Inspection plan not found

Hi,
no inspection plan is found for inspection lots created with origin 04 or 08; but they are found for 89.
I already checked:
- task list usage assigned to i type in customizing
- material set up for 08 and 04 with i plans
- validity date changed in inspection lot according to i plan
Any more ideas?
Thanks.
Jessica

Well. what you have to go by is what the actual inspection lot is telling you.  If it says it is looking for a task list usage of 3 then it is looking for a task list usage of 3.  So there must be another reason why its not selecting it.  I'm assuming you tried to manually assign the plan in the lot and it failed.
In the plan header, did anyone set a quantity value for the plan?  At the bottom of the header you can specify a quantity range and then the plan is only used for lots within that quanity range.  (89's aren't stock relevant this might not be an issue, hence that might be why they work).  Using this field you can set up multiple plans.  One for receipts less then 100 units. One for receipts from 100 -1000 and one for receipts > 1000.
I'm wondering if the lot size and plan size are incompatible?
Make sure you don't have a 'preferred' inspection type being used that doesn't have a different usage. (Of course then the lot shouldn't show usage 3 in it then).
There is no reason you shouldn't be able to use one inspection plan usage for all your inspection types.  I've done this before. Many clients want the 89 inspection and 04 inspections to utilize the same plan.
Craig

Similar Messages

  • Plan not found

    hi everyone,
    i am deploying a jms adapter after configuring new jms queue and connection pool. what happened is i mistakenly deleted plan.xml in following path C:\Oracle\Middleware\home_11gR1\Oracle_SOA1\soa\connectors.so what i did i created a new plan.xml while deploying the jms adapter.but now getting following error:
    <May 30 ,2013 15:59:40 IST> <Warning> <WebLogicDescriptorWL> <BEA-2156000> <" C:\Oracle\Middleware\home_11gR1\Oracle_SOA1\soa\connectors\plan was not
    found>
    i have restarted the server ,still its not working.
    please suggest a work around for this.
    Regards
    Tejas

    hi,
    i have updated the deployment plan for jms adapter ,still getting the same error on server console .when i go to path where i have plan.xml its not updated.please provide more workarounds.
    i want to know how can i create a plan.xml same as previous one which i deleted.
    regards
    Tejas

  • LSMW Direct Input Inspection Plan Not Writing Inspection Char File

    Hello Experts,
       I am using Direct Input Program RCPTRA01 to Load Inspection Plan.
    Created 3 structures - Inpection Plan/Operations/Inspection Characteristics one below the other in that order.
    We have a internal numbering system for assigning Group to Inspection Plan.
    I defined GROUPID column in Maintain Source Fields Inspection Plan/Operations/Inspections characteristics structures and set "Identifying Field Content" as 1.
    When i read data - program is reading inspection plan and operations. But it is not writing Inspection Plan file.
    What am i missing. Spent quite a bit of time trying to figure out what i am missing.
    Any help is appreciated.
    Thanks in advance
    Thanks

    Hi,
    I have exactly followed the same thread.
    1. I have actually maintained 3 files, but when reading it takes only the header file.
    2. When Creating input session I an getting a error,
    No profile with entry tool for task list /  3 in session INSPLAN
    Regards
    Subbu.

  • Difference between Material Specs and Inspection Plan

    Hi ALL,
    Whats the difference between Material Specifications and Inspection plan...?...Why Material Specification is required in QM...?
    Thanks & Regards,
    Ameya K.

    Hi Ameya,
                    The first thing is that material spec is the client level data in QM where as Inspection plan is the plant level.
    <u><b>
    Case 1:</b></u>    Suppose that there is an attribute Viscosity whivh needs to be checked whose UCL & LCL is 10 to 15. But in one plant where some highy precise requirement is there ...... then in that case we want that for that plant for the material viscocity should be 5 to 7 . In that case the requirement of the inspection plans comes in to picture .
    <b><u>Case 2 :</u></b>    The material got one extra attribute needs to be checked for some plant .... in that case we need to maintain inspection plan for that material with both Insp with material spec &   insp with inspection plan need to be checked  so that during the result recording apart from the attributes in the material spec this extra attribute gets populated from inspection plan
    Note : Apart from this as in material spec the data is maintained in the client level the load in the database will be compartively less  as there will not be any duplication of data which will be there in case of plant level data for the same material ..........
    I hope this will add some info apart from what the gurus has suggested above .....
    Please reward points if helpful.....
    Thanks & Regrads
    Kaushik Choudhury

  • Master data changes not updated in Inspection Plan- QP01

    Hi
    We created all the QM master data . After that we did some changes in inspection chars and in the sampling master data.but the values are not reflecting in the Inspection plan . How to update the changes in the inspection plan. We are trying to find indIvidual as well as Mass update
    Any input will he highly appreciated
    Thanks
    JJ

    Dear JJ
    Another easy method will be maintaining MIC as referenced mic. instead of maintaining it as complete copy model you can make it referenced. any changes in the mic can be updated automaticalyin the inspection plan using the referenced functionality.
    The issue being wherever the mic goes will be changed,
    Regards
    gajesh

  • Explain plan--Object not found error

    Hi All,
    I want to use 'explain plan' to optimise the query.
    How do i see the explain plan in toad.
    when i say
    explain plan set statement_id='XX' for select stmt;
    select * from explain plan
    where statement_id='XX';
    iam geeting object not found
    what parameters i need to set up before using explain plan
    Please give me details.
    Please suggest.
    Thanks.

    This should have been in TOAD Forum :-)).. Anyway,
    You need to set the plan table name in view->Options->Oracle. If the specified plan table doesnt exist, create the plan table

  • Logon group not found when launching planning workbench

    When I start planning workbench in RSPLAN, the following error appears:
    Connect to message server host failed Connect_PM  TYPE=B MSHOST=bwdev.shdl.com GROUP=PUBLIC R3NAME=BWD MSSERV=sapmsBWD PCS=1 ERROR       Group PUBLIC not found TIME        Mon Sep 25 13:13:13 2006 RELEASE     700 COMPONENT   LG VERSION     5 RC          -6 MODULE      lgxx.c LINE        4288 DETAIL      LgIGroupX COUNTER     1
    We filled group "PUBLIC" for template installer and it went through with all green lights including BI IP required 4 JCO desitinations.
    but after having a look at the following threads  Re: BIP in 2004s, I notice the following sentence: "3. Logon Group - Make sure logon group is specified in ABAP system (SMLG)", when I go to SMLG, only one record with empty logon group exists, but the status is green.
    Shall I maintain anything in SMLG? create "public" group in SMLG?
    need suggestion...
    Patrick

    Hi Gregor
    I have already followed points with 919850, and our basis already setup SLD (for bw system in SLD, he setup two logon group: SPACE(default) and PUBLIC).
    After I maintain logon group "PUBLIC" in SMLG, and then re-execute the step 14 (maintain 4 BI IP JCO destinations), 4 JCO destination appears with green lights again afterwards.
    However, now the internl error 500 appears in the web.
    any more suggestion?
    Patrick

  • 'ipod has not found a sensor' - could it be a problem with plane?

    I have just received a nike+ ipod sport kit, which I bought on ebay. Receiver is probably ok because the application works correcty. But when I am asked to walk around to locate sensor, it doesn't find anything, writting a message 'ipod has not found a sensor'. I'm sure that it's not in a sleeping mode.
    I was thinking if there could be a problem with delivery. Like some problem during flight or some mechanical damage.
    Could anyone help please?

    The same thing happened to me with a brand-new one! I wonder if someone knows what to do? I tried to press the sensor button to put it to wake - no change. Advantage on you I can go to the store and get it exchanged if required - I'll keep you informed.

  • Inspection lot creation based on "right" inspection plan version

    I manage inspection plan ( inspection lot origin 01 ) with Change number; in this way I have differents inspection plan version based on date.
    When I do a Good Entry based on purchase order , I need that system creates inspection lot version based on the purchase order creation date and not , as now, based on good entry date
    Is it possible ?
    When I create the purchase order I send to vendor also the inspection plan characteristich that have to be maintened ; for this reason I need to find same characterist during good entry inspection
    Regards
    Silly

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Inspection Plan/Revision level

    Hi PP Gurus,
    I have a Problem in Inspection Lot.The system is not reading the new Inspection Plan.
    The material is assigned to a Revision level with valid from date 10.12.2007 and the earlier Inspection Plan(Group 21) was also created on 10.12.2007.Now this inspection Plan( Group 21) is deleted and New Inspection Plan(Group 100) is created with the Valid from date 10.04.2008.
    I have created an Inspection Lot dated 12.04.2008, Now the system is not reading the new Inspection Plan(Group 100).And the system is giving error "No Insection Plan found" while recording result on the inspection lot.
    We cant change the material ECO revision date as this would contravene our traceability record and  since, the Revision Level is maintained at Global level so cant afford this to change for other Plants.
    Kindly help me to assign the new Inspection Plan to the Inspection Lot.
    Thx in Advance
    Regards,
    Rakesh wade

    Hi,
    I do not know the impact of rev&#305;s&#305;on level on &#304;nspaction lot.
    But, with reference to the Rev&#305;s&#305;on Level only the Conf&#305;rmation w&#305;ll work both in Descrete and aswell as in REM.
    Say &#305;f yor Reves&#305;on Level &#305;s AB, and the date &#305;s 01.03.2008, then during confirmat&#305;on the sytem will explode the BOM with referenec to this Date.
    It may be poss&#305;ble that there may not be any BOM available on that date then there w&#305;ll not be any Components suggested for GI or backflush.
    Probably you can corelate the same th&#305;ng to your &#305;nspect&#305;on lot... ( inspect&#305;on lot not available etc..)
    Hope th&#305;s helps..
    Regards,
    Siva

  • QM- delete inspection Plan

    Hi Guys,
    i have an issue regarding master data and inspection plan.
    i need to change the base unit of measure on a material.
    when i tried the system gave me this message:
    The base unit of measure cannot be changed.
    The reasons for this are:
    Routings already exist that are assigned to the material.
    Type Group    GrC Plnt
    Q    235723   1   USNA
    so i have checked table PLKO and found my material.
    i have seen that an Inspection Plan has been created, so i deleted the IP with QP02. went to MM02 tried to change the Bum but same error.
    run tcode QSR6 but i am not able to delete this I.Plan. am i missing something?
    can you please help?
    thanks
    C.

    BTW: for your process you don't need to delete the inspection plan.  All you need to do is go to the material assignment screen at the header level of the insp. plan and delete the assignment of the material to the plan.  Then, if you wanted to, after changing the BUOM in the material, you could use QP02 to change the UOM used in the inspection plan, and the reassign the material back to it.  Save you from having to recreate the plan.
    FF

  • How to map revision level materials to already created inspection plan?

    Dear All,
    I have created single inspection plan for many existing raw materials. Now it has been found that each raw material have different revision level as well as valid from date.
    My inspection plan is created on 02.07.2014 and each raw material has different revision level with valid from date which is also very old (like 11.03.2012 for revision level 09).
    My Requirement is:  how to correct my inspection plan?,  so that it will work for each assigned raw material and there will not be any material revision level wise problem created for the inspection lot so that my inspection lot should be created in REL status in QA32 transaction i.e. inspection lot is assigned automatically as per standard SAP functionality.
    Thanks,
    Narresh

    Hi Amol,
    Thanks for your reply.
    In this business scenario, we are not creating inspection plan for each raw material because there is similarity in inspection for 40-50 raw materials and total number of raw materials are around 500. This will be very difficult and unnecessarily data creation in the system.
    As per my understanding revision level is for material master revision and if material master changes then how it affect so much on inspection plan? also is it means that for every revision in future we will have to create new inspection plan?  hence I believe that if I will make back dated inspection plan for raw materials then it may work. Is my understanding is correct?
    Expecting much better solution from QM experts.
    Thanks,
    Narresh

  • BDC - Creating Inspections Plans using T-Code QP01

    Hi All,
    I want to Create Inspection Plans using QP01 transaction using BDC.
    It having 4 screens. Third and Fourth screens having line item details.
    I did recording. Upto First and second screens data is populating properly, coming to third screen data is not taking even though bdctable having data (in debug mode i found). I don't know hw to resolve this problem.
    Can u please explain hw to populate line-item details, possible give some example coding .
    Regards,
    Prabhakar

    Hi,
      If you are comfortable using function modules then you will not have any difficulty in using the BAPI, only thing we need to take care of the following, refer the following this is not using the bapi for Inspection plan, this is done for different purpose, still you can refer this and use accordingly,
    Data declarations,
    DATA: TOPNODEONLY LIKE BAPICO_GROUP-TOPNODEONLY,
          RETURN LIKE BAPIRET2,
          LT_HIERARCHYNODES LIKE BAPISET_HIER OCCURS 0,
          LT_HIERARCHYVALUES LIKE BAPI1117_VALUES OCCURS 0,
          LS_HIERARCHYNODES LIKE BAPISET_HIER,
          LS_HIERARCHYVALUES LIKE  BAPI1117_VALUES,
          LV_FLAG TYPE I,FLAG.
    DATA: BEGIN OF ORDERS OCCURS 0,
          ORDER_GROUP TYPE GRPDYNP-NAME_COALL,
          DESC(30),
          ORDER TYPE GRPVALUES-VFROM,
          END OF ORDERS.
    START-OF-SELECTION.
      CALL FUNCTION 'WS_UPLOAD'
           EXPORTING
                FILENAME = FILENAME
                FILETYPE = 'DAT'
           TABLES
                DATA_TAB = ORDERS.
      SORT ORDERS BY ORDER_GROUP ORDER.
      LOOP AT  ORDERS.
        IF LV_FLAG NE 1.
          TRANSLATE ORDERS-ORDER_GROUP TO UPPER CASE.
          LS_HIERARCHYNODES-GROUPNAME = ORDERS-ORDER_GROUP.
          LS_HIERARCHYNODES-DESCRIPT = ORDERS-DESC.
          LS_HIERARCHYNODES-HIERLEVEL = 0.
          LS_HIERARCHYNODES-VALCOUNT = 0.
          APPEND LS_HIERARCHYNODES TO LT_HIERARCHYNODES.
          LV_FLAG = 1.
        ENDIF.
        CLEAR LS_HIERARCHYNODES.
        LS_HIERARCHYNODES-GROUPNAME = ORDERS-ORDER.
        LS_HIERARCHYNODES-HIERLEVEL = 1.
        LS_HIERARCHYNODES-VALCOUNT = 0.
        APPEND LS_HIERARCHYNODES TO LT_HIERARCHYNODES.
        AT END OF ORDER_GROUP.
          FLAG = 'X'.
        ENDAT.
        IF FLAG = 'X'.
    BAPI is called to create Internal Order group in the system
          CALL FUNCTION 'BAPI_INTERNALORDRGRP_CREATE'
               TABLES
                    HIERARCHYNODES  = LT_HIERARCHYNODES
                    HIERARCHYVALUES = LT_HIERARCHYVALUES.
          CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'.
          CLEAR :  LT_HIERARCHYNODES[], LS_HIERARCHYNODES.
          CLEAR : LV_FLAG,FLAG.
        ENDIF.
      ENDLOOP.
    Hope this helps,
    Rgds,

  • Re:inspection lot not moving from 03 inspection type to 04 inspection type

    Hi all,
    I am in a issue. I have done UD for in process inspection. i.e 03 type. Now when I am looking for the inspection lot updateion to inspection type in QA32 I am not able to find it.
    This is a live issue,
    Please advice as soon as possible.
    I have chaecked all the setting ,I dont think there is any issues in it .
    Regards

    Hey Vivek you ask too many questions at once.
    To check the follow - up action. See in the UD screen itself below the ud code you enter.
    I checked this & I found :for each order item
    batch storage location.
    It means it will create inspection lot if any of the mentioned condition changes either order,batch,or storage location. In other words it will create unique inspection lot for Order,Batch and storage location combination.
    Now, remember  why I have directed to this field because Craig has furnished that it will create a lot with 04 type as soon as you release the order but for that you need to select the option for "Early Lot creation". Correct?
    And you were not able to find the way how and where to do. So I just guided to you but sorry dear I have never ever used this functionality.
    Now what are you doing? waiting for another two hrs to have the lot? Simultaneously you should check what is happening with the Order from where the lot is generated.
    Have you completed UD for Lot 03 this time?
    Most importantly pls let us know what is the Inspection points you have selected for the inspection plan for 04 type lot and at the Routing/Master Recipe from where the 03 lot get the MICs?
    It may possible as you described the lot is getting triggered after 2hr from UD of 03 lot then the inspection points for the lot 04 or 03 would be time based inspection.
    Regards,
    Shyamal

  • QM - Cert of Analysis - profile not found

    Folks,
    Can anyone help me out on this one?
    Have a problem whereby a cert of analysis profile we created is not printing out as expected. The print output error is - No certificate profile was found.
    I've checked using QC03 and we do have the certificate profile set-up, however can anyone direct me to the settings I need to check in config in order to ensure that the profile is linked to the output type correctly?
    Many thanks

    David,
             First of all you need to be sure that the characteristics you assigned in a profile are in the Inspection plan(If using Inspection plan)
             Second you need to assign this profile to the material (QC15) and the certificate type.
              These are two main things you have to consider when creating a certificate.Please reward if this helps.Also if you having problems please met me know.thanks
    Naik

Maybe you are looking for

  • Images too dark on external display

    Hello, I use Lightroom on my (Lenovo) notebook. Because of the small screen size, I tried using it with an external (Samsung) display. However, when I open Lightroom on the external display, all the images suddenly seem way too dark. It is the case t

  • Sql Server Partitioning for Update

    hi ...  i have created on my sql server database a table that hold transactions on my database , some of updating process take more time for update . my question is is the partitioning for this table will be useful and decrease the updating time , or

  • Problem during lsmw - bdc

    HI, There is reqirment from client to change the aternate bom text in mass. Now problem is using lsmw  or bdc value is not getting change during recording.  this problem is specific to this field stext (alternate bom text) only. BOM's were created us

  • Contact shows up in messages without a text?

    A contact will show up in my messages but there is no actual text message that comes with it. It looks like a blank conversation. There are no text bubbles or anything. Can someone explain to me why this happens please? Thanks!

  • My new shuffle won't work with my operating system

    I was really pleased to be given a new shuffle for my birthday, but it won't work with my operating system. I feel disgusted and cheated; I have been using macs for years and don't see why I should have to buy a new one in order to use a piece of App