Interface between UC and fire system

Hello,
We are trying to find a way to dial an extension number on our Cisco VoIP phones, that would enable the interface on our firelight alarm system.
In the old days it was just a plc interface that you could change some logic.
The company of the alarm system states that they only need an acknowledgment signal to activate a relay.
Is there a module that can go between a phone or UC system and the firesystem that anyone knows about.
There also maybe another way to do this and if anyone knows a good way, please let me know.
Thank you very much,
Jim

Ask the alarm company what is the interface device the use with other customer PBXs.
Buy and connect it to an FXS port.
If they can't indicate one, get something like a door opener.

Similar Messages

  • The interface between SAP and Banking system

    Hi gurus,
    Now we want to integrate SAP system and Banking system.I have some questions need to ask you.
    First, do we have any PI Content regarding that?I failed to find any content  in service market
    Second,which kind of adapter techniques I can choose to configure?
    Currently I think the possible solution may be as follows:
    1. Create custom ABAP program to generate txt files,then use XI FTP adapter to translate those files to another location,where banking system can dispose accordingly.
    2. The similiar techniques as 1,but to use ABAP proxy on SAP side.Through this way no txt files are generated,so it's more secure.
    3. Using idoc techniques.I'm very interested in that,but can we implement this scenario by using idoc?How?
    Any info or tips regarding banking data integration will be appreciated.

    When it comes to functional view,do you know what kind of data need be tranlated?
    This is again something that only the Bank can answer. There are many standards which are in use with various banks. e.g some banks use EDI for all types of processes. You have to confirm from the bank about the format in any case. It is also possible that the bank uses proprietary format. You may use both file or jdbc adapter.
    it seems XI supports FTPS protocal, right?
    Correct
    But some files may be need to be installed on WAS.
    The public certificate of bank.
    Regards,
    Prateek

  • Interface between business ware house system and SAP SD module

    hi,
    I want to develop interface between business ware house system(file adapter) and SAP SD module.  how can i post the data into SD system? can any one tell me which Idoc i should use in receiver side?
    if i want to go abap proxy how can do it?
    give some inputs(methods which i should use)
    Thanks in advance
    regards
    Ruban

    Hey
    the selection of IDOC depends upon what you wanna post into SD.get in touch with the ABAP guys and they should be able to tell u exactly which IDOC to use.
    once u have decided on IDOC,you can go for a File to IDOC scenario.
    as far as proxies are concerned,they kinda give better performance compared to IDOC but you need to do ABAP coding for them,in that case u dont need any IDOC
    Thanx
    Aamir

  • Standard XML schema for Vendor data exchange between SAP and other system

    Is there a SAP standard way of XML schema that we exchange between SAP and other system? Please let me know.
    Thanks.

    See SAP Interface Repository (http://ifr.sap.com).
    My proposal is to leave old SAP connectors staff and use SAP Exchange Infrastructure. There is a support of industry XML standards in XI 3.0 like xCBL.

  • Can you tell me some differences between R2 and R3 systems?

    Hi,
    Can you tell me some differences between R2 and R3 systems?
    I guess R2 is used only for mainframe systems some time back. But i dont know why we prefered R3 over R2.
    Please clarify this!
    Thanks,
    Venkatesh.R.

    SAP R/3 is
    Client server
    3 tier
    Presentation
    Application
    Database
    Relatively hardware and database independent
    ABAP/4 applications runs on application servers.
    Dispatcher, shared memory, gateway, work processes are major components of an application server.
    SAP R/3 offers
    Comprehensive suite of integrated applications meeting the needs of most business
    Best practice process design
    Ability to configure to
    Industry sector
    Unique business requirements
    In a R/2  System - it is a 2 Tier System based on Mainframe Systems with Intelligent terminals
    R/3 is based 3 tier Client Server architechture and supports the R/2 system as well.
    R/3 Middleware -
    Client server
    Uses underlying relational databases
    Oracle
    SQL server
    Ingress
    Sybase
    Its graphical user interface
    Sap GUI
    hence R/3 is preffered over R/2 systems because they support Client Server Architecture which is easily configurable,scalable and can integrate with ERP systems and integrate with SOA or Web based Apps.
    Thanks,
    Saurabh Shukla

  • DataSource / Structures mismatched between Dev and Test Systems. ..!!

    Hi,
    We are doing a scenario. Where XI will update the data into PSA through ABAP proxy.
    Scenario worked perfectly in development system.
    We transported the objects from Dev to test. The Strucures are mismatched in SE11 between development and Test systems as below.
    Data sources (ZDS_RECIHDR and ZDS_RECTPALL) looks ok. But when I saw the structures in SE11 they are not correct, they got mismatched.
    Development:
    /BIC/CQZDS_REC00001000 - Header (ZDS_RECIHDR)
    /BIC/CQZDS_REC00003000 - Allocation (ZDS_RECTPALL)
    Test:
    /BIC/CQZDS_REC00001000 - Allocation (ZDS_RECTPALL)
    /BIC/CQZDS_REC00003000 - Header (ZDS_RECIHDR)
    Kindly let me know where it might have gone wrong?
    Thanks
    Deepthi

    We done it already. Still it is failing.
    While transporting, it is failing and showing the error as
    Program ZPI_CL_IA_PAYMENT_ALLOCATION1=CP, Include ZPI_CL_IA_PAYMENT_ALLOCATION1=CM001: Syntax error in line 000016
    The data object 'L_S_DATA' has no component called'/BIC/ZSALENUM', but there is a component called
    Program ZPI_CL_IA_PAYMENT_HEADER======CP, Include ZPI_CL_IA_PAYMENT_HEADER======CM001: Syntax error in line 000016
    The data object 'L_S_DATA' has no component called'/BIC/ZTRANDATE', but there are the following com
    The Structure is mismatched in SE11 between header and allocation structures. That is the reason it is failing.
    Any more ideas pls?

  • Consistency between dev and prod systems!!!!

    Hi All,
    I wuld like to check the consistency between Dev and Prod systems for all the Data model and other objects existing. I would like to do this sanity check to see whether the two systems are in sync. Are there any tools or transaction codes within SAP framework which can guide me in this direction.
    Kind Regards,
    Surya Tamada.

    Hi Surya ,
    First build whole data flow :
    1 .Create Infoarea ,Infoobjects & Masterdata ,Infoproviders ,Infoobject Catelog under Infoarea,MetaData - Characteristics MeteData - Key Figures 
    2 DSOs  ,Infocubes ,Infosets, Multiproviders ,Views in the development system ,Datasources for BW system,Flat File Datasources,Transformations
    then get data from the se11 tables as per your requirement :
    like RSDVCHA ,RSDBCHATR,RSDCUBEIOBJ,RSDICMULTIIOBJ etc and built view on it  as per your requirement .
    then built flat file data sources and transformation .
    get all data downloaded to flat file in ur PC .In the same way from other system.
    make flow from PC File Datasource -> DSO -> Infocube and build queries for different objects .load the downloaded files to them and then run query .
    ex : query to compare cube will take cube name and systems name as input and compare objects .
    Regards,
    Jaya

  • Interface between WM and SD

    Hi,
    Is there anybody who can give me the details of the interface between WM and SD through shipping module?
    It would be nice to have few info about WM /PP and WM/QM.
    Thank you in advance.

    Hi,
    The interface is mainly through the LEWM movement type configuration. You need to define the Interim storage type and movement types required to sales process prior to that.
    After you are done with the above settings, then you can configure for the 2 step picking. If you need it.
    Thanks,
    Mono

  • IDOC Interface between CO and BW

    Hi Gurus
    I am just looking for documents about all interfaces between CO and BW/BI. Can any body supply me these??
    Thanks in advance
    SIM

    Hi Joe-
    There are several How To guides that provide detailed instructions on how to automate transactional and master data loads from NW BW into BPC.  Please check out the following guides:
    [How to Migrate Transactional Data|https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/b0427318-5ffb-2b10-9cac-96ec44c73c11]
    and
    [How to Automate Master Data Loads|https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/00380440-010b-2c10-70a1-e0b431255827]
    Regards,
    Sheldon

  • Interface between paravision and labview

    Hi,
    Does any one here who can help or give some idea how to make an interface between paravision and labview software???I need to acquire captured MRI image from paravision and store it to Labview.
    I would appreciate for any kind of assistance.
    Kind Regards,
    Jasim

    Hi Jasim,
    Could I get a little more information about how you are importing the MRI image into LabVIEW?
    1) How are you getting the MRI image into LabVIEW?
    2) What image format will the image be in?
    3) What will you be doing to the image once it is in LabVIEW?
    Best Regards,
    Bill
    Bill E. | Applications Engineer | National Instruments

  • Interface between sockmod and udp

    Hi,
    where can find info on interface between sockmod and udp stream modules. Iam specifically looking for how sockmod and udp/tcp modules inform each other of the destination ip/port numbers, source port number etc... any help would be greatly appreciated.
    Thanks,
    Surya

    Hi,
    In our case we are using
    IDOC-XI--SOAP ( For all Outbound scenarios)
    In this case ask abt wsdl files for SOAP Structure
    HTTPXI--IDOC ( For all Inbound scenarios)
    In this case POS will directly post the message to intergration server direcly by using parameters like namespace , IS details
    Regards
    Seshagiri

  • Scenario for interface between a non sap system and a SAP erp

    Hello,
    I need some help in order to elaborate a interface between a SAP ERP and a non-sap system with the help of a XI system.
       -  At first regarding the interface from the non sap system and a SAP ERP :
           the non sap system sends a flat file to the XI system. The flat file contains a row with header data and rows with item data. We were thinking when the file arrives to the XI system, to save the data in a header database and in a items database in XI. is it possible ?
    And then to have like a job that reads the database and creates idoc and sends them to the SAP erp and updates the xi header and items database  with a flag that means that the records have been sent to the SAP erp.
       -   Regarding the interface SAP erp to non SAP system:
           the SAP erp sends idoc to XI. Then the idocs are transformed into flat file.
    Is this scenario possible ?
    Do we need any adaptator between the non sap system and the XI ?
    Thank you for your help
    Christophe

    Hi Bontron,
    Idoc doesnot support synchronous call. So you can use either proxy or function module and inturn call the idoc from them and send response back to xi. You need to have two scenarios for your design.
    Scenario1:   Source File (file adapter) -- xi -- Dump into database tables (Jdbc Adapter)
    Scenrio2:  Pickup form Database tables  (Jdbc Adapter) -- xi -- RFC Adapter  ---> This is synchronous call.
    Regarding the interface SAP erp to non SAP system
    You can send idoc to xi and from there use File adapter to send to the receiving system.
    These blogs may help you to some extent:
    /people/sap.user72/blog/2005/06/01/file-to-jdbc-adapter-using-sap-xi-30
    https://wiki.sdn.sap.com/wiki/display/XI/step%2bby%2bstep%2bRFC%2bto%2bJDBC%2bscenario   (your scenario will be opposite to this)
    Regards,
    ---Satish

  • Interface between Legacy and SAP for Equipment Master

    Hello
    I got a requirement where I need to develop a interface between legacy system and R/3 system for Equipment Master Data update in R/3. I am thinking of getting a Idoc file from Legacy and then update the changes or any new creation of Equipments in R/3. I found a standard BAPI for this BAPI_EQUIPMENT_CREATE/CHANGE. This BAPI use a strcture BAPI_ITOB for data record of IDoc. But I got more data from legacy except what we have in BAPI_ITOB. I got Partner Data, Classification data also for Equipments. I am thinking of copying the BAPI to a Z function module and modify the Idoc structure , message type and all to capture all the data and then do a update in same way as standard transaction IE01(Equipment Create) is doing in Batch Input. Do you think if there is any better way of doing this? I am not used to transaction BAPI . just wondering if we Can use that in someway to include our modification?
    Thanks
    Harkamal

    20,000 is on quite higher side for IDOC.
    IBIP help doc says it needs 2 Kbyte for each record, i.e. 40 Mb for 20,000 rec. that should be ok. Since it has structures for Partner & classification data , I don't think u need to modify the BAPI.
    Transaction IE01 - Create equipment
    Transaction IE02 - Change equipment
    Structure - IBIPEQUI Equipment record
                     |->    IBIPNSTA     New status profile if necessary
                     |->>   IBIPSTAT     User status records
                     |->>   IBIPDOCU     Doc. from Doc. management system
                     |->>   IBIPPART     Partner details (comment below)
                     |-->>  IBIPTEXT     (see comment below)
                              for long text:          TEXT_MARK = " " empty
                              for internal comment:   TEXT_MARK = "1"
                     |-->>  IBIPCLAS    Classification record (eqpmt class)
                         |-->> IBIPFEAT     Classification characteristics,
                                               ie. features for the class
                     |-->>  IBIPBDCD     see below (from screen 102)

  • Adjustment of inventory between SAP and Legacy system

    Hi Gurus,
    Here is the scenario:
    1) One plant within a company code is in SAP and the other plant in a same company code is still in legacy. Since both of them are Not in SAP, I cannot do an STO.  But, ROH materials need to be moved from the legacy plant to the plant in SAP. I cannot treat the legacy plant as a Vendor, since we are Not paying them. But, still, we should make sure that the inventory needs to be devaulated by the monetary value of the goods taken out and the other inventory (plant in SAP) needs to be enriched by such monetary value.
    2) Similar situation as above, but between 2 Company Codes of same controlling area. Here one Company Code is in SAP, other is in legacy, but, when the other company code will be in SAP, it will be under same controlling area. The two companies are under one business. Some type of intercompany transfer (netting) needs to be done. Here, I have to treat the legacy company as a Vendor.(but modifying bank details)
    I understand, that it may not be possible in standard SAP, but what type of custom developments should I put up ? Any type of custom movement types? How should I set up the Vendor Master (in case of second scenario, the bank details to involve the netting thing).
    Any type of information is very valuable and I would be indeed very grateful.
    Thanks,
    Kumar

    For requirement 1, I suggest you keep track of the inventory acct for legacy and SAP system as separate acct to simplify reconciliation. Once this is done, you can use transaction MB1C movement 561 (or a copy of this movement type). This movement allows you to enter transaction amount in local currency as well; if this is not available, you can customize this through configuration for field selection of movement type (OMJJ). So through this posting, you can enter corresponding material, plant, quantity, and transaction amount that's passed from legacy system. In the account determination, you can set the opposite entry for inventory acct as the inventory acct from legacy system.
    You can then setup an interface that periodically extract GI txn on legacy system, and another interface that performs BDC or call transaction on movement 561 (or a copy of this movement) on SAP system
    Revi

  • SSO between EP and GRC systems

    Hi,
    We have EP 7.0 and GRC 5.3 systems in our landscape. In the login page of the portal, we have a link configured to the GRC system to use the Compliant User Provisioning application.
    On clicking the GRC link for accessing CUP, the user is prompted to enter the username and password to login to the GRC system. In our landscape both the EP and GRC systems have the ECC ABAP system as the UME and hence the user credentials are exactly the same for both EP and GRC systems for a particular user.
    I would like to avoid another logon for the user in GRC as he has already logged in with the same user credentials in EP system.This, i believe is achieved through SSO but i'm not sure about configuring SSO between two Java systems.
    Please help me in the configuration.
    Regards,
    Ragav

    Ragav_ss wrote:
    Everything is working fine when i click User Logon link in GRC system which comes up through the link from EP. The SSO is working fine there. But when i click Request Access or Request Status link, the SSO does not work.
    Any clues.
    GRC version is 5.3 SP 12
    Did you ever get that resolved? I'm having the same problem with 5.3 SP 15.
    Regards,
    Sean

Maybe you are looking for