Matildo, Edsel
    QM Consultant

    Hello Edsel,
    you can configure for example an inspection type 0401 and activate this inspection type for the inspection origin 04 in customizing. Please look at the following customizing items:
    Transaction QCC3
    -> Inspection Lot Creation
    - Maintain Inspection Types
    - Maintain Inspection Lot Origins and Assign Inspection Types
    By activating the correspondent inspection type in the material master you can decide which inspection type is used. If you need both then you could think about using the exit QAAT0001 to assign the correspondent inspection type.
    Regards
    Isabelle

  • Inspection lot with stock tab for sale return from customer.

    Dear,
    In our organization there are two scenarios,
    1)     Make to order- Strategy group -20
    2)     Make to stock- Strategy group -10
    I have maintained 05 inspection types in QM view for sale return inspection from customer.
    1) In make to order scenario Inspection lot created with inspection stock tab which is OK.
    2) But in make stock scenario no inspection lot is generated.
        Remember I donu2019t want inspection lot without inspection stock tab as per insp. type-06
    So please suggest me, what can I do for getting inspection lot with stock tab for make to stock scenario.
    Regards
    Shabbir Kureshi

    Hi
    QCC0>Quality inspection>Inspection lot creation>Inspection for shipping>Assign Inspection Lot Origin to Delivery Type-->aganist delivery type Enter 05 inspection lot origine
    Also in OMJJ check whether QM in active for mnt type 651
    Regards
    Sujit

  • Want to do mass processing for inspection lots with status SPRQ

    Hello,
    My company using early lot creation for 04 inspection type. We have thousands of inspection lots with status "UD   ICCO SPRQ PRII PRSI STUP". Now due to SPRQ status, system is not closing process orders associated with thousands of inspection lots.
    Is there any transaction where I can do mass processing of inspection lots to change the status "SPCO" from "SPRQ"?
    Thanks
    Bhavesh

    Dear Bhavesh
    You may have to modify the standard program to do so. Modify this program RQEVAI30.
    This can help you
    Regards
    gajesh

  • Diff between with production orders

    Hi Friends,
    pls explain dif between planned orders & Production orders.
    Regards
    Jagadeeshwar.B

    Hi,
    Planned orders are results of running MRP. Shortages of materials that are set to internal procurement will create planned orders, which can be converted into production orders. Production orders are like "hard copies", they cannot be adjusted by MRP anymore.  Well that's for a discrete environment, not sure about repetitive manufacturing.
    One we firm the planned order changes will be not reflected in the subsequent MRP, correct. e.g. BOM change. New components will not be recommended for firm planned order.
    I'm assuming when you ask about when to use planned vs production orders you are asking when to use Repetitive Mfg (with PE planned orders) vs Discrete Mfg (with production orders). We use both and while we're not perfect in our approach yet we are gaining a better appreciation for the two.
    For repetitive, the planning is much simpler, you basically run MRP against your demand and you get planned orders. You can change and firm these manually or you can use time fence strategies, and you can have multiple operations running through multiple work centres. They are very simple to maintain and use. Repetitive is normally run against shorter lead time build, where we don't need a high level of control. If we have the option we go with Repetitive.
    Where we want a better level of control we go with discrete. Planned (LA) orders are created from a run of MRP against your demand. These are converted to production orders, released, and processed. There is a lot more control (and work) with this order type than we see with Repetitive planned orders. We can link documents to the order, we can change the routing and the BOM on the order, and we have better visibility of the individual orders while they are in manufacturing. Costing is against the order as opposed to Repetitive where the costs (and variances) are seen against the cost collector. After everything is complete, you still have a record against the build. The order stays intact, though it may be complete and closed, you still the retain history.         
    Reward Points if found helpfull..
    Cheers,
    Chandra Sekhar.

  • Discontinuation functionality with production orders

    Dear Guru's,
    Can anyone please confirm: is the functionality for discontinuation of a material (including follow-up material) not available with production orders?
    Example: in our system we have component A that is followed up by component B. This is set in material master - MRP 4.
    We also have production orders for the upcoming 4 months in our system. If the stock of component A is depleted within these 4 months, we would expect to see requirements (orderreservations?)  on component B, but this is not the case.
    Thanks for any comments,
    Rgds, AJ

    Hi
    Discontinuation works for Production orders.Couple of Checks needed for both Follow up and Discontinued Materials to arrive to actual problem
    1) Base unit of measure must be same
    2) Should have same MRP type
    3) Not defined as Co-Products
    For detailed info pl refer the link
    [Discontinuation|http://help.sap.com/saphelp_47x200/helpdata/en/b1/c044d1439a11d189410000e829fbbd/content.htm]
    Regards
    Brahmaji

  • URGENT: Prob with Production Order Confirmation

    Hi Gurus,
    I have a problem with Production Order Confirmation.
    When I am confirming a Prod Order and if the components present are more than '999', then error is being thrown and Material Document Number is not being created.
    I want to split the records into 500 slots and pass them at a time for the creation of the Production Order so that it doesnt throw me an error while creating a Material Document No.
    While saving the Production Order confirmation order, it should split the records into 500 slots each and then create Material Document No for each slot.
    Can anyone please help me out in this regard, how to solve this.
    Thanks & Regards,
    Harish Kalla

    Hi Harish,
    This problem is addressed in OSS Note : 36353
    The Symptom reads like this
    ==========================================================================
    When you post documents using the AC interface (from SD, MM or other applications), items appear in the FI document which are identical in all or in almost all fields.
    This can also cause error message F5 727 ("Maximum number of items in FI reached"). The system issues this error if more than 999 items occur in an FI document.
    ===========================================================================
    This Note is an elaborate one..
    Hence, go through this and ask your FI Consultant to help you in this regard.
    All the best..
    Regards,
    Siva

Maybe you are looking for

  • Tabbing through components

    I have an array of JTextFields in GridBagLayout. Normally, I wouldn't be having trouble, but I specifically had to lay them out from top-to-bottom(wraping around to the top of the next column), instead of the normal left-to-right layout. So, what I n

  • Loading XSD Schemas as External Definition

    Hi all, I am trying to load an XSD Schema into XI. As part of this schema is another external reference. I have also loaded this into XI. Looking at the 'External References' tab of the first message, I can see the reference to the second message. Th

  • Illustrator not opening any .AI Files?

    All my .ai files will not open. Im getting a error saying the file is an unknown format? But the file was created in Illustrator? CS6 to be exact. Ive tried to open in photoshop, and Viewer.. Nothing works. Please advise..

  • Migrating from Progress to Oracle

    Hi, Wonder if someone's migrated from Progress to Oracle. What tools are available ? what are the constraints/pitfalls/limitations/restrictions ? I need to understand the overall migration process (not having done one yet). What are the tools ? what

  • Can't start up enterprise manager console again

    I don't know what cause it, I can't start up enterprise manager console again after installing Oracle DS9i and hasn't any error message. Who know how to troubleshoot it, please tell me know, thank.