Dear Gurus,
We need to install a new PI server. Client has a shortage of hardware resources and wants that PI server should co-exist with an already live EP server. This installation has already been done by the client as a part of EP Go-Live. When I say that both the application coexists, I mean to say that EP/XI would have a common database and common SID.
I have already shared my concerns with cons of implementing two production server simultaneously and all standard recommendations given by SAP including performance issues and typicality involved from admin point of view. I also refered the url /thread/176484 [original link is broken]
as a part of my claim that the systems cannot coexist under single SID.
Can you all please let me know whether the co-existence of PI/EP under single SID posses any potential risk and whether it is technically and functionally feasible.
Regards,
Vishal

Hi All,
I had raised an OSS also in this regards and got a reply on possible issues which had been discusses already in a post from me on the same issue.
The possible issues can be
1. Upgrading individual applications
2. Individuality is compromised when just one application restart is required.
3. Performance issues can't be segregated.
4. Complexity is increased.
5. Separating the two applications at a later stage would be impossible.
I had already mentioned the above points in OSS itself and had asked them if there is any application conflict and any application/design level issues. The consultant who replied back to my message had assumed that taking in consideration above points they can't coexist.
My client had raised a similar message and got a reply that they can coexist but with above limitations.
When I replied back on OSS raised by me asking the same, I got a blunt reply that they can coexist and this is a consulting issue. This reply was quiet weird.
Though the bottom line from the two OSS is that they can coexist but with aforesaid limitations.
We have finally tested it in our test environment and developments for both the applications can be done.
Though the good news for me is that my client has finally agreed to keep the instances separate.
Regards,
Vishal

Similar Messages

  • SAP NetWeaver and SAP ERP Central Component 6.0 installed or not,how to fin

    Hello Friends,
      I would like to know that in my system whether
    <b>     SAP NetWeaver  and SAP ERP Central Component 6.0</b>
      Installed or not?How to check whether these are installed or not?
    and where can i Find in the system?
    Regards
    Preethi

    Kinldy make  clear cut query before you look for an answer to that!
    To check for the WAS-J2EE Stack installation - kindly use the following link to access your WAS j22 Start page "http://hostname:5XX00" where XX will be the System No. for SAP System.
    Incase if you want to find out that you have a EP installed: goto:-
    "http://hostname:5XX00/irj"
    For XI , you can go to "http://hostname:5XX00/rep"
    Incase the links work properly the software component is installed.
    PREREQUISITE for the above CHECKS:
      1) The system number should be correct.
      2) The Fully qualified domain name should be used for the hostname.
      3) The Software components and the J2EE Stack should be operational.
    (ON the SAP SERVER)On OS level --> you can Go and have a look for the following directories existence --->
      1)  usr/sap/SID/DV*.../j2ee,
      2) usr/sap/SID/DV*.../SDM
    This means that you have atleast the Java Stack installed on your SAP Server.
    Next in the task manager(WINDOWS) / process level(UNIX) you can check if you have process "jlaunch process under the sidadm owner".
    In SAP Frontend-GUI :
    You can login and go to T-Code ST11 and check for the log files
    dev_disp, dev_dispatcher, dev_server0, dev_jcontrol, dev_bootstrapID.......,
    these file will give you info regarding the J2ee stack and its components....
    Hope this helps you...
    Regards,
    Prem

  • Connecting SAP ERP and SAP XI via RFC (in cluster)

    Hi all,
    I have a strange problem with SAP ERP and SAP XI (production systems). Both systems are installed in cluster. I am trying to connect both systems via RFC, so I configurred TCP connection using SM59. But, when I try to test connection, I am always getting error "Program xxxx is not registered". When I register the program on the sender communication channel on different system (develop system - different machine), connection works fine. Configuration on both SAP XI production and development systems is identical. I just cannot understand, why production SAP ERP does not see registered program on production SAP XI. Has anybody experiences with this? Or any other ideas where should be the problem?

    Are you configuring the RFC Sender adapter with load balancing?
    what is the hostname you're using for ERP?
    Is it the message server's?
    Also, make sure the dispatcher is properly configured, sending the requisitions to the application servers.
    Regards,
    Henrique.

  • SNC between SAP BO and SAP BW for MS Advanced Analysis

    Hy experts, i have configured the SNC between SAP BO and SAP BW but for any user i have this issue:
    when the user launch a Bex Query by MS Advanced Analysis, this error message occurs:
    No applicable data found.
    On the SAP BW system, on ST22 there is this runtime error:
    CALL_FUNCTION_SEND_ERROR.
    An error occurred when executing a Remote Function Call.
    "SNCERR_INVALID_FRAME#A received frame is invalid/truncated or is no SNC-frame"
    What happened?
    "CPIC-CALL: 'ThCMSEND' : cmRc=6 thRc=766#General SNC error "
    An error occurred when executing a Remote Function Call.
    An error occurred when executing a Remote Function Call.
    "CPIC-CALL: 'ThCMSEND' : cmRc=6 thRc=766#General SNC error "
    Status of connection.... "CODE=CM_SECURITY_NOT_VALID CM_SEND_RECEIVED
    CM_COMPLETE_DATA_RECEIVED SAPCODE=766 CONV=91584639"
    Internal error code.... "RFC_IO5"
    There is an error in the communication system. To clarify
    and resolve the error, contact your system administrator.
    Last error logged in SAP kernel
    Component............ "SNC (Secure Network Communication)"
    Place................ "CPIC (TCP/IP) on host ANDREA_13"
    Version.............. 5
    Error code........... "-12"
    Error text........... "SNCERR_INVALID_FRAME#A received frame is
    invalid/truncated or is no SNC-frame"
    Description.......... "SncProcessInput"
    System call.......... " "
    Module............... "sncxx.c"
    Line................. " "
    The error reported by the operating system is:
    Error number..... " "
    Error text....... " "
    User and Transaction
    Client.............. 100
    User................ 00000015
    Language Key........ "E"
    Transaction......... " "
    Transactions ID..... "6A3E22E031EEF13395AE0019BBCB620C"
    Program............. "SAPLRSBOLAP_BICS_PROVIDER"
    Screen.............. "SAPMSSY1 3004"
    Screen Line......... 2
    Information on caller of Remote Function Call (RFC):
    System.............. "########"
    Database Release.... 720
    Kernel Release...... 720
    Connection Type..... "E" (2=R/2, 3=ABAP System, E=Ext., R=Reg. Ext.)
    Call Type........... "synchron and non-transactional (emode 0, imode 0)"
    Inbound TID.........." "
    Inbound Queue Name..." "
    Outbound TID........." "
    Outbound Queue Name.." "
    Client.............. "###"
    User................ "############"
    Transaction......... " "
    Call Program........."C:\Program Files\Microsoft Office\Office1"
    Function Module..... "BICS_PROV_GET_INITIAL_STATE"
    Call Destination.... "GBP_boe_Default"
    Source Server....... "ANDREA_13"
    Source IP Address... "10.101.3.80"
    Additional information on RFC logon:
    Trusted Relationship " "
    Logon Return Code... 0
    Trusted Return Code. 0
    Note: For releases < 4.0, information on the RFC caller are often
    only partially available.
    Information on where terminated
    Termination occurred in the ABAP program "SAPLRSBOLAP_BICS_PROVIDER" - in
    "BICS_PROV_GET_INITIAL_STATE".
    The main program was "SAPMSSY1 ".
    In the source code you have the termination point in line 1
    of the (Include) program "LRSBOLAP_BICS_PROVIDERU13".
    Could you help me?
    Thank's a lot and best regards.
    Andrea Maraviglia

    Ciao Andrea,
    just a couple of hints:
    - Did you already tried to skip logon to BOE and instead directly select BW system? this should avoid to involve snc and then BEx query should be accessible. This would be a further confirmation that issue is the SNC, even if the log you posted is pretty clear about that.
    - Do you have snc installed even in local PC running MS Advanced Analysis? I Think it is necessary for the described workflow (page 24 of Admin Guide): 
    "With SAP BusinessObjects Enterprise as the BI platform, single sign-on works if the following conditions
    are true:
    u2022 BusinessObjects Enterprise XI 3.1 is configured correctly for single sign-on. For more information,
    see u201CConfiguring SAP authenticationu201D in the Integration for SAP Solutions Install and Admin Guide
    at http://service.sap.com/bosap-instguides SAP BusinessObjects Business Intelligence (BI) >
    Integration for SAP Solutions > XI 3.1.
    u2022 Secure Network Communications (SNC) is installed on each client PC. For more information, see
    SAP Help Portal at http://help.sap.com SAP NetWeaver > SAP NetWeaver Library > SAP
    NetWeaver by Key Capability > Security > Network and Transport Layer Security > Secure
    Network Communications.
    u2022 Each end user has a user account in the connected BW system."
    Furthermore, if I rember correctly, there could be restriction in license using SAP Cryptographic Library (client connection is not supported: SAP notes 597059 and 397195), so you should check your SNC software.
    Hope it could hep.
    Regards.
    Roberto.

  • SAP hostagent and SAP netweaver nodes not visible in WIEM

    Hi,
    We are implementing SAP BusinessObjects performance monitoring through
    RSC. RSC SP3
    We have installed SMD Agent on BOE server which forms "Managed Agent".
    We have utilising existing WIEM installed in SOlution Manager.
    We have installed SMD Agent on client desktop whicn forms "Managing
    Agent" since Solution Manager does not have connectivity to internet
    even through proxy server.
    We have run configuration UI for Managing Agent which completed
    successfully.
    The configuration setup of Managed Agent also completed successfully.
    But, as informed in the installation guide the "SAP HostAgent" and "SAP
    NetWeaver" processes & nodes are not created in WIEM.\ check configuration 6.3.3 in RSC SP3 guide/
    We checked connectivity & port settings and we have no issues.
    Kindly suggest
    Regards,
    Atul

    Hi Atul,
    I see where the problem is coming from by analyzing the debugging logs.
    When you ran the RSCSetup.bat and you were prompted for the Wily Introscope Enterprise Manager connection details and you put in:
    HOSTNAME:  CPHSMAD1
    PORT:      8081
    This is incorrect.  That port number is the HTTP port of Wily Introscope, not the WIEM port.  You must use the WIEM port which by default is port 6001 (this port will be the same as when you log on to WIEM via the Wily Introscope Investigator client)
    Please do the following to correct the problem:
    1)  On the managed host (CPWBOAD1) run the RSCSETUP.BAT again.  Choose deactivate and allow the process to finish.
    2)  On the managed host, uninstall the SMDAgent (with SID PRD) by running sapinst again and choose "uninstall"
    3)  On the managed host reinstall the SMDAgent (RSC Diagnostic Agent) again.
    4)  Confirm the new SMDAgent (PRD) service is running.  If it isnt, start it.
    5)  On the managed host, run the RSCSETUP.bat again and make sure to choose the correct "Wily Introscope Enterprise Manager" port and host name (for example, CPHSMAD1 and 6001)
    6)  Now on the managing host, run the RSC UI Configuration Wizard again.  The SMDAgent should appear now.
    Best Regards,
    Toby

  • Confuse between SAP Kernel and SAP Installation file

    Dears:
    My CPU is ADM 64 bit, but when i try to download the ECC5 which will be installed in linux 32 bit system from SAP site, i find the confuse between SAP Kernel and SAP instllation file.
    1. In the ECC5 download page, i can see lots of oracle download file, some named DVD ORACLE RDBMS 10.2 LINUX_IA32 1 of 4 , some named Oracle 10.2.0.2. for LINUX32. So if the LINUX_IA32 is only for the CPU which is Itanium CPU?
    2. I check the sap update kernel, SAP Kernel 32 bit unicode is devided by sap kernel 6.4 320-bit unicode---Linux on IA 32-bit, so if my CPU is AMD 64 bit, but my os is Linux 32 bit, if the upgrade kernel file Linux on IA 32-bit can be used for Linux 32 bit system whith 64 bit CPU, or if the Linux on IA 32-bit is just for Itanium CPU?

    Hello again
    I just checked the pam again, and it looks like i got it wrong. There is still 32-bit available for ECC5.
    ORACLE 10.2       LINUX REDHAT EL5/IA32 32BIT  24.07.2007  Released SAP KERNEL 6.40 32-BIT
    So technically it should be possible to install it the way you wanted. Sorry for my misleading post (but hey you should still consider using 64-bit :-).
    Best regards, Michael

  • What is difference between SAP R3 And SAP IS Mills Product

    HI Friends
    What is difference between SAP R3 And SAP IS Mills Product
    What are the futures are availables in IS MIlls
    Regards

    Hi,
    SAP R/3 is the central enterprise version. It is not specifically designed for any inducstry sectors and it can cater many of the industry types.
    Is is developed for specific industries an for SMB's (small and medium business). It will have components specifically for the industry.
    The SAP Mill Products component adds sector-specific functionality to an ERP system to satisfy the complex requirements of mill industries (e.g. metal, wood, paper, textiles, construction materials, and cable sectors).
    These industry segments differ from others primarily in that the materials used have a large number of characteristics and variants. The materials in the segments listed above are also predominantly area-based (e.g. paper, textiles, plastic film) or length-based (e.g. cables, piping). Account must be taken of these material characteristics throughout the entire supply chain.
    To cater for the particularities of these industry segments, SAP Mill Products features processes and functions that cover the entire supply-chain cycle – from product design and configuration, through planning, order processing, capacity planning and production, to final delivery. Additional functions are available in costing and inventory management. SAP Mill Products are also integrated into Quality Management, Financial Accounting, and Controlling.
    Prase

  • Where do i find daily posted question on sap abap and sap webdynpro abap

    Hi
    where do we find Daily posted questions on sap abap and sap webdynpro abap in scn sap  so that i can go through the questions and answer them .

    Hi,
    Go to the Content tab of any space and click on discussions. Then you can sort them by date created or any other
    For ex: This link for WDA discussions: - Web Dynpro ABAP
    You can also click on Receive email notifications for any space to get updates on that space.
    hope this helps,
    Regards,
    Kiran

  • How to configure for GPlus Adapter with SAP Phone and SAP CRM

    Hi All Basis Adm,
                   Please consider as an urgent basis i need the information that how to configure  GPlus Adapter with SAP Phone and SAP CRM . My server is CRM 5.0 (kernel 7) with Oracle Database. This information is require to connect Webclient to Sap Phone with GPlus Adapter (Genesys Adapter 7.1).  If u have any document regarding mentioned above than that will be acceptable. 
    Regds,
    Govinda

    Hi Prasad,
    In you case, it's a file to file scenario.
    Go thro' this link for a solution:-
    /people/venkat.donela/blog/2005/03/02/introduction-to-simplefile-xi-filescenario-and-complete-walk-through-for-starterspart1
    /people/venkat.donela/blog/2005/03/03/introduction-to-simple-file-xi-filescenario-and-complete-walk-through-for-starterspart2
    Regards.
    Praveen

  • SAP IBP and SAP S&OP on HANA

    I am trying to understand the relationship between SAP S&OP on HANA and SAP IBP.
    I see the latest version of S&OP on HANA is 3.0 SP02. Is this actually the 'S&OP' part of the IBP 4.0 application suite, or does IBP 4.0 have a specific, different, S&OP component?
    Thanks for any advice on this...

    IBP for S&OP is the next version of SAP S&OP on HANA.
    It is similar to our SAP APO and SAP SCM name change of next versions.
    IBP is a Suite and IBP for S&OP is one of the component. You can subsribe along with IBP's other components or Stand alone.

  • SAP PLS and SAP QM

    Dear sir,
      I want to know what is the differance between SAP PLM and SAP QM.
    Is there seperate certification course is available.
    Regards
    Sougata Das

    Dear,
    SAP Product Lifecycle Management is a complete and vast area in SAP. There are many functionalities covers in PLM. In simple word in whichever functionality directly involves in this process are can be a part of PLM like what you said QM also.
    The definition of PLM schould (or could) be:
    - Document Management (DMS)
    - cFolder and cProject (and PS)
    - CAD and Office Document integration
    - Task Management, Work Flow, Status Network etc.
    PLM can include modules: PS,PM,QM, PP, MM, CS, SD, Document Management etc..
    SAP QM is a separate module which you can implement with MM or wherever applicable.
    Regards,
    Syed Hussain.

  • SAP PA and SAP II Product Road Map

    Hello everyone,
    where can I find the latest SAP PA and SAP II product road map, based on the version SAP PA 1.17?
    The latest official product road map I found is from Dec. 2013.
    Thanks in advance,
    BJE

    Hello,
    The combined roadmap for II and PA is in its final elaboration phase.
    We will published it once approved.
    Regards,
    Didier

  • Course material for SAP TERP10 and SAP FICO

    please provide some study material and some guidance for certification exam of SAP TERP10 and SAP FICO as i am planning to sit for my certification exams

    Hello there!
    I found a cool website, that specialized in FICO:
    http://fico-forum.de/zertifizierung/zertifizierung.php
    if you cant read in German, I can advice you to use Google Translator

  • IDOC type for interface between SAP ECC and SAP F&R

    Hi Experts,
    I need SAP standatd IDOC type for interfacing between SAP ECC and SAP F&R [SAP Forecasting and Replenishment] using message type u201CFRE_LOC_SITEu201D.
    Please help me in finding the idoc type?
    Regards,
    Krishan

    Hi Denish,
    You have 2 ways of loading data from R/3 to APO.
    1. R/3 to BW cube to APO-BW cube to APO planning area
    or
    2.  R/3 to APO-BW cube to APO planning area   
    BW can be a enterprise BW system ( independent) or you can use the BW inbuilt in APO also referred to as APO-BW.
    The only difference between the 2 BW systems is APO-BW can not take the load of reporting where as the enterprise BW can.
    Unless your company policy requires the enterprie BW system, I suggest using 2nd way.
    You can load the data from R/3 to APO-BW cube using extractors either generic or standard depending on your data. You need to have a RFC connection setup between APO-BW and R/3. ( This is not CIF).
    When you load the data into the APO-BW cube, you just have to load the data from the cube to APO planning area using the transaction /sapapo/tscube.
    Refer to [DP Data Mart|http://help.sap.com/saphelp_scm50/helpdata/en/13/5ada58309111d398250000e8a49608/frameset.htm] for more information about the data transfer between APO-BW and APO.

  • SAP XML and SAP IDOC XML

    Hi Friends,
    Can any one tell me what is the difference between SAP XML and SAP IDOC XML?
    Regards,
    Kumar

    Hi,
    Various XML standards are supported by SAP. It presents data according to an SAP specification either in IDoc-XML or BAPI-XML, the SAP XML extensions for IDocs and BAPIs. It uses preprepared representations of the SAP interfaces to XML Commerce Business Language (xCBL) messages to facilitate communication with the MarketSet marketplaces.
    Messages are stored in a generic envelope. This envelope contains metadata that controls, among other things, the routing of the messages. SAP supports two different standards for these envelopes - Microsoft BizTalk and a format similar to Simple Object Access Protocol (SOAP). Packaging SAP BAPIs in a standard envelope offers several advantages, including direct processing of messages by external applications and a uniform system of error handling.
    Regards'
    Aashish Sinha
    PS : reward points if helpful

  • SNC between SAP BO and SAP BW

    Hy esperts, i have configured the SNC between SAP BO and SAP BW but for any user i have this issue: 
    when the user launch a Bex Query by MS Advanced Analysis,  this error message occurs:
    No applicable data found.
    On the SAP BW system, on ST22 there is this runtime error:
    CALL_FUNCTION_SEND_ERROR.
    An error occurred when executing a Remote Function Call.
    "SNCERR_INVALID_FRAME#A received frame is invalid/truncated or is no SNC-frame"
    What happened?
    "CPIC-CALL: 'ThCMSEND' : cmRc=6 thRc=766#General SNC error "
    An error occurred when executing a Remote Function Call.
    An error occurred when executing a Remote Function Call.
    "CPIC-CALL: 'ThCMSEND' : cmRc=6 thRc=766#General SNC error "
    Status of connection.... "CODE=CM_SECURITY_NOT_VALID CM_SEND_RECEIVED
    CM_COMPLETE_DATA_RECEIVED SAPCODE=766 CONV=91584639"
    Internal error code.... "RFC_IO5"
    There is an error in the communication system. To clarify
    and resolve the error, contact your system administrator.
    Last error logged in SAP kernel
    Component............ "SNC (Secure Network Communication)"
    Place................ "CPIC (TCP/IP) on host ANDREA_13"
    Version.............. 5
    Error code........... "-12"
    Error text........... "SNCERR_INVALID_FRAME#A received frame is
    invalid/truncated or is no SNC-frame"
    Description.......... "SncProcessInput"
    System call.......... " "
    Module............... "sncxx.c"
    Line................. " "
    The error reported by the operating system is:
    Error number..... " "
    Error text....... " "
    User and Transaction
        Client.............. 100
        User................ 00000015
        Language Key........ "E"
        Transaction......... " "
        Transactions ID..... "6A3E22E031EEF13395AE0019BBCB620C"
        Program............. "SAPLRSBOLAP_BICS_PROVIDER"
        Screen.............. "SAPMSSY1 3004"
        Screen Line......... 2
        Information on caller of Remote Function Call (RFC):
        System.............. "########"
        Database Release.... 720
        Kernel Release...... 720
        Connection Type..... "E" (2=R/2, 3=ABAP System, E=Ext., R=Reg. Ext.)
        Call Type........... "synchron and non-transactional (emode 0, imode 0)"
        Inbound TID.........." "
        Inbound Queue Name..." "
        Outbound TID........." "
        Outbound Queue Name.." "
        Client.............. "###"
        User................ "############"
        Transaction......... " "
        Call Program........."C:\Program Files\Microsoft Office\Office1"
        Function Module..... "BICS_PROV_GET_INITIAL_STATE"
        Call Destination.... "GBP_boe_Default"
        Source Server....... "ANDREA_13"
        Source IP Address... "10.101.3.80"
        Additional information on RFC logon:
        Trusted Relationship " "
        Logon Return Code... 0
        Trusted Return Code. 0
        Note: For releases < 4.0, information on the RFC caller are often
        only partially available.
    Information on where terminated
        Termination occurred in the ABAP program "SAPLRSBOLAP_BICS_PROVIDER" - in
         "BICS_PROV_GET_INITIAL_STATE".
        The main program was "SAPMSSY1 ".
        In the source code you have the termination point in line 1
        of the (Include) program "LRSBOLAP_BICS_PROVIDERU13".
    Could you help me?
    Thank's a lot and best regards.
    Andrea Maraviglia

    Hi Ingo,
    the runtime error occurs in this scenario:
    1) Launch MS Advanced Analysis
    2) Logon on SAP BO
    3) Select the System connection for SAP BW where the SNC has been configured
    4) Select  the bex Query
    5) The system response with this message: No applicable data found.
    On ST22 , on SAP BW, there is the runtime error: CALL_FUNCTION_SEND_ERROR with the message:
    "SNCERR_INVALID_FRAME#A received frame is invalid/truncated or is no SNC-frame".
    Thank's a lot.
    Best Regards.
    Andrea
    Edited by: Maraviglia Andrea on Jan 24, 2011 6:02 PM

Maybe you are looking for

  • Xml publisher output problem

    i am getiing the output of .rtf file in .rtf only but i selected the pdf format. why it is happning

  • Noted items posting

    Hi all, Can anybody tell me why iam getting the following error and how to resolve it? While posting Noted item for customer in F-49 selcting the Special GL Indicator as G and posting key 09 it is giving error as Do not use a special G/L indicator fo

  • ISync Nokia 8800

    BTFE works fine with my Nokia 8800 but I can't get it to sync - the bluetooth connection drops on the handset. It's listed as compatible with iSync on the Support site. Does anyone else have this problem? If so, are there any known workarounds? Imac

  • VS2012 - BTS 2013 : generated Items - consume adapter service does not work

    Hi, I have Instaleld VS 2012 and BTS2013..everything  is OK. i tried to installed a new project  and whene i tried to use generated items / consumeadapterservice,  i get this error message: An invalide character was found in text content. do you have

  • Can not backup my data which i store

    Hi i buy i phone and tray to backup my data and it gives me can ont restore your backed up data because of problems while i give the right apple ID and right pass word