Integration Process never starts

Hi everybody,
in my scenario, I'm getting an IDOC an I'm sending it to two Services (two receiving services in receiver determination): a) a BS with a mail communication channel b) to an integration process.
In first case a), the file is sent via mail correctly. In second case, it seems as if the integration process is never executed, but I don't get any error messages.
- I checked receiving interface of integration process and of receiver determination: both are the same
- in SXMB Moni, there are two entries for the split in the receiver determination; both show the final flag for correct execution
- but in SXMB Moni, there is no entry shown that I can see, that execution of the process at least started
- in SXMB MONI BPE, there is no entry for the IP
- the tRFC-queues show no failures.
Has anybody an idea?
Best regards
Torsten

Is your event queue switched on and background job active? ( tcode: SWEQADM )?
Also check this blog
/people/krishna.moorthyp/blog/2005/11/28/inactive-integration-process-ip-at-run-time
Message was edited by: Jay

Similar Messages

  • Merge to HDR and Photomerge have stopped working. Process never starts!

    I have a problem with Merge To HDR and also photomerge. The issue appears to have the same cause. Basically what happens is as follows:
    1. Open Photoshop
    2. Goto File->Automate->Merge To HDR Pro
    3. Dialog box appears.
    4. I select the files stored on HDD
    5. Click OK
    And then nothing happens... No screen appears, no progress bar, no dialog box of any kind. Photoshop continues to work fine as if I had just opened it.
    The other issue is even more strange.
    1. Open Photoshop
    2. Open the files that I wish to merge (saved on the HDD)
    2. Goto File->Automate->Merge To HDR Pro
    3. Dialog box appears.
    4. I select the 'Add open files' option
    5. Dialog box appears telling me that the files must be saved before they can be merged.
    The exact same issues occur with Photomerge as well.
    I am using a 15" MacBook Pro (Early 2011) with 4GB RAM, 500GB HDD (100 GB free), 2GHz i7 processor. Currently running OSX Lion 10.7.2. My current Photoshop version is 12.0.4 and I am running it on 64 bit (although have tried in 32bit mode).
    This is a link to a screencast I made which documents the issue (with a completely new user): http://youtu.be/6_jltW-f34Q
    I have had this issue before but was never really resolved. I contacted adobe and was told to try various things like creating new users, deleting preferences and even uninstalling and reinstalling my entire CS5 package.
    The problem resolved when I upgraded my Mac to OSX Lion, although I have no clue why. Now the issue has returned and is extremely frustrating.
    Cheers, Jeremy
    EDIT: Probaby should've said how do i fix this?

    I am having the same problem> My HDR & Photomerge are broken!
    Recently the functions for moving multiple images into HDR & Photomerge via Tools and Automate is not working. When I try I get dialog boxs that are incorrect and the software will not allow it.
    I've update, removed added items from Photoshop, have plenty of memory devoted to Photoshop, spent hours working with Adobe tech, now waiting for an answer from them takes 72 hours.
    Has anyone else experienced this and have you found a solution?
    HELP ! PLEASE !

  • Integration Process does not start

    Hi guru's
    My scenario is this. From ECC we send Idocs to PI. We have an integration process to receive the idocs because only max 9999 are passed in the port.
    We run just around 11000 CREMAS idocs now.
    The problem is that the integration process does not start on our QA environment while it does start on DEV environment.
    I've run many checks on both environments and they all look the same.
    To name a few:
    * Cache are all green and up-to-date.
    * I checked the WF models which are behind the Integration Process and they are the same.
    * Event correlation is correct in both environments
    * When i test the idocs are correctly sent from ECC to PI.
    However on DEV I see in transaction SXMB_MONI_BPE i see that the integration process is triggered and started. It waits 10 minutes and collects any messages that come in, and then bundles these and sends them on to the receiver.
    On QA i do not see the Integration Process being started. Only records i see in SXMB_MONI_BPE are three work items, 2 completed, 1 ready, all 3 are called waiting for event.
    I'm probably missing some configuration somewhere but what could it be?
    Regards
    Robert

    Hi Eng Swee,
    Thx. I checked it already and it works fine.
    Meanwhile i did do some changes and some retests and now i saw somewhere that all my tests were creating more steps in an already started integration process, that was still waiting.
    I now cleared some old workitems and started afresh.
    What i see now is:
    1)  the BPM process start correctly
    2)  it receives 1 or 2 or 3 or n messages
    3)  it then waits for the deadline to finish, i.e. it should run for 10 minutes and then proceed to the next step which is sending the collected idocs to receiver.
    On DEV the deadline works fine. On QA it doesn't.
    IN SWU3 i have done the customizing and it shows green, so that part is OK.
    Still the deadline is passed and it doesn't have the desired effect on mu BPM process (workflow).
    Are there any other checks i can do to see if the deadline mechanism is properly working?
    Is there a maybe a manual step i can do to trigger the deadline? Then at least i get some information on where the real problem is.
    (Sorry for earlier confusion but i hadnt realized that there was still a process running)
    Regards
    Robert

  • Can one start Integration Process on it's own?

    Hi,
    we have requirement where Integration Process should make RFC call to R/3 system. And the return from RFC is then processed further in Integration Process. Actually there is infinite loop & wait steps in IP, within this infinite loop, we want to call this particular RFC (which has some business logic in it) and this RFC will send some data from R/3 and based on return we want to process further. How can we start Integration Process, which has send as first step (rather then recv).
    We want to automate this process rather than to initiate within R/3?
    Thanks.

    Hey
    We can not have Send as the first step in IP.You need to have a Receive step as the first step in any IP.
    also to answer your question,you can not run IP individually,it needs to receive data from some source system.
    Thanks
    Aamir

  • Return-Code 99 of integration-process in TR  SXI_CACHE

    Hallo,
    in TR SXI_CACHE my integration-process has the return-code 99 (process cannot be activated). On selecting in the tree (left side) and dobble-click of my process following comes up:
    </properties>
    - <lines>
      <line id="208" predid="207" succid="5" parentid="207" order="0" linetype="DEFAULT" />
      <line id="213" predid="7" succid="13" parentid="207" order="0" linetype="DEFAULT" />
      <line id="214" predid="13" succid="9" parentid="207" order="0" linetype="DEFAULT" />
      <line id="215" predid="9" succid="59" parentid="207" order="0" linetype="DEFAULT" />
      <line id="217" predid="59" succid="97" parentid="207" order="0" linetype="DEFAULT" />
      <line id="219" predid="97" succid="89" parentid="207" order="0" linetype="DEFAULT" />
      <line id="220" predid="89" succid="21" parentid="207" order="0" linetype="DEFAULT" />
    The XML page cannot be displayed
    Cannot view XML input using XSL style sheet. Please correct the error and then click the Refresh button, or try again later.
    End tag 'prperty' does not match the start tag 'property'. Error processing resource 'file:///C:/W2KMF/Profiles/schmitf/Loc...
    <property id="59" guid="d56d20d4195e11daafd60003ba0ff8f5" name="SendMsgSyncResponse" counter="0" type="EXPR" valueType=""...
    n-left:1em;text-indent:-2em">   <line id="222" predid="21" succid="23" parentid="207" order="0" linetype="DEFAULT" />
      <line id="224" predid="23" succid="25" parentid="207" order="0" linetype="DEFAULT" />
    After activating the process once more the detail-information comes up. Then i see the error steps (Message-Type = E). So for example:
    Der Wert des Ausdrucks '&CH_EVENT_TAB_DATA.PAYLOAD.ERROR&' kann nicht als Quelle einer Zuweisung dienen (expression cannot be the source of an assignment)
    But in the integration-process this seam to be good. What can i do? Delete the container-element and create a new one?
    Thanks in advance,
    Frank

    Hallo,
    when i have a look at the details after acitvation my integration-process (with returncode 99) I make changes in my process. But after refresh there are the old items are still there. What´s about the Button "delete runtime Version" in the acivation step? Can i so delete this process in my cash? Have i to make a new integraion-process-object? After copy one process and giving a new name the same problems occures? What is the best solution?
    Thanks,
    Frank

  • BPM - ERROR while Activating Integration Process

    Hi,
       I am unable to activate my Integration Process if i use Transformation step between Receiver and Sender step.
    The ERROR Log is given below:
    Activation of the change list canceled
    Check result for Message Mapping Msg_Mapping_BPM_File | http://sap.com/xi/File_BPM_File: 
    Starting compilation 
    Compilation complete
    Check result for Integration Process Integration_Process_BPM_File | http://sap.com/xi/File_BPM_File:
    Expression must return the interface type MI_Outbound
    Check result for Integration Process Int_Process_File_BPM | http://sap.com/xi/File_File_BPM: 
    Source parameter MI_File_Outbound | http://sap.com/xi/File_File_BPM not set
    Target parameter MI_File_Inbound | http://sap.com/xi/File_File_BPM not set
    Regards,
    Prashanth

    Hi Prashant,
    Pl check if  u have used the abstract interfaces in the interface mapping.. I think thats where the problem is.
    Regards,
    Divya

  • BPM Integration Process that correlates 2 messages.

    I have an BPM Integration Process defined that collects Deliveries for an Order number and when an Invoice arrives for the same Order number it merges the messages to produce another file that is for a 3rd party.
    I correctly receive in the Delivery and the Invoice u2013 I can see them in SXMB_MONI with a checkered flag and they are directed to my BPM.  I can see this also in SXMB_MONI_BPE.  I can also see the correlation correctly found in both messages.  No error is reported by either SXBM.. transaction.
    However it does nothing except receive the files u2013 I am expecting a transformation and then the send step to execute.
    Start >  CollectIDOCBlock  > Collect Fork
    Fork1
    Infinite Loop for Receive Delivery (Start process) and Collect in Container. It uses and activates Correlation OrderNum
    Fork2
    Receive Invoice uses Correlation OrderNum (it does not activate the correlation)
    At the end of the Fork (when Delivery collected and an Invoice is received)
    It will then do the Transformation and Send Step.
    <End
    I have tried various combinations of the correlations and which receive step starts the process.  Any ideas ?

    Yes that did work.  Now does somebody know what exactly the FORK parameter number of branches does ?
    The SAPHelp is here
    http://help.sap.com/saphelp_nw04/helpdata/en/08/16163ff8519a06e10000000a114084/frameset.htm
    +You can specify the required number of branches and then define whether the process must run through all branches, or just a particular number of branches+
    But it does not explain why you need to have 1 as necessary branches rather than 2.  There are 2 branches in the FORK - so why does having 1 as the parameter work and not 2.
    In this SAPHelp for Message-Dependent Loop
    http://help.sap.com/saphelp_nw04/helpdata/en/08/16163ff8519a06e10000000a114084/frameset.htm
    it indicates to me that the parameter should be 2.
    BUT the SAP pattern (BpmPatternCollectMessage) I have used as a base for mine has this as 1 and not 2.
    Why is 1 the correct value and not 2 ??

  • Spliting a Message to reuse an Integration Process made for a single one.

    Hi,
    I have a Integration Process that works well for a XML message of the type:
    <EMESSAGE>
      <PERSON>
        <TAG_1>
        <TAG_2>
      </PERSON>
    </EMESSAGE>
    My BPM process the data for the Person correctly.
    Now I want to be able to tried more than one person per input message, some thing like:
    <EMESSAGE>
      <PERSON>
        <TAG_1>
        <TAG_2>
      </PERSON>
      <PERSON>
        <TAG_1>
        <TAG_2>
      </PERSON>
      <PERSON>
        <TAG_1>
        <TAG_2>
      </PERSON>
    </EMESSAGE>
    I build a 1:n Interface Mapping that creates me the following structure:
    <Messages>
    <Message1>
    <EMESSAGE>
      <PERSON>
        <TAG_1>
        <TAG_2>
      </PERSON>
    </EMESSAGE>
    </Message1>
    <Message2>
    <EMESSAGE>
      <PERSON>
        <TAG_1>
        <TAG_2>
      </PERSON>
    </EMESSAGE>
    </Message2>
    <Message3>
    <EMESSAGE>
      <PERSON>
        <TAG_1>
        <TAG_2>
      </PERSON>
    </EMESSAGE>
    </Message3>
    </Messages>
    But when I use a ForEach Block in my new BPM, it doesn't work if there is more then 1 person in the input. The error message I got is:
    <?xml version="1.0" encoding="utf-8" ?>
    - <MappingTrace>
      <Trace level="1" type="T">Mapping-Namespace:http://domain.com/xi/domain_4</Trace>
      <Trace level="1" type="T">Mapping-Name:IM_CPM_AbsSync_to_N_CPM_AbsSync</Trace>
      <Trace level="1" type="T">Mapping-SWCV:3E235261F43111DDB40AC952C0A80C15</Trace>
      <Trace level="1" type="T">Mapping-Step:1</Trace>
      <Trace level="1" type="T">Mapping-Type:XSLT</Trace>
      <Trace level="1" type="T">Mapping-Program:CPM_to_N_ContextPersonMessage</Trace>
      <Trace level="3" type="T">Mapping has one input message.</Trace>
      <Trace level="3" type="T">Dynamic Configuration Is Empty</Trace>
      <Trace level="3" type="T">Multi mapping required.</Trace>
      <Trace level="3" type="T">Creating XSLT mapping CPM_to_N_ContextPersonMessage.</Trace>
      <Trace level="3" type="T">Load 3e235261-f431-11dd-b40a-c952c0a80c15, http://domain.com/xi/domain_4, -1, CPM_to_N_ContextPersonMessage.xsl.</Trace>
      <Trace level="3" type="T">Search CPM_to_N_ContextPersonMessage.xsl (http://domain.com/xi/domain_4, -1) in swcv 3e235261-f431-11dd-b40a-c952c0a80c15.</Trace>
      <Trace level="2" type="T">Call XSLT processor with stylsheet CPM_to_N_ContextPersonMessage.xsl.</Trace>
      <Trace level="2" type="T">Returned form XSLT processor.</Trace>
      <Trace level="3" type="T">XSLT transformation: CPM_to_N_ContextPersonMessage.xsl completed with 0 warning(s).</Trace>
      <Trace level="3" type="T">Dynamic Configuration Is Empty</Trace>
      <Trace level="1" type="T">Content Type application/xml</Trace>
      <Trace level="1" type="T">No interface specified for parameter 2</Trace>
      </MappingTrace>
    Does someone have any idea or a suggestion on how to reuse my BPM that works for a single person?
    Thanks in advance for your suggestions.
    greg

    ok no success for the moment, so I will try to describe my BPM more precisely:
    The DT I use can contain up to 1'000 PERSON record inside a unique EMESAGE reccord (the root element)
    My containers: (all are of type Abstract Interface of my DT)
    Input (Process)
    requestList(Process) Multiline
    request(block)
    response(block)
    Receive Request Step
    Message: input
    Start Process: Yes
    Mode : Async.
    Split (Transformation) Step
    IM: My Interface that does the 1Message with N PERSON records to N Messsages with 1 PERSON record
    Create new transaction: Yes
    Source: input
    Target: requestList
    Block Step
    Mode: ForEach
    Block Start: New transaction
    Block End: New transaction
    Multiline_Element: RequestList
    CurrentLine: request
    No end condition
    Inside the block
    My Sync Send call to a BAPI
    Source: request
    Target: response
    A final Async Send step
    Message: response.
    The workflow stop at the Transform step, as if hte fact that many messages come in result could not be handled back. Here are the details for the Interface mapping used in the transformation step:
    Source: MyDataTypeAbstractAsynchroneInterface
    Occurrence: 1
    Destination:
    Occurrences: 0:unbounded
    Mapping program: the following XSLT:
    <?xml version="1.0" encoding="UTF-8"?>
    <xsl:stylesheet version="2.0" xmlns:xsl="http://www.w3.org/1999/XSL/Transform">
         <xsl:output method="xml" version="1.0" encoding="UTF-8" indent="yes"/>
         <xsl:template match="EPERSON">
         <ns0:Messages xmlns:ns0="http://sap.com/xi/XI/SplitAndMerge">
                   <xsl:for-each select="CONTEXTPERSON">
                   <xsl:element name="ns0:Message{position()}">
                   <EPERSON xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="ContextPersonMessage">
                        <xsl:element name="CONTEXTPERSON">
                             <xsl:attribute name="personid"><xsl:value-of select="@personid"/></xsl:attribute>
                        </xsl:element>
                        <!--End of CONTEXTPERSON> -->
                   </EPERSON>
                   </xsl:element>
              </xsl:for-each>
         </ns0:Messages>
         </xsl:template>
    </xsl:stylesheet>
    Still any suggestions ?
    The trace of the error is the same as before, so I won't copy paste it again.

  • Sending step in Integration Process waiting for Acknowledgement infinitely

    In process I had to send an MATMAS, CLFMAS and CNPMAS. The data for
    this IDoc comes in one message from third party system. So, my
    Integration Process has receive step (to collect a data), and three
    send-steps (for MATMAS, for CLFMAS, for CNPMAS), one by one. The
    receive-step catch an inbound message and then (without transforms)
    send this message to each of this three send-steps in Asynchronous
    mode. The inbound message transforms in Interface Determination to
    IDoc. Three steps, one Interface Determination with three conditions,
    that looks
    like «ProcessStep=send_matmas», «ProcessStep=send_clfmas», «ProcessStep=s
    end_cnpmas», and in this place I set a mapping to transform inbound
    message to IDoc. All send-steps has property Acknowledgement, which set
    to Transport value. So in first send-step MATMAS goes to R3, then R3 in
    response send ALEAUD IDoc (trans WE05 shows an incoming MATMAS and
    outgoing ALEAUD); ALEAUD comes to XI (trans IDX5 shows inbound and
    outbound messages), but ALEAUD didnu2019t transforms to XI Acknowledgement.
    And there is no any CLFMAS or CNPMAS, because all processes sleeps in
    their first send-steps (trans SWWL shows a many STARTED processes).
    Each send-step waits for event u2018SEND_OK_TRANSPORTu2019. Moreover, if I use
    trans sxmb_moni to monitor this situation and if I press refresh (F5
    button) every time, sxmb_moni every time requests a status of
    Acknowledgements, XI transform ALEAUD to Ack, send-step in process
    catch this status, process wake up and moves to next send-step (which
    sends an CLFMAS and waits for Ack). By continuously pressing refresh
    (F5) in sxmb_moni all process becomes COMPLETED (trans SWWL), all
    ALEAUD transforms to XI Ack and all IDocs goes to R3. But pressing F5
    itu2019s not a solution for integration.

    Hi Igor,
    I dont think your manual refresh changes the status . The status changes is the status change of GUI . The system will take how much so ever it needs to take and not as per your manual refresh.
    Regards
    joel

  • Integration Process w/ return code 99

    Have a very weird situation with an integration process. In our development environment, in SXI_CACHE, it returns a return code of 99 signalling some type of error. The weird problem is that the process works just fine. It's an IDOC to flat file scenario and the flat file gets generated each time perfectly. This is with the process status of 99 in SXI_CACHE.
    However, when the process is moved to QA, it does not work at all. The messages get stuck in SXMB_MONI with message "message has error on outbd. side". When I click on the PE to view the error, it appears the workflow behind the process is defined incorrectly becasuse in the event trace I see:
    <b>Workflow definition of task 'WS90100009' cannot be activated.</b>
    The reason for this error is
    <b>Container element '_CRL_I001ZMTRLNO_0025' not available</b>
    What is killing me is that this same error occurs in our development environment, yet the process still works fine.
    Can someone possible explain what the container error might mean and how to fix? The workflow never gets kicked off because the definition is not active.
    Thanks

    all green in that transaction...
    in the process, i have two branches.. one to receive a MATMAS the other to receive a ZCLFMAS IDOC....
    a file gets generated when any of the following conditions occur
    - both IDOC's are received for the same material
    - only MATMAS or ZCLFMAS are received and the other message type is not received within 3 minutes... we have time controls on the two branches
    the error is in the initial receive step...keeps saying that container element is not available yet I have no idea what that means

  • BPM - Simple integration process

    Hi guys,
    I'm new at BPM and I've created a simple process. Looking at the weblog "Walkthrough with BPM" by Krishna, i was able to create the simple scenario:
    Source System -(File Adapter)->BPM-(File Adapter)->Target System.
    Now imagine I wanted to include two more actions.Meaning, I'd like to repeat the process.
    So we would get,
    Source System -(File Adapter)->BPM-(File Adapter)->Target System -(File Adapter)->BPM-File Adapter)->Source System
    When I create this in the integration process, i'll have a:
    Start->Receiver->Sender->Wait->Receiver->Sender->End
    But he asks me for Correlations. Can you give me an idea about it? I've looked at the pdf's but the idea is still blurry...

    Hi Goncalo,
    Check my post in this thread..
    Correlation
    Since you have two receive steps in your BPM you need to correlate the message received by the first receive step  with the message received by the second receive step.
    Anand
    Message was edited by: Anand Torgal

  • Transactional Behavior of an Integration Process

    Hi All,
    As I have to optimise an existing BPM, to have some idea, I was going through the link describing 'Transactional Behavior of an Integration Process'.
    http://help.sap.com/saphelp_nw04/Helpdata/EN/25/a45c3cff8ca92be10000000a114084/frameset.htm
    which tells tas follows.
    'At runtime, the system normally creates a separate transaction for each step. The transaction then covers this step only. However, you can influence the transactional behavior of particular step types. In the step properties, you can define that the system is not to start a new transaction when the step is executed. The system then executes the step in the transaction that was started at the time of execution. Consequently, no background work item is created for the step and the database does not need to be accessed. In this way you can improve system performance'
    But I am not able to understand, how to implement that for any steps. Could you please explain?
    Regards,
    Subhendu

    Hi Subhendu,
    i ve got some doubts it was in SP 17 available. Please search at [Release Notes for SAP Exchange Infrastructure|http://help.sap.com/saphelp_nw04/helpdata/en/c9/9844428e9cbe30e10000000a155106/frameset.htm]
    Regards,
    Udo
    Edited by: Udo Martens on Feb 5, 2009 3:38 PM

  • Could not invoke a web service in an integration process from a portal

    Hello,
    I am a WebLogic user. I am using WebLogic 8.1. I created a process project which integration a few web services. The last service in the process is named "Alert Service". I also create a WebLogic portal to invoke the the Alert service in the process. After I run the process in WebLogic workshop, I run the portal. I met the issue like:
    <i><b>An error has occurred:
    An exception occurred in the action showAlert
    EJB Exception: ; nested exception is:
    com.bea.control.ServiceControlException: SERVICE FAULT:
    Code:java.io.FileNotFoundException
    String:Response: '503: Service Unavailable' for url: 'http://dbaldridge3000:7001/JC2Collab/JC2/collab/alert/Alert.jws'
    Detail:
    END SERVICE FAULT
    caused by: : com.bea.control.ServiceControlException: SERVICE FAULT:
    Code:java.io.FileNotFoundException
    String:Response: '503: Service Unavailable' for url: 'http://dbaldridge3000:7001/JC2Collab/JC2/collab/alert/Alert.jws'
    Detail:
    END SERVICE FAULT</b></i>
    I created a portal domain and extended the workshop and integration domain to the portal domain server. both the process and the portal are running on this server. If I don't run the workflow process, but run the Alert service only and then run the portal, there is no exception.
    The portal was created using the Alert service's control.
    Why did the integration process hide its service so that the portal could not find it ? Should I run the integration process and the portal in separate domains (servers) ? Should I start two WebLogic platforms ?
    Thanks in advance.
    Di

    I reproduced this error in another way by using portal only. I created a portal with a portlet which can invoke a meeting service. I posted two methods in the meeting service to the portlet - listMeetings and getMeeting. The portlet was generated automically from the meeting web service control. I invoked the listMeeting from the portal at first. The meeting info was displayed on the portal page. Then I invoked the getMeeting by entering a meeting key got from the first step. For the second call, the same exception was thrown.

  • Slow paralel processing (parforeach) in an integration process

    Hi all,
    I've an integration process with the following steps:
    1) Receive a message;
    2) Transform: map this message to a multiline message;
    3) Block: configured for parforeach mode, it send assynchronously the message n times (each line from the multiline message is a new message).
    I'm putting 50 messages in this integration process and the difference between the first and the last message processed is 65 seconds. I have the following questions:
    1) Is this process slow in our system or this time is expected?
    2) Where can I make this process faster?
    Another question is: Is BPM and Integration process the same thing?
    Thanks for any help,
    Alessandro.
    XI 3.0, SP10 in HPUX with much RAM

    Hi Frank,
    in case you are using QoS EO you will be able to tune partially through the tuning parameters in the integration engine (sxmb_adm), although I think you probably know that. However there are additionally some issues you could consider.
    Regarding your question of setting the rfc adapter max connections to 50 I would strongly suggest you NOT to do it. I imagine you will get outofmemmory errors in doing that. Start with a lower number, perhaps 5 is ok, and then you can test, raising this value a bit, but 50 seems to me to be too high. You could also think about tuning in the visual admin, the Messaging system service, that is, SAP XI AF Messaging, parameter "messaging connections", the values for consumers, recvmaxConsumers, call max consumers, rqst max consumers etc. Additionally tune the MaxThreadcount parameter. The tuning guide advises you to set a 300, but you could test other values too.
    Be careful, again when doing this tuning, because when trying to have high numbers, as I explained you, you may have memory problems because the heap size runs out. It will not always be good to increase the heap size excesively. Instead, it is much better to add an extra node for this purpose.
    I hope this helps you a bit. Regards, Jaime

  • BPM x Integration Process

    Heya guys,
    longe time no see.
    I'd like to start a conversation on the following subject: how do you understand the difference between business processes and XI's integration processes. This idea was inspired by the recurrent confusion that some clients and some managers make about those (or maybe I'm the confused one).
    In my view, integration processes are such that they shouldn't require any human intervention, and are designed with respect to systems (systems which XI access or systems that access XI). They are important mostly for the IT techs responsible for the systems integration.
    On the other hand, business processes may have human intervention (aprovals, data filling etc) and are designed with respect to the key user whose action will be required in that specific step of the process. They are important for the end users which use the process in a daily basis and also for the managers and directors for analyzing purposes.
    The problems begin when the users want to understand the integration process as if it was a business process. Want to check in which specific step it is at this moment (as if in Guided Procedures or Solution Manager). In my opinion integration processes shouldn't be trackable like business processes simply because it is not what they are intended for. They are similar tools for completely different applications.
    I think SAP has kinda understood that since they are changing XI process naming to integration process instead of BPM. IP is not a BPM, and it shouldn't be.
    Any comments?
    Regards,
    Henrique.

    I completely agree with you Henrique. BPM deals with the integrating people also where as the integration processes doesn't. But in XI, the integration process concept is linked with BPM which is very much confusing.
    Actually most of the things we do in the integration process in XI like, fork,loop, switch etc can be done without using any BPM in webMethods, TIBCO.
    May be in future SAP will come up with more appropriate conventions so that people will not be get confused what exactly is integration process and BPM.

Maybe you are looking for

  • How do I correct a problem with PDF Portfolio Links

    Problem with links. Converting a page from MSWord to PDF is presenting problems: I have changed preferences to deselect the Convert Word Bookmarks option; The straight conversion retains the links; Adding the file to PDF portfolio breaks the latest l

  • Grey Screen in iPad Content Viewer when swipe through the last slides of the articles

    Some of co-workers and clients reported and issue with the presentations and the viewer: some times grey screens appear when swiping in an presentation from article to article (reproducible only for the last slide of the article). Pre-conditions: 1.

  • Authenticate ADF application using adf security wizard against LDAP OID

    I have an adf application which i intend to authorise using LDAP. For now , i have actually hand coded in java for authenticating the users of my application. Using JNDI I directly connect to LDAP and authenticate users. However , recently it came to

  • Dynamic tooltip for a link

    Hi, I have a requirement to display a dynamic tooltip when the cursor is placed on a cell of a table. The cell contains a link. Is it possible in OA framework? How can we achieve this? Divya.

  • Convert to MP3 Loses Some Volume

    When I convert a text to speech .aiff to .mp3 in iTunes, I find that the volume goes from -9.4 db to -14.4 db. I don't want any of it to be - (minus) anything at all from the get go. But then when it goes lower, it's getting harder to hear. No idea w