Integration of Assets in Project System

Hi Guru's
We are able to create assets number in Project System, but the same is not connected with Purchase Requestion and system will not able to create accounting document.
Or Unable to integrate asset number in Project System.
Will anyone help me in this regard
Regards
Paramjit

Hi,
You inventory is maintain always in base unit of measure.
You can maintain different unit in material master like,
Order unit(Purchasing view) : - For Purchase Order
Unit of issue(Plant data1) : - For issue material.
You can see material stock in both unit of measure in MMBE.
After enter material code you can see material stock, by changing material unit of measure you can also saw material stock in specific unit of measure.
Maintain Order unit of measure in purchasing view and also active variable active unit( Enter 1 = active) in purchasing view
Regards,
Mahesh Wagh

Similar Messages

  • Business process of Purchasing, FI-AA, Project Systems, Invst Mgmt for BW

    Hi
    I am a BW consultant and I would like to know the business process like what-is-what regarding the modules of Purchasing, FI-AA (Asset Accounting), Project Systems, Investment Management, SRM from BW perspective like how much and what should I know.
    Help me by posting some material/documnets so that I can come to an idea regarding the business process of those modules that will help me to work in that application areas as a BW Consultant.
    Thanks in advance
    Sugandhi

    Hi Sugandhi,
    Take a look bi best practice - purchasing analysis
    http://help.sap.com/bp_biv235/BI_EN/html/bw.htm
    http://help.sap.com/bp_biv235/BI_EN/html/BW/PurchAnal.htm
    and sap help business content
    http://help.sap.com/saphelp_nw04/helpdata/en/ed/62073c44564d59e10000000a114084/frameset.htm
    (navigate left panel for infocube, query etc)
    Please go through this links:
    http://help.sap.com/saphelp_nw04/helpdata/en/e9/62073c44564d59e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_ides/helpdata/en/fd/45beec9d6411d189b60000e829fbbd/content.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/9c/df293581dc1f79e10000009b38f889/frameset.htm
    http://help.sap.com/saphelp_bw33/helpdata/en/e9/62073c44564d59e10000000a114084/frameset.htm
    http://www.sap-img.com/sap-mm.htm
    http://www.sapgenie.com/abap/tables_mm.htm
    SRM:
    This is the SAP help link:
    http://help.sap.com/saphelp_nw04/helpdata/en/3a/7aeb3cad744026e10000000a11405a/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/bb/66073c52619459e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/7a/68073c52619459e10000000a114084/frameset.htm
    Also check http://service.sap.com/bi -> business content -> supplier relationship management and http://service.sap.com/srm
    the connection/create source system should just same (for r/3, srm, scm with bi also), not sure you had this doc already
    http://help.sap.com/bp_biv335/BI_EN/BBLibrary/documentation/B84_BB_ConfigGuide_EN_DE.doc
    for portal
    https://www.sdn.sap.com/irj/sdn/developerareas/ep
    and search bi and portal integration in sdn library
    Keys for Integrating SAP BW 3.5 and SAP Enterprise Portal 6.0
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/6b1472a7-0301-0010-64bd-dc96509db6f7
    Hope these helps u...
    Regards,
    KK.

  • Asset settlement issue from Project System

    Hello everyone,
    In SAP, we have tied Project System and Fixed Asset in the sense that for each network/activity in PS we create and link an asset in Asset Accounting. In the Purchase Order, the network/activity number is assigned and all the transactions that occur through this PO (including down payment, its clearing, GR/IR)  are then settled on the specified asset when we execute settlement run at month end through CJ88.
    However, we have encountered scenarios where an asset was not timely allocated to the network/activity but the transactions were carried out through the PO. When the settlement run was executed, its impact was not visible in Asset Accounting. Later, it was realized and the asset was created and assigned. Once the asset was assigned, all the subsequent transactions through the PO were then being settled successfully. But the problem is with those transactions for which the asset number was initially not assigned.
    Is there any program that can be executed to include the impact of the previous transactions. Otherwise, suggest alternatives.
    Thanks

    Hi Thanks for your reply, But that is not relevent to this issue.
    The issue here is -
    First 2 documents has value date of 4th period and the amount is 8800
    Next document has value date of 5th period and the amount is 1200
    Now i am trying to settle 10000(8800+1200) with 5th period date. Its givign an error Settlement amount is greater than Available amount
    Will it solve if i settle 4th period with 8800 first and then 1200 with 5t period? or any other process?
    Thanks
    Yadayya

  • Project systems integration with portal (EP)

    Dear all,
    I have to integrate the projects systems module with Portal.(EP)
    In portal transactional I views can be used to create projects which can be store in the R/3.
    Now the issue is to create projects with out using Transactional I views. This should be a simple entry through portal, where in the user keys in the key fields and there by the project is created and scheduled.
    For this I have tried with using business packages given by SAP to integrate with portal.
    Now the issue is I can display the projects that are created in R/3 through portal and display the necessary fileds required for viewing (I views). Now the main problem is to create the project using these business packages so that the same get updated in the R/3.
    But business packages do not have the option of creating the project. I am using the business packages for projects 50.3.1
    Has any body come across this type of issue which has to be integrated with portal and subsequent creation of projects through portal
    If any body has done this in any other way please kindly share on this.
    Experts please throw some pointers on this.
    Regards.
    Vara Prasad

    Hi Aman,
    You may try creating transaction iViews of the desired PS Transaction.
    For more help you can take help of your Portal Administrator.
    Else, see if this link may help:
    http://help.sap.com/Business_Packages/EN/06/3ED93BE53BCD29E10000000A114084/frameset.htm
    Regards,
    Vivek Pandey

  • Integration revenues and earnings in project system

    Hi,
    can anybody send me documentation about the integration between SD and PS?
    thanks
    my email is [email protected]

    Hi David,
    Project System(PS) works for any project e.g construction, operation or any large projects where project management tools are required. it integrates all modules may be like MM for vendor process or for RFQ etc or say may be SD for Resource related quotation with the help of DIP profile or Milestone process etc. IT is largely used in construction projects. IT helps in controlling the whole of project from one single screen and it works with 3 elements WBS element ( work break down structure), Network and Activity.
    Please go throgh this Please check this links perhaps they may help.
    http://help.sap.com/bp_imcv1500/IMC_US/HTML/preconfigured_scenarios.htm
    ETO:
    http://help.sap.com/bp_imcv1500/IMC_DE/HTML/E83_EN_DE.htm
    http://help.sap.com/bp_bblibrary/500/HTML/E46_EN_DE.htm
    MTO:
    http://help.sap.com/bp_bblibrary/500/HTML/V66_BB_EN_US.htm
    http://help.sap.com/bp_imcv1500/IMC_DE/HTML/E70_MTOQuotProc_EN_DE.htm
    PS - SD integration are on
    1.Billing pan, at each WBS element, network and Activity level.
    2. DIP profile which is assigend to item category. DIP for resource related quotation works only with ECP ( easy cost planning).
    3.sales pricing - generally, there r 2 types of sales pricing in PS . lumpsum contract and unit rate contract.
    4. BOS - bill of Services. which has to be activated. It is industry specific solution. If BOS is activated you also have integration for vendor RFQ and Analysis.
    5. resource related Billing
    The specified item was not found.
    http://help.sap.com/saphelp_46c/helpdata/en/aa/96853478616434e10000009b38f83b/frameset.htm
    Following is the SD & PS integration scenarios where milestone billing & Periodic billing plays the implortant role for these integration:
    Milestone billing is typically used for billing projects, such as plant engineering and
    construction projects. Such projects often include a series of milestones that mark the
    completion of different stages of the work. In the SAP R/3 System, milestones are defined
    in a network along with planned and actual dates for the completion of work. The milestones
    are also assigned to the billing dates in the billing plan. The connection between the project and the sales document item is made in the individual
    schedule lines of the item. Each schedule item can be assigned to a network in a project.
    PS-SD Integration as below :
    A)Billing plan, at each WBS element, network and Activity level.
    B)DIP profile which is assigend to item category. DIP for resource related quotation works only with ECP ( easy cost planning).
    C)sales pricing - generally, there r 2 types of sales pricing in PS . lumpsum contract and unit rate contract.
    D)BOS - bill of Services. which has to be activated. It is industry specific solution. If BOS is activated you also have integration for vendor RFQ and Analysis.
    Reward points if find useful..
    Regards..
    Praveen Kumar.D

  • How can we explain the process from project system to final asset

    Dear masters,
    how can we explain from project system to final asset flow in the configuration level.
    thanks
    Moderator: Please, refer to basic SAP material

    Hi,
    Project & its related WBS will be initial cost collector (i.e invoices are booked against them). Once the status of Project/WBS is set to tech complet and AUC is assigned in the settlemnet rule. That particular asset record will recive values when we run the suttlemnets.
    This is an broad line view. Specific will depend on case to case.
    Thanks
    Vaibhav

  • Integration between SAP HR and PS (Project System)

    Hi Guys,
    Is there any integration between Project System and HR in SAP. My client is service oriented company.
    Every month New customers will join and each customer they call it as one project & maintain in PS. Now my client requirement is, through PS recruitment requisition should have to come to HR (For ex XYZ customer requires 2 Supervisors, 1 Manager), so that HR will recruit employees for the project.
    So is there any integration between PS & HR
    Regards
    Prasad

    Hi Vikram Patil,
    In my client place we are not implementing SAP Payroll, hence if any new project is created in PS, I need only man power requirement from PS, how can I proceed now
    If is there any documents on PS and HR integration please forward to my mail ID
    [email protected]
    Regards
    Prasad

  • Material To be Valuated in Project System

    Hi All,
    We are implementing PS,MM,SD,FI &CO for a companay which works essentially on engineer to order scenario and using vlauated projec stock & actvity account assigned networks
    Inhouse production is through typical assembly processing process - Where input & output materials are transferred through BOM PS Transfer from WBS BOM.
    Input materials are issued to activity; work performed by work centers are entered by confirmation; at completion of work out put materials is 'Received from activity'. Both material issue and receipt are done wrt reservation.
    When this is done, as per standard process, the cost addition (and hence value addition) is to activity and thereby to WBS element. The output material is not valuated. All the cost(or values) become project value which will reflect in WIP calculation. WIP is calculated as month end process.
    At month end if the company wants to know the current asset from project and relevant stocks:
    = WIP of project + Inventory value of the mmaterials.
    Pl. note that only input materials i.e. raw materials and Bought out materials will have inventory value; the output material will not have any value.
    The process is alright and I think we are alos complying to Accounting stanadard for project system - directive from Institute of Chartered accounts - India.
    This process was first aceeptable to customer; but now they say -  the out put materials should be valuated. So that, when inventory value is taken - it is RM+BO and valuated semifinished +valuaed finished materials
    One big reason they say is that they have to show inventory value to the Banks.
    Now I need clarification in following points
    1. How to valuate the out put material when working only with project system. (apart from using user exit )
    2. If this is done, the project cost/WIP calculations will show ups amd downs - as goods receipt with valuated value will be with sign - this will reduced the cost. This will cause variuos problems - almost no standard SAP PS cost report will reflect the reality - WIP can not go up and down...This is illogical.
    3. Have you faced similar situation in implementation - that - Banks can not be conviced about this PSway of WIP calculation? Taking into consideration that project implementation is in India - an experienced reply can be very helpful
    Thanks and regards
    A.Saravanan

    Dear Pradeep,
    When we work with network/activity/wbs element, Finished material is assigned to activity with sign. This means GR can be done. Technically system treats lke by-product. This material will not be valuated with in put costs...since there is no logic...For our convention, one WBS element, one network or one activity can be used to book all related costs..but still GR will happen with valuation as per valuation variant in NW only. This is quite logical and correct.
    So...customer wants to know the cost of manufacturing a complex project assembly..then process under one WBS element..cost accumuated at that WBS element is cost of mfg. I have kept such finihed material std price at Rs.1. (Ideally it should be '0'.). Meaning material will not valuated.
    Now if customer wants to knwo the cost ...look at WBs element
    If needed, you can do unit costing and update the value in a suitable field in material master.
    Therefore, I have kept all the semifinished/finished material std price at Rs.1.
    This way..std functions of PS like RA, costforecasting are work properly.
    For WIP calculation, this is of standard method and WIP will be current asset of company..this will be acceptable to Banks...one concern I had..cross checked with a Banker.
    Another issue was sub-contracting. In India during S/C..we have Delivery challan and legal requirement of excise. We developed a program integrating dc, excise challan, transfer posting, goods issue against reservation and mateials assigned in activity. For user it will appear as one transcation, and system will propmt/list appropriate excise challan No. based on dc no & material as input...(I hope i remember right).
    Again here GR of seni/finished naterial was atRs.1. since Service cosst, matarial issue cost get booked at activty.
    Thanks and regards
    Saravanan.A

  • Sales order in Project system

    Hi All,
    Can u tell me please how can we create  a sales order,Quotation in projects and what are tcodes for that.
    As i am here involved in Capital projects i dont have any idea of customer projects ican u pleease let me know the customizing part too.
    Assured of rewarsd points
    Thanks in Advance.
    Regards,
    Abraham.S

    Hi,
    to create quote from project system there is quite a bit of PS ( project system ) SD integration is required. i will try my best to deliver with whatever time i have right now.
    1. t-code -CKCM - your will define easy cost planning here whihc will be your pricing factor in in sales order.
    2. ODP1- you define DIP profile here you will also define your costing elements here. this DIP profile is attached to sales doc type. and on main menu you will find button that says quotation. click on that. this willd irectly take you to quote and from there u can take it forward.
    I hope it helps u little. Though i know its not enough.

  • WBS Elements not getting created in ECC Project System from CRM 7.0

    Dear all,
    We are trying to integrate SAP CRM 7.0 with SAP ECC-PS module. The objective is to bring in the marketing plan and elements data from the CRM system, and to create the corresponding WBS in project system. We have done most of the configuration as recommended by SAP in both the systems, and we see that the BDOCS are getting generated and sent to the ECC system. The following steps have been successfully completed:
    1.       Set up the RFC connections between the two systems
    2.       Selected the connection type as Middleware in CRM system.
    3.       Installed the cProject Add on in CRM box.
    4.       Created a project scenario (with project and network profiles) in the PS system and assigned the same in the CRM system.
    5.       The Project Scenario in PS config has the same name as the Project Type in CRM config.
    6.       Created and released the campaign ids being created in the CRM system.
    As already mentioned, we can see that the BDOCS are coming to the ECC system and are getting stored in BDOC_TRACK table. However the issue is that the corresponding WBS elements are not getting generated in the ECC system. Is there anything that that we are missing in the ECC box which would trigger the WBS element creation?
    Request you all to share your inputs which would be immensely beneficial for us in achieving this integration.
    Thanks and Kind Regards,
    Aditya Shrivastava

    Hello Aditya,
    We too are facing this issue.. if you have resolved the issue could you please let us know the solution ?
    Some inputs related to our system,
    We have upgrade from CRM 4.0 to CRM 7.0 SP07 and R/3 backend system is on 4.7 SP27, earlier we have completed the upgrade on sandbox without any issues which was upgrade to CRM 7.0 SP04 but with SP07 we are facing the problem of WBS Element not getting created in R/3.
    Your help is highly appreciated.
    Thanks & Regards,
    Sumukh Kapoor.

  • Customer Downpayment Update in Project Systems

    Hi,
    I am facing problems w.r.t. update of customer down payment update in project systems. As per standard SAP, after doing customer down payments, this will get updated in project info systems (CN41/CN41N).
    Please suggest me to fix the issue.
    Best Regards,
    Ranjan

    hi,
    Downpayment request is used to create a billing request through
    the t code DP 90.This DR can further be used to create a billing document
    say invoice.
    Actually you will be using these fundas in Resource Related Billing because that is
    where the integration between PS and SD module take place with the help of
    DR against actual resource utilized in the project.
    I hope this clarifies your question and award points if it is so.
    Do not hesitate to ask me if you have any further questions in this.
    Thanking you,
    Best Regards,
    R.Srinivasan

  • Settlements in project System for public sector.

    We are having a unique requirements for Project system.
    A Capital project will be mostly funded by Federal agency. However the capital project will end as an asset. eg, Roads, bridges etc.
    1. We want to acumulate all expenses and settle it to AUC ( IM ) and later settle as an asset. ( currently possible )
    2. However, based on the billings done to Fed agencies, the revenue is also to be identified in the project. ( should not be condisered for settlement, as it will reduce the Asset value ).
    We tried to seggregate the cost and revenues by source structures namely 10 and 20 for Cost and revenues respectively. In the settlement rule we move the cost up from WBS element to Project level. From project we move to AUC and finally to AMR.
    Our requirement is to just settle the expenses to AMR and leave the Revenues in the the project itself. However the gives a hard error that the revenue settlement should also be settled. The other option we thought about, was to settle to a cost center, but it is not advisable as the revenue will put back  the budget of that cost center/fund center.
    So my questions is .
    1. Can part settlement happen ? ( Meaning move only costs ) ?
    2. In private sector, it is possible because expenses are Cost element 1 and Revenues are 11 ( not selected for settlement except PA settlement ). However in public sector expenses and revenues are treated as Cost element 1. so how to circumvent this issue ?
    Any help or direction will be much appreciated..
    regards,
    Venkat Kota.

    I am already using the source structure to split the cost and revenues. I am also using the same settlement profile for all the requirements.
    1. lower WBS to Higher WBS.
    2. Higher WBS to AUC
    3. AUC to AMR.
    So i am not sure how i can maintain 2 settlement profiles for one project ?

  • Version 999 Project System Plan Data Issue

    I am using transaction CJ9B to copy the Project System related plan data i.e. plan data at the WBS element level from Version 10F, period 1 to 12  in year 2010 to version 999, period 1 to 12 in year 2010. The transaction CJ9B runs successfully in the update mode. But when report CJI4 is executed for version 999, period 1 to 12 in year 2010 then we do not find plan data in sync with version 10F.
    I analysed this issue, had a meeting with end user and blanked out target version 999 using source version 9ZR for the year 2010. Then I again copied version 999 from version 10F. Still plan data in version 999 do not exist as they are in version 10F. I have checked the version 999 master data in transaction OKEV. Integrated Planning for SPL, COPA, cost center accounting and business process is active. COPY Allowed is also enabled. Version 999 is unlocked as well.
    Hence I am not sure why the copy functionality is not working fine for version 999, period 1 to 12 in year 2010.
    Can you please take a look and revert with your opinion so that this issue can be fixed ?
    Thanks,
    Umesh

    Hi,
    If you want to copy all the plan date from 10F to 999, then in Txn CJ9B
    select the indicator reset and overwrite in target version and execute in test mode.
    Regards,

  • Change Table Fields in "Costing" in with Project System (PPM 5.0)

    Dear Gurus;
    I need to know, how can I change fields in "Costing" with Project System (Project Management in tab name "Accounting").
    The integration works well, but I need to view the values of: Actual, Plan and Commitment.
    In the Standard way, just only can see the Plan (with the colum "Costs").
    Please, help.
    Best regards.
    Mariano.
    Edited by: Mariano Sabiche on Apr 27, 2011 3:17 PM

    Hi Mariano
    The particular screen you are referring to will only show the planning on Easy Cost Planning due to the labour costs and revenues planned on the cProject.  You can use the services&deatil on the assignment - click on the WBS assigned to get the detailed list of services for the assigned WBS element.  You can then click on Detail Data to get detailed data on the assigned WBS element.  If you want a report with all the data, best use the BW cubes for that to combine cP and PS data.
    Hope this helps
    Regards
    Duan

  • Project System for ABAPers

    Dear All,
    Can you please explain me the importance of Project system in an ABAPer's perspective? In which phases of Project system, does an abaper come into picture?
    regards,
    Surya

    Hi,
    As an ABAPer, it does not matter which module you are working in as long as you know the business flow of that module, what are the main tables, how the module is integrated with other modules etc.
    I am working in PS module. Here i have done custom reports / tables / FMs, user-exits, work-flows and many more things. Also, since it is integrated with SD / FI / HR / MM etc, i have to work in those module also and code related to some custom integration scenarios between these modules and PS module.
    The question you are asking is vague. What ABAPer can do in any module can only be answered on case by case basis depending on what the requirement is.
    I hope i clarify your doubt. Let me know if you have further question.
    Regards,
    RS