Inter Plant sub-contracting Issue

Dear All,
I have the following scenario to be mapped.
Under one company code i have two plants(Plant 1000 & 1100)
Material  'A'  is manufactured at Plant 1000 except one operation.
Material 'A' has 5 operations in the routing. Operation 1 to 3 will be performed in Plant 1000, 4th operation will be performed in Plant 1100 and the last operation will be done in Plant 1000.
In the 4th operation of routing,  i have given the Plant as 1100 and the work center available at 1100 so that the capacity requirement will be booked at plant 1100.
My problem is how to track the Material movement from one plant to other plant. The material movements are as follows:
1. Sending the material from plant 1000 to 1100
2. Making sub-contracting challan for excise purpose.
3. Receiving the material at plant 1100
4. Sending back the material from plant 1100 after processing
5. Receiving the material at plant 1000
Please guide me to solve the issue.
Thanks & Regards
Bala

Hi Raj,
Thanks for your quick reply.
I tried the same, but problem is the receiving plant 1100 is not having any entries of Goods receipt and returning the goods to the plant 1000.
What i did was,
1. I created the plant 1100 as a vendor and assinged in the routing operation no. 4 with the control key PP02.
2. System has generated a Pur Req in the operation, then i did the regular External processing.
The problems in the above method are,
1. i am not able book the capacity of the plant 1100 since i am giving the control key PP02, system is not accepting the other plant and its work center in the routing.
2. There is no entry of the goods receipt and goods issue from  the plant 1100 to Plant 1000.
Please suggest me a solution.
Thanks & Regards
Bala

Similar Messages

  • Inter company sub-contracting order

    Hi all!
       Can anyone tell me the complete configuration settings for an Inter company sub-contracting order and the process in detail.
    Thanks in advance,
    Raj.

    create the vendor in the name of that company
    if its ur own company u can make ur plant as vendor and issu material for subcontracting
    Process cycle:
    1. PO creation
    Use item category--> L
    Taxcode --> zero taxcode
    Enter the components of the material manually, if the product material doesn't have the BOM created.
    2. Transfer posting to issue the material to the subcontracting vendor. Tcode--> MB1B
    USE MVT. TYPE --> 541
    POST THE DOCUMENT
    3. FOR EXCISEBLE MATERIAL,CREATE A SUBCONTRACTING CHALLAN USING TCODE --> J1IS AND W/ REF TO THE TRANSFER POSTED DOC. NUMBER.
    4. GOODS RECEIPT
    NORMAL GR WITH REF. TO PO AND MVT. TYPE 101, ENTER THE RELEVANT CHALLAN # IN THE POPUP WINDOW.
    5. TCODE--> J1IFQ
    RECONCILE THE QTY.
    6. TCODE--> J1IF13
    COMPLETE THE CONFIRMATION PROCESS OF THE RECONCILED QTY.
    7. TCODE--> MIRO
    INVOICE PAYMENT FOR THE VENDOR
    regards
    kunal

  • Inter-company Sub-contracting

    Dear Experts,
    I am working on a scenerio where
    Plant A is sending Components to Plant B.
    Then In plant B the processing is done on those components and a semifinished material is made.
    Then the Semifinished Material is recieved back into plant A.
    I am trying to map this process in SAP like as INTER COMPANY SUBCONTRACTING.
    I am following the steps,
    1) Sub-contracting PO in plant A. (me21n)
    2) Outbound delivery against PO in plant B.
    But facing problem while taking Goods Reciept against Outbound delivery in plant....it is showing error
    *Goods receipt not possible for delivery 800050: error code 3*
    can anybody tell me where i am doing a mistake. or plz suggest if any customisation required for this process
    Thanks in advance
    Mehul

    Have done PGI in VL02N you can get PGI tab in Delivery header details.if done PGI check delivery  follow on documents material document created or not.
    Check in PO confirmation tab have you maintained any confirmation controle key.If yes Po requires inbound delivery.If you dont want to create Inbound delivery Remove confirmation controle key in Po confirmations tab.Then do MIGO it will allow.

  • Sub-contracting issue

    Hi All,
    I have created a SC PO, issued componenets to SC vendor (541), howerver while creating GR for final product, i am getting an error for components (543) "Material xyz do not have enough stock " , but it is there in vendor stock.
    Thanks in advance.

    Hi,
          Please check the stocks of all the componets which are in the BOM /componets mentioned in the Subcon PO, through MBLB.
    If the stock of any one component material is insufficiant then  you will get such error.
    Ensure that all  the stocks of the components available with the same vendor which is mentioned in that PO.
    Hope this will help...

  • Interplant sub-contracting scenario

    hi,
    how to set-up inter-plant sub-contracting.
    from plant-1 materials will be sent to plant 2.
    In plant -2 processing will be done and send back the finished goods along with scrap if any to plant-1.
    pl explain the scenario in detail - step by step (with T,codes) if u know the solution.
    thanks
    mohan

    In plant A for material M1 (finish) define with special procurement key (stock transfer from plant B) in MRP2 view from plant B. (If it is MRP relevant)
    I am sure you know the config of Stock transfer
    Create the sub contracting PO as like out side vendor for plant B (make sure you have created the Plant B as vendor also and plant A is customer also and all config has been done for STO.) with second line item for the scrap if you are systematically do otherwise just receive with 501 movement
    Then follow the same process as regular sub contracting process

  • Sub-Contracting material Issued to Vendor and balance to be Issud

    Hi,
    Sub-Contracting material Issued to Vendor and balance to be issued against the Sub-contracting Purchase Order.
    Please suggest T.Code for the same.  (Same Like ME2O, but PO number should be an input parameter)
    For example I have Created PO with header Material for 1 quantity which having one child item and qty say 20 numbers, and issued child material to vendor 10 numbers (541) and balance is to be issued to vendor is 10 numbers, now I want a report which gives PO number, Header item with qty, total requirement of qty for the child item with line item number, issued child item with qty and balance to be issued child item with qty.
    Thanks
    Ramesh.G

    Report MB51 is there. Here you have to input your Purchase order number and execute but, it will show only material issued to subcontractor through 541. It will not show the balance quantities.
    And there is no such standard report which will show information how much issued to subcontractor and how much is balance based on Purchase order.
    You can develop a z report with the help of abaper.

  • MTO Discrete Manufacturing with multiple plants and sub-contracting

    Dear PP Gurus,
                           I am facing a problem, pl. help me out.
    My Scenario is as follows:
    I am having 4 plants with Make-To-Order Discrete Manufacturing scenarieo .
    Suppose to manufacture a particular Product , there are 10 operations.The first 4 operations are carried out in Plant A, 5th and 6th carried out in Plant B, Operations 7 is Sub-contracted to a Vendor. After the job-work from Vendor, the job returns back to Plant A and the remaining operations are carried out in Plant A.
    The whole scenario has to be mapped into SAP. Please guide me from the very beginning( Masterdata maintenance). Also, what shud be the MRP( Single-item multilevel or anything else)
    Your help is highly required by me.
    Thanks in advance,
    Soumyendu

    Hi Sadhukhan,
    For external processing in different company code, u need to specify PP02 in the routing for external vendor. In PP02 control key indicator must be set in external opn. Before that create purchase info record. Enter subcontract info record in routing. After running MRP , convert the PR to PO. Send the material by MB1B by 541 mvt. Receive the material by MIGO by 101 mvt.
    Reward if useful.
    Keerthi

  • Single BOM across multiple plants in sub-contracting

    We have a single purchasing organisation managing sub-contracting for around 17 plants. This organisaiton purchases sub-contracted items for all the plants.
    The problem we are facing is having to maintain the same BOM for all the 17 plants.
    The central purchasing org is going to create the PO with multiple lines - requesting delivery from the vendor to the different plants.
    How can we avoid having to create the same BOM in every plant?
    Regards,
    Praveen.

    hi 
    u can  avoid  by choosing  the  recurrcive  allowed  for  BOM  can  avoid it
    kishore  reddy

  • Sub contract po coproduct issue

    Hi All,
          In sub contracting process one(raw material) material is supplying to vendor .During single punching the process we are getting 2 products & scrap.For this process we are paying some amount to sub contractor.
        While raising the Sub contarctor PO,  raised aganist one product .Here iam able to maintain job charges for one product only .But at the same time it should apporinate to coproduct also.
    I have maintained a bom for one product (header material) & i maintained second product as coproduct,raw material & scrap .In bom &  material master for that material i maintained as coproduct
    After maintaing this price is not apporinating to co product.Pls guide me how to solve this issue.
    Regards
    Vr

    close not ansered

  • Issues in sub-contracting

    in subcontarcting scenario i have one issue
    issue 1:
    Materials (both excisable and non excisable) are supplied to
    subcontracting vendor.
    At this time in 57Fc challan only excisable items are maintained.
    But in sap while creating the sub contracting challan it is showing all
    excisable items and non-excisable items.
    But as per client requirement non-excisable items only should be displayed
    while creating /reconciling/completing the sub contracting challan.
    issue 2:
    when semi finished material is returned back to client by sub contractor
    some raw material is still with the vendor.
    while raising sub contracting order to the vendor  against the same
    material ,system should pop up how much raw material left with that
    subcontracting vendor .
    Kindly give me solution for this scenario.

    Hello,
    All the materials which are declared for excise have to be maintained against the respective chapter ID's. Please refer the settings in excise rate maintenance.i.e j1id.
    If only the non excisable items have to be appeared then only maintain the same.
    Please check if it helps. As I suppose you will get the help in J1id.
    Regarding issue 2:
    Is it the scrap that is produced at the the subcontractors level or the main parent raw material which is left??
    If scrap is left then that has to be mentioned along with the components provided at the sub contractors level.
    If the parent material is left then it has to be checked at the stocks at the subcontractor level and brought back by GR against 101 mvt type.
    The BOM has to be defined accordingly. If semi finish of 1 is to be produced by supplying 2 parts of raw material then mentioned only the one which is required. Do not supply additional extra Quantity.
    Regards,
    Prasanna.

  • Sub-contracting Quality Rejection issue in QA32.

    Dear sir.
    when i am returning material to vendor in QA32 , i am getting the bellow error .( it is sub-contracting return process , scrap quantity is also there.).
    1 KG Incorrect posting back to vendor, error message:
    Goods movement not possible with mvt type 546, M7 96
    message number M796.
    please help me out in this issue.
    regards
    JRP

    Dear.
    You receive error message M7096 "Goods movement not possible with mvmt type 546" right.
    You can use Transaction OMJJ to include the table entries. Enter 546 as the movement type and select the 'Allowed transactions' option. Make the additional entries here.
    Or,
    Insert a new entry in table T158B.
    Call Transaction SM31.
    Table -> 'T158B' -> select the function 'view maintenance'
    Select the function 'New entries'
    Movement type (MvT):546, Transaction (Tcode):QA32;  ENTER
    F3 back; F11 save.
    It will work for you.
    Regards,
    R.Brahmankar

  • Sub-Contract Order Stock Issues

    Dear All,
    In Sub-Contract Order, i will create an Order for Finished product for X quantity & i maintain BOM(Semi-Finished Components) of Y quantity for the Finished Product. After approving the same the order was send to Sub-Contractor.
    And Store In-charge issues these stocks to Vendor by 541 Mov-Typ in MB1B T-code.
    In the same ways these Order's are placed to multiple Sub-Contractors.
    Then how could i now, these stocks are issued to Vendor against these Sub-Contract Order's by Standard Reports.
    Regards
    JC

    Thanks for your reply.
    In MBLB report, i can see the stocks against Vendor Code. But if i place the same Materials for a single Vendor on Multiple Sub-Contract Order's. Then how come i verify the Stock report against Order's.
    Regards
    JC

  • MRP run for sub contracting plant

    Hi all,
    Please let me know if this scenario is possible:-
    I have two plant A and B. A is manufacturing plant and B is sub contracting plant. For one FG I plant there is demand of 100. After MRP run planned order is created for 100 for FG. For raw material purchase requisition for 50 is created and delivering plant will be B.
    In md04 for plant A I can see pur req for 50 and for plant B in md04 I can see 50 as stock requirement.
    Now use wants that if MRP is run for plant B, it should generate planed order against stock requirement.
    Strategy 11 we are using.
    Please let me if it is possible
    Regards,
    D.Dutta

    Hi ,
    Cross plant planning is possible ( like Plant A & B) , no need to run MRP in two plants separately  . but you need to the follow the following config .
    1) Define special procurment key ( Spro> MRP> Master data --> Define spl procurement key)
          You can copy standard key 40 , ( you have to defined supply plant and recving plant)
    2) Identify the Materials which are to be cross plant planning and go to material master MRP 2 view and assign Speial procuremnt key
    3) run MRP for FG in Plant A and down level MRP for  RM/PM/SFG  will be generated in plant B.
    I hope this will help your requirement .
    Thanks
    sekhar

  • Sub contracting Process issue for A/c entry

    Hi All,
    While doing the GRN for subcontracting process ,cost object error is appearing for stock change SFG account ( BSV).
    Business would like to do not assign the Default cost object for change in stock account. Kinldy confirm whether it is possible to determine Internal order number ,whcih same assigned to GRN for stock in change account SFG.
    Any alternative method would be apprecaite
    Rgds
    SumaMani

    Thanks to all of us for answers !!
    We solved problem as mentioned !
    1. Created separate SFG Stock change over subcontracting GL account and assigned same in OBYC - BSV & profit centre wise internal order defaulted in OKB9 settings.Also created sub contracting expenses GL and assigned OKB9 profit centre wise. ( Problem has been solved with separate GL account of stock change over)
    It can be possible to solve with using of substituion GGB0 with module pool RGGB0*
    Rgds
    SumaMani

  • Issue in Sub Contracting Purchase Requisition Urgent!!!

    Hiii All,,
    I have maintained a two BOM's for a finished material one for In House production and one for Sub contracting the components for the Two BOM's are different.
    i have maintained Two Versions for the finished material also.
    when i covnvert a planned Order to an Sub Contracting Purchase Requisition alternate BOM doesnt explode. i have also maintained a production version in the Purchase info record. Still the main BOM explodes.
    i have to manually change the planned order and give the other production version ie not the Inhouse BOM.
    After creating the PR then again i have to go planned order and change to the normal InHouse  BOM.
    Please Provide me the solution.
    Thanx & Regards,
    Kumar Rayudu

    Hi Kumar,
    BOM explosion occurs during MRP run and when you convert into purchase requisition.
    If you are using procurement type "X", then logically system does not know whether you will be producing inhouse or go for external procurement.
    You may consider to go for MRP areas or manually re-explode the BOM as you are doing now
    Regards,
    Jayakandan

Maybe you are looking for

  • I am trying to restore my locked ipad however, I get an error message in itunes, what do I do next?

    I am tryint to restore my locked ipad 2, however, in itunes I get 2 popup messages.  The first pop up says "itunes can not connect to ipad because it is locked and requires a password"  So I attempted to restore the ipad and an error message "itunes

  • I am unable to assign breakpoints in Flex Builder 4

    I am new to Flex ( a month or so ) and have inherited a big project. This is an odd one. I am unable to assign breakpoints in a particular project. (I've redacted company specifics...) Here is an example: If there is a breakpoint loaded the project w

  • In Need of a recovery disc

    I have a HP Pavilion dv7 Notebook PC and a few weeks ago my screen was shattered but was covered under warranty. When my computer was sent into HP to get fixed from Best Buy they replaced my hard drive without telling me. When I was asked to pick up

  • Ipad mini 2 need screen guard? i am in screen papers

    ipad mini 2 need screen guard? i am in screen papers need.what is the ipad mini display glass? Normal n/a scratch proved

  • Global Operations in ADF,BC

    I want to create a global custom operation (such as commit and rollback) which can interacts with the DB and be used by all the datacontrols (e.g: a custom delete then commit, or a transaction log.), but I don't know where to start, could any one hel