Inspection type 01 - inspection lot creation based on vendor batch number

Hi Guys,
this topic has been discussed several times here, but I was not able to find a suitable answer for my question.
I am facing the folowing requirement:
I have activated inspection type 01 for a raw material.
I am receiving a firs goods receipt from vendor A with vendor batch number 0001.
The system creates its own goods receipt batch number 0546 based on internal numbering.
A new inspection lot is created.
I am posting a second goods receipt from vendor a with vendor batch 0001.
The system creates a new batch number 0547 based on internal numbering.
A new inspection lot is created.
I do not want to get the second inspection lot, because I received vendor batch 0001 before and I am assuming it has been inspected or is in inspection.
Option 1: Post the second goods receipt against the first internal batch number created.
I am aware of this need at the moment, but a user is not always checking if there is an internal batch with the same vendor received before.
Can I customize the system to create inspection lots based on the fact that the vendor batch number was received before?
Or do I have to use an exit and some ABAP code to get the wanted result?
Thanks for your advice in advance.

You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
Craig

Similar Messages

  • Inspection lot creation based on "right" inspection plan version

    I manage inspection plan ( inspection lot origin 01 ) with Change number; in this way I have differents inspection plan version based on date.
    When I do a Good Entry based on purchase order , I need that system creates inspection lot version based on the purchase order creation date and not , as now, based on good entry date
    Is it possible ?
    When I create the purchase order I send to vendor also the inspection plan characteristich that have to be maintened ; for this reason I need to find same characterist during good entry inspection
    Regards
    Silly

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Inspection lot creation while partial comformation in 03 inspection type

    Hi
    I want inspection to be created while partial confirmation of operation in CO11N in 03 inspection.
    It is happening with release of production order.
    PLz let me know -if anybody can help.
    Regards
    Pooja

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Inspection lot creation for inspection type 05

    Hi Gurus,
    We have finished material FERT & semifinished material HALB.We have assigned insp. type 02 & 05 in material master of matl. HALB.When we create production order for FERT & confirm the order , inspection lot is generated for matl.HALB of inspection type 02.
    Now we are reversing the goods issue by movement type mb1a, movement 262.In customizing for movement 262 inspection lot origin 05 is assigned.
    My problem is that when i reverse the goods issue with mvmt.262, inspection lot is not created for insp. type 05. What should be the reason behind this? or are any changes to be done to above setting?
    Regards
    Ram

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Inspection Lot creation for the 103 movement type

    <<Don't ask for or offer points>>
    Dear Experts,
    we have the requirement of Creating the Inspection lot for the 103 movement type. we have done all the necessary settings for 103 movement type (in OMJJ and under the node   Quality Management --> Quality Inspection -->Inspection Lot Creation -->Inspection for Goods Movements) but still I am unable to achieve the results. Same is happening for 105 movements.
    Kindly let us know what settings need to be done in order to achieve the same.
    Full points will be awarded for the reply
    Regards.
    Edited by: Matt on Sep 18, 2011 4:44 PM

    Hi,
    If you have activated two inspection types (eg 01, 0101) of same inspection lot origin (01), in material master you should  have a preferred indicator set for the inspection type for which you want to be selected when you perform goods receipt.
    This check box is available in the inspection type set up in the Material master.
    Also check whether the post to inspection stock indicator is set for the material (in the inspection type), then only material will be posted to inspection stock.
    Please confirm, what happens to the stock after making MIGO. check in MMBE and confirm
    Go through the link and maintain the necessary settings. I think default settings for 01 type should work.
    http://help.sap.com/saphelp_470/helpdata/en/2d/350e4d448c11d189420000e829fbbd/content.htm
    Regards
    Hari

  • Inspection lot creation logic related movement type

    Dear QM Guru,
    I'm newly for QM module
    I would like to know how config of movement type and lot origin under below config relate to inspection lot creation.
    Quality Management>Quality Inspection>Inspection for Goods Movements-->Movement Type/Update Control/Inspection Lot Origin
    i try to delete all record of customized movement type 949 that i think it copy from movement type 501 in this customizing then try to GR with this movement type, so system still generate inspection as normal.
    then i re-insert the movement back into this customizing again then i wonder that system automatic fill in lot origin for me and this field also gray that not changeable
    how system know the appropriate lot origin for this customized movement type?
    Please anyone explain to me.
    Thank in advance
    Konnapa

    Hi,
    Inspection lot origins are assigned to movement types in standart. The assignment is hardcoded and cannot be changed. In this customization step you can only see the origin assigned. When you copy movement types from standart the assigned inspection origin also gets copied, and you also cannot chenge this assignment.
    What you can do is to activate inspection for each movement type, or to customize selection of the inspection type within the inspection origin assigned.
    Regards.

  • Inspection lot creation during STO return

    Hello Gurus,
    is there a trick to trigger inspection lot creation during STO return ?
    Scenario is the following:
    1 - Creation of STO
    2 - Supplying plant ships materials... stock in transit
    3 - Receiving plant receives materials
    4 - Materials with defects -> Receiving plant add new line with return tick on the same material
    5 - GI from Receiving plant... stock in transit
    6 - Supplying plant receives materials -> Inspection lot has to be created
    I used inspection type 08 on Receiving plant w/o success.
    Many thanks.
    Stéphane

    No inspection lot is created when we return Materials to Vendor (Plant A) even if we maintain Inspection type 02.
    Before STO customizing, Plant B creates a subcontracting purchase order. Next Materials are sending to Vendor (Plant A) and put in "Stock provided to vendor" (Transaction ME2O).
    Vendor (Plant B) creates a Repair request (Sales document / Transaction VA01). Next run VRRE to reveice Materials to repair. Inspection lot is automatically created. The usage decision triggers the creation of Service order to manage all the repairing flow. Last step is to deliver Materials to Plant A and create Repair invoice.
    Repair request supports all repairing flow (inspection lot, service oder...), especialy status (out of warranty or not).
    After STO customizing, I expected the following result:
    1° - Return STO to Vendor (Plant A) / ME21N with return tick
    2° - Plant B ships Materials / MIGO wih 101 (SAP converts in 161)
    3° - Stock in Transit
    4° - Materials receive to Vendor (Plant B) / VL10B
    5° - Creation Inspection lot
    6° - UD triggered Service order creation
    7° - ...Repairing flow with Service order...
    8° - Materials ship to Plant B
    9° - Repair invoice
    10° - Stock in Transit
    11° - Plant B receives Materials
    As I said, there are 2 blocking points:
    - Inspection lot not created when Vendor receives Materials
    - Service order not created automatically (because no Repair request to support inspection lot, service order...)
    Thanks a lot for your help.
    Tell me if you have any questions.
    Stéphane

  • Early Inspection Lot Creation on Goods Receipt

    I work for a company that melts steel into batches referred to as Heats.  Each of these Heats are processed through various steps to create tubing.  In the tubing operations multiple Heats are applied to production orders but the integrity of each Heat is always maintained.  If we do a Goods Issue for 6 Heats into a production order, we expect to do a Goods Receipt of 6 Heats from that production order and inherit all of the Heat related characteristics for each Heat processed.  At certain points we do laboratory tests for chemisties and properties of each Heat.  These tests are run while the order is being processed through other operations but need to be recorded against the batch.  We are thinking that we need to do Goods Receipt Inspection with Early Inspection Lot Creation.  It looks like this method will create a single Inspection Lot upon release of the Production order.  Is there a way to create multiple Inspection Lots that will correspond to Heat batches prior to the actual Goods Receipt?

    6 partial GR (Heats) are done against 1 production order? Then, you will have one inspection lot and one usage decision for the entire lot (03 / 04: Goods Receipt Inspection with Early Inspection Lot Creation.).
    Think this: Each heat can be one sample/ inspection point each, in case of early goods receipt. So, if you have 6 samples: 3 pass and 3 fails, then do the Usage decision on 3/6th of the quantity at the end of the test: this needs to done manual stock psting while doing the UD.
    So, you do the inspection at the sample levels, but not at multiple inspection lot level.
    There is a way to create mutiple inspection lots on partial GR for the same process order.
    The logic lies like this, if your previous inspection lot is reset on usage decision, then you will get a new inspection lot when doing a partial GR.
    If the UD is not reset case:
    (a) Usage decision open: It will increase the QI stock in the same inspection lot. This means no new inspection lot creation.
    (b) Usage decision done: It will post to unrestricted, thinking that the rest of the sample is OK!! So, again no new inspection lot creation.
    This I tried on 04 inspection type. I am not sure on 03. Hope this helps!!

  • Inspection lot creation during GR with respect to Purchase Order

    Dear Experts,
    Here is my Question
    Inspection lot creation during GR with respect to Purchase Order
    Inspection type 01 set in the material master
    inspection lot will be created during GR for a Purchase order
    from my understanding for every GR a inspection lot will be created
    No batch Management
    but the requirement is irrespective to GR qty and number of times of GR
    we need inspection only one inspection lot
    For Instance
    There is a PO for 1000 kg no batch management
    now i do GR for 100 kg for 10 times with different dates
    now i need to have only one inspection lot
    not 10 inspection lot for each 100 kg
    can any one suggest a solution, please advise my understanding is correct
    Many thanks
    Raj

    Dear Raju,
    There is a solution for that .The setting can be done two ways, either in the material master or in the configuration
    1) Material Master
    MM02> QM View> Inspection Setup> 01> Control Insplot> 'X' An inspection lot for each purchase order item/order item 0r  An inspection lot for each material document and material
    a) 'X' An inspection lot for each purchase order item/order item
    This Means
    This setting is limited for use with the inspection lot origins 01 and 04.
    An inspection lot is only created during the first goods receipt for each PO item or production order.
    b) '1' An inspection lot for each material document and material
    If you set this indicator, the system creates only one inspection lot for a material document (in a goods receipt transaction) for each material. This setting is useful, if several purchase orders or partial deliveries are processed for the same material in a goods receipt transaction.
    2) You can do this default in the config
    SPRO > Quality Management >  Quality Inspection > Inspection lot creation >  Define Default values for inspection type > 01> Control Insp lot
    Hope this helps
    Regards
    gajesh

  • Control of Inspection Lot Creation (Lot Summary) in Material Master

    Dear Experts,
    I would like to set the "Control of Inspection Lot Creation" to '1' An inspection lot for each material document and material"
    But according to Help (F1), the lot summary is not supported ship the stock to unrestricted-use for skip lot.
    <If you have made settings for the lot summary, no ship to stock takes place for skip lot. That is to say, the stock type is not immediately changed from "in quality check" to "unrestricted-use".>
    Any idea to solve this problem?
    Thank you very much.
    Regards,
    Wong

    Dear Wong
    If both a skip lot and an automatic usage decision occur, the system performs a ship to stock without posting the material into the quality inspection stock. The ship to stock does not take place during inspection lot summary.
    It seems the '1' An inspection lot for each material document and material" is creating an inspection lot summary by which it is preventing the ship stock movements. I have tested with this and found that this works only for  each material document only
    The solution could be run a program in the backgroud setting the automatic UD so that the skip lots are cleared at the earliest. you can do this with the help of QA17, QA16
    Regards
    Gajesh

  • Quality inspection lot creation at  GIR

    Dear MM/QM guru's........
    Can you explain me in bref wat are the customizing setting in Quality managemnt and MM for creation of inspection lot the moment you go GIR and how to release the inspection lot..
    Reagrds
    SARFRAZ

    hi sarfrazny,
    first you have to activate the QM view in material and activate the inspection type in the material master .
    inspection plan to be prepared
    as soon as you process the the GIR a inpection lot will be created for which you have to record the result .
    kindly look into this
    <b>Inspection for a Goods Issue</b>
    Purpose
    The system can automatically create an inspection lot when a goods issue is posted in the system. A goods issue can be posted internally (for example, a material withdrawal from the warehouse) or to an external destination (for example, a goods issue to a customer). In a goods issue, the materials are usually withdrawn from unrestricted-use stock and posted to a cost center, project, customer, or other account assignment object. When the system creates an inspection lot for a goods issue, the inspection lot is not stock relevant.
    Prerequisites
    The system creates an inspection lot automatically for a goods issue if the following conditions have been met:
    In Customizing for Inspection Lot Creation (Inspection for a Goods Movement) QM is active for the movement type.
    QM is active for the material. This means that in the inspection settings of the material master:
    In Customizing for Inspection Lot Creation (Inspection for a Goods Movement) QM is active for the movement type.
    An inspection type is active for inspection lot origin 02 (goods issue)
    The other indicators for the inspection type are set appropriately to meet your requirements for inspection processing (for more information, see Processing Inspection Settings)
    Process Flow
    The system creates an inspection lot automatically when the goods issue is posted in Materials Management (MM).
    If the inspector will record results for inspection characteristics (controlled by the inspection settings in the material master), the system assigns an inspection specification (for example, a task list or material specification) to the inspection lot. If the system cannot find a specification or if more than one inspection specification is assigned to the material, you must assign a specification to the inspection lot manually.
    If dynamic modification criteria are defined for the inspection lot origin or task list usage, the system checks the existing quality level for the material (and the other criteria, if applicable):
    If a quality level is not available, the system creates one.
    If the dynamic modification rule specifies that the quality level must be updated when the usage decision is made, the system does not update the quality level now.
    If the dynamic modification rule specifies that the quality level must be updated when an inspection lot is created, the system updates the quality level now.
    The system calculates the sample size.
    If the sample calculation must be triggered manually (controlled by the inspection settings in the material master), you must call up the inspection lot in the change mode and choose the function to trigger the sample calculation manually.
    If you are going to inspect the goods in the inspection lot using an inspection specification:
    The system can print out the inspection instruction and/or sample-drawing instruction automatically when the inspection lot is created
    You can print out the inspection instruction and/or sample-drawing instruction manually when you call up the inspection lot in the change mode
    Result
    You can use the information in the sample-drawing instruction and inspection instruction as a guide to:
    Draw and prepare the samples at the work centers specified for each operation
    Inspect the goods in the inspection lot
    Record characteristic results and/or defects
    When you have finished recording inspection results and/or defects, you can complete the inspection.
    Result
    When you have finished recording inspection results and/or defects, you can complete the inspection.
    regards
    thyagarajan

  • Quality inspection lot creation during GR for STO

    Dear Friends,
    I have a Scenario for Quality inspection lot creation during GR with respect to STO
    can use inspection type 01
    or is there any other inspection type to create inspection lot during GR for STO
    Thanks & Regards
    Raj

    Dear Friends,
    when i maintain inspection type 08
    Inspection lot is created in GR  Plant
    Thanks for that
    but when i am moving the stock from  Plant  Sloc A to same plant Sloc B one more inspection lot is cretaed (movment type 311)
    if i go to SPRO i can deactivate 311 movement type to avoid creating inspection lot
    but it is client level , i need to restrict only for one plant
    is there any other way to control  just one inspection lot for one GR
    if you are not clear with my writing pls do not hesitate to ask for more information
    Thanks & Regards
    Raj

  • Auto Inspection Lot Creation.

    Dear Expert,
    I have created new inspection type as Z01 by copying the 01 and I have maintain Inspection Lot Origins and Assign Inspection Types under 01. After that I have assigned my new inspection type Z01 to material master and activated it with material post to quality. Up to this it is working fine but after GRN system is not creating the lot. Even thou material is posting to the quality stock but no lot is in QA32.
    But if I Create the lot wih QA01 it working fine and I'm able to do the UD also. But for no automatic lot generated for purchase order.
    Please provide the details how to resolve this issue?
    Thanks and Regards,
    Manish

    Dear Manish
    These are the procudural steps when going to create a new inspection type
    1) Maintain task list usage - SPRO> QM> Quality Planning > Inspection Planning> General> Define task list usages
    2) Maintain inspection type - SPRO> QM> Quality Inspection > Inspection Lot Processing > Inspection Lot Creation > Maintain inspection types (for eg Z89) - Also maintain the task list usage here
    3) Maintain Quality inspection lot origins and assign inspection types - SPRO> QM > Inspection Lot Processing > Inspection Lot Creation > Maintain inspection lot origins and assign inspection types
    4) Define default values for inspection type - SPRO > QM> Quality Inspection > Inspection Lot Processing > Inspection Lot Creation > Define default values for inspection type
    5) please check for any user exits in MIGO which have been used which is creating any issues.
    Regards
    gajesh

  • Manual Inspection lot creation

    Hi,
    In our scenario, there is customer inspection which is done after the final inspection.
    For this I have configured manual inspection lot creation after the final inspection.
    I expect that if a lot exists for a Sales order, it should not allow PGI for delivery.
    How can I set this?
    Regards
    Ramakanth

    With manual inspection, it may not be possible.But it possible by using standard inspection type 10.For this activate the insp type 10 in material master QM view and create the master data (insp plan). or you can use the same inspection as used for 04 insp type.For this do necessary config changes.Also in QM config, assign insp lot origin 10 to the delivery type used by SD(Std is LF).
    Vishal
    Edited by: VISHAL JONNALWAR on Aug 20, 2010 11:08 AM

  • Inspection lot creation not required for intercompany Stock transfer order

    Hi Team,
    The client  does not want system to create inspection lots for inter comapny STO. But for intra STO system does not create the inspection lot and thye are happy with it.
    I have have flagged the indicator "QM not active' for the movement type
    101 entry as below at transaction code OMJJ.
    101  B(goods movement for Purchase Order) X(Stock Transport Order)
    Even after flagging the above indicator, system is still creating the inspection lot at the time of GR for InterCC STO.
    Are you aware any other place to control inspection lot creation for Inter company STO.
    Thanks & Regards
    Mangesh

    The ispection types assigned to the material are given below.
    Z05 Goods Return Inspection(copy of 05)
    Z09 Shelf life extension Inspection(copy of 09)
    Z89 Inspection for Quality Assurance(copy of 89)
    Z90 Goods Receipt  for Trading goods( It is a copy of 01 inspection type)
    There is no inspection type 08 active in the material .
    Thanks & Regards
    Mangesh

Maybe you are looking for

  • Have lost my Administrator account  - can no longer make any system changes

    Since I had forgotten my Administrator Password on my son's Mac, I inserted a Leopard DVD, restarted the Mac while holing the "c" key and used the utilities menu to reset the password on my Administrator acount. After following the on screen steps to

  • Latest update for n95

    Help!!! I have just installed the latest updates for my n95 but now i cant play my music. when i go into media player it comes up with a message saying system error. then just says connecting and does,nt I have tried reinstalling the software again b

  • Safari freezes when i try to open a link off of my facebook page.

    Hi everybody, I just recently had a little brother do a facebook quiz "spongebob" quiz on my laptop without my knowledge. After this being posted on my profile, every time i try to click on a facebook link off my page, it freezes safari and i have to

  • Error while cifing sales order

    Hi all, I am getting the following error, 'A table is unknown or does not exist' For your information, Production version for the material is created with routing only. And BOM wrt sales order is created (CS61) Please let me know if you need more det

  • I Pad 2 & I Phone 4s: Help!!!

    I have 1 Apple ID but it's used on my iPhone 4S and now my I pad 2;  how do I keep the information off my I pad from my phone? Do I need to create a whole new Apple ID?