Intergration of Production Planning with Plant Maintenance (SAP Modules)

Our SAP Implentation Consultants are creating work centres in Production Planning which are different to the workcentres in Plant Maintenance as follows.
Work Centres in PP
Mixing
Blowing
Filling
Packaging
Work Centres in PM
Mechanical
Electronics
Electrical
My observation is that in PM the work centres should be identical to PP work centres. whereas Mechanical, Electronics and Electrical should be configured as divisions or departments. The idea is that by having PM WC identical to PP WC the costing will be simplified.
looking forward to expert's advices, please
Amjad

I am locking this thread in PI forums. Ask your question under SAP Solution forums
/community [original link is broken]
Regards,
Prateek

Similar Messages

  • 'Log Book' in plant maintenance (SAP PM module)

    Dear Experts
    I want to know about 'Log Book' in plant maintenance (SAP PM module). How to work on LOG BOOK & what are the configuration settings available in SAP PM for Log Book?
    Basically, the concept of logbook is to update shift activities & measures during Plant Maintenance without SAP. but in SAP, What i know about the Log book in SAP PM is : It is an industry specific feature, before it was only used in (IS- Aeronautical). but now it is available in ECC 6.0 also. To activate this node, we need to update the patch 2.0 in ECC 6.0
    Thanx,
    PMGURU

    Dear,
    The Logbook is an easy-to-use tool that supports the controlling and execution of daily maintenance tasks for assets in operation. This tool provides personnel, who are operating the assets, with the functions to log defects and operational data. It provides maintenance personnel, such as maintenance engineers and technicians, with functions that ensure the timely and reliable execution of their maintenance tasks.
    Logbook is easy to use and provides functionality that is seamlessly integrated with follow-on processes of the mySAP for Aerospace & Defense solution for Maintenance, Repair and Overhaul (MRO). For example, operational data captured in the Logbook updates measurement points that, in turn, trigger preventive maintenance events. Maintenance work steps created in the Logbook generate material and resource requirements in materials and capacity planning. Material exchanges update the asset structure and automatically generate the required goods movements.
    An important business example for using the Logbook is to control the daily line maintenance tasks for aircrafts.
    The logbook helps you record defects encountered during aircraft flights and the actions taken to correct them. The log may also include the space to record additional flight data, such as the names of the crew members, flight parameters, payload data, fueling data, flight hours, and cycles operated.
    Regards,
    Rakesh

  • Production planning with resource constraint in APO

    Hi All,
    Could you please share some documents on  " Production planning with resource constraint in APO" or
    If possible,kindly  proivde some business scenario with the above concept and and its sequence steps.
    Regards
    Vel

    Hi Velavan,
    You may refer to the related links below on SAP Library, please navigate further in the menu which appear in these links to get details on sub-topics.
    http://help.sap.com/saphelp_ewm70/helpdata/en/a5/8b623c8a6da167e10000000a11402f/content.htm
    https://help.sap.com/saphelp_scm70/helpdata/en/4c/6af71b832821d1e10000000a42189c/frameset.htmHi
    You may also refer to the standard SAP PPDS book SCM 250 for more information.
    Regards,
    Umesh

  • MDG with Plant Maintenance

    Hello Experts,
    Is there anything called 'MDG with Plant Maintenance'?  If yes, what activities are involved related to Plant Maintenance?
    Thanks
    Sanjay Tiwari

    I'm not aware of anything in the PM module..
    But I did find this on the web:
    http://www.utopiainc.com/data-services/eam/mdg-for-eam
    PeteA

  • Planning in Plant Maintenance using MCB.

    Hi Experts,
    My client is into Mining Industry. This is a Greenfield SAP Implementation.
    Client is not clear with the Planning requirements in the Plant Maintenance module.
    Therefore, I have suggested that all the Standard Businenss Content Extractors and relevant Queries will be delivered as part of Maintenance Planning.
    I tried but could not find any Plant Maintenance Planning (MCB) related DataSources and Queries in the BI 7.0 Business Content page @ http://help.sap.com/saphelp_nw70/helpdata/EN/f6/7a0c3c40787431e10000000a114084/frameset.htm.
    Could you please help me with this?
    Thanks in advance,
    Chandu

    Hello Chandra,
    We are in the Health Care sector and I have a similar requirement as of yours. We are not really sure what all we would require from PM, so we are thinking to go ahead with all the Business Content Reports and I have been asked to install all the Cubes, DSO's, Extracots, Reports Etc, Etc....
    I just also have the above link in my hand and it doesn't give us a whole lot clear picture..? So how did u carry out with your requirement? What all you ended up installing? Please do share it, will be a great help for me.
    Thanks in advance, Venu.

  • Budget Planning for Plant Maintenance

    Explain functions for Budget planning through SAP BW-BPS (SAP Business Information
              Warehouse)

    SAP has the MCB functionlity for this.
    With maintenance cost budgeting (MCB) functionality, SAP offers a product life cycle management cross-application component supplying a solution for planning a maintenance cost budget. A MCB in general is a budget for all costs for maintenance, inspection, and repair of technical assets. In the stricter sense of SAP R/3 software, a MCB is a budget for PM order costs.
    MCB provides the following planning scenarios with pre-configured standard entries:
    - The history-based scenario is history-based and the budget categories are combined in one overall planning scenario. This scenario can create records with budget categories “preventive”, “planned” or “unplanned.”
    - The ad-hoc (hist) scenario
    - The maintenance plan scenario is zero-based and can only create records with budget use “preventive.”
    - The task list scenario is zero-based and can only create records with budget use “planned.”
    - The ad-hoc (plan) scenario is zero-based and can create records with budget categories “planned” or “unplanned.”
    The benefits of an appropriate budgeting tool include:
    - Tool to drive down maintenance costs
    - Better data integrity than spreadsheet-based budgeting
    - Access to your plan data from everywhere with a user-friendly front end (Web interfaces)
    - Ability to reflect changes in near future
    - Flexible and accurate reporting
    - Integration with other enterprise systems
    - Data extracted automatically from back-end system
    - Reduction of the budget preparation time
    - Continuous planning with standardized, automated budget processes
    - Better transparency of the budget planning process
    - Support of planning as a company-wide effort, with a great number of managers and employees contributing
    - Not just a tool but analytical applications
    Regards,
    Paul

  • Planning for plant Maintenance and CS (MCB)

    Hi there
    We are looking into implementing the Budtet Planneing for Plant Maintenance and Customer Service (MCB). However vi lack som information regarding the complexicity in this solution.
    Does anybody knowledget about the time and resources needed for implementing this?
    Chris

    Hello Chris,
    this is like asking how much a car costs. It's not possible to answer it with a lot more information about the business requirements.
    Regards
    Marc
    SAP NetWeaver RIG

  • Unable to create a production plan and schedule on SAP B1

    Hi,
    I've been trying to figure out how to use SAP B1 to give me a production plan and schedule for quite some time now.... I have no problem in accessing my pending orders. There seems to be no option in my production tab to enter resource information! Would be great if you could possibly tell me how to figure this out.

    Hi,
    Without capturing the actual time of production orders, it is not possible to perform scheduling. You may create planned production order by based on theoretical time.
    Only third party add-on fulfill your requirement.
    Thanks & Regards,
    Nagarajan

  • Plant Maintenance Feature / Module

    Does Apps have any module on Plant Maintenance covering or does Apps cover Plant maintenance including:
    a. breakdown reporting with reason and categorisation into recurring & nonrecurring
    b. preventive maintenance schedule
    Please revert back ASAP.
    Thanx
    Ganesh

    Dear All,
    Can anyone share some links or materials regarding the PM module.
    I have checked the help.sap reference. but since I dont have experience & practical knowledge regarding this module I am finding a bit difficult to follow. So please advice how to start with ?
    Materials with the basics structure & Process flow in PM  Or if someone can explain the PM process flow like the PR-LIV flow in MM it will be really very helpful.
    Also if you can provide details regarding the SDN forum i.e related to PM module where I can find PM materials & threads it will be highly appreciable.
    Expecting your valuable replys.
    Regards,

  • Plant Maint (SAP Modules)

    We wrote to our SAP Implementation Team
    In the Plant Maintenance Module we need a well-defined setup procedures allowing addition of new / modification of existing Standard Operating Procedures and a mechanism which allows the system to ensure all plant maintenace operations are strictly done in accordance to the SOPs, and deviations are either restricted and/or highlighted by alerts depending upon the sensitivity
    Our SAP Implementors have said
    In the task lists (SAP) which will be created by you will contain all
    the SOP's as defined by you which are needed to carry out maintenance
    on a particular machine. However the automation to generate alerts if
    someone does not follow the SOP's cannot be done in SAP. This is
    because that SAP is not a Plant automation software it is an ERP
    software.
    Can anyone help us resolve this issue.

    Hi ,
    I think this is not relevent forum,move theread to relevent forum,you may get valuable inputs
    Regards,
    Raj

  • Basic Data (PP-BD) - Production Planning and Control (PP) - SAP Library

    To add a comment, please log in or register on the top of this page and choose Reply. Please write your comment in English.
    You can also go back to the SAP help page.

    To add a comment, please log in or register on the top of this page and choose Reply. Please write your comment in English.
    You can also go back to the SAP help page.

  • SAP Enterprise  Structure for Plant Maintenance Module

    hi,
    please explain me SAP Enterprise  Structure for Plant maintenance (PM) module.

    Hi,
        As SAP PM enterprise structure comprises of Company, Maintenance Planning plant & Maintenance Plant. Company will be defined in Financial Accounting. Production plant will be the maintenance plant. Seperate plant would be created as Maintenance Planning Plant. All the plants (Maintenance Planning plant & Maintenance Plant) should be assigned to the company. All the maintenance plants should be assigned to Maintenance Planning Plant. For all the Maintenance Plants, technical objects would be created.
    Company --> Maintenance Planning Plant --> Maintenance Plant.
    Relation between Maintenance Planning Plant & Maintenance Plant will be 1:1 or 1:n or n:1.
    Regards,
    Maheswaran.

  • Future of SAP Plant Maintenance (PM)

    Hi,
    Can anybody tell me Future of SAP Plant Maintenance (PM) module. Please give me reply. I am waiting.
    Regards,
    Radhika

    Also deleted
    To all - Please keep threads on topic. Do not post personal comments or reply to those who do. This thread is being locked.
    Radhika and Srinivas - Read the [rules of engagement|https://wiki.sdn.sap.com/wiki/display/HOME/RulesofEngagement] before posting again - all of them.
    -Paul
    Moderator
    Edited by: Paul Meehan on Jun 22, 2009 10:42 AM

  • Plant Maintenance Material

    Hi Can any one provide me with Plant maintenance material....
    Thank you

    Dear Preethi
    I hope this link will help you a lot.
    http://help.sap.com/saphelp_46b/helpdata/en/b0/df293581dc1f79e10000009b38f889/frameset.htm
    Regards
    VRMP.
    Edited by: VRMP on Feb 5, 2009 9:25 AM

  • BW Production Planning Implementation Routines?

    hi all,
    We are going for PRODUCTION PLANNING with BI7.0 Implem. any related docs info?. the best practices and the routines used to enhance the data sources?
    later we are planning to implement PP with APO.
    PL provide me any related docs for the same?
    reg
    vadlamudi

    Hi,
    Business content of PP are available in the link below.
    http://help.sap.com/saphelp_nw70/helpdata/en/79/0a383fdb800804e10000000a114084/frameset.htm
    Thanks,
    Arun