Intercompany Scenario for Export and without Plant

Hi
Our client creates Big Projects; with two company Codes, One in India and another in Germany. They are working on PS. In most of the cases they get an order and they send the required material through Vendor, Vendor uses his Excise Invoice for sending the material and submit his Invoice to our Client for Payment. In turn our Client Bill to Customer and collect the payment; so use Third Party Sales Process. There is no Delivery from our Client Plant.
Besides the material our Client also provide Services.
Now the requirement is to Map the Intercompany Sale. It is not mapped at present, and so doing outside SAP. This need to be mapped. Scenario is like Sales Organisation of Germany gets the Order (for Material and Services both) they pass this order to Sales Organisation which belongs to Co. Code of India. Now material is sent from Vendor and India will bill to Germany and Germany will do the final billing to Customer. Here the customer is outside of India so India will have to Export, and Plant of our Client is not involved, as Material is sent from Vendor.
Also the same scenario happens for providing the manpower.
Guide me how can I map this scenario in SAP.
Thanks and Regrds
Amitesh Anand

Hi,
Intercompany sales- create seperate sales order type,
create 2 non stock material-
1-for to collect positive amount - assign this to WBS element-Billing element- YINT
2- for collect negative values-assign this to WBS element-Billing element& account assignment-YIND
Maintain Same milestones in both items.
for maintain seperate WBS level for these items
Maintain same billing type- and do collective billing- to capture both positive and negative value-
pass the amounts-first item - Sales account-credit-50(PK), second item 40(PK)-debit

Similar Messages

  • Guide me for exporting and importing data from oracle 10g to oracle 9i

    I have been trying export and import options in oracle but m not very clear about the procedure..
    Also when i am logging in as Scott/tiger i am facing an error
    ORA 1542 - tablespace 'USER' is offline and cannot allocate space in it.how to resolve it

    Hello,
    I see two questions.
    ORA 1542 - tablespace 'USER' is offline and cannot allocate space in it.how to resolve it About the error ORA-01542 you have to bring the Tablespace USERS online:
    http://www.error-code.org.uk/view.asp?e=ORACLE-ORA-01542
    If you cannot bring it online you may have to Recover it first.
    I have been trying export and import options in oracle but m not very clear about the procedure..About the Export in 10g and Import in 9i (9.2 or 9.0.1 ?), you have to export with the Export utility of the Target Database (the lowest Database version here: 9.0.1 or 9.2) then, you have to Import to the Target Database using its Import utility (in 9.0.1 or 9.2).
    The following Note of MOS may guide you:
    Compatibility Matrix for Export And Import Between Different Oracle Versions [Video] [ID 132904.1]
    NB: You cannot use here the DATAPUMP.
    Hope this help.
    Best regards,
    Jean-Valentin

  • WebDynpro scenario for Objectives and Appraisals in ECC 6.0

    Does anybody know if the scenario for Objectives and Appraisals under WebDynpro is available in ECC 6.0?
    Our customer prefer not to use the BSP scenario and we know SAP was working in a new one based on WebDynpro but we can not find any information about that.
    Any information will be very useful.
    Thanks in advance.
    Cristóbal.

    Duplicate WebDynpro scenario for Objectives and Appraisals in ECC 6.0.
    ~Suresh

  • Configuration of special procurement for issuing and receiving plant

    Dear all,
    I have two plants "x" and "y" which are not yet maintained in SAP. MRP run is carried for plant y and it triggers a STO to plant x. Please let me know the config steps for receiving and supplying plants. Also, the precautions to be taken while creating plants in SAP.
    Thanks in adavnce!!
    Suraj

    Hi,
    In plant Y, you have to maintain Spl.procurement key in material master. In MRP 2 view assign External procurement & spl.procurement kery 40.
    In the plant X, create material master as inhouse production in MRP 2 view.
    Have to maintain BOM & Routing in plant X.
    Configure in SPRO> MRP> Planning> Define spl.procurement key.
    In this assign Issue plant as X.
    Run MRP for plant Y. System create Stock transport req in plant Y.
    Convert this req into stock transport order.
    In plant X, dependent req will create.
    Use MB1B mvt type 301for single level stock transport.
    For multi level stock transport use MB1B 303 - issue & 305 -receive mvt.
    Regards,
    Dharma

  • What format used for exporting and read 1920 * 1080 HD windows media?

    hello,
    what format used for exporting and read 1920 * 1080  hd  in  windows media  ?
    i try many format and  windows media refused to read ...
    merci thanks
    Yves

    thanks, sorry, but  i want produce small clips for   many  caritatives organisms    their computer have only Windows media ....and no many used of internet...
    this morning, i try   format windows media , hdtv 25 i/s high quality ...i'll try read it on another computer ...on my computer, it's ok ....

  • Different GL Codes for export and domestic behind account key ERL

    Hi all,
    I have created separate pricing procedures for export and domestic sales. The issue is that condition type PR00 is used in both procedures and the acount key behind PR00 is ERL. Now the issue is that from finance side, if i have to segregate revenue from export sales and revenue from domestic sales then how can i do that as the gl code is same in both procedures.
    Please respond.
    Best Regards,
    AI.

    Hi
    In account determination procedure you could use two different access sequence such that for domestic revenues 1st access will come into picture while for export the other one.
    try and revert

  • Shell Script For Export And Import Of Table Records

    Hello,
    We have production and test instances and for constant testing we need to copy data from production to test or development environment.
    At the moment what we do is manually doing export and import table records. At times this could be very tedious as we may need
    to do this exercise a couple of times in a day.
    Is it a good idea to do this exercise using shell script? If so how could I do this? If this is not a good idea what are the best alternatives?
    Any input is highly appreciated.
    Thanks

    Ah I see, your company prefers stupidity over efficiency. It would be possible to do it in a controlled environment, wouldn't it? Also the test database would be allowed to select only.
    So the non-allowance is just plain stupid.
    To the second question: do you use hard-coded passwords in shell scripts?
    Don't you think that poses a security risk?
    Don't you think that is a bigger risk than a database link, properly set up?
    In my book it is!
    Sybrand Bakker
    Senior Oracle DBA

  • Best settings for exporting and dropping a MOV file into iDVD7?

    I have a movie (originally shot in HD), made in iMovieHD6, and that I'd like to export and drop into iDVD7. *What settings would the brain trust recommend?* I cannot seem to get iDVD to render a good version through direct export from iMovie. (As a side, I wonder if it is because I started this process by bringing AVCHD files from my camera into iMovie8 and "going backwards" to iMovieHD6.)

    I have used Pro-res from Final Cut Pro into iDVD and it works.
    *This is from iDVD help menu:*
    Video and image formats that work with iDVD
    You can use these movie and graphic formats in iDVD:

    Most video or image files supported by QuickTime (see the list of unsupported QuickTime formats below)

    16:9 widescreen formats

    AAC, MP3, and AIFF audio files

    Any format from iMovie: DV, high-definition video (HDV), MPEG-2 SD, MPEG-2 SD, MPEG-4 SD, MPEG-4 HD, and AVCHD
    High definition video is converted to work with the format of your project. iDVD supports using 16:9 widescreen video; therefore, when your DVD plays on a DVD player that supports widescreen format, the footage appears in its original aspect ratio.
    The following video and image formats are not supported in iDVD:

    Copyrighted or protected videos.

    Movies saved in thousands of colors using the “none” compression setting in iMovie.

    48-bit color images (16 bits per color). To use source files in one of these formats in iDVD, save them in a supported format.

    Aurora uncompressed files. For best results, export Aurora clips as DV-format video before importing them into iDVD.

    QuickTime VR, MPEG-1 or MPEG-2, Flash, streaming or encrypted movies, or QuickTime spanned movies. You can’t add MPEG-1 or MPEG-2 files to an iDVD project because they don’t contain standard video tracks.

    QuickTime Fast Start movies. (Fast Start movies are intended for Internet playback.) When saving a QuickTime movie for use with iDVD, click the Options button in the QuickTime Export dialog and make sure that the “Prepare for Internet Streaming” checkbox is not selected.

  • Sales forecasting scenario for production and procurement

    Hello Gurus
    We have currently one scenario  need your inputs and expertise
    We have a requirement for the Sales forecast for the production and procurement planning. More over its like demand planning but sales needs to have a 6 months or yearly sales forecast in the system.
    Is there any option or functionality available for the same.in  SAP-SD
    Thanks inadvance
    Regards
    Venkat

    Hi KV chalapathi
    check this link
    How to maintain Sales forecast or projection in SAP
    hope clear your issue
    Regards,
    Krishna

  • Shell script for export and import

    Hi,
    I want to run exp command in background since i need to export 40gb database of other database
    if i won't use & my session will die.
    appreciated any inputs.
    i need to run this line from shell script.
    /oracle/bin/exp pin@voipdbstg/pin file=voip.dmp owner=pin log=voip.log
    bash-2.05$ more export.sh
    #!/bin/sh
    /oracle/bin/exp pin@voipdbstg/pin file=voip.dmp owner=pin log=voip.log
    bash-2.05$ sh export.sh &
    [10] 13352
    bash-2.05$
    Export: Release 8.1.7.0.0 - Production on Fri Dec 4 22:51:09 2009
    (c) Copyright 2000 Oracle Corporation. All rights reserved.
    Password: pin
    bash: pin: command not found
    [10]+ Stopped sh export.sh
    input appreciated
    thanks
    Prakash

    Hi,
    /oracle/bin/exp pin@voipdbstg/pin file=voip.dmp owner=pin log=voip.log
    should be
    /oracle/bin/exp pin/pin@voipdbstg file=voip.dmp owner=pin log=voip.log
    Also for running the script is background and you should be able to log out of shell scriptthen run the command in nohup mode.
    $nohup export.sh&
    Regards

  • Any combined scenario for Subcontracting and DropShipment

    Hello Experts,
    Requirement is to drive Sales Order to create Subcon order and push the processed semi finished goods from SC to Customer end and unprocessed scrap back to supplying plant. Transport from SC to Customer will be arranged and paid by supplying plant hence not a challenge. Is there any combined process to address SO driven Subcon and Drop Shipment? I thought of use of contract manufacturing but it suits majorly for big volume and finished product.

    If you are on ECC 6 with enhancement pack 5 or higher then you might want to look that the following:
    Third party order processing with subcontracting
    It's included in EHP6.05 function LOG_MM_OM_2.

  • Render (both for preview and export) takes forever

    I'm running Premiere Elements 12.0 (really 12.1) in a MacBook Pro Retina running 10.10.1 (14B25)
    It has quad Core i7 each 2.7 gH,  NVIDIA GeForce GT 650M 1024 MB, 16 GB of ram, and a 750GB SSD disk. There are no other applications running on the computer, and there is at least 300 GB of free disk space on the SSD.
    I am trying to edit HD video from my GoPro Hero 3+. I'm just loading the GoPro files using Add Media. Then I cut out boring parts, add in image stabilization and some titles, etc. The sessions typically have 6 to 8 files, each about 2GB of video. It represents 2 to 3 hours of capture. The goal is to get maybe one hour of nice video.
    Previewing viewing is terrible, with video out of sync from the audio by many seconds. You can't see any movement in the video for 10 to 30 seconds. This gets better if I use the "render" button on the timeline, but this process takes 15 to 30 hours.  And the improved preview speed only stays effective for a short while, as I do edits, add effects, etc. it gets slow (aka unusable) again.
    Once I've fought the program to get ready to do an export, I've got another multi-hour wait. Usually this is a bit shorter than the initial rendering, since the editing process has removed an hour or two of content.
    I know, these are big input files, and the resulting movies are big (a couple of gigabytes). But this is one of the fastest and most expensive laptop computers sold in the world. I'm just using a GoPro, not some fancy Red or 4K camera.
    I need to have the editing process be 3 times faster, I want it to be much better, ten times faster.
    I thought that quad real core with 8 threads, 16GB of ram, and a 750GB SSD was fast.
    I'd like concrete answers as to how I can get there.
    Are there settings for Premiere Elements that will help? Would I be happier with Premiere Pro? Would I be happier on a Windows machine with 2 or more high end graphics cards?

    thanks for the reply. I'm new to GoPro and Premiere Elements, so I don't know exactly what some of your stuff is.
    The video is taken on my dirt-bike, a motorcycle going through trails, woods and rocks. Its unwatchable without stabilization.
    The files are all taken as a single ride, single push of the shutter, and I go off and ride for a couple of hours. The GoPro automatically switches to a new recording file when the old one gets to 2.4 GB (which is about the maximum file size for 32 bit file formats.
    I copy all of the video clips to the SSD from the GoPro. Then I load them as assetts. Since that it the only disk I have, everything is there. But an SSD should be fast enough to handle swapping, file reading and writing.  I don't think that you can get two separate SSDs in a MacBook Pro Retina. It has no optical drive (which you could replace with an SSD in older models)
    I'm not against buying Pro if I have to, I'm cheap, and would rather not, but if that will make the workflow feasible, I'll cough up the money.
    All of clips (everything) have "Motion" "Opacity" "Stabilizer" and "Image Control"
    I actually have no clear understanding of what Motion does vs Stabilizer.
    Timeline rendering takes 10+ hours. More if the Mac sleep mode sets in. I have no idea where the rendered files are. Whereever PE defailts them. Still SSD
    What is "the Edit area monitor"? Do you mean the smallish video window above the timeline? Sometimes the video looks pretty good, other times the viewing of it lags 30 seconds or more behind the sound and timeline pointer.
    I don't think I understand your comment about when to stabilize. I agree that I should be able to work and do edits, titles, etc. without stabilization, and then just turn it on at the end. Or maybe even render it for export and then stabilize that file. But I don't know how to do any of that.
    Thanks
    Pat

  • SAME NUMBER RANGES FOR DOMESTIC AND EXPORT INVOICE

    Dear All,
    We have maintained Two objects separately for Exports and Domastic sales invoices which is inturn giving two different number ranges.
    But our client needs same number to be continued for both.
    For eg: 000001 .  000002 and 000003 is the number range for domastic invoices for Export invoice 00004 should come. now as we have maintained different objects Export invoice is starting from 00001.
    Our client does'nt want to maintain separate number ranges for Exports and Domastic, same number range should be there for both which should follow continues numbers.
    Please suggest me on this at the earliest.
    Regards,
    Jay

    Dear Jay
    Assuming that you are asking about Excise Invoice number ranges, please do maintain Numbers for the Object: J_1IEXCLOC
    When you go into J1IIN, you will need to mark the checkbox: Use Local Number. If at the first time (in the case of Deemed and Regular Exports), you do not see this checkbox, click on the 'Calculator' icon and hit the 'Back' icon. Mark the checkbox and save your Excise Invoice. This number will be a continuation of your Domestic Excise Invoice.
    thanks
    G. Lakshmipathi

  • Accounting document for Export Excise invoice

    Dear All,
    We have two scenario's one is Domestic Sales & Export Sale.
    In domestic sales as per the normal flow of document we create excise invoice after billing document and accounting documents are also generated and updated in the billing document accounting (VF02). Accounting document for excise invoice has been generated.
    However in export sales we create excise invoice with the reference of billing document but no accounting document has been generated for excise invoice.
    Can u please tell me where i have to make changes so my accounting document for export excise invoice will generate?
    Thanks & Regards,
    Ratish

    Hi ALL,
    There are 4 export scenario :
    1) Deemed export 2) Export under Bond 3) Export under claim for rebate [No bond] 4) Export under Letter of Undertaking.
    3) In export under no bond process is :- we pay the excise on the goods for exports and create the ARE-1 doc and send to port where the customers officials note the actual quantity of goods on the ARE-1 doc and stamped it. Then these stamped ARE-1 will be send to the excise range of the despatch plant(for exports) where we claim the rebate.
    Now if you are not able to generate the accounting doc for such a scenario some of the consultants may suggest u to use the user exit (J_1I7_USEREXIT_DUTY_IN_EXPORT) and pass the the value X to the parameter SUPPRESS_CALCULATION this intern will help u to generate the Accounting doc also. but real problem lies somewhere else.
    Actual Solution: Maintain J1ID (Customer excise details)
    for export customer maintained the excise indicator to 3 {Nil Duty} insted of 1 {100% tax}.
    Problem will be solved
    Regards
    Satish Zade

  • Multiple Intercompany scenario

    Hi experts,  i have a question.
    Im trying to create an intercompany process.
    I have seven company codes (A, B, C, D, E, F,G) and each company code has its own Plant (P1, P2, etc) and one sales organization per company code (SO1, SO2, etc)
    Co. code-->  Sales org. -->   Plant
    A   -->               SO1       -->        P1
    B   -->               SO2       -->       P2
    C   -->               SO3       -->        P3
    D   -->               SO4       -->        P4
    E   -->               SO5       -->        P5
    F   -->               SO6       -->        P6
    G   -->              SO7       -->        P7
    My process require that I can make intercompany sales in all ways, that means that the Company code A can ship from all the plants (P1, P2, P3,P4, P5, P6, P7); The company code B can ship from all the plants too... and so on.
    i have make my configuration but when I arrive to the menu path  IMG>Sales and distribution>billing>intercompany billing>assingn organizational units by plant-->assing organizational units to the plant
    I only can see here the seven plants and the possibility to assing only one sales area (sales organization + distribution channel + division) to only one plant. I can only make seven combinations instead of being able to make 42 combinations for all my intercompany scenarios.(all the plants will all the sales areas)  Could you please tell me what is missing or why i cant configure intercompany scenarios for all my sales area? what is the problem?
    PS, I have already assigned all the plants to all the sales organizations in the menu path IMG-->enterprise structure > assignment>sales and distribution--> assign sales organization-distribution channel-plant
    thanks in advance and i hope you can help me.
    Alberto
    Edited by: omtorre on Oct 20, 2011 8:19 AM

    Hi Alberto,
    I think this should be possible. If I have understood correctly, when the SO1 (creates a sales order in SO1DC1) delivers some goods from P3 then the interco billing should happen from Company Code C to A and then the customer invoice from A to the end customer (in case of intercompany sales) Similarly, if SO4 delivers goods from P7, then the interco billing will happen from company code G to D and then the customer invoice follows. For doing this, you need 49 (not just 42 as you have mentioned) combinations. Assign SO1DC1 --->P1 first and then assign all other 6 plants to SO1+DC1. So, toatlly 7 combinations foe each Sales Org.
    If the above way doesn't work, then I have a work around which involves some enhancements if your client allows extra budget for this :-). Let me know, I can give you that in detail.
    Regards,
    Raghav

Maybe you are looking for

  • JPEGS not rendering correctly in Finder, Preview or Safari

    Need some quick help, guys. Here's the symptom: JPEGs look lousy in the Finder, Preview, Safari, etc. Open them in Photoshop, and they look fine. Move the file to another computer, and it looks fine. It appears to me that any application that uses OS

  • Net value missing

    hey friends need some help i am using the same pricing procedure for my sales order document and for Contracts. when i insert the condition type for price, the net value gets calculated for Sales order and the same doesn't happen when i am creating c

  • JSrollPane

    Hello! I've filled a JScrollPane with some components. When I try to add a some new components and repaint the scroll pane, the picture on the screen starts to twitch. What can I do in this case? Help me, please. TIA

  • Soundtrack Pro, iTunes, iTunes U, and Metadata

    I'm part of a team that creates and uploads content to our college's iTunes U site. When we create content we like to include metadata that will be presented when users see the various podcasts and vodcasts we offer on the site. The metadata that we

  • Windows 8.1 Store Instalation Error

    HI  I try to install windows 8.1 from the Store.  After The Restart i saw a Error screen with this message: unknown drive error. What i must di?? Thanks Ruben