Integration with Microsoft project

Hi
I am trying to create a ECC project from MSP(using OPENPS). However one of the field in SAP is mandatory at project definition(ex Company code). But I cant see the same field in MSP hence system does not create any project and showing a message enter the Company Code.
I created a column in microsoft project as "Company code" but it did'nt work. Please suggest how to create project in this case.
Thanks & Regards
Aby

Hi,
OPENPS can not handle different company codes. It takes company code mentioned in the project profile.
You can try different project profiles for each company code.
You can also make the company code field as input field and then make changes manually after uploading from OPENPS. Can make a BDC or LSMW for this also.
Try MPS tool, but it is not free tool, it works on top of OPENPS so you still need OPENPS installed on your system but MPS gives many more options to work with; download its free version and test if it can fulfill your requirement.
[http://www.mpshp.com/]
Regards,
Harsh.

Similar Messages

  • Integration of cproject with microsoft project 2003

    dear all,
    i want to integrate cproject with microsoft project 2003.
    can u send me documents related this. what are settings required for this.
    my email id: <b>[email protected]</b>
    thanks
    amit

    Hi Amit,
    Can you share  DOCUMENT  with me
    my mail id [email protected]
    thanks
    sunil

  • ECC 6.0 integration with Microsoft Dynamics CRM

    Hi All
    I am working on a ECC 6.0 integration with Microsoft Dynamics CRM. I need to send the customer master data, va01/va02, vl01n/vl02n/ vf01/vf02 to CRM system. One option I have is to send in the form of IDOC with TRFC - TCP/IP. But looks like this needs a middleware like Biztalk.
    Is there a way I can send this data using a Internet service in ECC 6.0 ??? As this would cut the cost of the Biztalk.
    I really appriciate your thoughts on this. We don't have XI either.
    Thanks a lot
    Van

    HI Van Dan Jan,
    We have just implemented integarion of SAP with Microsoft stack (Microsoft CRM, Share point and Axapta), But in all integration BizTalk as a middleware used.
    There is two way requirements :
    1. whenever Most of the control are at the Microsoft level like : Customer creation, Creation of orders, which need to be synchronus activity we have used RFC which internally calls BAPI. (So SAP adapter Configured at BizTalk). and whenever Biztalk receives request file from CRM or share point to there location they call SAP RFC's.
    2. When DATA is needed from SAP to microsoft stack like to syncronize the missing transaction like customer pad and all.
    Scheduled job at BizTalk end which call SAP to get the DATA via RFC mode :
    In SAP we have two things
    1.  if DATA size is small (below 2 MB) like  in last 1 hrs what are the sales contract created in SAP that need to updated in Microsoft other system than Biztalk will trigger a job at 1 hr interval or on deemand to get the detail which directly we pick from data base or using BAPI to get the detail via RFC.
    2. If Data Size is large (more than 2 MB)  like total transation happened in a day for all customers: then we wriiting the data in OS or application server  and that job also get initiated from Biztalk end by sending any parameter to SAP.
    advantage of using BizTalk is most of the control you can give it to them so they can run there job on deemand basis.
    There is a something known as web service we can use to avoid Interfacing tool, but I dont have much Idea about that,
    and  please check how many interfacing point is there with SAP in your project, because if Interfacing points are more then I think it is not good to write a web services for so many things.
    do let me know if you need further information.

  • Is there any way to Integrate Sap b1 with microsoft project

    Hi,
    I would like to do add-on  Project Management.
    Before that I would like to get some idea from you experts
    Is there anyway  to integrate SAP B1 with Microsoft Project.
    I appreciate your help, and desperately need your help.
    Thanks in advance
    Regards
    Parthiban

    Hi,
    It all depends of what you want to accomplish, but both MS Project and SAP B1 have SDK's so yes, it's possible to integrate both the applications.
    MS Project SDK Documentation
    Regards,
    Vítor

  • Integrate cProjects with Microsoft Project server

    Dear all,
    Does anyone know how to integrate cProjects 4.0 with Microsoft Project server 2003 in details? Pls kindly help.
    Thanks and best regards
    Trung

    Hi Murali,
    Do you have any documents showing how to configure cProjects step by step to integrate with Microsoft Project server? Pls help.
    Hi Niranjan,
    Pls check your email.
    Thanks and best regards,
    Trung

  • SAP Workflow integrated with Microsoft Outlook

    Hello All,
    I have the following question. When an work item comes in the SBWP inbox, as soon as the work item is executed by the user
    the workitem disappears from the SBWP. Now my question is if SAP Workflow is integrated with Microsoft Outlook (so that email containing the work item as a link reaches Outlook), is there a way to make the email disappear from the Outlook as soon as the SAP work item is completed.
    Can someone throw some light on the same.
    Thanks,
    Sachin

    Hi,
    Duet workflow scenario is available. SAP Application sends workitem to Duet Server and Outlook client has Duet add-in. You need Duet Server and user license.
    Also SAP MAPI Service Provider is available. You can access SAP Inbox items from your outlook client. I think SAP MAPI Service provider is free.
    Regards,
    Masa

  • DPM integration with Microsoft Azure backup queries

    Hi All,
    We have made the test set-up environment with installed the below details
    DPM 2012 R2 on VM (Windows 2012 R2)
    We are using a raw disk of 200 GB for disk staging.
    DPM integrated with microsoft azure.
    Able to take file backup and databases backups from DPM and can perform the restore from Disk staging as well as from azure
    Queries:
    Will DPM support deduplication for exchange (2007,2010,2013) databases and for sql databases (2000, 2005,2008,2012,2014) ?
    on the wire compression is enabled but how to verify that?
    Is it possible to mount the raw disk to some other drives except local Disk (C:\)
    How to do granular recovery in DPM 2012 R2 for microsoft exchange?

    Chris,
    Really sorry for the delay in response.
    I found lots of warning messages in the logs like below one:
    578    788    24-Apr    20:49.7    18    readeriterator.cpp(587)    [000000002435A140]    0BABF215-19DF-49F5-B8DF-7210CB336DD5    NORMAL  
     "CFileReaderIterator:GetNextFileReader -> Skipping Hardlink with Physical FilePath: \\?\GLOBALROOT\Device\HarddiskVolumeShadowCopy34\Windows\WinSxS\amd64_microsoft-windows-i..l-keyboard-0001042b_31bf3856ad364e35_6.2.9200.16384_none_f8e4c1f6d2951dd3\KBDARMW.DLL,
    Logical FilePath: \\?\Volume{bd3973d0-2f82-11e4-93f6-806e6f6e6963}\Windows\WinSxS\amd64_microsoft-windows-i..l-keyboard-0001042b_31bf3856ad364e35_6.2.9200.16384_none_f8e4c1f6d2951dd3\KBDARMW.DLL"
    578    788    24-Apr    20:49.7    18    readeriterator.cpp(587)    [000000002435A140]    0BABF215-19DF-49F5-B8DF-7210CB336DD5    NORMAL  
     "CFileReaderIterator:GetNextFileReader -> Skipping Hardlink with Physical FilePath: \\?\GLOBALROOT\Device\HarddiskVolumeShadowCopy34\Windows\WinSxS\amd64_microsoft-windows-i..l-keyboard-0001042e_31bf3856ad364e35_6.2.9200.16384_none_fa395780d1ba2b68\KBDSOREX.DLL,
    Logical FilePath: \\?\Volume{bd3973d0-2f82-11e4-93f6-806e6f6e6963}\Windows\WinSxS\amd64_microsoft-windows-i..l-keyboard-0001042e_31bf3856ad364e35_6.2.9200.16384_none_fa395780d1ba2b68\KBDSOREX.DLL"
    So, I'm checking with concerned guys in here about this. I'll get back to you once I receive any update from them.  However, if it very urgent and need immediate assistance, I suggest you to open up a support ticket with Azure technical Support team
    as they will be able to provide you very quick solution.
    Regards,
    Manu

  • CCME integration with Microsoft Business Contact Manager

    Hi,
    Can anyone tell me, if a CCME can be integrated with Microsoft BCM such that when a call comes in details of the client pop up, should they exist in the Business Contact Manager.
    Finding exact information is like find a needle in a hay stack.
    Regards
    LN

    Hi Swinster,
    Apologize for the late reply.
    What is your current situation? As JS2010 stated, also in this KB article:
    http://support.microsoft.com/kb/2101557
    During the 'Specialize phase' of Sysprep, Sysprep.exe looks at the Last Modified Date of the ntuser.dat file for each user profile to determine which user profile to copy to the default user profile. However, the earlier cleanup functions of sysprep.exe
    loads each Ntuser.dat file to make security ID (SID)generalizations. You cannot predetermine which user profile will be copied if more than one user profile exists.
    How about we skip the copyprofile option?
    Further, see if the following article would help to customise the user profiles settings:
    Configuring Default User Settings – Full Update for Windows 7 and Windows Server 2008 R2
    http://blogs.technet.com/b/deploymentguys/archive/2009/10/29/configuring-default-user-settings-full-update-for-windows-7-and-windows-server-2008-r2.aspx
    Or we may consider seek help at the office outlook forum for the BCM deployment.
    Best regards
    Michael Shao
    TechNet Community Support

  • Groupware integration  with microsoft exchange server

    I have a query regarding Groupware integration with microsoft exchange server.whether we require IIS server and microsoft exchange server on the same machine for groupware integration.or they can be on different machines.
    thanks,
    Pramod

    hi,
    We actually implemented integration of SAP with microsoft exchange server. It is not necessary for server and IIS to be in the same machine.
    regards,
    Ganesh.N

  • MSP Integration with Oracle Projects

    Hi Dina,
    Does the integration between MSP and Oracle Projects work without any issues in R 12.1.3? We've tried using it in the past with R 12.0.6 but have to say the experience was not good. It used to work at times and fail on other times. Most of the times the first time import from MSP to Oracle Project used to work but subsequent changes to the WBS used to give issues while trying to import into Oracle Projects (even though the link to the Oracle Project existed in MSP).
    One of our new customers (Construction Company) wants to create the WBS in MSP (Microsoft Project ver 2003 or 2007) and then import it into Oracle Projects to track progress, effort and cost. Any changes to the WBS (which happens frequently) will be done in MSP and imported back into Oracle Projects. Does the above mentioned requirement work consistently in R 12.1.3? Please let us know.
    Thanks
    Regards,
    Sri

    The MSP integration requirements that you describe should work in the latest versions of 11i e.g. (FP.M RUP4) as well as R12.1.3.
    My experience is that providing all scheduling is done in MSP then the integration functionality works well.
    The recommended process flow for MSP integration is:-
    •     Oracle Projects: A project manager creates a project in Oracle Projects from a project template containing information for deliverables, work breakdown structures, and resource assignments
    •     MSP: The unscheduled resource and workplan data is downloaded to Microsoft Project for scheduling
    •     MSP: The project is scheduled in Microsoft Project based on task assignments, task dependencies, task constraints, and other attributes
    •     MSP: The scheduled workplan data is uploaded to Oracle Projects for publishing
    •     Oracle Projects: The project workplan is published in Oracle Projects
    •     Oracle Projects: After the workplan is published, the project is accessible to all team members working on the project. Team members work on their assignments and report their progress in Oracle Projects
    •     Oracle Projects: The team members' progress on the tasks is collected for updating the project plan
    •     Oracle Projects: The project plan is updated with the team members' progress
    •     MSP: The project is now unscheduled. The unscheduled project plan is downloaded to Microsoft Project for rescheduling
    •     MSP: The project plan is rescheduled in Microsoft Project and the task information is updated
    •     Oracle Projects: The rescheduled workplan is uploaded to Oracle Projects for publication
    Andy.

  • Lync with Microsoft Project 2013

    Hi,
    I have Microsoft Lync 2013 and Microsoft Project 2013.
    Can anyone send me the steps to integrate these two so that i can get the updates from the team members without leaving Microsoft Project?
    K.Gokulraj

    In addition to Ben his answer.
    The integration with Lync is not supported in Project Standard only in Pro & Web App:
    http://blogs.office.com/2012/10/19/project-and-lync-together-reducing-communication-barriers/
    https://technet.microsoft.com/en-us/library/ee683978.aspx
    - Dennis | Netherlands | Blog |
    Twitter

  • OIM integration with Microsoft CRM by using webservices? (OIM: Oracle Identity Management)

    Hi Guys,
    can you provide me integration document for my new project
    OIM with Microsoft CRM, by using webservices.
    Venkat
    [email protected]

    user1106726 wrote:
    We currently have ILM 2007 in our environment with limited usage at the moment. We are looking at purchasing Oracle Identity Manager to implement an enterprise wide IAM solution.
    We were wondering if it is possible to continue using ILM like a middleware between our AD forests and the Oracle IdM. Where the Oracle IdM is the overarching IAM solution and Microsoft ILM 2007/FIM 2010 is like the metadirectory for our AD forests.
    Is this possible without installing the Oracle Management Connector on any of our DCs and using ILM as the directory that Oracle IdM connects to. All AD account provisioning/de-provisioning, acct updates, password sync/reset will be initiated from the Oracle IdM to ILM and then implemented on AD. In order words no direct interaction with AD domain controllers from Oracle IdM, everything will go to ILM and ILM in turn applies it to AD.
    Is this possible?yes
    >
    Is there a custom connector that will work with ILM 2007/FIM 2010Yes, if you write one you will have a custom connector
    >
    Is this a simple customization or something that can be problematic and expensive?It won't be simple. Problematic and expensive maybe, depends on how good you are with OIM and ILM

  • Using Flex with Microsoft Project

    I am absolutely brand new to FLEX. What I saw on the Adobe
    site was a data chart that could be drilled down to expose
    additional layers of "contriburory detail" for the master graph.
    What I am wondering is if it is possible to do something
    similar using Micrsoft Project Data as the basis. MS Project will
    allow users to save the file as XML. So, all the data should be
    available in a form understandable to FLEX.
    Here's the tricky part (and I can add more detail if needed).
    Project will create a summary line (at some level of indentue) and
    show you a calculated %Complete such as 47%. So, level of indenture
    1 I have the major summary tasks of the project at various status
    of %Complete. I believe FLEX can make some type of bar or pie chart
    out of that for me. What I want to do is click on a "Level1"
    indenture and have it expose the Level2 indure that contributes to
    that 47%. Then drill on one of the Level2's to Level3 .... to Level
    "n".
    This needs to be accomplished in "stand alone" fashion so the
    ultimate user can launch a desktop application and tell the
    application the name of the Microsoft Project XML file. We will not
    be able to use Client/Server ... client side only with the file
    located either locally or at least on a network drive.
    Can this be done? Has anyone looked at a MS Project XML
    schema to see if there is sufficeint information available?
    OK, now the blunt truth. It ain't %Complete that I care
    about. What I care about is BCWS, BCWP, ACWP, %Complete, and a few
    other parameters. These are the "Earned Value Fields". If you do
    not know what they are, don't worry about it just now .... it is
    really all just time phased data.
    Can anyone give me some advice or an opinion? TIA.
    Jim

    Hi,
    Pls check out these links below for this info -
    Adobe Flex with RFC - 
    Binding Data through function module in adobe to display charts
    How to connect to SAP Database from a Adobe flex application?
    Adobe flex and Sap
    Adobe Flex within SAP NetWeaver Developer
    Regards
    Lekha

  • Portal Integration with Microsoft Active Directory

    We are working on a project to integrate Oracle9iAS Portal with Microsoft Active Directory. I am wondering if anyone has any experience with this and hence suggestions. Particularly, I'm wondering if its possible and how to use Active Directory to manage the Portal user accounts and group relationships?

    Please note that we finally got this working. For Active Directories sake, I would suggest using userPrincipalName or sAMAccountName as the Unique Attribute. Also, note that Active Directory uses OUs for organization, not CNs, so the search base should be either just the DN of the domain or an OU in the domain. Also, be sure to specify the full DN of the Bind DN as in CN=Administrator,CN=Users,DN=domain,DN=com

  • Webforms with Microsoft Project

    Hello,
    Our requirement is, we need to open Microsoft Project with a link in webforms. The microsoft project (.mpp) file will be placed in a folder on the network drive. We are using Forms 6i running on UNIX environment and MS project 2002 professional edition.
    If possible what libraries do I need to use within webforms?
    I will be happy to provide more information if asked.
    Thanks in advance,
    Arun.

    Arun,
    you don't need to do antything in Forms. Just define a MIME type on the client browser to open MS Projects each time a file of type mpp gets downloaded. A similar MIME type needs to be defined on the server to determine the client application that should be launched.
    Frank

Maybe you are looking for

  • IRRITATING PLEASE HELP ME Satellite L775-S7111

    So my dumb laptop i have not had this laptop no more than a crazy month (sorry im upset trying not to curse) anywho so i turn off the computer (dumb thing froze) ended up turning it back on and guess what dumb thing came on to Windows Boot manager an

  • How to Set Report Region Title Dynamically

    I have code working to periodically refresh a Interactive Report on a page. I have the following code in the page header: <script type="text/javascript"> //automatic reload IRR function fnc_reloadIRR () { gReport.search('SEARCH'); window.setTimeout(f

  • Non-Apple iBook batteries and how this affects the warranty

    I have a 14" G4 iBook (not eligible for the Apple battery replacement program) in which the original battery is clearly dying after almost two years of heavy use. There are vendors out there selling non-Apple replacement iBook batteries, and some mak

  • "this phone number is no longer in use" Well thats good isnt i

    I quote from a creative mod himself. "This thread is not appropriate for this forum. If you are having a specific problem, post about it and someone may help you. Otherwise, feel free to contact Support via phone (number is on your install CD) or via

  • Cannot find servlet class

    I have a new computer and I have installed the latest version of Tomcat but kept the old free version of the Sun One Studio which I still had a setup file for (as I couldn't find it on this site anywhere for free anymore). The new version of Tomcat p