Inspection Plan/Revision level

Hi PP Gurus,
I have a Problem in Inspection Lot.The system is not reading the new Inspection Plan.
The material is assigned to a Revision level with valid from date 10.12.2007 and the earlier Inspection Plan(Group 21) was also created on 10.12.2007.Now this inspection Plan( Group 21) is deleted and New Inspection Plan(Group 100) is created with the Valid from date 10.04.2008.
I have created an Inspection Lot dated 12.04.2008, Now the system is not reading the new Inspection Plan(Group 100).And the system is giving error "No Insection Plan found" while recording result on the inspection lot.
We cant change the material ECO revision date as this would contravene our traceability record and  since, the Revision Level is maintained at Global level so cant afford this to change for other Plants.
Kindly help me to assign the new Inspection Plan to the Inspection Lot.
Thx in Advance
Regards,
Rakesh wade

Hi,
I do not know the impact of revısıon level on İnspaction lot.
But, with reference to the Revısıon Level only the Confırmation wıll work both in Descrete and aswell as in REM.
Say ıf yor Revesıon Level ıs AB, and the date ıs 01.03.2008, then during confirmatıon the sytem will explode the BOM with referenec to this Date.
It may be possıble that there may not be any BOM available on that date then there wıll not be any Components suggested for GI or backflush.
Probably you can corelate the same thıng to your ınspectıon lot... ( inspectıon lot not available etc..)
Hope thıs helps..
Regards,
Siva

Similar Messages

  • How to map revision level materials to already created inspection plan?

    Dear All,
    I have created single inspection plan for many existing raw materials. Now it has been found that each raw material have different revision level as well as valid from date.
    My inspection plan is created on 02.07.2014 and each raw material has different revision level with valid from date which is also very old (like 11.03.2012 for revision level 09).
    My Requirement is:  how to correct my inspection plan?,  so that it will work for each assigned raw material and there will not be any material revision level wise problem created for the inspection lot so that my inspection lot should be created in REL status in QA32 transaction i.e. inspection lot is assigned automatically as per standard SAP functionality.
    Thanks,
    Narresh

    Hi Amol,
    Thanks for your reply.
    In this business scenario, we are not creating inspection plan for each raw material because there is similarity in inspection for 40-50 raw materials and total number of raw materials are around 500. This will be very difficult and unnecessarily data creation in the system.
    As per my understanding revision level is for material master revision and if material master changes then how it affect so much on inspection plan? also is it means that for every revision in future we will have to create new inspection plan?  hence I believe that if I will make back dated inspection plan for raw materials then it may work. Is my understanding is correct?
    Expecting much better solution from QM experts.
    Thanks,
    Narresh

  • Revision no of Routing/Inspection plan in Purchase order

    Hi MM friends,
    I have two requirements from client
    1. Is it possible to update the revision number of Routing/inspection plan or attaching any document in Purchase order to inform the vendor the relevant changes.
    2 Also the Routing changed revision number can be made as
    mandatory field in P.O?
    Regards,
    Anil

    It should pick latest revision level.Becuse PO get all data from material master.

  • Revision level not updated in Delivery inspection

    Dear QM friends
    I am facing the below issue when implementing delivery inspection.
    We are maintaining Engineering Change Number concept and it is applicable for Material Master, BOM and Task lists. So our inspection Plan will always maintained with Change Number for all inspection type.
    This Change number concept works fine in GR inspection (Inspection type 01) in following way. Revision number was maintained in Schedule Agreement Line Item, additional Data screen (In administration BOX). When GR was made inspection lot generated and shows the Revision number for the material in inspection lot display QA03 (Header). If plan having same change number system assigns the Plan and releases. Also this revision number can be viewed in QA32 screen itself.
    This is failing when creating inspection lot for a delivery. Origin 10 and inspection type used was 10. Inspection plan maintained with change number. Schedule agreement (Sale order) having revision number in the same tab of above said. Even though in lot display QA03 it was not appearing. So the same is not coming in QA32 screen. But inspection plan was attached automatically.
    We need same change number (Revision level) concept for Delivery inspection also. Kindly help us, i have missed any masters, or config or any steps i have to do to solve this issue.
    Thanks n Regards
    Madhan

    Any one kindly help us to resolve the issue.
    Thanks & Regards
    Madhan

  • Create Inspection Plan -error in control Indicators

    Hi,
    I am creating Inspection Plans using LSMW-DIRECT INPUT Method.
    Although MIC's control indicator parameters are correct while creating a plan it is changing the control indicator parameters.
    how can we suppress this?
    I want to use MIC's default parameters.
    Regards
    Praveen

    Hi Naresh,
    QA32 screen shot suggests material has Revision level as "B".
    Now Check Revision level for Inspection plan.
    Amol.

  • Long text problem while uploading Inspection plan through BDC.

    Hi,
    I am facing some problem while uploading the inspection plan. There are few MICs for which we are having long text, while uploading the inspection plan through BDC - some other long text is getting copied into the MIC's long text. After checking I came to know that in function module, read_text - some text which is stored in ABAP memory is getting copied into the inspection plan.
    I am working in SAP release 4.7. I have checked with SAP notes: 97419, but it is also not satisfying.
    Waiting for quick solution.
    Thanks in advance.
    Fahié

    Hi a®s,
    Thanks a lot for your kind reply.
    My requirement is I want to maintain long text for few MICs (which are not having long texts at MIC level) in inspection plan (QP01).
    When I am trying to manually assign the MIC's to inspection plan (QP01), long text is copied whereas I am not clicking the long text icon in (QP01). Long text is not maintained in MIC level, still some long text is copied to this MIC. This was also happening while uploading the inspection plan thro' BDC.
    I believe what you have mentioned about function module SAVE_TEXT cannot be used here since long text is already copied before we pass the long text. Also if we pass some long text, still apart from the long text what we have passed there is some other long text copied (extra long text).
    Waiting for quick solution.
    Thanks in advance.
    Fahié

  • Inspection plan based on workcentre

    Dear Sir
    We have one plant,in that we are using two interfaces,result recording has to come from this interfaces for that there is only one material code,we are using workcenter in inspection plan and even for that plan there are two operation,so how get the correct plan for the production confirmation
    Aim if there is eg X work center  its should take X plan
    If there is Y workcenter it  should take take Y plan
    We donu2019t want to use dynamic modification rule ,and in search field in we use some to detect  the plan,it will peak but how to segregate that w r t to workcentre

    Dear Kunal,
    I am not so sure what sort of user interface you are dealing with.
    First of all may I request you to clarify with which inspection type you are working (03, 04, 01 or 89)?
    For every operation you can assign only 1 work center and 1 inspection plan may contain several operations.
    Inspection characteristics are defined at operation level only. These MICs may also vary operation to operation depending upon nature of operation. For example, if your inspection plan contains u201CDrillingu201D and u201CInner Threadingu201D as 2 operations, you can have diameter as inspection parameter for drilling and pitch for threading. Kindly note this entire information is associated with only 1 plan.
    When the inspection lot is created and you click on results tab in QA32, system throws pop up of operations. There you need to choose for which operation you want to perform result recording. If you select Drilling, only diameter will be displayed to you to put observed reading.
    To sum up, this mechanism ensures to pick operation specific (work center specific) inspection characteristics. There is no need to create 2 inspection plans if your plan contains 2 operations in a single plan.
    Regards,
    Anand Rao

  • QM- delete inspection Plan

    Hi Guys,
    i have an issue regarding master data and inspection plan.
    i need to change the base unit of measure on a material.
    when i tried the system gave me this message:
    The base unit of measure cannot be changed.
    The reasons for this are:
    Routings already exist that are assigned to the material.
    Type Group    GrC Plnt
    Q    235723   1   USNA
    so i have checked table PLKO and found my material.
    i have seen that an Inspection Plan has been created, so i deleted the IP with QP02. went to MM02 tried to change the Bum but same error.
    run tcode QSR6 but i am not able to delete this I.Plan. am i missing something?
    can you please help?
    thanks
    C.

    BTW: for your process you don't need to delete the inspection plan.  All you need to do is go to the material assignment screen at the header level of the insp. plan and delete the assignment of the material to the plan.  Then, if you wanted to, after changing the BUOM in the material, you could use QP02 to change the UOM used in the inspection plan, and the reassign the material back to it.  Save you from having to recreate the plan.
    FF

  • List of Selected Set with Inspection Plan

    Hi Friends,
    We have assigned a selected set with a number of MIC in different Inspection plan.
    Now, we want to see what are the inspection plan to which  a particular selected set has been assigned
    Pl give any idea through  which we can see it.
    Thanks and Regards,
    SADAN

    Hi,
    You can use PLMK table & create query using SQVI transaction as generally table level access not given in production client.
    Sanjay

  • Inspection Plan & MIC status.

    Dear SAP,
    We have a requirement that QC will creat the MIC & Inspection Plan in status created, and QA will review and change the status from Created to Release.So where or in which object level i can put control so that QC not able to select the Status 4 for inspection plan, and Release for MIC.
    Regards,
    Asif.

    Dear Craig,
    I have created a new roll will basis help.and attached the below condition in the object you can refer dow.But then to user able to create MIC & Inspection plan in release mode.Please explain what would be the issue.
    MIC Status Table & Field Name (Object Name-Q_STA_QPMK,Table-QPMK, Field-LOEKZ)
    Inspection Plan Status Table & Field Name (Object Name-Q_ROUT,Table-PLKPO, Field-VERWE)
    QSTATMERK Master Inspection Characteristic Status 1
    STATU  Status  1
    Regards,
    Asif

  • Multiple Revision Levels for a Material

    Today, Tyco Electronics has many manufacturing sites located around the world.  A given material may be manufactured in multiple locations.  When Engineering determines that a given material must change revision level, they determine a date that this new revision level becomes effective.  Unfortunately, not all manufacturing sites can be ready to manufacture to that new revision level.  In fact, based on tooling, one manufacturing site may manufacture to both the old and new revision level for a period of time until all of their tools/dies have been switched over.  In addition, customers may require that only the latest revision be sold to them.  Does anyone else have this requirement/issue today?  If so, how are you handling this within the SAP R/3 system since material revision is at a global level and there is no component revision level field on the bill of material.  Requirements are to sell at a material/revision level, plan to a particular material/revision level, stock at a material/revision level.  Any input you have would be greatly appreciated.

    Which strategy shall I use for picking?
    Can you please guide me what material master data fields are required for these strategies.
    regards,
    VS
    Edited by: vs on Jan 12, 2008 7:01 PM

  • QM-Assign inspection plan to a variant of material (classification view)

    Hello,
    Inspection plans are commonly assigned to materials.
    In my case, I would like to manage, in <b>Classification view</b> (MM01), a new characteristics named "Variant" that could have 2 or more values, depending on which variant I order to my supplier.
    <b>But is it possible to assign an inspection plan at this sub-level ?</b> In QP01 the only possibility I see is assigning a material to the inspection plan. Can I customize something, or does it exist a trip to manager another level of assignment ?
    Thanks a lot for your help !
    Emilie

    Hi Emilie,
    Now I understood your requirement. But I would like to know the exact purpose of this requirement so that I can try to give you correct solution.
    I will consider your example:
    Material : 123
    Classification: Inspection
    Characteristics 1: Variant 1 for Inspection 1
    Characteristics 2: Variant 2 for Inspection 2
    Selection of inspection plan takes place during the creation of inspection lot. So now you have to link this material/classifcation/inspection plan combination at the time of inspection lot creation. I doubt whether this can be done using one user exit.
    The user exits are
    EXIT_SAPLCZCL_001
    EXIT_SAPLCZDI_001
    EXIT_SAPLCZDI_002
    Please let me know whether it helps.
    WR,
    Sanjeev
    Message was edited by: Sanjeev
    Selection of inspection plan takes place during the creation of inspection plan
    changed as
    Selection of inspection plan takes place during the creation of inspection lot
            Sanjeev

  • ECM revision level in material master record

    Hi experts
    I need to remove the last revision-number (REVLV) in a a material master record.
    The ECM is not relesead and we have used tcode MM02.
    I have seen that the tcode CCUNDO check the planned changes with tcode MM12.
    Thx in advance
    Marco

    Hello Rahul ,
    Please see the following link for more information regarding the Revision Level in Material Master.
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/ff/5160a249d811d182b80000e829fbfe/frameset.htm
    A revision level identifies a specific change status of a material with reference to a change number. It is used, for example, to identify changes affecting other areas such as Production.
    You generally assign a revision level when processing a material BOM (bill of material created with reference to a material master record). However, you can also assign a revision level when processing a material master record.
    You can display a revision level assigned to a material by choosing Display revision level on a departmental data screen in a material master record.
    I hope this information has been helpful for you.
    Best Regards,
    Frank

  • Stock of material at different revision levels

    Hi,
    We are planning to have revision levels (from Engineering Change Management) for a material. There will be different revision levels of the material (for each minor enhancement) and there can be stocks of the material at each of these levels. Can I get the stock of the material for each revision level?
    Please note that I will not create new material for each minor enhancement.
    Regards,
    Lakshman

    Thanks for the replies.
    Workarounds are fine... (I have already considered these workarounds) but my question was whether I can see the stock at different revision levels.
    To rephrase with an example, I have a material 1001 with the current revision level 03. Can a standard report show me the following:
    material 1001, revision level 01 stock 100 ea
    material 1001, revision level 02 stock 300 ea
    material 1001, revision level 03 stock 700 ea
    I am looking for an answer to this specific question.
    Thanks
    Lakshman

  • Inspection plan assignment

    Iu2019m facing an issue when creating inspection lots.
    I have one task list group with 3 counters inside.
    Counter 1     Material A / Plant A / Customer A;
    Counter 2     Material A / Plant A / Customer B;
    Counter 3     Material A / Plant A / Customer C.
    When I create these inspection lot through of transaction QA01, the system is assigning  the  inspection plan properly to each one of these combinations.
    If the creation is done through a delivery the system doesnu2019t assign any inspection plan.
    Somebody can help me?

    The inspection lot origin that I'm  using is 02
    I created 2 inspection plans to  2 differents customers.
    I also created 2 delivery process with 2 differents customers and the Inspection Lot was created after the Goods issue in the delivery process, but the Status is CRTD.
    As I believed that it was wrong, then I tried to create new inspection lots through the transaction QA01 to each one of this customers, with lot origin 02 to check the system behaviour.
    At this test the system assigned properly the inspection plan to the inspection lot.
    I read the explanation of marwadi, and I understood that can't assign inspection plans at the Customer level.
    Can you check if is it OK?
    Thank you
    Tiago

Maybe you are looking for

  • DIY Fusion Drive...

    So i've just installed a Crucial M4 128GB SSD and when i get home from work i'm putting the original HDD back in my MacBook Pro in the optical drive bay with a 'caddy' kit. I'm considering creating a Fusion drive out of the 2 internal HDD's but befor

  • What are the major changes in BI -7

    Hi experts, can any one send me document for major changes in BI -7

  • How do I write into multiple target tables in DIFFERENT schemas?

    It is easy to have a mapping that writes into 2 or more tables it's results. I now need that all these tables are in different schemas! When I create a 2nd warehouse target with a 2nd location and configure this location to be a different schema on t

  • SAN reboot for oracle DB at ASM in linux RAC

    Hi Experts, we use 10.2.0.4 database in ASM at oracle RAC in red hat 5 linux. we use 3 directoey ( asm, crs, and database) I got notes that SAN box (support SAM in database) will be reboot. Under this condition, what do i need to do? shutdown instanc

  • Can force a partitioned drive to open in OS 9 w/out running Classic?

    So there is no way to "insulate" a partitioned OS 9.04 from opening Classic? I had read that one of the reasons to partition is to be able to set up distinct OS environments in which to run apps otherwise not compatible with the dominant OS. Has the