Hi,
When i transfer a resource from R/3 to APO the data is transferred to APO but not to the active version.
Instead it sits in APO as model independent version i.e without a version number.
Please let me know how this happens and how to overcome this ? I want the data to be available in version 000
BVN**

Hi Valavan,
I assume your issue is related to only the changes made to R/3 Resources and not for new Resources.
There is a customizing setting in R/3 to control this. Use trns. CFC9 and set the value 'N' for the 'Change Transf. Mode’ field. This will ensure any changes to Resource in R/3 will also be released to 000 version in APO. If the value is 'X' the changes are released only to model independent version.
Regards,
Srinidhi

Similar Messages

  • TVARV - Integration model.

    hi
    we currently use TVARV entries for specifying the materials in the integration models ( to CIF to APO).  when we use a TVARV entry, we have a limitation of using only 500 entries at a times. so the number of materials in Integration Model  is restricted.
    is there any way not to specify the materials in the integration model but during runtime.
    regards
    Joe

    Joe
    Here is one way to solve the problem . Create a custom field in MARA . It will be a boolean field with values " " and some other non blank value say "Y" . For the materials that you like to transfer to APO , set the value of this custom field to "Y" .
    You can enhance your integration model selection criteria and add fields to the IM selection. Add the custom field to the selection . Refer note 360723 . It explains how to add  fields to IM selection
    Save a variant of the integration model with value for custom field = "Y" .  Now all you have to do on a daily basis is to go and set the custom field to Y for materials that you want to CIF to APO . This will make sure the materials get picked by the IM automatically.
    Thanks
    Saradha

  • Integration Models and CCR simultaneously . .

    Dear All,
    i have 2 questions :
    1) Why cant we run two Integration model simultaneously ???
    and
    2) Why cant we run CCR jobs in parallel with planning run ???
    Please let me know your observations and opnions.
    Regards,
    Prasad

    Hi Prasad,
    Below are the answers for your queries.
    1) Why cant we run two Integration model simultaneously ???
    Integration models are the building blocks of both master data and transactional data for APO.  It has to be contructed in APO in a sequence or in a order so that the updation of data can be performed sequentially.  Each data will look into the update of other data.  For example, we need to run integration model for location first and then location-product.  The first run of location will create integration model for location in APO and then when we run subsequently the location-product, the combination will be referred in APO.  If we run both location and location-product together, if location-product tries to update the APO system first(tables) before location data, then it will throw out error and cancel the model run.  Hence, it is advisable to run the models one by one in a sequence.
    2) Why can't we run CCR jobs in parallel with planning run?
    CCR runs will compare the transactional data between both R/3 and APO and display the results.  Planning run will perform the planning based on the selection conditions and it takes data from both R/3 and APO.  The planning results will be transferred from APO to R/3 based on our customisation settings.  During the time, when transfer of results happening, if paralley, comparison of both system data happens via CCR job, it will not give correct data or end up with errors or tries to cancel the job.
    Hope this clarifies your question.
    Please confirm whether you are clarified?
    Regards
    R. Senthil Mareeswaran.

  • Integration between R/3 and APO

    Hi Friends
    I had created integration model betwee R/3 , APO and activated 
    My R/3 material is in X (Ex 1000) plant.
    Iam not able see my product in Locations Y & Z  (ex 3000 & 4000).
    Iam able to see the product in Location  X(EX 1000 only)
    what settings i have to be made in R/3 and APO.
    Please advise me..
    Regards,
    Srihari.

    Hi Srihari,
    You said that,
    "My R/3 material is in X (Ex 1000) plant.
    Iam not able see my product in Locations Y & Z (ex 3000 & 4000).",
    does this mean that your material is not created at locations Y and Z in R/3.
    If not it should be done.If your material is not created at locations Y and Z, obviously they are
    not available in APO system at those locations( Y and Z).
    Regards,
    Rajendra.

  • Integration model activation issue - After Prod to Quality refresh of R/3

    Hi Guys,
    Our R/3 quality system refreshed from production. Hence all the integration models Logical system pointing APO production system. Mistakenly I deactivated all the integration model in R/3 Q system which having APO Production logical system.
    All the IM in R/3 quality system are inactive. When try send material getting error message "relavent location doesn't exist".
    For that try to move the Location getting error message "Location already exist in APO Quality" system.
    Now I want to active the all the Plant, material.etc integration models. Please let me know if any more information and help to overcome the issue.
    Thanks,
    Saravanan V

    Saravanan
    Make a table level change and set the integration model flag as active in the table CIF_IMOD. This will help you solve the issue .
    Go to transaction SE16 . Give table name as CIF_IMOD. Give the name of you integration model and execute . Now all versions of that integration model will be displayed ( this will happen if you have many inactive versions and do not have the RIMODDEL program to delete inactive IM's) . Choose the latest version and go to change mode  and set the value of "Entry is active"  (technical name ACTIVE) field to  I.
    You can take help from development team if you do not have authorization to SE16
    Thanks
    Saradha

  • Transfer of material from R/3 to APO, Problem in Integration model

    Hi
    I have created Integration model for Transferring material from R/3 to APO.
    While  activating the model, it is giving error  with status as i..e. SYSFAIL
    On clicking the status, I am getting the following message
    "Logical system R3CON does not assigned to Business System Group"
    ?Where to locate the BSG in  R/3 and assign before transferring  matl to APO
    i require the steps&help  to solve the problem.
    Thanks in advance to all members for the help.
    Srikanth

    Dear Srikant ,
    Pls check you have followed the below steps in the same sequence for R3 and APO
    <u>CIF Settings in R/3</u>
    Check ALE settings or activate ALE settings          
    •Define the logical system               <b>BD54</b>
    •Assign logical system to a client               <b>SCC4</b>
    Set the RFC destination               <b>SM59</b>
    <i>Assign target system and queue type          <b>CFC1</b></i>
    Maintain the SAP APO release               <b>NDV2</b>
    Activate BTEs for SAP APO integration          <b>BF11</b>
    User parameters for CIF               <b>CFC2</b>
    <u>CIF Settings in APO</u>
    Check ALE settings or activate ALE settings          
    • Define the logical system               <b>BD54</b>
    • Assign logical system to a client          <b>SCC4</b>
    Set the RFC destination                <b>SM59</b>
    Set up business system group     
    –Create BSG                <b>/SAPAPO/C1</b>
    –Assign logical systems to BSG          <b>/SAPAPO/C2</b>
    Maintain distribution definitions               <b>/SAPAPO/CP1</b>
    User parameters for CIF               <b>/SAPAPO/C4</b>
    You have got stuck up somewhere in R3 setting , which I have marked in italic font i.e.<i>Assign target system and queue type          CFC1</i>
    I hope this will solve your problem .
    Thanks ,
    Digambar

  • Can I work backward from APO CIF function module to ECC Integration Model

    On our APO box, I have activated the "new-style" BAdI which is called by the CIF function module /SAPAPO/CIF_TLANE_INBOUND:
    CALL BADI lr_ref_cif_enhance->inbound_tlane
    How can I find out what the business analysts have to do in their ECC Integration Model
    to make sure that the CIF_TLANE_INBOUND function module is called when the Integration Model is activated (so that the BAdI will also fire)?.
    Our current Integration Model does fire the BAdI /SAPAPO/IF_EX_TR_TRANSFER , but not the "enhance inbound tlane" BAdI called by CIF_TLANE_INBOUND.
    So ...to restate the question:
    How do I figure out what I have to tell the business analysts  to do in their Integration Model to make sure that CIF_TLANE_INBOUND is called when the model is actrivated ???

    Hi David,
    I was away in a long meeting and just came back. A quick check in another R/3 (Enterprise) system showed the following:
    There is no FM in the R/3 Enterprise box as CIF_TLANE_SEND and in APO (SCM4.1)  
    /SAPAPO/CIF_TLANE_INBOUND. This is not surprising esp when I check the other system versions based on which I did the initial research. It was ECC 6.0 with Enterprise Extension DFPS switched on (checked SWF5) and the APO system SCM 5.0.
    Lucky me I checked the internal Sandbox systems instead of my client systems otherwise I would have posted there is no FM CIF_TLANE_SEND
    Forget the SD Scheduling Agreement object I mentioned in the previous reply. That master data object will not trigger FM CIF_TLANE_SEND. I found the correct FM for it CIF_SDLS_SEND on R/3 side and /SAPAPO/CIF_TPSCO_INBOUND on the APO side.
    So you have to necessarily use the BADI or User Exit enhancements for TPSRC and NOT TLANE.
    In any case if its a Contract or Scheduling Agreement or Purchasing Inforecord master in R/3 (or ECC any version) then TPSRC is the FM used to create External Procurement Relationships (txn /SAPAPO/PWBSRC1) in APO during CIF transfer. Also a corresponding Transportation Lane (txn /SAPAPO/SCC_TL1) gets created when the Procurement Relationship is added in APO. Otherwise you can always manually create a transportation lane in APO which is an important master data for External Procurement Order / Requisition creation in APO.
    Hope this helps. I am logging off for today - so no more further digging. But thanks to you I discovered another small "blackbox" of SAP. Will blog on this some time later - till then you can take a look at the [CIF Wiki|https://wiki.sdn.sap.com/wiki/display/SCM/CIF] page.
    Best regards,
    Somnath

  • CIF - Integration model name and APO application

    Hi Experts,
    In the CFM1 Transaction, there are 3 mandatory inputs are Model name, Logical system and APO application.
    Logical systems are customized in CFC1 transaction. I couldn't trace the model name and application creation.
    What is the transaction to customize/Create the new Model name and APO application.
    Hope this is very simple question to you and expect your soon.
    Thanks,
    Saravanan V

    Hi Somnath,
    Thanks for ur reply.
    First I saved the selection as variant. But it was not updated in the IM table.
    Then I tried to generate the model and now I can see the details when I use the F4 help.
    So, to create a integration model need to generate the variant once.
    Thanks for the confirmation.
    Thanks,
    Saravanan V

  • Activtion of PPM Integration Model does not send any data to APO

    Hi all,
    When I activate my PPM Integration Model, the activation finishs without any error, but no data is being tranfered to APO.
    I do not get any error message to start looking for the problem.
    Thanks and regards,
    LHM

    Hi Luiz,
                  "no data is being transfered to APO" Which data are you looking for?? I am assuming youa re expecting a PPM to be created in APO.
    If so,
    1. Do you see any PPm in /sapapo/scc03?
    2. Check if the pre reqs. for creating PPM as in [Integration of Production Process Models|http://help.sap.com/saphelp_scm50/helpdata/en/8e/d4ef37e9a4ba6ee10000009b38f842/frameset.htm] are satisfied.
    3. make sure to check the inbound APO queue or outbound R/3 queue depending on what you are using.
    4. Also not the time of activation and check CFG1 in R/3 to see if you can get any clues.

  • Error activating integration model in APO

    Hi,
    I would like to have a solution to the folowing problem.
    I've tried to activate integration models in ECC with transaction CFM2.
    I've build several integration models for class, customer, masterdata and transaction data.
    When I try to activate one of these integration models the system gives the next error message:
    outbound queue blocked
    Function/Q/SAPAPO/CIF_CBASE_INB
    Text:        Reference product has not been classified
    I would like to know what causes the problem and how to solve this problem.
    I hope to receive an answer soon.
    Thanks for the help!
    kind regards,
    Marco

    Hi,
    A program enhancement allows you to exclude the relationship between a product and a reference material from the transfer.
    The prerequisite for this solution is that this "reference material for materials that can be packaged in the same way" is not required in SCM and is not relevant for the transfer.
    Procedure:
    Start transaction SMOD. Display the components of enhancement CIFMAT01. On the following screen, double-click function module EXIT_SAPLCMAT_001 (user exit '001' of function group 'CMAT', program SAPLCMAT). In the program editor that appears, double-click include ZXCIFU01. You may have to create the inlcude again if necessary. Implement the system response you want in this include (follow the sample coding given below).
    Example:
    DATA: LS_MATKEYX TYPE  CIF_MATKYX.
    LOOP AT CT_CIF_MATKEYX INTO LS_MATKEYX.
      if link_to_RMATP_needed = 'X'.
        continue.
      endif.
       clear LS_MATKEYX-EXTRMATP.
       MODIFY CT_CIF_MATKEYX FROM LS_MATKEYX.
    ENDLOOP.
    Regards
    Vinod

  • Regarding Integration Model to CIF from ECC to APO

    Hi ,
    Please assist me in the following issues:
    What will the impact if any material is ciffed twice or multiple times from ECC to APO through IM ...will it generate inconsistency ? if so, how we can avoid this ?
    While I'm ciffing the material from ECC to APO through IM, the ' Find Master Data Object ' is showing certain number say 'X' but when I'm running CTM for it the explosion of BOM  of Master Data is showing less number of material than 'X'...in that case what might be the possible issue ?
    While generating IM , can I club Sale Order, Sale Order Stock, Planned Order, Prodn order under same variant ? or ill it generate inconsistency ?
    TIA
    -Michael

    Hi Michael,
    1. It is not a problem. Is is quite common to CIF materials twice a days or even more. It shoul not generate inconsistencies.
    2. You could have more materials than materials bith BOM. In other words, maybe not all your materials have a BOM.
    3. Its recommended to have a separate integration model for your object.
    Read this document with the Best Practices:
    https://websmp102.sap-ag.de/~sapidb/011000358700000715082008E
    Also, note that I was mentioned by Dog Boy, it is convinient asking single questions in your threads. This way you will find more responses.
    Kind Regards,
    Mariano

  • APO Integration model error

    Hi all
    when activating Integration model in R/3 with APO below error is coming
    "Outbound queue blocked"
    System:APOCLNT800,USER DDIC 09.02.2008 13:28:15
    Function:/SAPAPO/CIF_LOC_INBOUND
    Text:Host name: "XXXXXX"unknown/CPI-C error CM_Product.
    when we click QRFC monitor  lot of queues are there..
    can any boby give solution for this
    Regards,
    srihari

    Hi Somanath
    Our basis consultant checked   every thing in SM59  and he told every thing is ok.
    In QRFC monitor lot of queues are there how to handle/delete the queues   .. i tried  but not able to resolve.
    Regards,
    srihari

  • EWM CIF Integration Model master data transfer Issue

    Hi Gurus,
    I am not able to transfer the master data from ERP to EWM.
    When I excecute the transaction CFM1 and CFM2 integration model ,the material is not getting transferred.
    I am getting the below mentioned Error message.
    "Location does not exist for external location 9997, type 1040, and BSG CSSCMDEV"
    Please help me in resolving this issue.
    Regards
    Govind

    Hi,
    Thanks for the reply
    I had created the location 9997 for the location type 1001earlier.
    When I tried to delete the location and create new Location for Location type 1040.System is not allowing me to delete.Please let me know how to delete the existing Location.
    Regards
    Govind

  • Integration Model for the resources terminates with an error

    Hi
    we have deleted the existing Integration model for the Resources and trying to create a newones, when iam activating the new resource integration model it is terminating with an error "Resource already exists(mapping error occured)".
    we did the consistency check for the resources and ran OM17 everything seems OK. when tried to the same in the test system it works fine...
    How to rectify this..

    5,
    Deleting integration models for master data is a poor way to start any process.
    The message implies that the offending resource probably was created locally in SCM, or perhaps to support a different Business System Group. The easiest solution is to delete the resource and then recreate via Core Interface.
    Best Regards,
    DB49

  • Creating integration model

    I have created an integration model using CFM1 & activated in CFM2.
    now  dont know how to proceed.
    is there any document or link to transfer data from R/3 to APO system.
    i m new to this field & trying by own.
    Thanks in advance.

    Best way of creating CIF integration Model
    Hai,
    Please go through the above thread which can help you for understanding more about the integration models creation.
    You have mentioned that you have done CFM1 and CFM2. Can you please inform for which object you have done and what you would like to see in APO?
    Giving more details would enable helping you better.
    Regards,
    Murali.J

Maybe you are looking for

  • Can I assign a task based on information from another column?

    For example: Let's say I have a column called "Question Type" and this column has multiple checkbox choice, those being:      Math      Science      History      English      Other I want to allow users to be able to select multpile catagories for th

  • Adobe Flash Player 10 ActiveX -- Error 2753. The File 'InstallAX.exe' is not marked for installation

    Adobe Flash GPO Deploy error "InstallAx.exe" Flash won't uninstall correctly from a GPO deployment Error message from EventViewer: Product: Adobe Flash Player 10 ActiveX -- Error 2753.The File 'InstallAX.exe' is not marked for installation. I am runn

  • JSF in WebSphere

    I have deployed a JSF application in WebSphere 6.1 . I created a shared library through the console which has jars tomahawk-1.1.3.jar myfaces-impl-1.1.4.jar, myfaces-api-1.1.4.jar The application is mapped to this Shared library. When i access one of

  • Portal User Time Out Setting

    Hi Does anybody know where one can set the time value after which a user will be logged off if there is no activity? Thanks

  • Screen goes blue every five seconds.  Unable to reinstall OS.

    Hi,   I am facing weird problem of screeing going BLUE every five second.  I tried checking Hardware using hardware test DVD and it found no issues.  Additionally, I verified both the partitions along with permissions verification using DiskUtility.