Integration with QM-Inspection lot not getting creating

Hi ,
Inspection lot is not getting created after GR is posted.
Scenario:Storage location is connected to external warehouse management.
Can anyone please explain the necessary check points and  Integration steps needed to be followed for inspection lot creation.

Hi,
Since you didn't say much, I assume you are creating stock into ECC via LSMW using 561 movement. Now to get inspection lot for these batches/ docs, you need to activate inspection type 05.
Go to material master QM view, assign and activate inspection type 05.
Additionally, create a respective inspection plan/ task list for the material(s) to carry out RR and get the consistent inspection lots.
ntn

Similar Messages

  • Integration with EWM-Inspection lot not getting created

    Hi,
    Inspection lot not getting created after GR is done.
    The scenario is Storage location is connected to external warehouse management,so after the GR is done in the legacy system via interface it is updated in ECC.so while checking the material document inpection lot is not created.
    Can anyone please tell me the necesaary check points and integeration steps  between WM and QM in this case .
    Thanks in advance.......

    Hi,
    Since you didn't say much, I assume you are creating stock into ECC via LSMW using 561 movement. Now to get inspection lot for these batches/ docs, you need to activate inspection type 05.
    Go to material master QM view, assign and activate inspection type 05.
    Additionally, create a respective inspection plan/ task list for the material(s) to carry out RR and get the consistent inspection lots.
    ntn

  • Inspection lot not getting create for 01 Insp type after Intransit

    Hi Qm Gurus,
    I have a Material 'A' which is producing in the plant IN05 and transferring to IN06 plant. We have Scheduling agreement PO for this. After Scheduling Agreement we are doing Transferring the Goods thro 351 GI Movement type. So now the parts will be there in transit.
    So now when I receive this goods in IN06 thro 101 MT, Insp lot is not getting create, it goes to Unrestricted. If I create a std PO for the same when I receive the goods thro 101, it is posting into Insp lot. But after 351 & if I do 101 material is not going into Inspection. Pls advise.
    I checked the Insp type 01 Active for IN06, Quality info record is fine, Quality plan also fine. Pls let me know whether i am missing something?

    Hi ,
    Please activate inspection type 08 stock transfer ..
    If this inspection type is active then during stock transfer lot gets generated.
    Also check QM active for this perticular movement in custamizing setting.
    Regards
    SANIL

  • Inspection lot not getting created

    Dear MM guru's...
    SUB: Quality inspection lot neot creating.
    when i am do GIR, system is not creating Inspection lot for the material,
    i have maintained the QM view in material master and assigned the inspection type aslo, then why system is not creating an Inspection lot for quality inspection, is there any extra settings need to be maintaied in QM.
    Regards
    SARFRAZ

    There is a small check mark which says "active " for each inspection type you maintained in QM view .Make sure you have checked this .If you have not ,then there is no way a lot will be created .
    Please let me know on any furthur doubts coz as far as i know this is a common mistake every person new to QM does .If this not the issue then get back to me .
    regards
    Naik

  • Inspection lot not getting generated after PurcGR

    Hi,
    Inspection lot not generated after doing GR for a purchase order. what could be the reasons?
    for the first 2 puchase orders, Inspection lot was created. however, for the 3rd Purchase order of 100qty, i did GR for 50 qty only. after then for new purchase orders, the material status has become unrestricted and directly going to stock.
    Inspection type 01 is mainted in material master
    QM info record has been maintained.
    please clarify

    Hi Nagaraj,
    Try the following.
    1. Check the inspection set up in the Material Master record for inspection type 01 whether 'post to inspn stock' is selected. If not, select it.
    2. Check in Customizing for 'QM in Procurement' in 'Define QM system' activity, 'certified QM system - skip' is marked(Actual QM system). If this indicator is selected no inspection lot is created even if there is an active inspection type. This is valid if you maintain a target QM system in QM view of Material Master (Purchase data).
    3. Check in IMG set up :
    Quality Inspection -> Inspection lot creation -> Inspection for goods movement  - whether inspection lot origin 01 is specified for movement type 101 and also ensure that QM is active for this movement type.
    Please revert after trying these options.
    Regards,
    Swati

  • Inspection lot not being created against inspection type 10 or 02

    Hi
    We need to inspect material at the time of goods being delivered to material. I did the following steps:
    1. in SPRO, Assign Inspection Lot Origin to Delivery Type, against Delivery Type LF we mentioned insp. origin 10 
    2. Assigned insp. type 10 in material master QM view
    3. Created Sales Order using the same material code
    4. Created Outbound Delivery against Sales order, but when we press button for Post Good Issue, the system issues the message "Status of inspection lot 100000000004 / partial lot 000000 does not allow good issue" BUT NO INSPECTION LOT IS BEING SEEN WHEN WE USE QA32/QA02. I have also seen the QALS table using SE16 and no record for inspection 100000000004 is seen.
    Please also note that
    1) other inspection lots are being created and processed normally such as inspection origin 01, 14, 15, etc.
    2) each time we try again to create delivery and press post good issue button, IL number is incremented say 100000000005, then 100000000006, 100000000007, so on.
    3) the issue is the same for insp. origin 02
    Please reply
    Chris

    Hello,
    Check if this is helpful to you.
    qm in sd

  • Inspection lot not getting cancelled after the inbound delivery is created

    Hello,
    The scenraio is like this.
    1. Material was procured in plant A.
    2. Using the stock transfer purchase order, transferred the material from Plant A to Plant B.
    3. Outbound delivery was created, Handling units were assigned and Post Goods issue was done.
    4. As soon as this was done, inbound delivery got created automatically in plant B and Handling units were assigned.
    5. Inspection lot was created with origin "08".
    6. Now I want to reverse all the transactions, so I did as mentioned below.
    7. Handling units were deassigned from the inbound delivery and inbound delivery was successfully deleted.
    8. Now tried to do the reverse post goods issue and got the error "Handling unit XXXXXX cannot be reversed"..Goods movement cannot be reversed for handling unit XXXXX because it has been changed or assigned to object since the last goods movement posting".
    The issue is that as soon as the inbound delivery is deleted, the inspection lot status should change, which has not changed. So kindly let me know how to make the system cancel the inspection lot as soon as the deassignment of handling units is done in inbound delivery or the inbound delievry is deleted.
    Regards,
    Narendra Bora

    Hello,
    Can anyone please reply.
    Regards,
    Narendra Bora

  • Inspection lot not getting generated for schedule in stability study

    Dear All,
    Need your urgent help to solve a issue. I need to perform inspection of material after specified interval of time for which i am using stability study process. Following are the steps which i have followed :
    1) Create initial sample (physical sample created)
    2) Confirm initial sample
    3) Initial test inspection lot( Inspection lot created )
    4) Complete initial test
    5) Specify storage conditions (Physical sample created with CRTD status)
    6) Create testing schedule( Maintenance schedule is created )
    7) I have scheduled maintenance plan through IP10 tcode. All the calls are getting generated.
    Now i have given manual call in IP10, but inspection lot is not generating.
    Please help to solve this issue ASAP.

    Dear Craig,
    Yes i have activated inspection type 16 to material master.
    Actually issue is solved now, I have missed one step " Store stability Sample".
    Now the lots are getting generated.
    i am closing this thread now.

  • Inspection lot not getting generated by Z inspection type

    Hi,
    I created a inspection type Z1 , copying the inspection type 01. I guess I maintained all the required configurations or conditions.
    I maintained the inspection type Z1 in the QM view of a material with status Active, but I am not able to do MIGO, neither the stock type is coming as Quality Inspection automatically in both the Purchse Order creation and MIGO. As a reslut, the inspection lot is not getting generated.
    I am also not able to create a manual lot but QA01, Its giving error as "Inspection type Z1 not maintained for material X" .
    Thanks in advance for your valuable suggestions.
    Regards
    Kunal

    Dear check preffered inspection type in material master QM view and do the GRN.
    Check and Revert.
    Cheers
    KK

  • Inspection lot not getting generated during SD delivery

    Hi QM experts,
    I am working on QM in SD function. I activated inspection type 10 in the material master in QM view as shown below.
    I created a QM info record SD through QV51 for the combination of customer and Sales organization and assigned the material and quality inspection as before delivery as shown below.
    Now I created a sales order for the material with sales organization and when I making the delivery system is allowing delivery and no inspection lot is generated and delivery is also not stopped. am i missing something..can u please guide..
    Thanks
    Kumar

    Hello,
    You have activated 10 and 11 both , any specific reason ?
    If you activated 10, then system will allowed you delivery check QM customization---> During Shipping. have you assigned inspection type against Delivery type in customization ?
    Regards

  • 09 inspection lot not getting generated

    Hi Friends ,
    I have one material batch for which next inspection date is 7.6.2014 . I have activated 09 inspection type in material master . Now when I am executing QA07 for the material  with checkbox " To insp. stock at lot creation" selected and with initial run in days = 4 . System shows following msg in green :
    "No batches found for processing"
    But it should create a lot for the above batch because inspection date is 7.6.2014 . Stock also exist
    Regards

    Please go through the following steps & maintain the same
    > Batch management should be active against material.
    > Next inspection date should be maintained.
    > Inspection interval should be maintained according to next inspection date.
    > UD must be completed for the previous inspection lot.

  • EWM with QM - Inspection label not getting printed

    Hi Experts,
    We are not able to print inspection label after usage decision in EWM. Please provide your inputs on this.
    We are using tcode /SCWM/QINSP for usage decision.
    Appreciate your time.
    Thanks & Regards,
    Prashant

    We changed the printer name in condition record and we could print the label.
    Regards,
    Prashant

  • EWM with QM -Inspection label not getting printed after usage decision

    Hi Experts,
    We checked configuration settings related to this but we could not find missing configuration. Right now we are not able to print label after we take usage decision. Please let us know your inputs on this.
    We are using /SCWM/QINSP for usage decision.
    Thanks & Regards,
    Prashant

    We changed the printer name in condition record and we could print the label.
    Regards,
    Prashant

  • Inspection lot should be created only for particular vendor

    Hi
    Can anyone please help in achieving the below scenario:
    *Material  has been assigned to the inspection type A (one time inspection) has been set as preffered and active  in the inspection set up in the material master.
    *Quality level has been created for material and vendor  such that inspection should be carried out when next stage is 1 and no inspection should carried out when next stage is 2.
    *Tasklist   has been assigned with material and vendor .
    Material can be supplied by different vendors,For this material,  inspection should be done only for one vendor  and for other vendors there should  not be any inspection to be done and no inspection lot should be created.i.e Inspection lot should be created only for one vendor say AA whereas now inspection lot is getting created when  goods receipt is done for the purchase order  with other vendor BB.
    My requirement is  the inspection lot should not be created when goods receipt is done with other vendors say BB  except AA.
    Is there any other way other than using quality info record to achieve this.
    I can try with DMR  but the thing is there should not be inspection lot created  while posting GR.
    can anyone suggest me any other way to achieve this requirement.

    There are user exits when you create an inspection lot.  One of those could be used to suppress the inspection lot.  Have you looked at these?  Have you researched any QM user exits yourself yet?  This isn't the first time this specific question has been asked over the years.
    It's not hard and there are lists of QM user exits available all over the internet.
    Please do some research.
    You can also assign vendors to inspection plans with a DMR that requires one inspection, and than after that creates all skip lot inspections which you automatically close by a batch job.  The first lot can be manually forced closed.  Thereaftter all receipts would be skipped.  Not 100% but pretty darn close.  This requires that you know which vendors to assign to which plan.  Probably as much data maintenance as maintaing the Q-info records.
    And yes.. your client needs to come up with better reasons than "I don't wanna..".  It's part of a consultants job to convince them.
    Craig

  • Calibration process : inspection lot not created

    Hello,
    When creating a maintenance order (PM05) , i can not get the inspection lot created .
    There has been some thread about this process , i believe i followed the instructions :
    -equipment category is production ressource/tool
    -master inspection characteristics created (released)
    -sampling procedure created for PM
    -equipment task list created with inspection point at header level , with control key including inspection characteristic , with master inspection characteristic , with sampling procedure
    -configuration for inspection type and order type is done
    then when creating the order manually (or via a maintenance plan) : the order is created and released but with no inspection lot assigned...
    does anyone have an idea where the error might come from?
    Thanks again,
    Pete

    Hi Pete
    Weather this is correct or not for your scenario but please check the below spro setting.
    Plant Maintenance and Customer Service --> Maintenance and Service Processing --> Functions and Settings for Order Types --> Assign Inspection Types to Maintenance/Service Order Types
    click on the symbol
    in Change view " Assign Inspection Types to Maintenance/Service Order Types" :Overview screen assign inspection type against plant and order type combination. for PM 14 is inspection type.
    please confirm.
    regds,
    Venkat

Maybe you are looking for

  • My iPod Nano 6th generation no longer shows up on iTunes

    how do I reconnect my Ipod Nano 6th generation to my iTunes?

  • Upgrade oc4j container from 10.1.2 to 10.1.3

    Hi to all, We use oc4j container 10.1.2 for old applications, but now we have developed ajax applications using oracle maps, but if i'm riight 10.1.2 doesn't support oracle maps. I've tried to install oracle application server oc4j container 10.1.3 i

  • How do I pause a subvi from a mager program without stopping the mager program

    Hello to you all I am having a problem and i hope that you can help me, i am traying to make a sub vi to be paused (after it had started to run) at any time that the mager program neads to pause the sub vi. what i mean is that the mager program is ru

  • Paste in Place across Layers Script

    I'm looking for a script to paste an object (paste in place) on top of all other layers in a file. I know I can position a single object on the top layer and then turn the bottom layers on and off, but for my needs (and in this situation) I need to a

  • Corruption of MIDI Melody Track

    Background: I loaded a MIDI file that I created on a Korg PA1 X Pro keyboard. I added a MIDI melody track. It played fine for several days, but then stopped playing when I start the song, and no MIDI data is generated for this track. If I click on th