Integration for routering and bom

Hi,all:
I want transfer master data from ERP to ME using standard MEINT.There are two problems:
1、ERP router is so different from ME, when I want to Integrate router, Shall I define all operations in ERP?
In fact,I don't want Integrate the router, I want to define the router in ME,and config the same fields with the standard MEINT(the reporting step,the control key and so on). If i do this, can i use the ERP Yield Backflushing collaboration,so i can send data automatic to ERP?
2、I don't want to send all bom component from ERP to ME. Is there any configeration in ERP for this. So i can send key components data to ME(the bom only contains key components).
thanks for your appreciation!

Hi Rama,
it seems that the supported tool for web site statistics is Tealeaf. Have a look at the documentation:
- <a href="http://help.sap.com/saphelp_crm40/helpdata/en/69/d185eec9b06e44988d8a0d09af91cb/frameset.htm">Web Site Monitoring</a>
- <a href="http://help.sap.com/saphelp_crm40/helpdata/en/01/f756d82627d44face99f56f221b1fa/frameset.htm">Web Analysis</a>
Regards
Gregor

Similar Messages

  • Metadata Integrator for ECC and MDM

    Hi ,
    Please help me choose the correct Metadata Integrator for the following:
    1. ECC
    2. MDM
    Thanks in advance,
    Munavar

    HI Manoj,
    Thanks for your reply.  Yes, I am looking for integrators for ECC and MDM.
    How do we pull metadata from ECC and MDM into BOMM?
    Thanks,
    Munavar

  • UWL Integration for Material and Customer Repositories

    Hello all,
    Has someone done the UWL Integration for Material or Customer repositories? Do we have to write own XML Configuration file for UWL and upload? or is that supplied by SAP somewherer for Material and Customer repositories?
    Any pointers in this direction are highly appreciated.
    Thanks
    Suman

    Hi Suman,
    You can create your UWL Configuration file through UWL Cofiguration file wizard.
    The path is navigate to System Administration  System Configuration   Universal Worklist – Administration.
    Under Universal Worklist Content Configuration select Click to configure item types and customize views using a wizard.
    Thanks
    Namrata

  • Decimal on quantity for GI and BOM

    Dear Respected Gurus,
    can any one tell me how to allow decimal quantity for inventory transactions and BOM.
    Like GR, 12.20
    Like GI, 12.20
    Like BOM, 12.20.
    Regards,
    qsm sap

    Hi,
    Please try by allowing the decimal values for the Unit of measure.
    Thx
    Raju

  • WebADI integrator for extract and upload

    Hi All,
    Can we create an integrator which extracts data from database table / view, and the same integrator be used to upload back into database?
    We need to generate a webadi extract , modify some data in the excel, and upload this integrator to modify the data in the tables. (procedure to make this update is already built)
    Any pointers / documentations on the same is much appreciated.
    Thanks,
    Sumanth

    You can also follow following notes to get more info how to use update WebADI.
    Oracle Web Applications Desktop Integrator Documentation Resources, Release 12 [ID 396181.1]
    Understanding and Using Web ADI in Oracle HRMS [ID 360105.1]
    UNABLE TO CREATE AND UPDATE A WEB ADI TEMPLATE FOR HR [ID 1060203.1]
    thanks

  • TCP Syslog output for routers and switches

    I am installing a Log Correlation Server at a Customer site whom is very heavy Cisco.
    I have a 3825 at their Border, ASA boxes on both sides of the DMZ, and 40 + cisco Switches in the Infrastructure routing between Production VLAN's.
    One of the features fo the Logging Server is the ability to accept TCP connections for Syslog.
    Does this functionality also exist on the 3825 Router? How about a 3550 switch? Or a 4500 switch?
    Thanks

    It exist on all of those product.
    www.linuxhomenetworking.com/cisco-hn/syslog-cisco.htm
    This link give a quick overview but you will find how to configure syslog in the product documentation.
    Please rate all helpful post

  • SRM-PI Integration for Supplier and Company Replication ( EBP-SUS Scenario)

    Dear Experts,
    We are doing a scenario where we are trying to replicate the Company and the Vendors from EBP to SUS via tcode-
    BBP_SP_COMP_INI and BBP_SP_SUPP_INI.
    When we are doing this in EBP , at SLG1 it is showing the replication done successfully. I have also checked  in EBP - SXI_MONITOR the corresponding XML messages has been successfully generated and the respective proxies are called.
    But these messages are failing in XI.
    In XI the corresponding service interfaces are used -
    from EBP (outbound) - SupplierPortalTradingPartner_CreateOrChange_Out       http://sap.com/xi/EBP
    to SUS   (Inbound)-  SupplierPortalTradingPartner_CreateOrChange_In              http://sap.com/xi/SRM/SupplierEnablement
    corresponding interface mapping used-    EBP40Partner2SRM40Partner    http://sap.com/xi/SRM/SupplierEnablement/Global/IC
      corresponding message mapping used -  EBP40Partner2SRM40Partner   http://sap.com/xi/SRM/SupplierEnablement/Global/IC
    data type used                                           TradingPartnerCreateOrChangeInternalOut    http://sap.com/xi/EBP
    We are doing this scenario from  SAP  Pre-delivered  standard content -
                          Service_Procurement_SupplierEnablement
    in XI the inbound message is failing at mapping step, it is showing the below error-
    Cannot produce target element /ns1:SupplierPortalTradingPartner/Method. Check xml instance is valid for source xsd and target-field mapping fulfills requirements of target xsd
    I have also tried to test the mapping in test tab with the same payload but it showing the same error, even if I try it with a blank payload error remains same.
    below is the error I got-
    <?xml version="1.0" encoding="UTF-8" standalone="yes" ?>
    - <!--  Request Message Mapping
      -->
    - <SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="">
      <SAP:Category>Application</SAP:Category>
      <SAP:Code area="MAPPING">EXCEPTION_DURING_EXECUTE</SAP:Code>
      <SAP:P1>com/sap/xi/tf/_EBP40Partner2SRM40Partner_</SAP:P1>
      <SAP:P2>com.sap.aii.utilxi.misc.api.BaseRuntimeException</SAP:P2>
      <SAP:P3>RuntimeException in Message-Mapping transformatio~</SAP:P3>
      <SAP:P4 />
      <SAP:AdditionalText />
      <SAP:ApplicationFaultMessage namespace="" />
      <SAP:Stack>com.sap.aii.utilxi.misc.api.BaseRuntimeException thrown during application mapping com/sap/xi/tf/_EBP40Partner2SRM40Partner_: RuntimeException in Message-Mapping transformatio~</SAP:Stack>
      <SAP:Retry>M</SAP:Retry>
      </SAP:Error>
    Trace -
    <Trace level="1" type="T">com.sap.aii.utilxi.misc.api.BaseRuntimeException: RuntimeException in Message-Mapping transformation: Cannot produce target element /ns1:SupplierPortalTradingPartner/Method. Check xml instance is valid for source xsd and target-field mapping fulfills requirements of target xsd at com.sap.aii.mappingtool.tf3.AMappingProgram.start(AMappingProgram.java:420) at com.sap.aii.mappingtool.tf3.Transformer.start(Transformer.java:142) at com.sap.aii.mappingtool.tf3.AMappingProgram.execute(AMappingProgram.java:118) at com.sap.aii.ibrun.server.mapping.JavaMapping.executeStep
    I have gone through this thread  SRM-SUS Scenerio Replicating company code and suppliers to SUS via XI
    but I think we can not change this interfaces as mentioned here as we are using standard SAP content.
    Any help would be very much appreciated.
    Thanks
    SUgata B Majumder

    Hi All,
    I have resolved the issue.
    it was a cache problem. I have changed the map, just edited description and activated  the map. Though it was a SAP standard Map. I have made the objects as modifiable from SWCV and all the messages are processed.
    Thanks

  • Velocity Displcement Calibration for Sound and Vibration Tool Kit

    Hello Guys,
    I have been working on sound and vibration tool kit recently.
    I'm taking input from sound port of PC by signal generator and taking single and double Integration for velocity and displacement resp.
    I want to check the correctness of the values for different amplitudes,and different frequencies of signal, velocity and displacement. 
    The RMS values for signal is calibrated as per signal generator, RMS value for the Velocity is correct for a limited frequency range 
    and the RMS value for the displacement is not at all calibrated for any of the frequency. 
    I will appreciate replies,

    Hey guys,
    The following vi is working
    for the signal generated with in Labview but if the signal is taken
    from mic port through signal generator.
    then the velocity and displacement is not coming.
    i'm attaching vi below kindly  reply if someone get something
    Attachments:
    avd signal generator labview.vi ‏26 KB
    avd mic port.vi ‏36 KB

  • Middleware on CRM 7.0 for ERP and CRM sales integration

    Hi all,
    i am involved in a CRM upgrade project in order to repleace the client current release with CRM 7.0.
    currently, my client handles sales integration between ERP and CRM using middleware fucntion and in particular SCENARIO A that allows to create sales orders both in the CRM system and in the R/3 system and to change them mutually in both systems.
    my question is: new release 7.0 covers all those included functionalities by default without implementing this scenario? If yes, how and what exactly.
    thank you in advance and i am looking forward your feed-back
    cheers, lucia

    Hi Christophe
    this can be done. You can call MDM web services for either doing a Free form search or even run a MDM matching strategy to find potential duplicates defined based on rules in MDM.
    In one of our projects we have used Web services call from CRM ecommerce portal to MDM for doing a Customer search.
    Thanks-Ravi

  • Business scenario..for ISU and integration with R/3 modules..

    Scenario: 
    1.     Client is providing Utility services to the customer and also to its own employees.
    The service is also consumed by the employees who are treated as contract partners in ISU. The constraint is that the utility bill has to be deducted from their payroll, which is deducted monthly using a wage type from their pay roll, which is in SAP R/3.
    2.     Similarly some of the contract partners are also vendors to the client (the vendor and contract partner is same). The consumption of utility bill is adjusted to the payment made by the client to vendor. 
    Questions :
    1.     How we can deduct the utility bill of the employees from their payroll. Is there any integration of ISU with HR ?
    2.               Also how  can we clear the receivables in FICA since data can be pushed from FICA to FICO thru reconciliation keys but not vice versa ?
    3.     How can the utility bill be deducted from vendor’s account and there is no standard link between vendor master to contract partner in ISU.
         Can anybody suggest any standard solution for these two scenarios or  any work arounds .
    Early solutions are highly appriciated
    Thanks and Regards

    Hello,
    Please look into my answers below:
    Questions:
    1.     How we can deduct the utility bill of the employees from their payroll. Is there any integration of ISU with HR?
    i.     There is no integration between ISU with HR.  What you need to do is that create separate account determination id <say HR> and use this id in Contract account to identify that a particular contract account is an employee related ID.
    ii.     Now at the end of the day or month collect the O/s balances of all the employee contracts in a form of flat file, use a BDC program to update the data in the HR table PA0014 <Please confirm with your HR colleague too> so that their pay would be = Actual payroll-Amount due.
    iii.     After the above step, make sure that you run FPY1 <Payment run program> to clear all employee open items. You can have a separate payment method for Employees and attach the same in contract account
    iv.     You can create a separate ‘Z’ table to map Employee ID with a contract number so that during creation of flat file in step 1.ii above, your job becomes easier.
    2. Also how can we clear the receivables in FICA since data can be pushed from FICA to FICO thru reconciliation keys but not vice versa?
    i.     Please refer to point 1.iv above. You need to run FPY1 Payment run to clear employee receivables in FICA.
    3. How can the utility bill be deducted from vendor’s account and there is no standard link between vendor master to contract partner in ISU.
    i.     There is no integration between ISU with AP.  What you need to do is that create separate account determination id <say AP> and use this id in Contract account to identify that a particular contract account is a Vendor related ID.
    ii.     Now at the end of the day or month collect the O/s balances of all the vendors in a form of flat file, use a BDC program to update the data in the AP table BSIK so that amount to be collected from vendor = Actual amount-Amount due.
    iii.     After the above step, make sure that you run FPY1 <Payment run program> to clear all Vendor open items. You can have a separate payment method for Vendor-Contract Accounts and attach the same in contract account
    iv.     You can create a separate ‘Z’ table to map Vendor number with a contract number so that during creation of flat file in step 1.ii above, your job becomes easier.
    Additional points to be considered
    1.     Check if at all separate clearing rules are needed for Employee- Contract accounts, Vendor-Contract Accounts & other contract accounts.
    2.     Verify FM ‘COMPUTE_CONTRACT ACCOUNT_BALANCES’ is useful in obtaining the balances of contract accounts <I do not have SAP ISU active system with me else I would have provided correct FM>
    3.     There may be performance issues based on the volumes of the data.
    Rgds
    Rajendra

  • Integration of customers and vendors- customer exit for renaming

    We are planning to use customers for capacity reservation functionality and vendors for subcontracting in APO.
    Due to this, we will need Vendors and Customers in APO.
    Currently some plants are using same number range for customers and vendors.
    So, we will have to rename either customer number or vendor number.
    In such situation, do you recommend renaming customer number or Vendor number?
    Do you see impact of renaming customer or vendor in above processes?
    Can you please e-mail me which customer exit  I should use and steps that should be followed for renaming?
    Thanks,
    Srini

    Your problem:
    Different location types with the same name or number in the external system. For example, a customer and a supplier both have the number 1000. This problem occurs especially with vendor and customer numbers.
    You can do the following:
    described in SAP Note 458914.
    Activate BAdI Implementation for Location Prefix
    Procedure
    1.     Access the activity using one of the following navigation options:
    SAP SCM Menu     Tools  Customizing  IMG  Execute Project  SAP Reference IMG  SAP Implementation Guide  SCM Basis  Integration  BAdIs for Specific Applications  Location and Business Partner  BAdI: Inbound Processing for Location
    Transaction Code     SPRO
    2.     In the Business Add-Ins: All Implementations for Definition SMOD_APOCF001 dialog box, go to the Defined filters table and select the suitable implementation for your problem situation, for example:
    Field Name     Entry Value
    Bus. add-in implementation name     APOCF001_TYPEDIF
    Implementation short text     Locations of different type with similar names
    3.     Choose Change.
    4.     Confirm the warning message.
    5.     On the Business Add-In Builder: Change Implementation APOCF001_TYPEDIF screen, choose Activate business add-in implementation.
    6.     In the Prompt for transportable Workbench request dialog box, enter a workbench request and press ENTER.
    7.     Choose the Back pushbutton (F3) twice.

  • PP and PM integration for PRT equipment

    Hi,
    i got integration issue when implementing PP and PM.
    i used PRT equipment with counter, PP confimation will update the counter.
    If it reach some value it is overhaul and maintenance order created.
    1, if it is overhaul, can i automatically set the PRT so it is not available (status)
    2. can PP people know this and the they reschedule the PP order and it schedule automatically considering the maintenance order for the PRT equipment they use.
    after PRT equipment i will user work center as equipment too and then we will have botj issue as above
    is it really possible for pp and pm integration like this.
    please kindly help.
    best regards,
    Freddy Ha

    hi
    In the normal process once your production order is confirmed ,your maintenance order from plan will be triggered ,but your PRT status is in release only which will not be updated as LOCK automatically .it can be locked manually in the Master data.
    check with abaper whether it is possible to update the status using measurement document ,for say once it reaches 2000 pc
    Once the status is locked it cannot be used for maintenance or production order
    for Workcenter as equipment then you can process with System condition as Not in operation which will show the maintenance order while checking the production order planning table
    regards
    thyagarajan

  • Can any one send procedure for integration between XI and Geographic inform

    can any one send procedure for integration between XI and Geographic information System(GIS).
    Please clarify ASAP..
    Thanks

    Hi,
    Please see the below links
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/d53af8ca-0801-0010-08b0-dce9e02130a8
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/d53af8ca-0801-0010-08b0-dce9e02130a8
    GIS VS XI
    Regards
    Chilla..
    Points rewarded if it is usefull..<i></i>

  • Download of prepackaged composites for the integration of OTM and EBS

    Hi,
    Can anybody help me out where I can download the latest version of prepackaged composites for the integration of EBS and OTM.
    Thanks in advance.
    Regards,
    Sarala

    Wahid,
    Do you have any step by step guide,How to integrate this?
    I want to check check the process how you have done that?
    Thanks,

  • How to setup a Provider topology using OSPF as IGRP for P and PE routers

    Hi,
    I am trying to create a typical provider topology in GNS3.
    I would like to know what IOS to use for the:
    - P routers
    - PE routers
    Also the minimum Hardware to use for:
    - P routers
    - PE routers
    I am also going to use OSPF for the IGRP on the MPLS devices.
    From what I am reading so far you would need 4 routers for the P routers, 4 routers for the PE routers and 2 CE's pointing to the 2 PE's
                                  ce
                               pe     pe
                                |        |
                               p--------p
                                |        |
                               p--------p
                                |        |
                               pe       pe
                                   ce
    Kindly help send a link if there is any.
    Thanks,

    Hi Reynaldo,
    There is no clear answer for your questions.
    I would like to know what IOS to use for the:
    It depends on what features do you need.
    Also the minimum Hardware to use for:
    It depends on size/traffic load/number of devices in your network
    From what I am reading so far you would need 4 routers for the P routers, 4 routers for the PE routers and 2 CE's pointing to the 2 PE's
    It depends on your topology how much redundancy do you need, how big is your budget. If you can not afford big spending, you don't have to implement any P routers. So for certain traffic your core routers will be P routers and for another type of traffic will be PE routers. 
    My answers probably won't help you, but I am afraid that for these types of general questions there are not any other answers.
    Best Regards
    Please rate all helpful posts and close solved questions

Maybe you are looking for

  • Connection to Airport has gone haywire since upgrade to 10.6.7

    I've been searching the web for five days not to come to solution with my problem. Many users reports the same problem and so far i haven't seen anybody come up with something that works to fix this. Since i upgraded to 10.6.7 my WIFI hasen't work at

  • How can I import address book info from old mac to new one?

    Just got a macbook, and migrated all the info as per instructions. Now I need to get all the info from my old address book to the new one. Spent about 6 hours today trying to figure this out, and an hour of that was spent on the phone with a friendly

  • Is WLAN connection possible with Satellite A40-702?

    I phoned Broadband provider the other day to upgrade to wireless - now concerned that my laptop (model above) wont be compatible with wireless. Could anyone advise?

  • Error from Microsoft Visual C++ while importing a Journal Voucher

    Hi Experts: We are requesting your Help because we getting the following error from  Microsoft Visual C++ Runtime Library while importing a  Journal Voucher throught DTW: Runtime Error! Program:  This application has requested the Runtime to terminat

  • How to align content in Grid panels

    Hello, I have a grid panel using the following tag <h:panelGrid> . I have only one column and I want the child component inside it, to be placed in the middle of the panel and not on the left part as it is done by default. I can probably use somethin