Integration Server in SLD
Hi,
In our SLD under Business Systems definitions all of our "Related integrated Server " fields have no values (No Intgration Server is defined"). I am trying to understand where I am missing an entry in SLD for the integration servers.
Thanks
Hi SUnil,
Hope this document, helps in fixing your issue.
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/uuid/ac6de690-0201-0010-54ac-8923089dcc97
take a spl look at point: 8.3
Regards
Vishnu
Similar Messages
-
Error CIM_ERR_FAILED - Configure the integration server for sld
Hi,
I´m running the Configuration Wizard SLD in "PI_00_This wizard will execute Postinstall steps of technical configuration for the PI Usage". In step 33/142 Configure the integration server for sld, I got following error:
Error: CIM_ERR_FAILED: Qualifier MAX(1) violated for property reference SAP_XIIntegrationServerLogicalIdentity.SameElement
Someone help me?
Regards,The version is 7.0. I skip this step and finished with sucess. No run the step:
PI_00_This wizard will execute Postinstall steps of technical configuration for the PI Usage Cancelled
PI_01_This template checks if the necessary services are started Cancelled
PI_05_This wizard will configure the integration server for sld Incompletely executed
These steps are with the same error.
Error: CIM_ERR_FAILED: Qualifier MAX(1) violated for property reference SAP_XIIntegrationServerLogicalIdentity.SameElement -
Use of Related integration Server in SLD
Hi all,
I understand that Related integration Server from SLD is used when we have proxies. Is there any other use for it?
cheers
danusHi,
The Related Integration Server is used to assign your Business System to a Transport Group.
When you create a Transport Group in the SLD you assign the corrsponding Integartion server to this transport Group.
Now, when your create a Business System and assign the Related Integration server , this assigns the Business System to the correspinding Transport Group.
The best use case is when you have a single SLD being shared between Dev , QA and Prod.
The Related Integartion Server has nothing to do with proxuies.
Regards
Bhavesh -
Integration Server in SLD shows no System
Hello,
I have the following problem. When I log into the SLD, go to technical System, filter for XI then I See Adapter Engine, Integration Directory etc. For each of them the column System is filled (SAP-System and Host). Only for the Integration Server it isn't.
And when I log into the Runtime Workbench and select Configuration then I et an error that no Integration Server is available in the SLD.
Does anybody know what is the problem for that.
thanks
MichaelaHi,
The best way what you could do is goto transaction RZ70 and enter the appropriate details in the SLD Bridge tab
then do the proposal and finally press the esecute button to start the data collection.
This will automatically create an entry in the SLD then you need to maintain business system manually.
But before executing the data collection remove the existing IS server info if it's already present.
More details on this can be found in XI Post installation document.
RGds,
Vasanth. -
[XI] Missing related integration server in SLD
Hi Experts.
I'm very new in SAP Netweaver and it's components. Now I study <b>XI</b> and I would like to config some simple scenarios (FILE-XI-FILE etc). My colleague have installed XI on our machine and everything set up as well. I started with <b>SLD</b> in order to configure Technical systems and Bussiness systems. At first, I configured <b>Technical system</b> as <b>Third-Party system</b> and then I start to configure <b>Bussiness system</b>. I used Third-Party system as well and when I was on the last step of the Business system wizard. The Business System role was preddefined (Application System) and unabled to change. I wanted to choose from the List of Related Integration Servers, but there is <b>nothing in the list</b>. Now I'm helpless and I don't know how to get the name of the integration server to the list. Could anyone help me with my issue? Any help would be welcome. ThanksHi
Thank you for your help. Your posts were helpful, but it didn't solve my problem yet. Look at that scenario: <a href="/people/srinivas.vanamala2/blog/2007/02/05/step-by-step-guide-xml-file-2-xml-file-scenario-part-i:///people/srinivas.vanamala2/blog/2007/02/05/step-by-step-guide-xml-file-2-xml-file-scenario-part-i. I have exactly followed <b>that scenario</b> and in the <b>step 6</b> I wanted to choose <b>related integration server</b> (in that scenario it's <b>SXI</b>) but I have an <b>empty list</b> of my related integration servers. In SLD I tried in Administration->Content Maintenance->(subset)Landscape Description->(class)XI Domain and I found out that there are <b>XI Contained Adapter and XI Contained Integration Server</b> associated with it. So is there needed some configuration in Content maintenance in order to solve my problem. Probably my question isn't very well described, but I'm sorry because I don't have any experience with XI and I just started with it. <u><i><b>So my question again: How will I get the name of my integration server to be in that list (like in that scenario in step 6 ...)?</b></i></u> -
Business System of type Integration Server In SLD .
Hi
Can anybody tell what is the criteria on which we decide whether a business system to be created in the sld should be of type Integration Server or Application System .
And also can we have only one Business system of the type integration server in the sld ?
Can anyone please explain the concept behind this.
Thanks
Nilesh.
Edited by: Nilesh Taunk on Jun 19, 2008 7:24 AMhi,
steps to create a business system
https://www.sdn.sap.com/irj/sdn/wiki?path=/display/xi/flatFILETOFLATFILE&
If there is no business system for integration server, that means the post installation steps are not completed or someone messed with the business system for integration server.
To define a business system, follow post installation steps from install guide.
http://service.sap.com/instguides
SAP NetWeaver -> Release 04 -> Installation -> SAP XI -> Installation Guide - SAP Exchange Infrastructure 3.0 SR1 follow page 38
If you do not have integration server, that means your XI will not work.
Thanks,
Vijaya -
How to create Business System in SLD with Role "Integration Server"
Hi,
We were trying to create a Business system of role "Integration Server" in SLD. However, we are getting an error saying "There is already an Integration Server defined foer the selected Technical System. Select as Application System."
We could not find any relevant BS with the role "Integration Server" for that Technical System.
Please advice.
Warm Regards,
Bhaswarhmm
I have same situation on a fresh installation.
Also error "There is already an integration server defined for the selected technical system; select the Application System role".
But, there is no Business system at all visible and also the Business system tab of the technical system is completely empty.
What to do?
BR Patrik -
How to register an Integration Server with an SLD?
In my SLD I can see:
- Adapter Engine
- Integration Directory
- Integration Repository
- RWB
But the Integration Server is not there.
I have tried:
- Restarting the PI 7 system
- OSS Note 764176 (Error in XI due to inconsistent SLD contents)
- Registering to the SLD using the Visual Administrator and RZ70
Any ideas?
Thanks.HI Paul,
Just check in Integration repository whiole creating the Communication channel for File Adapter
Are you able to see the entry for Adapter Engine as--integration Server as shown in the Blog OR missing that???
If you are missing that means you need to implement that Blog which i provided
If you just want to create the Integration Server in Sld means , follow this
The specified item was not found.
Regards
Seshagiri -
SAP PI 7.0 INTEGRATION SERVER ERROR
Hi,
When i am working with the Business Systems in SLD PI 7.0 I am unable to see Integration Server. It was displaying INTEGRATION SERVER as NONE. How to connect to the Integration server in SLD.Hi,
Try these,
1) Create a business system in SLD with role as Integration Server->Give the pipeline URL as that of ur PI i.e http://<host>:<port>/sap/xi/engine/?type=entry
Then assign this as integration server to other business sytem whose roll will Aplication System.
2) In PI -> sxmb_adm-> integration engine configuration-> corresponding integration server maintained or not.
3) In ECC -> sxmb_adm-> integration engine configuration
maintain role of business system as "LOC Application system" and
Corresponding integration server as "dest://<RFC destination for XI>" or
"http://<host>:<port>/sap/xi/engine?type=entry"
4) Cross check the RFC Connection
TCP/IP - LCRSAPRFC & SAPSLDAPI
HTTP Connection to ABAP System.
Regds,
Pinangshuk. -
How to change the ROLE: Integration server in business system in SLD
Hi,
I am facing error in communication, becuase the integration server has been attached to in correct business system with incorrect client (001 instead of 700).
In SLD, business system, 'integration' tab there is button "Associate with XI'.
I have selected the role as integration server for the corrrect business system and aslo gave the correct pipeline url for integration server.
When I press the button "Associate with XI" and Save nothing happened.
How do i change my integration server.
Please help.
Regards,
RehanHi Gaurav,
I have checked the teachnical system and its of type WEB AS ABAP. and when i click on the business systems tab, there are two business systems. When i double click on the business systems
I realised that both the business systems has been defined with role: integration server.
IN one business system i can see that there is "associate with XI" button.
But when i want to chnage the business system with correct client 700 , i tried pressing the button after entering the correct pileline url.... nothing happens.....
Can you please let me know the procedure to chnage the technical system with respect to integration engine???
PLease help as our project is held up due to this.
regards,
Rehan -
Related Integration server for Business System in SLD
HI All,
IN SLD we have one Technical System for PI and one TS for R/3 System.
When I crating Business System for R/3 in R/3 TS, in Integration Tab what I have to select for Related Integration Server option.
It is having None and Business System of PI TS System.
Please help me in this.
Regards,
SreeHey
Looks like you are defining this Business system as a Integration server.
See here is what you need to do.
Step 1:First of all create a business system for XI system itself,this business system will have details of XI system and its role will be Integration server.You can have only 1 Integration server(hence you are getting the error).
Step 2:Now define a business system of type Web as ABAP for R/3 system,this system will have role as Application system but the related integration server will be the name of the business system of PI system(the one which you defined in Step 1).
As of now,are you getting any business system name in the drop down box for related integration server while creating business system for R/3 in SLD?
If yes,then simply select that
Thanx
Aamir -
SLD: recreate deleted Business System of type Integration Server
Hi,
accidentally i deletet the business system of type "Integration Server" in the SLD. And i can't recreate it. It always says:
"Integration Server already defined There is already an integration server defined for the selected technical system. Please select role Application System."
Any ideas to create such a business system?
The old one isn't there in the list, after i deleted it.
regards,
msHi,
If you change/delete the host name of the Integration Server after the installation in either the SLD or the exchange profile, you must adjust it accordingly in the exchange profile or the SLD, respectively
Maintaining a Business System for the Integration Server
http://help.sap.com/saphelp_nw04s/helpdata/en/9b/da0f41026df223e10000000a155106/frameset.htm
Regarding Integration server in Business System
Regarding Integration server in Business System
Refer editing the Business System
http://help.sap.com/saphelp_nw04/helpdata/en/59/2cb3a3c93a4c7086500b8345143418/frameset.htm
Thanks
Swarup
Edited by: Swarup Sawant on Jul 7, 2008 2:03 PM -
Two integration server on the same sld group
hii,
If I configure two xi integration server to one sld in the same group?
Is it recommended?
Will it cause a collision between the two systems?
tanks in advanced
RoyiHi,
This can be done as follows,
1. Create multiple Business System Soruce Gropus. When creating the group for the source, you need to give the related integration server . In your case create the Source Busss System Group A and Group B for intregration server A and B.
2. Create Business System Target Group Group C for integration server C which is the target integration server.
3. Assign the source business systems to the correspiodning groups by providing the correct related integration server.
4. Do the same for the target Business Systems as well.
5. Now, go to each of the Source Business System and then select the Transport Targets option and map it to the corresponding business system on the target side. This should be done for all Source Business System of Group A and Group B . They should all point to the correct Business System of Group C.
6. When importing objects you would need to make sure that the Business Systems Being used in the Configuation Scenario all belong to the same Source Business System ., ie. a confgiuration scenario should be such that all business systems used in it belong to either Group A or Group B and not to both.
Regards
Bhavesh -
Hi,
i am not able to select my integration server and my host name as xi1. what is the problem. As i have created a third party TS. and given the host name as xiser0 which is the xi server host name. and selected the softwere component. i have created 2 logical system with tcode bd54. while creating the BS i am not able to select the business system role as integration server and related integration server. is it any problem.
ThanksHi
Check the following thread
SLD: Diff b/w Standalone java, Web AS Java
this question gets featured in the SDN at least every fortnight i guess
regards
krishna -
How to get DEV Integration Server into Prod SLD?
Hello,
in a two-tier landscape I need to define transport targets in SLD. Both PI syetems have their own SLD. In each SLD there is just the Integration server of the corresponding PI system. How to get the DEV Integration Server into PROD sld? Manually?
Thanks,
CHRISTOPHHello Seshagiri,
that is what I wanted to know. So there seem to be two possibilities:
- Creating the DEV Integration Server in productive SLD manually
- Exporting the DEV Integration Server from DEV SLD and import it into productive SLD.
I tried importing / exporting SLD content some time ago. AFAIK there is no exporting single technical / business systems, you can just export all the content together from a SLD?
Thanks,
Christoph
Maybe you are looking for
-
IPod could not be synched. The disk could not be read from or written to.
Does anyone know what this means and how I can fix it? Thanks
-
I recently updated my iphone software to 6.0.1 and my ringtones did not get restored. The ringtones are lised in my library but I can't get them added to my phone. When I click on the button to sync my phone, it does nothing.
-
I am hoping that someone out there can help me to transfer two songs I purchased on Itune~ loaded into my Itunes account fine~ but won't let me copy the song into my Ipod??? Many thanks in advance!!!
-
Trying to get Ipod to Update songs from ITunes
I have downloaded a whole stack of CDs into iTunes but I can't get my Ipod to Update with the new stuff. Ever since I got my iPod (40GB) I have had problems with this. Sometimes I just have to go round and round in circles til the computer takes pity
-
How to smoothly scale movieclip while moving it towards viewer?
Hi, I have a movieclip (mstone) depicting a signpost, which is within another movieclip (graphic1). I am trying to scale mstone to increase by about 44%, and it needs to move along the screen in such as manner that it is moving towards the user. Some