Hi Not sure aout installation, but by work cneter and plant  you can chck report COOIS for production orders.

Similar Messages

  • Work center planned cost calculation- PM related

    i have created a work center with t-code ir01, used in Maintenance order under operations tab. In cost tab, it is not showing Planned costs of the pm order. Please advise what are check ups or config settings should be done? Thanks.

    hi
    first kindly check whtether you have defined value categories, grouped the calue value categories then specified the defualt values categories for order,
    then plan for activity type and cost center specified in workcenter in KP26,
    also check whether you have specified the formula in the work center costing tab page
    regards
    thyagarajan

  • Work Center - Material Number

    Hello,
             Is there any function module or any table available where i could check the materials assigned to a particular work center.
    I have a report to develop where i have the value of plant and work center. I need to display the material corresponding to this selection criterion.
    I have searched the forum, but could not find a suitable reply to solve this query, hence posting one.
    Thanks
    Nayan Kurup

    Hello Anil,
                    Thank you so much for the reply. I have already cheked this table ,and the data does not exist there.
    Any other sugestions ??
    Thanks
    Nayan

  • Network Activity - Timesheet: Work Center in plant does not exists

    Hi All,
    While doing Timesheet entry against Network and Activity in CAT2 transaction Code, I come across one scenario in which If I use copy function then one error message appears as " Work center XXXXXXX in Plant XXXX does not exists"
    But same combination gets worked if I put manually and do not use copy function.
    I think system checks copied entry plant with new entry Plant.
    Is this system inconsistency ? If so what may be the probable solution ? OSS Note ? Exit ?
    Please suggets to rectify this wrong validation message.
    Many thanks in advance.
    Swapnil Kharul

    Hi Swapnil,
    You can check following points once again.
    1.Check your Network Actvity details:
    Work Center/Plant : 1000/1300
    Work 10 (hrs)
    Activity Type :11000
    DistKeyCapRqlnt:SAP020
    Also Status of activity :whether it is in PCNF or CNF.
    and in Network Header: check Capacity Requirements.
    2.In CR02, check whether the work Center and Plant Combination.
    Plant:1300
    Work Center:1000
    Goto Costing Tab: Note the following:
    Cost Center: 4295
    Actvity Type Int Proc(Bottom Field):11000
    Formulae:SAP008
    3.Check in KP26/27, whether Cost center has been
    assigned to Activity Type for the period (or else entire Fiscal year).
    Version:0
    From Period:6
    ToPeriod:6
    Fiscal Year:2010
    Cost Center:4295
    Activity Type:11000
    with this combination whther rate has defined or not.
    Plan Actvity/Fixed Price/Variable Price
    4.And also CAC2, don't hide any field in all screen Groups of your data entry  profile.
    Now Pl. let us know the results.(all values considered here are for your understanding)
    Vemula

  • How can I relate an equipment with the PP Work center & functional location

    Hi,
    I'm trying to relate equipments with their PP work centers (field ITOBATTR-ARBPL listed in the Location tab of the equipment) and the functional location (field ITOB-TPLNR listed in the Structure tab of the equipment) through SQVI.
    The workcenter is in a structure and the functional location relation in table ITOB gives me thousands of results with different functional locations per equipment so I can't tell which one is the propper one.
    Additionally I would like to filter the equipments flagged for deletion, but I also can't find the field of thet flag).
    In resume I need to create a query that gives me all equipments not flagged for deletion with their corresponding PP Work center and functional location.
    Thanks in advance
    JV

    Please check table EQUZ or view V_EQUI.
    In table EQUZ (GEWRK is the work center object number ) -> Use this go to table CRHD and find ARBPL for the correct time slot.
    For fucntional location in EQUZ (ILOAN is the location assignment ) -> go to table ILOA with the ILOAN and fetch TPLNR.
    Please ensure you fetch records which are currently valid from EQUZ (Use the valid to date field compare . Valid to date must be greater than or equal to current date).

  • Reg: Combined work center / Capacity requirement planning .

    Hi,
    i need few informations  regarding work center.
    1. Can we create Resource (for process industry) similar to that as Work center which we create for (discreate industry)
       can i use the workcenters (CR01) instead of Resource(CRC1) to my master recipe. is there any impact by using workcenter instead of resource to master recipe..?
    2 In foundry we are using some Iron Plates for resting of Moulds. And these Plates we are having in limited numbers in Foundry.
    Arond 30  Now  i want to create a resource for this..? How to consider this Plates for resource..? Whether M/C or what..?
    We are planning to carry out Proper scheduling and capacity planning for this resource.
    3. And May i know how to carry out Proper scheduling and capacity planning of resource.. So if capacity is not available ,i should be not able to go-head even with the releasing of order. How to carry out this. Is any customization required.
    4. Can we create combined resource  Ex: Crane  and laddle.
    I need to create these two resource has single resource ..is it possible..? may i know how the costs/ time to capture.?
    Please let me know.......THANK U IN ADVANCE.
    Edited by: dan01234 on Dec 30, 2010 6:21 AM

    Dear
    Frist of all , I would appreacite if you can create seperate theard as you have multiple question .Refer : http://wiki.sdn.sap.com/wiki/display/HOME/RulesofEngagement
    However , please find the answers :
    1.. Can we create Resource (for process industry) similar to that as Work center which we create for (discreate industry)
    can i use the workcenters (CR01) instead of Resource(CRC1) to my master recipe. is there any impact by using workcenter instead of resource to master recipe..?
    Yes you can with Usage Type 009.But there may be diffienece in Standard Value Key and Formula Key  which will be used  for calcuating activity  and also Capacity Reuiqemenet .
    .2 In foundry we are using some Iron Plates for resting of Moulds. And these Plates we are having in limited numbers in Foundry.Arond 30 Now i want to create a resource for this..? How to consider this Plates for resource..? Whether M/C or what..? We are planning to carry out Proper scheduling and capacity planning for this resource.
    A resource is plance where certain operation will happend sequentially as per Master Recipe or Routing .If you have Plate where you carry our certain engineering optiaon rather utlising thoem at requorce to excute the opration , then you can very well create them as resource or work centre .This Resource /Work centre will be having optaion , material , scheuling , CRP etc .Do u think that u will doing the same for Plate ??
    If you are interested to carry out CRP/Scheduling the refer this theard : Capacity Leveling of Work Center
    4. Can we create combined resource Ex: Crane and laddle.I need to create these two resource has single resource ..is it possible..? may i know how the costs/ time to capture.?  :
    Yes you can  if both of them are intregal part of the resource /work centre as per as Setup , Machine , labour hrs is concern based on selection of Standard value Key and Formula Key .Wor centre or Reosurce cost captured through Actvity type ( KP26  with fixed or variable rate aginst costing elenemts) and Formula Key as assinged in the reosurce or work centre -Costing tab .
    Check and revert
    Regards
    JH

  • Operation number and work center

    I'm looking for the link between inspection plan/recipe header and operation at table lavel.
    Reason: I have two inspection plan number with same group number but both has different counter and each has 4 operation and each operation has different work center.
    Now I can get header info in PLKO and operation level info in PLPO table. From PLKO I can pass PLNTY and PLNNR in PLPO table but this gives me 8 entry in PLPO table (4 for 1st group counter and 4 for 2nd counter).
    So my question is how to differentiate 4 operation of each inspection plan header. Even same issue facing at recipe level.
    I can't find any table. Do we have any BAPI?

    Detailing the above reply through SQVI.
    The Join.
    Selection Screen
    The output
    If you need you may have Header table (PLKO) also in the join to have more details.
    Jogeswara Rao K

  • How to connect MAPL and PLPO to derive work center for planned order

    Hi,
    Anybody know how to derive work center using MAPL and PLPO for planned order (PLAF). Is there any connecting table between MAPL and PLPO.
    Please help asap.
    Regards,
    Mitali

    I guess u r trying to view the detail scheduling info (tab in MD13) for a planned order . In that case -
    1. Go to PLAF and enter the planned order number. (PLAF-PLNUM) and get the ID of the capacity requirements record (PLAF-BEDID).
    2. With this PLAF-BEDID go to KBED. pass the value here. KBED-BEDID. The KBED-ARBID values are your work center ID.
    3. To get the work center texts ( the way is appears in the screen) - Pass this value to CRHD . CRHD-OBJTY = 'A' ( i.e Type work center) and CRHD-OBJID = KBED-ARBID.
    Hope it solves ur prob.
    Cheers
    SKC

  • Maintenance Work Center : Capacity Planning CM01

    Hello Gurus,
    We are using T-code CM01 to determine the Requirements / RemAvailCap of the Maintenance Work Orders in a given Maintenance Work Center.
    After executing CM01, the detail capacity list contains Not Scheduled orders( CRTD )and  capacity of these not Released orders also taking into consider.
    How to restrict CM01 Order selection based on the work order System status or User status ?
    I found below discussions on SCN but couldn't get precise answere.
    Plant Maintenance: Capacity planning CM01/ CM07
    Configuring profiles in CAPACITY PLANNING (CM07)
    Please help.
    Thanks in Advance
    Ashok M

    There are a few ways:
    Create a new status profile via BS42 and assign the REL status only (see image 1). Then in the CM01 display screen, use menu path: Planning->Selection->Order and enter the status profile created above (see image 2)
    Create a new selection combination via OAP0. In the CM01 display screen, use menu path: Planning->Selection->Combination and enter the selection combination created above (see image 3)
    The above settings can then be defaulted via the various capacity planning profiles.

  • Maintaining work center list in Capacity Planning: Selection List in CM01

    Hi,
    Where can find the config route in SPRO for maintain work center into the Capacity Planning: Selection List in CM01?
    Thanks a lot!
    Min

    Mandy,
    Couple of combinations you should check,
    1. First try to identify "Selection Profile" which is used. In "CM01" go to menu Planning->Profiles->Selection Profile.
    2.Check the defination of this profile using transaction "OPA2". Here you need to look for "Work center Set" which is assigned.
    3. Now look at the defination of the workcenter set using transaction "CMS3", here is were we define as how the list is to be fetched.
    Hope this helps....Reward your points and close the thread if so,
    Regards,
    Prasobh

  • Table Link for EQUNR (Eqpt Number) and GEWRK (Main Work Center)

    Hello,
    I need to fetch the main work center from equipment master. I need a direct table link between the equipment number and mainwork center. We are getting a link of equipment number (EQUNR) to work center (ARBPL) and a link of work center (ARBPL) to main work center (GEWRK). But the problem with this scenario is - main work center is not getting fetched from equipment master once work center is missing.
    We want a direct link through some table between EQUNR and GEWRK.
    Puneet

    Hi Puneet,
    Appreciate your problem !
    Many a times in such a situation (which I presume exists where no direct link is available between fields); we have 2 clear cut approaches -
    Approach 1:
    Develop a SAP Query, Functional Area/Infoset, and User Group ( using T code :SQ03,SQ02,SQ01 respectively )
    While developing Functional Area feed in these 2 tables (Table 1- equipment number (EQUNR) & work center (ARBPL) and Table 2 - work center (ARBPL) to main work center (GEWRK) with  work center (ARBPL) as the Primary Key- bridge to join these 2 tables.
    In SAP Query Development; you may take Plant as the Selection Field or any other field as per business requirement to make a search in the query.
    Now when you execute this query, you will get a complete Download of (EQUNR),work center (ARBPL)  and main work center (GEWRK) in one table.
    For SAP Query, you may also approach your ABAP Team Member. This is a cleaner approach than the other one.
    Approach 2:
    Take SE16 download of the Table 1 and Table 2 and join them in Excel (using vlookup if required).This approach is however limited to the data volume that you have to process.
    Please let me know, if you get stuck !
    Thanks,
    RAVI.

  • How to see Planned Purchase Order in Buyer Work Center

    Hello,
    I need to see Planned Purchase Order
    (created in Purchasing Super User(responsibility) => Purchase Order -> Purchase Order , Type (Planned Purchase Order))
    in Buyer Work Centre.
    I can see Standard Purchase Order in Buyer Work Center (under Orders Tab).
    I can see Contract Purchase Agreement in Buyer Work Center (under Agreement Tab).
    I can see Blanket Purchase Agreement in Buyer Work Center (under Agreement Tab).
    But can not see Planned purchase Order in "Buyer Work Center".
    Is this intentional ? If yes, then why.
    if no, then where we can see Planned Purchase Order in HTML pages.
    Thanks,
    Vishal Garg
    Mb: 9985803224
    Email: [email protected]

    hi
    there is no standard report which shows the expenditure/conditional value in po. you have to develop your customs report./

  • Combine Work Center Link Groups in one Work Center

    Hello Experts,
    our requirement is to combine the Work Center Link Groups of several Work Centers into one Custom Work Center.
    For example, the work centers Knowledge Management and Managing Operations. (IC-MGRKM, IC-MGRMA)
    They have Work Center Link Groups like IC-MGMA-CR or IC-MGKM-CR. Now we defined an own work center Y-IC-MGRMA and assigned these links groups (and others) to the Work Center.
    However, when we open the Work Center we only ever see links of one work center type (for example only the links of Knowledge Management).
    Is it even possible to combine the different work centers into one big work center with many links? What would we have to do to achieve this?
    Help would be appreciated!

    If I am not wrong you are assigning standard work Center Link Groups like IC-MGMA-CR & IC-MGKM-CR to newly created Work center Y-IC-MGRMA .If I try the same, all related links can be made visible. The process you are following is correct.
         You may have confused with the nomenclature of your work center ID - Y-IC-MGRM. Please look into the "Group ID" column, if you are assigning standard group links as mentioned above you will find three logical link ID for Knowledge management & two for MGMA too. In short if five logical links are available in second level navigation then things are correct at you end. I tried it and its working fine.
    Pease check.
    Thanks & regards,
    Amit

  • Blocking of work center capacity for capacity planning

    How can i block a work center capacity for capacity planning during Machine breakdown( via a Preventive maintenance order)?
    i believe it will reduce machine capacity, yet how can i view this, against the previous capacity? is there a possible report or can it be shown through a transaction?

    Hi,
    In capacity header details screen not exactly as "can be used for capacity evaluation " but
    "relevent to finite sceduling"
    "can be used for several operations"
    "long term planning"
    these all indicators you can deflag this and check the results ,it may helpful to you.

  • How to construct Work center Hirerchy in Production Planning.

    Hi Experts,
    How to construct Work center Hirerchy in Production Planning.
    Thanks in advance.

    Amit,
    I guess you must have overlooked the rules of engagement for this forum. It is customary for questioners to first perform basic research before posting any questions.
    First, search in the forums (search box in the upper right of this page). FYI The question you raised has been covered dozens of times.
    Next, check online help. This help is generic, and not generally specific to a particular industry:
    http://help.sap.com
    Work Center Hierarchy:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/b1/c037ae439a11d189410000e829fbbd/frameset.htm
    Next, look for generic solutions solutions in Best Practices. Basic index at
    http://help.sap.com/saap/sap_bp/BL_IN/html/Content_Library_BL_EN_IN.htm
    Next look for industry specific solutions in Best Practices:
    http://help.sap.com/content/bestpractices/industry/index.htm
    If you are experiencing a problem, or you believe that SAP is not working per the online help, you can then search OSS notes.
    http://service.sap.com/notes
    Next search in one of the standard online search engines (such as Google).
    Only after you have performed all of these tasks, and studied all of the online help that is supplied for free by SAP, should you then consider posting a question to these forums.
    If you are unwilling or unable to perform such research, then you should probably engage a consultant to assist you. All consultants use searches to assist them in designing and executing solutions. If you intend to one day become a consultant, you would be wise to cultivate this skill.
    Best Regards & Good luck,
    DB49

Maybe you are looking for