Integration of Plant Maintainence with Time Management

Hello All,
I need to present integration of Time Management with Plant maintaince.
The focus points would be how to integrate Workcenter at the Plant with Time Management data of the employee.
Kindly do send me any links or docs
Pls this is very crutial for me and would appreciate anyone helping on the same
Cheers
Vijay

Hi,
The following might help u :
http://www.sdn.sap.com/irj/scn/advancedsearch;jsessionid=%28J2EE3414900%29ID1321608750DB11628593195917906764End?query=integrationofTimeManagementwithPlantmaintaince
All the BEST
KRC

Similar Messages

  • SAP Travel Management Integration with Time Management

    Hello Gurus,
    Need some assistance with Travel integration with Time Management.
    Scenario.
    Punch in Punch out system at the client so when the employee is traveling or when he enters the Trip Request, after approval the attendance should be counted.
    Is there a config step for the same or a BADI needs to be implemented in this scenario ?
    Regards,
    BLITZZ

    A direct update of time infotypes is not possible. You can however switch on the integration in view V_T702N_A. With add. user parameter START_CATS = X you have the possibility to jump to CAT2 to record the time. For the update of the infotypes you have to follow the subsequent steps in time management.

  • Integrating EP 6.0 with Solution Manager 3.2 .

    Can anyone please help me regarding the steps for integrating EP 6.0 with solution Manager 3.2.
    It would be nice if any one would direct me to any link or any presentation where in the steps for the above subject are illustrated.
    Regards,
    Ashish .A. Poojary

    Ashish,
    What is your requirement?
    Could you be more specific about the area your exploring
    Solution manager is huge...
    Please assign pts if it helps

  • In which Infotype ,we link Payroll(India ) with time Management

    Hi Expert,
    Can you explain , in which infotype ,we link Payroll with Time management?
    Can you Expalin the procedure

    It should be through different infotypes
    For Eg   IT0008  taking capacity utilisation  and Work hours/period from infotype 0007 ( capacity utilisation level and Employment percent)
    For absence valuation in payroll the absence types will have to mention (IT2001)
    check this link
    Where is link between 0007 and 0008 infotype

  • PNPCE with Time Management   Urgent!!!

    Hi,
       I got a Project using PNPCE LDB on Time Management.They  didn't mention Unicode any where in the Specs.
      But, when I was trying to do a simple test program with PNPCE LDB mentioned in attributes and I didn't even check Unicode but it is giving this syntax Error.     
       "  The program is not Unicode-compatible, according to its program attributes. "
       Though I avoided this I coulldn't execute the Program.
       Can anyone please help me.How to proceed with this.
    Thank You,
    Swapna

    Hi Chander,
    You can read 0027 similar to how you read 0002 concatenation in PNPCE.
    Since, your original question was anwsered completely by Uwe, pl mark this thread as closed by clicking on the radiobuttons to the left.
    ~Suresh

  • Integrating new ext HD with Time Capsule and MacBook pro

    I just purchased a 4 TB Seagate Backup Plus that I’m looking to integrate with my mid-2009 MacBook Pro and 2 TB Time Capsule that I’m currently using to store my iTunes library (I know, bad move, one of the reasons for the new Seagate) and run my Time Machine backups.  If I can use the TC only as an external HD and backup with Time Machine to the new Seagate I’m willing to do that.  If I can’t, I understand the limitations of the larger capacity Seagate with the smaller TC.  Probably won’t top 2 TB for a while so I’ll cross that > 2 TB of info bridge when I get to it and need a larger drive for Time Machine backups
    The current plan is to move the iTunes library to the Seagate along with the new, and ever growing Aperture library (currently on the MB) while backing up both the MacBook and Seagate to the Time Capsule; unless I can switch them and use the TC as an ext HD and the Seagate for backups.  How do I go about doing this?  How do I answer the “Do you want to use this new drive with Time Machine” prompt being that I’m currently not planning on backing up to the Seagate but want to backup the Seagate up to the TC?  Do I need to reformat the Seagate disc?  Still figuring out how I want to configure the Aperture (which I’m still learning) library but I’d like to keep the mobility advantage of the laptop and use the internal HD for a working library and move the post-processed images to the Seagate for archival.  I’ll be checking on the Aperture forum.
    Thanks for any help to this incredibly newbie type question.  There’s usually a similar, but not exact, answer to my questions on forums or the threads are a few years old, so figured it would be faster and more accurate to just ask.

    I just purchased a 4 TB Seagate Backup Plus...  If I can use the TC only as an external HD and backup with Time Machine to the new Seagate I’m willing to do that.
    The Seagate Backup Plus portable drives are Time Machine compatible so you shouldn't have any issues backing up your MacBook Pro to this drive. You also shouldn't have any issues using the TC as an "external HD" if you actually meant "network" drive. That is, it will still be available on the network as a storage device.
    The current plan is to move the iTunes library to the Seagate along with the new, and ever growing Aperture library (currently on the MB)...
    That shouldn't be a problem.
    ...while backing up both the MacBook and Seagate to the Time Capsule
    Backing up the MacBook Pro using Time Machine will not be an issue, but you will not be able to use Time Machine to back up the Time Capsule to the Seagate. It may still be possible to use some other back up solution for this.
    How do I answer the “Do you want to use this new drive with Time Machine” prompt being that I’m currently not planning on backing up to the Seagate but want to backup the Seagate up to the TC?
    At this point, just answer "No." You can always choose the Seagate as a Time Machine destination later via the Time Machine interface. Again, you CANNOT back up the Time Capsule to the Seagate with Time Machine.
    Do I need to reformat the Seagate disc?
    If you got the Mac version of this Seagate drive it is already properly formatted. However, if you got the PC version, you will need to reformat it for HFS+ in order for the TC to share it out properly. That means you will need to temporarily connect it to your Mac, via USB, and then, use the Disk Utility to format it.

  • Can't remote connect to Integration Services 2008 r2 with 2012 Management Studio

    I am getting a Connect to Server error "Class not registered" followed by the trying to connect to 2005 information. It is not a named instance. I don't get the error when connecting with Management Studio 2008. Any ideas. Everything else is
    all set up properly..

    Can you try this workaround and see if it works?
    http://www.ssistalk.com/2012/03/21/connecting-to-a-pre-sql-2012-ssis-instance-with-sql-2012-ssms/
    Please Mark This As Answer if it helps to solve the issue Visakh ---------------------------- http://visakhm.blogspot.com/ https://www.facebook.com/VmBlogs

  • Integration between Time Management and Payroll

    I configured Time Management and Payroll....
    Before It created a problem in time management in absence quotas...
    for testing payroll I deactivated schema DAYPR that is time data processing....
    Generated absence quotas correctly
    Now I activated DAYPR still in display log i dont see any integration with time management....
    I changed the time management status to 7 and 9
    still its not integrating with Time Management
    what is that I want to do to integrate time management with payroll

    Payroll is not integrating with Time Management
    In Log I can see   No Time Management Integration
    I configured Time Management and Payroll....
    Before It created a problem in time management in absence quotas... it throwed an error in DAPPR
    for testing payroll I deactivated schema DAYPR that is time data processing....
    Generated absence quotas correctly
    Now I activated DAYPR still in display log i dont see any integration with time management....
    I changed the time management status to 7 and 9
    Payroll is running with out time management
    still its not integrating with Time Management
    l

  • Waht does time management status 0 without payroll integration mean

    In our project, the client does not want to use time evaluation and so, we have set the time management status value as 0 (no time evaluation). Also, the client is not implementing (at least now) SAP-Payroll, as they are processing payroll through a different software. We have configured work schedules ( they need just 4 different work schedules) and assigned appropriate ork schedules to all employees in infotype 0007. We have also configured one absence quota (Earned Leave of 20 days per year).
    My query is how will the system behave now with time management status value as 0? Can we process absence quotas? What is the use of work schedules, in this context, as any way the system does not evaluate employee time in Time Management. Neither the time wage types are evaluted in Payroll, as SAP Payroll is not implemented.
    -Shambhvi

    My thanks to all of you. I would like to summarize the answer for my query:
    Since time management status = 0, there won't be any time evaluation, which means attendance and absence data, even if entered won't be evaluated in Time Management. Since Payroll is not implemented, the question of time data getting evaluated in Payroll does not exist. However, absence quotas can be maintained, irrespective of the value of time managment status.
    Please correct me, if my understanding is wrong
    -Shambhvi

  • Time Management Status

    Hi Experts,
    Im relatively new to this fourm, and also to Time Management Module.
    We are implementing Negative Time Management for our client.
    Have a clarification with Time Management Status.
    I have suggested '0' to be defaulted as it is going to be Negative time management.
    Just for my understanding would like to know the difference between the time management status 0, 7 & 9.
    Also we have LWOP and Holiday Wages in place.
    your expert answers awaited...
    Cheers,
    Sri...

    Indicator 0 or BLANK:
    The employee's actual times are not recorded, and his/her time data is not accounted using the time evalulation program.
    Indicator 1:
    The employee's actual times are recorded and he/she participates in time evaluation.
    Example:
    The employee's actual times are recorded at a time recording terminal.
    The employee's actual times are recorded in the Attendances infotype (2002).
    Indicator 2:
    Employees' actual times are recorded and they take part in plant data collection. Their time data is accounted using the time evaluation program.
    Example:
    Employees' actual times are recorded using PDC systems.
    Employees' actual times are recorded in the Attendances infotype (2002).
    Indicator 8:
    This indicator is intended for external employees. The employee's actual times are not recorded, attendances are recorded in the Attendances infotype (2002), and time data is accounted in time evaluation.
    Indicator 9:
    You can use indicator 9 for employees for whom only exceptions to the work schedule are recorded. In this case, the employees' actual times are not recorded, but they do participate in time evaluation.
    I hope it helps you!!!
    CheerS!!

  • LSO & Time management

    Hi, we are using LSO with time management integration
    Does anybody know where SAP saves the link between a participation in a course and the correspondent attendance entry in infotype 2002?
    Thanks!

    Hi Silva
    If I understand your requirement correctly, you want to develop a report which would show the exact attendance hours of an employee for a Course but not the attendance hours stored against the attendance types (T77S0 attendance types).
    If the above is your requirement, I think you can still manage to meet this requirement by having Course Schedule (HRT1035) - Attendance Hours (IT2002 T77S0 attendance type). Because when you have a participant who is not present for a course I guess you would create absence in IT2001. When you create the absences and if that absence is colliding with attendance then attendnace record will be altered accordingly.
    You can use standard followup report and can copy and modify it to meet your requirement.
    If SAP had some kind of link (a field or function), will be very helpful for me
    I think you need modify standard LSO Followup Screen to have absence hours field, so that during course followup absence hours can be entered and the same need to be updated in Infotype 2001 which in turn will update the attendance hours and provide you exact attendance hours (Standard modification which is obviously NOT Recommended) LLSO_FOLLOWUP include i guess.
    Hope this helps
    Best Regards
    Reddy

  • Change Time Management status

    Hi All,
    We have presently uploaded all the employes in the system with Time management status - zero.  We would like to change the status from zero to 7 now.
    Please suggest me the best possible way to achieve this. Total employees in the system are close to 70k.
    Thanks,
    Binu

    Hey Binu,
    As Rashid said correctly, TMSTA feature is used to default Time Management Status i.e when you create or change then it will default the TMSTA value. Its of no use to you.
    I would recommend BDC method because for LSMW you will have to create a file and upload it.
    Write the BDC using below logic.
    1. Select the Active employees using PA0001-PERSK = 1.
    2. Change (MOD) the TMSTA of IT 0007 to your requirement
    Selection screen can have employee numbers.
    Ask you ABAPer to record the screen using SHDB for changing the IT 0007 i.e
    1. PA30 - select your EE - IT 0007 - Change
    2. On IT 0007 you change TMSTA and SAVE
    IT should be done in no time.
    cheers
    Ajay

  • ESS-portal integration with Time and Travel management(HR) in R/3

    Hi,
         Im doing with ESS-portal configuration with Time and Travel Management in R/3,So please kindly send me Documents for integration part.I'll b so thankful if u people send me docu as soon as possible.
    send me documents to [email protected]
    thanks
    pavi

    Hi
    Please go through this functional module HRMS_BIW_EXTRACT_PY1 in r/3 side to know the exact table where u r getting the data.
    There are lot of tables involved in HR-payroll info types.
    As far as your problem is concerned you take one employee and go to PA20 and analyse the payroll for each week or twice a month (depends up on ur client)
    run the report on the payroll cube and find out exactly what u want.
    Thanks
    Roopa
    Assign points if help full

  • Document on Positive Time Management & Integration with payroll

    Hi,
    Can any one suggest me any link from where I will get the IMG steps of Positive time management implemetation, time evaluation, time wagetype detail as well as the steps of integration with payroll..
    Thanks in advance.
    Ajay

    Hi Chandrashekar,
    Can you please advise how actually the transfer of clock times from time recording terminals to SAP R/3 will work?
    I read from help.sap.com that there is a SAP certified CC1 interface (BAPI based) which can be used for this purpose. However, in such a case, the time recording terminals should be SAP CC1 certified.
    If the time recording terminals are not SAP CC1 certified, then what is the method to be used? Will we write a custom BDC program in this scenario and what all should be considered in functional specification of such a BDC program.
    Please advise.
    Thanks and warm regards,
    Vianshu

  • Integrating Shift Planning in PP with Negative Time Management in HR

    Hi Experts,
    How to integrate shift planning in Production Planning with the negative time management in HR.
    Please advice.Thanks in Advance.
    Regards,
    IFF
    Edited by: IFF on Nov 4, 2010 9:58 AM

    I think it is in
    V_T77S0   Group name is PEINS please try
    got it
    PEINS     VARTI     05     Substitution type for shifts in the actual plan (s
    PEINS     VARTS     02     Substitution type for shifts in the target plan (s
    PEINS     VARWI     06     Substitution type for working time preferences (se
    PEINS     VTART     X     Change of substitution type in shift plan active
    Edited by: Sikindar on Nov 4, 2010 12:32 PM

Maybe you are looking for

  • How to open a popup and get some data from a model class

    Hi experts, mi problem is the next. I am opening a popup from a view that is  controlled by a controller named identificador.do, the controller class is z_identity_cl. the window that is opened is other view controlled by nocupentes.do, with a contro

  • System Update 5.0.2 fails to install on Windows 8.1 Preview

    I am trying to install System Update 5.0.2 on a W520 running a fresh install on Windows 8.1 Preview.  Solution Center is already installed.  No other software has been installed on this box, other than standard windows updates. When I try to install

  • Calling a .m file from inside a mathscript node

    hello all i am hoping someone can help me out, I am in the process of converting our version 7.11 matlab node vi's to mathscript (I hope) AND I HAVE RUN INTO AN ISSUE. we have a very simple matlab script that bundled the data and sent it to another m

  • Question about restoring from backup

    The local Apple store swapped out my iphone 4 for a new one yesterday because of issues with the headphone jack. When I restored from backup, all texts, contacts, call records, etc. moved over perfectly. However, it didn't copy my books, music or pho

  • Convert to PDF error

    I bought convert PDF a few weeks ago and about 90% of the time I try to convert a PDF, no matter what the file is, an error message comes up and it does not covert for me. What is the problem here?