Inspection plan for all materials GOODS Receipt

Hi qm experts,
I have a scenario. How could I make an inspection plan which covers all materials with variable base unit of measure. Its because my client is using winlims for their results recording. I want to create only one inspection plan to incorporate all materials for assignment, how could I make this one. I hope anybody could answer my question.
Regards,
Edsel matildo
QM Consultant

Hi,
  Say u have different materials with different base unit of measure ( kg / ltr / ea / pc /  --- -
etc ) And u have assigned all these material in qulity plan having only one unit of measure (say mm )for characterisrics then there is absolutely no need to maintain conversion rule for all these
Beacuse base unit of measure is different and unit of measure is different .
Note Conversion rule is only required if ur using alterenate base unit of measure
Amol

Similar Messages

  • SAP QM Default Inspection Plan for all Inspection Lots created in the Plant

    Scenario: We have a Proto type plant in which Daily 15 to 20 materials are created every day. We have only one inspection plan for all the materials.
    Problem: We don't want to do material assignment in the Inspection Plant header every time a new material is created
    Requirement: Is there any way to default the inspection plan for all the inspection lots created in the Plant by Standard Configuration or User Exit.
    Your answers will be much appreciated and rewarded.
    Thanks in advance,
    Thiyagu

    Hi,
    In our case Creation of Inspection lots are controlled by QM View of Material Master. Our problem is to find alternative for assignment of New Materials in the Plan header in Tcode QP02, as we have only ONE INSPECTION PLAN. So our expection is all QM Inspection Lot created in the Plant should always get assigned to the SINGLE INSPECTION PLAN, with out doing any assignment of material in the Plan.
    Thanks,
    Thiyagu.

  • Single inspection plan for all Inspection Plan usages

    Hi
    I have to prepare a single inspection plan, than can be used against inspection type '04' and '15' and '01'.
    Please tell me which inspection plan usage I should use, I tried '3' = Universal, but at inspection lot creation the system is unable to find inspection plan.
    Thanks in advance.

    My customer manufactures semi-finished good, some times he can purchase semi-finished from the market. Sample are reserved for future testing as well.
    so following inspection types are required for the same material
    1) GR against PO                '01'
    2) GR against Production    '04'
    3) Sample Management   '15'
    Almost all the time, the same specifications are tested and my customer wants to maintain a single inspection plan.
    I have one option that is to create 3 inspection types using all the above  inspection types and to use the same "Usage" say '5' in customizing of Inspection Type. But I don't know the consequences
    Please give me other solution or highlight the consequences of my solution
    Kindly help.
    Edited by: Chris SAP on May 13, 2010 11:36 AM

  • Same inspection plan for different materials

    Hi, our materials are such that only visualinspection is required. so wants to create one insp plan to assign multiple materials. please advise how to do the same.

    Dear Raju,
    1.     QP01
    2.     Do not specify the material at initial screen
    3.     Put plant code
    4.     If required put group externally, otherwise system will generate internal number for it.
    5.     Enter
    6.     At header level you find Material assignment tab. Click there.
    7.     Here paste all material codes which have the same parameters of inspection.
    8.     Put group counter and plant code
    9.     If you want to assign n number of material codes, I would suggest to go for LSMW by recording method.
    Best Regards,
    Anand Rao

  • Measuring Instrument Needs to be added in inspection plan for each part

    Hi
    How to assign the Measuring Instrument in the quality inspection plan for all the materials.
    Whether i need to assign as material assignment or as PRT.
    how to use prt to assign to the operation in the quality plan (task list)
    Thanks
    VRAJ

    Hi,
    when i try to assign the Equipment for first Inspection Characteristics.
    the system thru the ERROR as,
    Production resource/tool is not intended for this type of task list
    Message no. CF230
    Diagnosis
    You want to use the production resource/tool in a task list or work order with task list type Q. However, according to usage 004 of the PRT, this task list type does not exist.
    Procedure
    Change the usage of the PRT in the master record or select a PRT which can be used in this task list type.
    How to resolve this issue.

  • Assignments of materials and vendors to inspection plans for the plant 1500

    Hi to all,
    Please give me solution for make assignments of materials and vendors to inspection plans for the plant 1500.
    Thanks,
    NAgesh

    hi gang,
    try to make usage decision ,kindly check in material document which you have created while making the GR, check in which storgare location you have specified and try to transfer the stock from quality to unrestricted.and also make a note on batch number also if you have activated the batch management
    regards
    thyagarajan

  • Reg., Quality Inspection at the time of Goods Receipt against the P.O.

    Hi
    Pls provide the procedure for the "Quality Inspection at the time of Goods Receipt against the P.O."
    Thanks in advance.
    Regards
    Ravi

    Answers:
    1.Our client wants that he want to send back to Vendor, In which way we have to do in SAP?
    In QM,Raise notification for rejected qty in special stock, this will carry task of return delivery.
    2. Without Quality inspection User shouldn't do the MIRO?
    User discipline only it will be solved or
    Prepare user exit with help of ABAP'r
    while goods receipt(MIGO) for all scenarios(under delivery/over delivery/rejected) in development,
    Check MIRO for QC passed qty is allowed for bill booking, give meaningful messages for all scenarios.
    3. Quantity was certified by 13 only, so the user should do the MIRO for 13 only, Kindly suggest iIn which way we have to configure in SAP?
    Do return delivery for rejected quantity(2),if there excise,reverse it thru J1IS.
    After finishing above steps,Wheu u do IV only Quantity 13 will flow.
    Invoice verification will be done only for the accepted quantity.
    Above solution will solve problem.
    Edited by: Jeyakanthan A on Jan 11, 2010 12:01 PM
    Edited by: Jeyakanthan A on Jan 11, 2010 12:02 PM

  • One inspection lot for multiple materials of purchase order line items

    Hi All,
    My client requirement is one inspection lot for multiple materials of purchase order line items.
    Please share your thoughts.
    Thanks in advance for early reply.
    Regards,
    Jishu

    I totally agree with Amol.
    I don't think I would touch that development nor would I ever tell a client it could reliably be done through development.
    Knowing what I know about the table structures, I don't think you could create any development for this that could use a significant amount of the existing tables and functionality.  I think you'd have to create all your own Z tables and basically rebuild the functionality.  Tying it back in with SAP data will be difficult.
    You're even looking at all custom screens for your results recording and UD as well.  And if you have follow-on functions like batch classification requirements, batch determination, COA publication, results copy functions, use of DMR and sampling procedures, physical samples, quality notifications, etc. etc.. you could be looking a whole lot of development.
    Craig

  • Inspection plan for inprocess inspection

    Hi QM Gurus
    please let me know can I use an inspection plan for inprocess inspection
    Thanks
    TR

    Dear,
    Inspection Plan is similar to routing, which will indicate what are all characteristics need to be checked / inspected when you receive a material. Is a master data. Once the inspection lot is created we will check the inspection plan and perform the inspection and give the defects recording and usage decision for the inspection lots.
    So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
    when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1.
    Regards,
    R.Brahmankar

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • Find a bapi for Creates a Goods Receipt with correspond to Inbound Delivery

    hi expert!
    exist a bapi for tcode:MIGO_GR ( Goods Receipt with correspond to Inbound Delivery)
    i know one bapI  BAPI_GOODSMVT_CREATE can Creates a Goods Receipt,
      but i can't know to use it to Creates a Goods Receipt with correspond to Inbound Delivery.
    or other bapi exist for MIGO_GR?
    Best Regard!

    Hi Vatcan,
    Chek the Inbound Delivery 1st weather you refer the right PO in it
    You can also chek in  PO i
    1 Me23n Go to confirmation tab here you can see the  Inbound delivery  quantity
    2 Chek  which reference document you recived the goods,  (i.e You recived the goods with reference to PO or  Inbound delivery)
    2 Coz if you refer the inbound delivery then syestem will deafult show the inbound quanity
    And yes the actual quanity will update in inbound delivery if you refer the inbound deivery while reciveing the goods

  • How to get available quantity in Inventory levels  for all materials

    Hi..All
    I am Abap Developer and i have a Requirement that to Print a report that Displays " Inventory levels (available quantity) for all materials"
    1) What tables can i use to retrive the data to get the Inventory levels (available quantity) for all materials.
    2).What are the fields can used in that tables that use ful for end user.
    Thank you,
    Madhu .
    Edited by: madhubabu rao on Oct 15, 2008 9:10 AM

    Hi,
    I'm not sure what you mean when you are speaking about inventory levels and available quantity.
    I mean that you may have stock of 100 pcs of a certain material but from an open PrdOrd can come a reservation for this component (e.g. 20 pcs) that reduces this the available quantity (to 80 pcs).
    If you want only the stock levels, you don't have to write any ABAP code, since MB52 report is designed for this purpose.
    If you want to know the available stock (considering requirements (PIR, DepReq, SO), and stock-like MRP elements (PldOrd, PurReq, PrdOrd, PO, etc)) you should check report MD04 and examine how it works, which tables it uses (ST01).
    http://iorboaz.blogspot.com/2005/04/get-md04-data.html
    Regards,
    Csaba
    Edited by: Csaba Szommer on Oct 15, 2008 9:34 AM
    Edited by: Csaba Szommer on Oct 15, 2008 9:34 AM

  • Reg: MRP Run for all Materials

    Hi Abapers,
    I have an issue where in using MD01( Material Run), i need to raise one PR for all materials below the re-order stock. Currently system creates one PR for each material below the re-order stock.
    Please throw any ideas regarding this.
    Thank you

    Hi ,
    to procure assembly take 10 days.
    And delivery date is after 2 days
    After MRP run , system will take first backward schedulling from delivery date will take 2 days and going forward scheduling and take 8 days .
    So that from current date system will take 10 days so assembly will procure easily .
    Suppose today date 19/05/2011. And delivery date is after 2 days .( on date 21/05/2011 )
    if MRP is run on 19/05/2011. System will create delivery date 29/05/2011.So assembly will be easily procure within span of 10 days from 19/05/2011 to 29/05/2011. Delivery of FG is easily available on 29/05/2011.
    Regards
    Vinod

  • Muliple inspection plan for same material and same usage

    Hi,
    I need to create multiple inspection plans for same material with same usage.during the inspection lot creation i need to select any one inspection plan.
    In standard SAP its not possible.Any user exits available for this..
    Regards,
    S.P.Selvathangam

    Dear Selvathangam Palanisamy ,
                                                       My Dear Shayamal is absolutely correct and we are corrently using this SAP facility. You can create 'N' number of inspectio plans for a material and then whenever the inspection lot will created ( Thru a process order or Manual) then you will get the Inspection Lot Status 'CRTD' (Created mode) then you have to select your Inspection Task list manually by two way...
    Either go to QA02 and then select it from the list of multiple plans.
    Or you can directly go from QA32 ...select your inspection lot row and directly click on the Inspection Lot icon to go directly to the inspection lot window to slect the Task list.
    Further there is no need to remove the Automatic Assignment from the QM View of the Material Master as if there is only one task List then system will automatically assign the TASK LIST, if you deselect it then you have to select in every case.
    Thanks

  • Discount for all materials

    Hello,
    I would like to create a purchasing info record in SD VK11 (condition record) but for all materials.
    I mean when the customer buy 1000 peaces (not depending from material) by us he receives 2% discount.
    How ca I loose this problem? with VK11 or with another T.CODE.
    Thanks
    Dede

    Go to V/06, select the condition type for discount and execute.  There tick the box "Condt.update" under the tab "Master Data". 
    Next go to VK11, input the discount type and execute.  There click on magnifying lens on top and maintain the maximum value you require in the field "Upper Limit".
    thanks
    G. Lakshmipathi

Maybe you are looking for

  • Can I install Windows 8 on an older Mac Pro with Mavericks upgrade?

    I have an Early 2008 Mac Pro which I just upgraded to Mavericks, which came with Boot Camp 5.1. Can I install Windows 8 on my machine? The information on this site suggests I can only use Windows 7 with Boot Camp 4 on my system, but does this take an

  • Quicktime 10 player stutters and skips but quicktime pro doesn't

    I have a early 2011 17inch i7 mac book pro and just recently when I play 60fps footage from my 7D camera in quicktime 10, the clips stutter and skips, it does this intermittently and in different parts of the same clip. I can play the clip and it wou

  • How do i print my iCal month showing the time

    When I view or print my iCal for the month it shows my appointments but does not give a time.  I would like to see the time so I know when to arrive at my appointment.  Seems simple, but I'm unable to figure it out.  Help please?

  • Time Machine/Time Capsule with Old Computer

    I have migrated all of the contents of my old, slow MacBookPro to my new MacBook Pro. My time capsule keeps giving me messages that I have exhausted available space and must delete old backups. I would like to delete the thirty backups for my old com

  • No Plug-ins are installed.Please install .....

    Hi, I have installed OMWB on my windows machine and the plug-in for SQL server2k.i have renamed the plug-in to .jar file and put in the plug-ins folder.I have tried creating a dsn also but still it said No plug-ins are installed....How to install plu