Inspection time Capacity Updation in work center for skipped lots
Hi Guys,
I am using in process inspection type 03 along with DMR criteria at lot level i have defined the DMR rule and assigned it in routing header.DMR rule is inspection lot 1 in 5 will be inspected i.e when the inspection lot will be created and if there is no quality level exists it will first create the quality level with 1st inspection lot which will not be skipped lot and then it will skip next 4 lots and 5th will be inspected again.Quality level is updated during lot creation level.
what i am looking is when you have the skip inspection lot he capacity which has been planned for inspection for that work center should not be considered since there is no inspection done because of skipped inspection on that work center although it's the part of Routing/production process.
please let me know if any more inputs required.
your inputs/feedback is really appreciated
Regards
Ashutosh Shende
Hi Krishna,
It is distributing unevenly because of the Int. Dist. key maintained for "Labour" capacity category.
Following are the available dist keys.
I think for your scenario, you should select SAP020
SAP000 Overall load for latest start date
SAP010 Overall load for earliest start date
SAP020 Equal distrib. earliest dates, fact.cal.
SAP030 Equal distrib. latest dates, fact. cal.
SAP040 Equal distrib. latest dates, discrete
SAP050 Equal distrib. earliest dates, oper.time
SAP060 Equal distr. latest dates, operat. time
SAP070 Overall load at latest finish date
Please let me know if this works for you.
Regards,
Abhay Kapase
Similar Messages
-
Error " No working/operating time maintained in work center for scheduling"
Hello Friends,
When i am scheduling the planned order than in scheduling log, system throwing the error "No working/operating time maintained in work center for scheduling".
Message no. C7014
But in workcenter, i have attached the grouping and in interval and shift for the available capacity 1, i have maintained the shifts.
According i can see the capacity on that workcenter in CM01.
Same error i am getting when i am scheduling the routing and check the scheduling log.
Regards,
Jitendra.Hi
Have u checked , to maintain the time required to perform the activity in the work-center?
please check, i think, we have to maintain for each activity type.
regards,
rasika -
Capacity category in work center
Hi All,
please clarify me on this,
capacity category under scheduling tab in work center creation is showing as mandatory, but i do not want to maintain this field because iam not putting anything under capacity tab to avoid capacity planning.
is there anyway to take off it as mandatory under scheduling tab?Dear Sprint,
Goto OPFA and select the scheduling and click on influencing and mention the work center category in the field contents and
press enter and for the field capacity select the radio button for input or else display (remove it from the radio button mentioned
under required) and press enter and then save the data and now create a new work center for the changes made work
center category and revert back.
Regards
S Mangalraj -
To find 'Maintenance Work Center' for Equipment (without Production order)
Hi,
I have a Report for - 'Equipment BOM' - IB03.
Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
[ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
So - Not possible to fetch from AUFK, HIKO or any other order tables. ]I have a Report for - 'Equipment BOM' - IB03.
Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
[ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
So - Not possible to fetch from AUFK, HIKO or any other order tables. ]
EQUZ-GEWRK has the main work center. Pass the equipment number and valid-to date to get the main work center.
Cheers
Sujay -
Tables to retrieve work center for target costs
Dear all,
currently i developing a report which requires me to display the work centers and their target and actual hours and costs. I tried using production order link tables but they only show work centers that are related to planned costs. May i know which tables can i refer to, in order to retrieve work centers that contribute to the target costs?
Thanks and Regards
YMI have a Report for - 'Equipment BOM' - IB03.
Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
[ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
So - Not possible to fetch from AUFK, HIKO or any other order tables. ]
EQUZ-GEWRK has the main work center. Pass the equipment number and valid-to date to get the main work center.
Cheers
Sujay -
Standard Hours Required on a Work Center for a month along with CC
HI Gurus,
My requirement is :
I need a report which fetches how many hours are required in a month on a particular cost center attached to work center for a plant.
Is there any standard report to fetch this . If no how can we develop a report. Which tables we need to combine in CO and PP.Hi,
Check report S_ALR_8703611.
Regards. -
Capacity cumulation in work center hierarchy
Hello
Does anyone uses workcenter hierarchies to cumulate capacity requirements ?
I've created a hierarchy but in the capacity evaluation transaction cm01,
the capacity requirements are not cumulated from the underlying work center.
Instead a capacity requirement of zero is shown on the hierarchy work center.
Is there any specifics to cumulate the capacity requirement to work center hierarchy header
Best regards
PascalHi,
In the transaction CM01, choose the pull-down menu Settings-> General. In the pop-up screen, under the "Herarchy" tab, select the check boxes "Cumulation of reqmts" and "Dyn. capacity cumulation", choose the "Hierarchy" and "Plant" and click on "Continue".
Now the "Available Capacity" will be as per hierarchy setup and Rem. avail cap = Reqmts-Available capacity.
Hope this solves the requirement.
-Thaila Shree -
DMR - stock posting for skip lot
hi experts,
i am creating a DMR for raw material GR gainst PO.
I am creating DMR at lot level. i will inspect first batch an skip next 5 batches.
after executing i am getting 6 inpsection lots with first as normal inspection lot and next 5 in skip status.
now the query is in one system after GR of PO i am getting the skip lot stock in quality and in other system (other client) .
i am getting the skip lot stock directly in unrestricted use. both have inspection lots status REL SKIP.
dmr RULE is same , material master inspection type settings are same.
what is standard SAP function shud the stock go to quality or untrestristed for skip lot ?
what might be reason for this different behaviour ? any function module or user exit is used?
anything i need to look in config.?
Thanks
satishBit late but maybe other people find this a helpful answer.....
Check the inspection lot control settings in the material master.
If option For each material document item is chosen, the skiplot goes to unrestricted stock.
If option For each material document, batch and storage location is chosen, the skiplot goes to quality stock.
BR,
Arno -
Pooled Capacity Not updating in Work center
Hi All, I want to update pooled capacity in Work center. But when i delete the existing capacity it is giving error that " Capacity still being used". Can any one suggest,how to tackle this problem? I want to give solution to Client. Thanks in Advance..!
HI,
Capacity Utilisation rate = Actual Capacity / Theoritical Capacity
Theoritical Capacity= Shift period * No. of machines available
= 8 hrs * 2 = 16 hrs
Actual Capacity value depends on how the company decides it. Say if the break 30 mins has to be considered, then the actual capacity will be 15 hrs for 2 capacities and hence,
Capacity Utilisation rate = 15 / 16 = 93.8%
So, decide the utilisation rate based on the Company's requiremnt.
Hope the above gives you an idea.
-Thaila Shree -
FM for getting the capacity of given work center
Hi all ,
1) Is there any function module to get the capacity of the workcenter .
2) how to know the number of hours that work center works .
Please mention the field which represents the capacity .....
Regards
RajHi ,
You can use .
CHEeck out Transaction C0R4 .
Field is BEDID .That is Capacity Id in table KBED .
BEDID is there in table AFKO or AFPO . -
Capacity Leveling of Work Center
Hi all,
I have a problem with Capacity of Work center (WC).
I have a Internal Activity, and i assigned a WC for this Internal Activity. WC's capacity is 100H/day for 1 number of element.
Work of this WC is 250H, duration 5 days, number of element 1. Default capacity of this WC is distributed by Distribution Key define in Activity. . And they are divided equally between factory days in 5 day. That is capacity requirement is 50H/Day
So, i want to edit this WC's capacity following value:
Day 1: 100H/day
Day 2: 50H/day
day 3: 0H/day
day 4: 0H/day
day 5: 100H/day
How can i do it?? I try to use Dispatch Manually but i cant solve this problem.
Please help me for this case.
Thank all.
NLQDear
Capacity leveling depends on some of the basic set up of Capacity Requirement Planning .You need to have proper CRP set up frist .
Couple of check points : -
Did you work centre is relevent for finitie scheduling in CR02-Capacity Header and wht is the over laod percentage for work centre ?
Did you have Capacity Requirement Related Set up like Over all profile , time profile , Startegy Profile -OPD0?
Did your Capacity Check -OPJK -Order Control at order level are active for availibilty Check 1 and 2 and assinged Over all Profile ?
Set up :
1.Please assing a operation control key like PP01 where Details Capacity Check and scheduling is active .
2.In CR02-Work centre -Capacity Header -You should have Follow check box marked
1.Releven for Finitie Scheduleing
2.Can be used for multiple Operation
3.
3.OPU3/OPU5 -Define Scheduling paramter -Mark Scheduling and Capcity Check for planned order or production Order
4.In SPRO -Shop Floor Control-Define Production Scheduling Profile -You need to matian the relevent Parameters like
1.Schedueling Automatically 2.Scheduling Log 3.Adjust Scheduling -Basic date , Depedent Requirement date 4.Scheduling Type -Backward etc .
These are all basic level set up beside CRP overall profile and other profile like strategy /time etc which may in place as you are analysing in CM01.
Please find below some of the useful CRP details : Refer this threads which are self explaintory :
http://help.sap.com/saphelp_47x200/helpdata/en/8a/a5a3154adc11d189740000e8322d00/frameset.htm
http://www.scribd.com/doc/17026521/SAP-ECC-60-PP-Capacity-Planning-httpsapdocsinfo
capacity planning
http://help.sap.com/printdocu/core/print46c/en/data/pdf/PPCRPSFC/PPCRP_SFC.pdf
Capacity Planning
capacity requirements planning
How to dispatch operation to do Capacity Leveling at Work Centre Level :
1.Frist Check the over load at work centre . Goto -CM07/CM05-give plant only -then hit the Stnadard view -You will find weekly or daily baiss load ( Requirement , Avaliable Capcity , Overlaod etc )
2.Check the week in which days you are tring to dipatch -if you selet the week check box and double clik it will show u all the dataiul load .Basde on the available capacity in other week-days u need to dipatch in CM22/CM31 or CM25/CM21
While dipatching in CM22/CM31-Select the Stragegy button on the top header -Mark Date entry when dispatching so that when you select the operation of any production order or planned order for certain work centre , it will pop with window having information of Date , Work Centre , Time .Onec you did this you will receive Scheduling log with certain information .
Hope this helps
regards
JH -
Why ist Pool Capacity from PP work center automatically involved
Hi, All
i use PP work center to create a PM Order.
this PP work center has machine-, labor- and pool capacity. and I add "SAP008" into field "other fomula" for labor capacity in Tab capacities.
now after I create a PM Order, when I check CM50, I can see for this PP Work center also Pool Capacity involved.
Question:
1. where comes this Pool capacity, even though I didnot set any formula in field "other formula" for pool capacity in Tab capacities?
2. for creating PM Order, do I also need add "SAP008" into field "other fomula" for machine capacity in Tab capacities?
thanks®ardsHi Shrithar,
Do you means the time Profile in CM50.
when I check this time Profile, I see differant time interval, -Database read period
-Evalution period
-plannung period
-Dispatching of backlog
is it also influencing work center capacities?
thanks®ards -
How do I create a new Work Center for the transaction launcher and links
Hi
The requirement here is for me to find out if I can create a new Work Center that will contain up to 6 assignment blocks and each block having either links to websites and BW reports, or triggers to R/3 applications via the transaction launcher.
Can I do this purely through customising or do I need to create a new view using BSPs? If I can do it through customising please could I have a few pointers to what component I would need to use/copy?
Regards
DeclanHi Robert,
Thanks again for taking the time to reply.
Just so I understand, if I want to show a work center I need to link it to a component / view? I think this was the original query - do I need a developer to create the view that contains the 6 blocks with their links to reports, transactions and websites? I think when I talk about blocks I mean 1 viewset containing 6 views. There is no SAP standard view that would suit my requirements is there? Even if the work center had 8 views, I can always hide the two views in configuration.
After the developer has created the view, I then reference that component in the target Id in the define logical links section of my work center.
If my understanding is right, then it follows that it is not possible to create a user specific work center without some development.
Is this correct?
Cheers
Declan -
How to connect MAPL and PLPO to derive work center for planned order
Hi,
Anybody know how to derive work center using MAPL and PLPO for planned order (PLAF). Is there any connecting table between MAPL and PLPO.
Please help asap.
Regards,
MitaliI guess u r trying to view the detail scheduling info (tab in MD13) for a planned order . In that case -
1. Go to PLAF and enter the planned order number. (PLAF-PLNUM) and get the ID of the capacity requirements record (PLAF-BEDID).
2. With this PLAF-BEDID go to KBED. pass the value here. KBED-BEDID. The KBED-ARBID values are your work center ID.
3. To get the work center texts ( the way is appears in the screen) - Pass this value to CRHD . CRHD-OBJTY = 'A' ( i.e Type work center) and CRHD-OBJID = KBED-ARBID.
Hope it solves ur prob.
Cheers
SKC -
Capacity evaluation in work center which has number of indivisual capacity.
Hi. guys.
Work Center(WC01) has 2 indivisual capacity.
and available capacity is 16H. (8H * 2)
I made capacity requirement(production order) with 26H.
Capacity evaluation displays the result as below.
Entries Rem.cap.reqs Avail.capacity R
Total 26 H 1,632 H
2009.10.09 0 H 16 H 0
2009.10.10 0 H 16 H 0
2009.10.11 8 H 16 H 50
2009.10.12 8 H 16 H 50
2009.10.13 8 H 16 H 50
2009.10.14 2 H 16 H 12
2009.10.15 0 H 16 H 0
I don't know why the requriment capacity is only 8H per day.
I think that the requirement capacity should be 16H per day.
can anyone explain the reason?Thanks.
But It's not what i want.
I'll explain my problem more detail
Work Center(WC01) - Available Capacity: 16H ( 8H * 2 (No. of Indivisual capacity))
Caracity Requirement - production order 1000001 (Start date: 10/10, Excution Time: 24H)
Capacity Evaluation (CM01) <NOW.>
Day Requirements AvailCap. CapLoad
2009.10.10 8.00 16.00 50%
2009.10.11 8.00 16.00 50%
2009.10.12 8.00 16.00 50%
So, I don't understand 'capacity load(%')
I want to product the material using two capcity
but capacity evaluation calcuate only one capacity now.
I think the below result is right.
Capacity Evaluation (CM01) <NOW.>
Day Requirements AvailCap. CapLoad
2009.10.10 16.00 16.00 100%
2009.10.11 8.00 8.00 50%
2009.10.12 0.00 0.00 0%
Is it impossible??
Maybe you are looking for
-
Hi I have just got an Audigy 4 pro. Everything seems to be working fine except parts of the hub. At the moment the Remote Control, volume, headphones and cmss etc dont seem to be working. But the other posrts like the Firewire, optical, and spidf etc
-
Is there any way I can connect three AirPort Expresses to a D-Link DIR 655?
I have a 2009 D-Link DIR 655 running 1.33NA and I need to connect my three AirPort Express systems in order to run my XBox to XBox LIVE, and I am having some serious difficulty doing so. I've checked all over the Internet, googled the issue about te
-
Issue with debit credit indicator in datasource 0CO_OM_WBS_6
Hi experts, I'm workin gon cube 0COOM_C=2 that was implemented.. i was analizing values and matching them to R3 when i came across with something that might be an issue (or is just something that i still don't understand). I'm specifically refering t
-
Can't find basic brush tool in PSE8
The basic brush tool is missing from my toolbox in PSE8. Does anyone know how to restore or reinstall it? I have all of the smart brushes, but none of the basic ones.
-
Is it possible to delet apps that came with the iPhone? I would just love to delete the Nike + iPod, and Stocks etc. All they do is clutter up the screen.